0% found this document useful (0 votes)
106 views

As Built Quotation

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views

As Built Quotation

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

QUOTATION

Date: November 12, 2024


Project: 3-Storey Residential Building Renovation
Location: Sikatuna Village, Quezon City

ITEM DESCRIPTION QUANTITY PRICE


1 STRUCTURAL AS BUILT PLAN, STRUCTURAL ANALYSIS,7
SETS OF BLUEPRINTS AND OTHER DOCUMENTS (SIGN AND LOT 17,000
SEAL)
2 ELECTRICAL AS BUILT PLAN, LOAD COMPUTATION, 7 SETS
OF BLUEPRINTS AND OTHER DOCUMENTS (SIGN AND LOT 17,000
SEAL)
3 ARCHITECTURAL AS BUILT PLAN,7 SETS OF BLUEPRINT
SPECS AND OTHER DOCUMENTS (SIGN AND SEAL) LOT 17,000
4 PLUMBING SANITARY AS BUILT PLAN, 7 SETS OF
BLUEPRINTS, SPECS AND OTHER DOCUMENTS (SIGN AND LOT 17,000
SEAL)
5 MECHANICAL AS BUILT PLAN, 7 SETS OF BLUEPRINTS,
SPECS AND OTHER DOCUMENTS (SIGN AND SEAL) LOT 17,000
6 BOM & BOQ (3K EACH TRADE)
LOT 15,000

SUBTOTAL PHP 100,000

INCLUSION
This quotation is solely for the use of the above-mentioned project.

EXCLUSION
Rendering

PAYMENT

70% of the payment shall be made as a deposit, and the remaining 30% is to be settled upon completion.
The project will commence upon receipt of the down payment, and the duration of the project is 3 weeks

Account: UnionBank (1096-4032-2980)


: Gcash (09390138607)

Prepared by:

___________________
Structural Engineer

You might also like