0% found this document useful (0 votes)
9 views

Load Calculation

Uploaded by

milan giri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

Load Calculation

Uploaded by

milan giri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 25

Beam Load Calculation

Basemnet Beam :
Length Breadth Depth Unit wt Self wt
S.N. Index Total wt (kN)
(m) (m) (m) (kN/m3) (kN/m)

1 PB 258.198 0.300 0.500 25.000 3.750 968.243


2 SB 99.780 0.200 0.325 25.000 1.625 162.142
TOTAL 1130.385

Ground Floor Beam :


Length Breadth Depth Unit wt Self wt
S.N. Index Total wt (kN)
(m) (m) (m) (kN/m3) (kN/m)

1 PB 249.562 0.300 0.500 25.000 3.750 935.858


2 SB 92.008 0.200 0.325 25.000 1.625 149.513
TOTAL 1085.371

1st to 9th Floor Beam :


Length Breadth Depth Unit wt Self wt
S.N. Index Total wt (kN)
(m) (m) (m) (kN/m3) (kN/m)

1 PB 242.956 0.300 0.500 25.000 3.750 911.085


2 SB 85.200 0.200 0.325 25.000 1.625 138.450
TOTAL 1049.535

Top Floor Beam :


Length Breadth Depth Unit wt Self wt
S.N. Index Total wt (kN)
(m) (m) (m) (kN/m3) (kN/m)

1 PB 43.892 0.300 0.500 25.000 3.750 164.595


2 SB 12.040 0.200 0.325 25.000 1.625 19.565
TOTAL 184.160
Beam length calculation:
PB(500x300) SB(325x200)
m m
Basement 258.198 99.780
GF 249.562 92.008
1st - 9th Floor 242.956 85.200
Top Floor 43.892 12.040
Load Calculation Due to Column

Basement + GF + 1st to 9th Floor


Unit wt Self Wt. Total
S.N. Column Type No. Height Width Depth
(kN/m3) (kN/m) Load (kN)
1 Edge 12 3.353 0.400 0.400 25 4.000 160.934
2 Face 8 3.353 0.450 0.450 25 5.063 135.788
3 Intermediate 16 3.353 0.600 0.600 25 9.000 482.803
Total: 779.526

10th Floor (Stair Cover)


Unit wt Self Wt. Total
S.N. Column Type No. Height Width Depth
(kN/m3) (kN/m) Load (kN)
1 Edge - - - - 25 - -
2 Face - - - - 25 - -
3 Intermediate 8 3.353 0.600 0.600 25 9.000 241.402
Total: 241.402
LOAD CALCULATION OF BASEMENT SLAB

LIVE LIVE LOAD FLOOR


S.N INDEX AREA DEPTH UNIT WT. SELF WT. FINISH
TOTAL
(m2) (m) (kN/m3) (kN/m2) LOAD (LL>3=0.5xLL and
LOAD (kN)
(kN/m2) LL<3=0.25xLL) (kN/m2)

1 EF-12 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075


2 EF-23 20.138 0.125 25.000 3.125 2.000 0.500 1.000 93.138
3 EF-34 13.840 0.125 25.000 3.125 3.000 0.750 1.000 67.470
4 EF-45 20.140 0.125 25.000 3.125 2.000 0.500 1.000 93.148
5 EF-56 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075
6 DE-12 18.450 0.125 25.000 3.125 2.000 0.500 1.000 85.331
7 DE-23 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
8 DE-34 16.169 0.125 25.000 3.125 3.000 0.750 1.000 78.824
9 DE-45 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
10 DE-56 18.460 0.125 25.000 3.125 2.000 0.500 1.000 85.378
11 CD-12 16.780 0.125 25.000 3.125 3.000 0.750 1.000 81.803
12 CD-23 21.427 0.125 25.000 3.125 3.000 0.750 1.000 104.457
13 CD-34 14.690 0.125 25.000 3.125 3.000 0.750 1.000 71.614
14 CD-45 10.220 0.125 25.000 3.125 3.000 0.750 1.000 49.823
15 CD-56 16.780 0.125 25.000 3.125 3.000 0.750 1.000 81.803
16 BC-12 18.460 0.125 25.000 3.125 2.000 0.500 1.000 85.378
17 BC-23 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
18 BC-34 16.170 0.125 25.000 3.125 3.000 0.750 1.000 78.829
19 BC-45 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
20 BC-56 18.460 0.125 25.000 3.125 2.000 0.500 1.000 85.378
21 AB-12 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075
22 AB-23 20.138 0.125 25.000 3.125 2.000 0.500 1.000 93.138
23 AB-34 13.840 0.125 25.000 3.125 3.000 0.750 1.000 67.470
24 AB-45 20.140 0.125 25.000 3.125 2.000 0.500 1.000 93.148
25 AB-56 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075
Total: 2123.731
LOAD CALCULATION OF GROUND FLOOR SLAB

