Course Content But 307
Course Content But 307
1) lengths, areas and volumes of kerb construction, paving and horticultural works.
2) plumbing works – pipes work, fittings, ancillaries, sanitary appliances, etc.
3) areas, volumes and weight of items of work in fence wall measurement – earthworks,
concrete works, formwork, reinforcement, block wall, copings, render and painting.
4) drainage works – underground pipe work, manholes and septic tank
5) highand low voltage cabling and wiring, luminaires and accessories in a typical domestic
building.
The student should be able to prepare Bills of Quantities for the study areas.
1
9 Electrical Services measurement – HV and LV power and lighting.
10
11
12 Review / Revision
13
14 End of Semester Examination
15
16
MODE OF DELIVERY
1. Lectures (Classroom / Online via Zoom)
2. Group Presentations (Classrooms)
3. Videos (Online)
4. Tutorials (Classroom / Online)
COURSE ASSESSMENT
Assessment Method Description Weight
1. Continuous Presentations 5%
Assessment Assignments, Quiz, Class Test 10%
Class Attendance 5%
Total 100%
READING LIST
Building Quantities Explained by Seeley, I. H. & Winfred R.
Quantity Surveying Practice by Seeley, I. H, (Macmillan Series 2nd Ed.).
SMM7 Code of Procedure for Measurement of Building Works.
SMM7 Explained and Illustrated (RICS Books) by Kelly P. & McNamara P (2010).
Advanced Building Measurement (Macmillan Series 2nd ed.) by Ivor H. Seeley.
SMM7 Rev. Ed. (1998), (RICS Books).
2
The Construction of Buildings, Vol.4, ELBS Edition by R. Barry, Seeley, I. H, (1989).