0% found this document useful (0 votes)
15 views

Sap Micro Project Part A 123

Uploaded by

Yogesh YT
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views

Sap Micro Project Part A 123

Uploaded by

Yogesh YT
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Part A : Micro project proposal

Title : Transmission Line Faults Detection With temperature


Protection

1.0) Aims/Benefits of the micro-project :-


1.For getting knowledge about faults detection by using relay .

2.For protection of power system

3. To detection and protection to Power System

2.0) Course Outcomes Addressed:-

a) Identify various types faults in power.


b) Select suitable switchgears for different applications.
c) Test and performance of different protective relays.
d) Maintain protection system of alternator and transformers.
e) Maintain protection scheme for motor and transmission lines.

3.0) Proposed Methodology:-


1)We discuss about group of five students for Micro
-Project .

2)Then we form a group of five students.

3)Then we discuss about micro project topic.

4) Later we select 3 topic for micro project.

5) We select one topic for micro project.(i.e. make a modal on transmission line
faults detection with temperature sensor

6) We collect information about basic material for micro project

7) We collect information about market survey.

8) We collect information about relay circuit.

9) We find the required component in local market


10) We collect specifications of dual channel relay modual
11) We collect some required circuit in local market also few circuit not found in
Market

12) Then the remaining material we can search on web browser and google chrome
13) We after that discuss with team members and order the components on online
shops
14) We can cross check the deliver material .

15) Defective material replace and reorder the new material

16) We can start the work on plywood

17) Make the tower by using wooden stick

18) Make the connection in all part and check the circuitry

19) Then prepare a report in the given format.

20) Submitted microproject.

4.0) Action plan:-


Sr.no Details Of Plan Start Date Plan Responsible
. Action Finish Team
Date Members
01. Group 15/7/2027 20/08/202 All group
discussion 4 members
02. Group 22/07/2024 All group
Formation 27/07/202 members
4
03. Topic 05 /08/2024 All group
Discussion 10/08/202 members
4
04. Selection Of 12/08/2024 All group
topic 17/08/202 members
4
05. Final Topic 19/09/2024 All group
selection 24/08/202 members
4
06. Collect The 26/08/2024 31/08/202
Information 4 Rameshwar
For
Making
Market
Survey
07. Collecting 02/09/2024 Onkar
various 06/09/202
Universal 4
motors with
their
application .
08. 14/09/202 Bramhaji
4

Find the
component
on online
shops

09. Collecting 17/09/2024 22/09/202 Bramhaji


photos and 4
video
about
microproject
10. Collect 23/09/2024 28/09/202 Rameshw
specification 4 ar
s of circuits
11. Paint the 28/09/2024 02/10/202 Onkar
cardboard 4
12 Make a 04/10/2024 09/10/202 Onkar &
Transmissio 4 Bramhaji
n tower
13. Check all 11/10/2024 16/10/202 Pranjali
component 4
working
properly and
mount on
card board
14. Prepare 02/10/2024 04/10/202 Rameshw
report Part A 4 ar
&Bramhaj
i
15. Prepare 03/08/2024 Yogesh
report Part B 10/10/202
4
16 Give the All group
presentation members
17. Submitted All group
the members
microproject
.

5.0) Resources required ( major resources such as raw materials some