LIVE LIVE LOAD FLOOR


S.N INDEX AREA DEPTH UNIT WT. SELF WT. TOTAL
(m2) (m) (kN/m3) (kN/m2) LOAD (LL>3=0.5xLL and FINISH LOAD (kN)
(kN/m2) LL<3=0.25xLL) (kN/m2)

1 EF-12 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075


2 EF-23 20.138 0.125 25.000 3.125 2.000 0.500 1.000 93.138
3 EF-45 20.140 0.125 25.000 3.125 2.000 0.500 1.000 93.148
4 EF-56 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075
5 EF-34 13.840 0.125 25.000 3.125 0.750 0.188 1.000 59.685
6 DE-12 18.450 0.125 25.000 3.125 2.000 0.500 1.000 85.331
7 DE-23 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
8 DE-34 16.169 0.125 25.000 3.125 3.000 0.750 1.000 78.824
9 DE-45 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
10 DE-56 18.460 0.125 25.000 3.125 2.000 0.500 1.000 85.378
11 CD-34 14.690 0.125 25.000 3.125 3.000 0.750 1.000 71.614
12 CD-45 10.220 0.125 25.000 3.125 3.000 0.750 1.000 49.823
13 BC-12 18.460 0.125 25.000 3.125 2.000 0.500 1.000 85.378
14 BC-23 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
15 BC-34 16.170 0.125 25.000 3.125 3.000 0.750 1.000 78.829
16 BC-45 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
17 BC-56 18.460 0.125 25.000 3.125 2.000 0.500 1.000 85.378
18 AB-12 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075
19 AB-23 20.138 0.125 25.000 3.125 2.000 0.500 1.000 93.138
20 AB-34 13.840 0.125 25.000 3.125 0.750 0.188 1.000 59.685
21 AB-45 20.140 0.125 25.000 3.125 2.000 0.500 1.000 93.148
22 AB-56 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075
Total: 1840.099
LOAD CALCULATION OF 1st to 8th FLOOR SLAB

LIVE LIVE LOAD FLOOR


S.N INDEX AREA DEPTH UNIT WT. SELF WT. TOTAL
(m2) (m) (kN/m3) (kN/m2) LOAD (LL>3=0.5xLL and FINISH LOAD (kN)
(kN/m2) LL<3=0.25xLL) (kN/m2)

1 EF-12 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075


2 EF-23 20.138 0.125 25.000 3.125 2.000 0.500 1.000 93.138
3 EF-45 20.140 0.125 25.000 3.125 2.000 0.500 1.000 93.148
4 EF-56 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075
5 DE-12 18.450 0.125 25.000 3.125 2.000 0.500 1.000 85.331
6 DE-23 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
7 DE-34 16.169 0.125 25.000 3.125 3.000 0.750 1.000 78.824
8 DE-45 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
9 DE-56 18.460 0.125 25.000 3.125 2.000 0.500 1.000 85.378
10 CD-34 14.690 0.125 25.000 3.125 3.000 0.750 1.000 71.614
11 CD-45 10.220 0.125 25.000 3.125 3.000 0.750 1.000 49.823
12 BC-12 18.460 0.125 25.000 3.125 2.000 0.500 1.000 85.378
13 BC-23 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
14 BC-34 16.170 0.125 25.000 3.125 3.000 0.750 1.000 78.829
15 BC-45 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
16 BC-56 18.460 0.125 25.000 3.125 2.000 0.500 1.000 85.378
17 AB-12 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075
18 AB-23 20.138 0.125 25.000 3.125 2.000 0.500 1.000 93.138
19 AB-45 20.140 0.125 25.000 3.125 2.000 0.500 1.000 93.148
20 AB-56 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075
Total: 1720.729
LOAD CALCULATION OF 9th FLOOR SLAB (Terrace)

