Project Proposal

Proposal

Uploaded by

Reymark Billanes
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

PROJECT PROPOSAL: CONSTRUCTION OF SUPREME SECONDARY

LEARNER GOVERNMENT OFFICE

I. ACTIVITY DETAILS

Title of
Activity
Nature of ENMP/
Activity ENP
Type of
Time
Activity
Date Venue
Project Contact
Head/s Number

II. BRIEF CONTEXT/PERSPECTIVE OF THE ACTIVITY


<Minimum of 3 paragraphs answering the following questions in application of the
Lasallian Reflection Framework>

(Part 1)
 What situation do you see (observation/s) in your organization, university, society, or
our world?
 What certain experiences, problems, or questions do you have in relation to what you
see? (May be supported with data or research if there is any or if needed)
(Part 2)
 Why is there a problem?
 What could be the cause and effect?
 How did you feel about the experience, situation, or problem? And why did you feel
that way?
 What can we discover or realize?

(Part 3)
 Out of all the possible projects, activities, and solutions, Why this?
 As an organization, what will you commit as a response to what you have stated in
Part 2?

(Part 4)
 Briefly state what will happen to your project/ program.
 Who will be your project/program beneficiaries?
 Who will be your partner/s in this project/ program?

III. OBJECTIVES
<State what you intend to address through this activity – the expected outputs of
the activity.>
1.
2.
3.

IV. COMPREHENSIVE PROGRAM DESIGN

<ORGANIZATION’S OFFICIAL LETTER FOOTER MUST BE PLACED HERE>


< List ALL activities that will be done by person/ people-in-charge in preparation
for the actual day/s of the program/project implementation. Moreover, activities
that should be done after the event should also be indicated here.>

BRIEF
PERSON- IN-
DATE DURATION ACTIVITY DESCRIPTION OF
CHARGE
THE ACTIVITY
Number Sequence of 1-2 sentence This part can
hrs/ days activities description of the serve as your
activity stated in reference
the previous during
column preparation,
execution,
and
implementati
on.

< List the actual activities that will happen ON THE DAY of the program/ project
implementation.>

BRIEF
PERSON- IN-
TIME DURATION ACTIVITY DESCRIPTION OF
CHARGE
THE ACTIVITY
Start time and End Number of Sequence of 1-2 sentence This part can
time minutes/ activities description of the serve as your
**note: Registration hrs activity stated in reference
and clean up time the previous during
should be outside column preparation,
the activity time** execution,
and
implementati
on.

V. BREAKDOWN OF EXPENSES
< List ALL projected expenses and its total amount.> TABLE BELOW IS
REQUIRED. PUT N/A as the total if no expenses shall be incurred.>
Materials Quantity Unit Cost Total Cost

Total: ABCD

Declared Activity Budget (from Budget Proposal/GOSM): ABCD

<ORGANIZATION’S OFFICIAL LETTER FOOTER MUST BE PLACED HERE>


VI. ALLOCATION OF EXPENSES
< List the breakdown on where you will get the funding for the activity>
<The amount to be listed is the portion of the fund to be allocated for expenses>
< This table IS NOT REQUIRED. If no expenses shall be incurred, delete the table,
and please place this statement: THE ACTIVITY WILL NOT INCUR ANY
EXPENSES; THUS, IT WILL NOT NEED FUNDING>

Source/s of Funds Amount

Organizational Funds AAA

Participants Fee BBB

Others (please specify, i.e. Sponsorships) CCC

Total: ABCD

VII. PROJECTED INCOME


<This is a requirement for fund-raising and selling activities.>
< This table IS NOT REQUIRED. If no income is expected, delete the table, and
please place this statement: THE ACTIVITY IS NOT A
FUNDRAISING/SELLING ACTIVITY; THUS, IT WILL NOT INCUR
INCOME OR LOSS.>

Projected Revenue

Item Qty Selling Price Amount

CDEF

TOTAL REVENUE
Less: Projected Expenses (Should Match with Section 5)

Item Qty Selling Price Amount

TOTAL EXPENSES
TOTAL PROJECTED INCOME (Revenue less Expenses) n/a

VIII. SUMMARY OF FUNDS


< Kindly indicate the current organizational funds and this should be endorsed and
signed ONLY by the VP Finance or Treasurer; Org’s President can be the ONLY ONE
who can For Sign. TABLE BELOW IS REQUIRED.>

<ORGANIZATION’S OFFICIAL LETTER FOOTER MUST BE PLACED HERE>


Accumulated Operational Funds

Operational Fund Php xx,xxx

Accumulated Depository Funds

Depository Fund (as of) Php xx,xxx

Other Sources of Funds (should match with


projected revenue, if applicable)

Participants Fee/Donation/Sponsorships CDEF

Total Cash for Disbursement Php xx,xxx

Less: Total Projected Expenses (should match Php xx,xxx


with Section 5)

REMAINING BALANCE Php xx,xxx

________________________
Juan Miguel Chua
USG Executive Treasurer/ VP-Finance

IX. PROVISIONS FOR PROFIT AND LOSS


< Must be at least two (2) DIFFERENT persons responsible that will be signing>

The following persons shall be held liable and will shoulder any remaining
balance incurred by the project.
< DO NOT DELETE THE STATEMENT ABOVE>

Name of Person Responsible Name of Person Responsible


Position Position

Prepared by:

Name of Person Responsible


Position

Noted by:

<Name> <Name>
President Faculty Adviser

<ORGANIZATION’S OFFICIAL LETTER FOOTER MUST BE PLACED HERE>