LIVE LIVE LOAD FLOOR


S.N INDEX AREA DEPTH UNIT WT. SELF WT. TOTAL
(m2) (m) (kN/m3) (kN/m2) LOAD (LL>3=0.5xLL and FINISH LOAD (kN)
(kN/m2) LL<3=0.25xLL) (kN/m2)

1 EF-12 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075


2 EF-23 20.138 0.125 25.000 3.125 2.000 0.500 1.000 93.138
3 EF-45 20.140 0.125 25.000 3.125 2.000 0.500 1.000 93.148
4 EF-56 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075
5 DE-12 18.450 0.125 25.000 3.125 2.000 0.500 1.000 85.331
6 DE-23 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
7 DE-34 16.169 0.125 25.000 3.125 3.000 0.750 1.000 78.824
8 DE-45 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
9 DE-56 18.460 0.125 25.000 3.125 2.000 0.500 1.000 85.378
10 BC-12 18.460 0.125 25.000 3.125 2.000 0.500 1.000 85.378
11 BC-23 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
12 BC-34 16.170 0.125 25.000 3.125 3.000 0.750 1.000 78.829
13 BC-45 23.530 0.125 25.000 3.125 2.000 0.500 1.000 108.826
14 BC-56 18.460 0.125 25.000 3.125 2.000 0.500 1.000 85.378
15 CD-34 14.690 0.125 25.000 3.125 3.000 0.750 1.000 71.614
16 CD-45 10.220 0.125 25.000 3.125 3.000 0.750 1.000 49.823
17 AB-12 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075
18 AB-23 20.138 0.125 25.000 3.125 2.000 0.500 1.000 93.138
19 AB-45 20.140 0.125 25.000 3.125 2.000 0.500 1.000 93.148
20 AB-56 15.800 0.125 25.000 3.125 2.000 0.500 1.000 73.075
Total: 1720.729

LOAD CALCULATION OF 10th FLOOR SLAB (Staircase cover)

LIVE LIVE LOAD FLOOR


S.N INDEX AREA DEPTH UNIT WT. SELF WT. TOTAL
(m2) (m) (kN/m3) (kN/m2) LOAD (LL>3=0.5xLL and FINISH LOAD (kN)
(kN/m2) LL<3=0.25xLL) (kN/m2)

1 CD-23 21.680 0.125 25.000 3.125 0.750 0.188 1.000 93.495


2 CD-34 14.690 0.125 25.000 3.125 0.750 0.188 1.000 63.351
3 CD-45 23.530 0.125 25.000 3.125 0.750 0.188 1.000 101.473
Total: 258.319
FLOOR SLAB LOAD(kN)
Basement 2123.731
Ground 1840.099
1st to 8th 1720.729
Top floor 1720.729
Stair cover 258.319
TOTAL LOAD 7663.607
Wall Load Calculation

Actual
Thickness Volume( volume Unit Wt. Total Load
Floors Length(m) Height(m) Reducing Load (kN)
(m) m 3) 30% for
(kN/m3) (kN)
openings

Ground floor
Full brick wall 131.369 0.230 2.853 86.203 60.342 19.2 1158.567
1555.820
Half brick wall 94.183 0.110 2.853 29.558 20.690 19.2 397.253
1st to 9th floor
Full brick wall 125.578 0.230 2.853 82.403 57.682 19.2 1107.493
1504.746
Half brick wall 94.183 0.110 2.853 29.558 20.690 19.2 397.253
10th floor (Terrace)
Full brick wall 26.518 0.230 2.853 17.401 12.180 19.2 233.864
Half brick wall 0.000 0.110 2.853 0.000 0.000 19.2 0.000 603.205
Parapet wall 119.482 0.230 1.000 27.481 19.237 19.2 369.342
Staircase Cover
Parapet wall 39.929 0.230 1.000 9.184 6.429 19.2 123.428 123.428
1555.820

1504.746

603.205

123.428

Wall Lenth Calcualtion


Full brick
thick 1m
Half brick Full brick
prapet
thick wall thick wall
wall
(110mm) (230mm)
(230mm)
m m
m
GF 94.183 131.369 -
1st - 9th F 94.183 125.578 -
10th Floor 0.000 26.518 119.482
Staircase c 0.000 0.000 39.929
Load Due to Boundary Shear Wall (200mm)
Thickness Unit wt Self wt Total wt
S.N. Length (m) Height (m)
(m) (kN/m3) (kN/m) (kN)
1 81.3816 0.200 2.853 25.000 14.264 1160.827
TOTAL 1160.827

Load Due to Elevator Shear Wall (200mm)

Basement + GF + 1st to 9th Floor + Staircase Cover

Unit wt Total
S.N. C/S area Height
(kN/m3) Load (kN)

1 2.617 3.353 25.000 219.394


TOTAL 219.394
4057.04 sq.inch
2.61744 m2
Plaster Load Calculation

Length Height Thickness Volume ,V Actual Volume


S.N Floors (m) (m) (m) (m3) (0.7V) (m3)
Unit Wt. (kN/m3) Load (kN)

1 Basement
Walls 162.7632 2.853 0.012 5.572 5.572 20 111.447
1 Ground Floor
Walls 451.104 2.853 0.012 15.444 10.811 20 216.216
2 1st to 9th Floor
Walls 439.522 2.853 0.012 15.047 10.533 20 210.664
3 10th Floor (Terrace)
Walls 53.035 2.853 0.012 1.816 1.271 20 25.420
Parapet 238.963 1.000 0.012 2.868 2.868 20 57.351
4 Staircase Cover
Parapet 79.858 1.000 0.012 0.958 0.958 20 19.166
111.447

216.216

210.664

82.771

19.166

Wall Lenth Calcualtion


Full brick
thick 1m
Half brick Full brick
prapet
thick wall thick wall Total
wall
(110mm) (230mm) Length
(230mm)
m m
m
GF 94.183 131.369 225.552 -
1st - 9th F 94.183 125.578 219.761 -
10th Floor 0.000 26.518 26.518 119.482
Staircase c 0.000 0.000 0.000 39.929
LOAD CALCULATION OF STAIR CASE :
Floor to Floor Height = 11' (3.353m)
Total No. of risers = 22
Height of a riser = 6" (0.152m)
Dead Load = 6.165 kN/m2 (DL of waist slab + DL of step)
Live Load = 3 kN/m2

Area Loading Total


SN Flight Landing Length
(m)
Width
(m) (m )
2 Dl + LL Load
(kN/m2) (kN)

1 F1 - 2.438 1.524 3.716 9.165 34.057


2 F2 - 0.914 1.524 1.394 9.165 12.771
3 F3 - 2.438 1.524 3.716 9.165 34.057
4 - L1 1.524 1.524 2.323 6.750 15.677
5 - L2 1.524 1.524 2.323 6.750 15.677
SUM 112.240

Fig. Staircase Layout


GROUND FLOOR TO TOP FLOOR
Rise=0.105m(6"), Tread=0.305m(12"), Thickness of waist and
landing=0.105m(6") Total number of Rise per floor
= 22
Total number of Tread per floor = 19
Live Load = 3kN/m 2

0.1524
3.3528 rise depth of wt of one wt of live load
waist step waist
0.105 0.105 1.905 4.2597 3

unit load for landing


3.81
Load Calculation on Each Floor

Staircase Terrace (10th 1st to 9th Ground


S.N. Components Basement
Cover Floor) Floor Floor

1 WALLS 123.428 603.205 1504.746 1555.820 -


2 COLUMNS - 241.402 779.526 779.526 779.526
3 BEAMS - 184.160 1049.535 1085.371 1130.385
4 SLAB 258.319 1720.729 1720.729 1840.099 2123.731
5 BASEMENT SHEAR WAL - - - - 1160.827
6 ELEVATOR SHEAR WALL - 219.394 219.394 219.394 219.394
7 STAIRCASE - 112.240 112.240 112.240 -
8 12 MM PLASTERING 19.166 82.771 210.664 216.216 111.447
TOTAL LOAD (kN) : 400.912 3163.902 5596.835 5808.666 5525.310

MASS LUMPING

Total Load at Lumped


Each Floor Mass at
Slab each level

400.912 1782.4070
Stair Cover 3163.902
4380.3683
9th Floor 5596.835
5596.8350
8th Floor 5596.835
5596.8350
7th Floor 5596.835
5596.8350
6th Floor 5596.835
5596.8350
5th Floor 5596.835
5596.8350
4th Floor 5596.835
5596.8350
3rd Floor 5596.835
5596.8350
2nd Floor 5596.835
5596.8350
1st Floor 5596.835
5702.7504
GF 5808.666
5666.9878
Basement 5525.310
65270.305 kN total seismic weight
1782.4070

4380.3683
5596.8350
5596.8350
5596.8350

5596.8350

5596.8350

5596.8350

5596.8350

5596.8350

5702.7504
5666.9878
eight
Vertical Distribution of Design Forces

Design Seismic Base Shear, VB = 2323.623 kN

Storey Shear
S.N FLOOR LEVEL Wi(kN) Hi(m) WiHi2 Qi=VB*(WiHi2/∑WiHi2) Forces (Vi
kN)
1 Staircase Cover 1782.407 40.2336 2885258.106 202.720 202.720
2 Terrace 4380.368 36.881 5958148.073 418.624 621.344
3 9th 5596.835 33.528 6291552.166 442.049 1063.393
4 8 th
5596.835 30.175 5096157.255 358.060 1421.453
5 7th 5596.835 26.822 4026593.386 282.911 1704.364
6 6 th
5596.835 23.470 3082860.561 216.604 1920.968
7 5th 5596.835 20.117 2264958.780 159.138 2080.106
8 4 th
5596.835 16.764 1572888.042 110.512 2190.618
9 3rd 5596.835 13.411 1006648.347 70.728 2261.346
10 2 nd
5596.835 10.058 566239.695 39.784 2301.131
11 1st 5702.750 6.706 256424.578 18.017 2319.147
12 GF 5666.988 3.353 63704.128 4.476 2323.623
ΣWiHi2: 33071433.117
Vb= 2323.623 kN
5 PROJECT SCHEDULING, FLOWCHART AND TASKCHART

GANTT CHART
10-Jun 20-Jun 30-Jun 10-Jul 20-Jul 30-Jul
Group Formation

Project Selection

Literature Review

Preliminary Design

Load Calculation

Proposal Writing

Proposal Presentation

Fig.3: Gantt Chart Showing First Phase Task Schedule

15-Oct 4-Nov 24-Nov 14-Dec 3-Jan 23-Jan

ETABS Modelling

Data Analysis

Model Review With Supervisor

Drawing & Detailing

Estimating and Costing

Report Writing & Presentation

Fig.4: Gantt Chart Showing Second Phase Task Schedule


PROJECT SCHEDULING
Task Start Date End Date Duration
Group Formation 10-Jun 17-Jun 7
Project Selection 17-Jun 27-Jun 10
Literature Review 24-Jun 14-Jul 20
Preliminary Design 4-Jul 8-Jul 4
Load Calculation 8-Jul 20-Jul 12
Proposal Writing 22-Jul 27-Jul 5
Proposal Presentation 28-Jul 31-Jul 3

Task Start Date End Date Duration


ETABS Modelling 18-Oct 6-Nov 19
Data Analysis 6-Nov 11-Nov 5
Model Review With Supervisor 11-Nov 14-Nov 3
Drawing & Detailing 18-Nov 8-Dec 20
Estimating and Costing 10-Dec 25-Dec 15
Report Writing & Presentation 1-Jan 20-Jan 19

You might also like