0% found this document useful (0 votes)
21 views

Weekly Planned Vs Actual Report-SASRF-06-Jan-2022

Uploaded by

Hortencio Samuel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

Weekly Planned Vs Actual Report-SASRF-06-Jan-2022

Uploaded by

Hortencio Samuel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 23

MANARAH AL-JUBAIL CONST. CO. LTD.

ELECTRO-MECHANICAL AND CIVIL CONSTRUCTION


Project Name: South Area Safety Related Facilities Start Date: 8-Dec-19
Owner: KJO Revised End Date: 30-Apr-22
Client: ENPPI Weekly Progress Report summary Contract No: 3940-200
Location: Khafji Cut Off Date 06-Jan-2022

Upto Previous week This week Cumulative upto this week


Sl. No. Descriptions Weightage
Plan Actual Variance Plan Actual Variance Plan Actual Variance Remarks

1 Civil 42.80% 100.00% 93.22% -6.78% 0.00% 0.30% 0.30% 100.00% 93.52% -6.48%

2 Architect 41.79% 100.00% 56.81% -43.19% 0.00% 0.23% 0.23% 100.00% 57.04% -42.96%

3 Pre Engineering buildings 2.19% 100.00% 98.35% -1.65% 0.00% 0.00% 0.00% 100.00% 98.35% -1.65%

4 Landscape 7.55% 100.00% 62.87% -37.13% 0.00% 2.83% 2.83% 100.00% 65.70% -34.30%

5 Plumbing 3.15% 100.00% 73.50% -26.50% 0.00% 0.82% 0.82% 100.00% 74.32% -25.68%

6 Punch list clearance 2.52% 100.00% 2.54% -97.46% 0.00% 3.20% 3.20% 100.00% 5.74% -94.26%

Overall Progress 100.00% 100.00% 72.92% -27.08% 0.00% 0.54% 0.54% 100.00% 73.46% -26.54%

MCCL ENPPI

Prepared By Reviewed By Checked By Approved By

Maruthu Pandiyan.D Remesh Sasi Alaa Samhoud Mohamed Moawad

Planning Engineer Project Manager Planning Engineer Planning Manager

1
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF South Area Safety Related Facilities 382 8-Dec-19 24-Feb-21 100.00% 72.91% 0.54% 73.45%
SASRF.5 Construction 305 10-Feb-20 30-Jan-21 97.48% 74.73% 0.47% 75.20%
SASRF.5.1 Package-1 101 10-Jun-20 5-Oct-20 9.28% 74.40% 1.68% 76.08%
SASRF.5.1.1 New Swith Gear House No.11 100 11-Jun-20 5-Oct-20 40.09% 71.79% 0.09% 71.87%
SASRF.5.1.1.1 Architecture 100 11-Jun-20 5-Oct-20 100.00% 71.79% 0.09% 71.87%
SASRF.5.1.1.1.1 CMU wall 44 11-Jun-20 1-Aug-20 29.29% 43.54% 0.00% 43.54%
A-SG-CMU-1000 Erection of Precast wall panel and slab by others 8 11-Jun-20 20-Jun-20 0.00% 100.00% 100.00%
A-SG-CMU-1010 Laying of Block 12 5-Jul-20 18-Jul-20 37.56% 25.00% 0.00% 25.00%
A-SG-CMU-1020 Scaffolding 5 9-Jul-20 14-Jul-20 13.66% 0.00%
A-SG-CMU-1030 Internal Wall Plastering 7 19-Jul-20 26-Jul-20 19.51% 25.00% 0.00% 25.00%
A-SG-CMU-1040 Preparation of Floor For screed Concrete 4 27-Jul-20 30-Jul-20 13.66% 100.00% 0.00% 100.00%
A-SG-CMU-1050 Screed Concrete on Floor 2 30-Jul-20 1-Aug-20 15.61% 100.00% 0.00% 100.00%
SASRF.5.1.1.1.2 Painting 56 2-Aug-20 5-Oct-20 41.29% 72.37% 0.00% 72.37%
A-SG-P-1000 Scaffolding for ceiling & wall 15 2-Aug-20 18-Aug-20 24.22% 100.00% 0.00% 100.00%
A-SG-P-1005 Surface Preparation for Ceiling 9 11-Aug-20 20-Aug-20 7.96% 100.00% 0.00% 100.00%
A-SG-P-1010 Painting for Ceiling 7 16-Aug-20 23-Aug-20 5.54% 100.00% 0.00% 100.00%
A-SG-P-1020 Surface Preparation for Internal wall 11 20-Aug-20 1-Sep-20 15.22% 100.00% 0.00% 100.00%
A-SG-P-1030 Internal Painting for Wall 8 27-Aug-20 5-Sep-20 7.61% 95.00% 0.00% 95.00%
A-SG-P-1033 Surface Preparation for External wall 13 17-Sep-20 1-Oct-20 15.57% 0.00%
A-SG-P-1035 External Painting for Wall 10 24-Sep-20 5-Oct-20 11.42% 0.00%
A-SG-P-1040 Surface Preparation for Floor 8 7-Sep-20 15-Sep-20 7.27% 100.00% 0.00% 100.00%
A-SG-P-1050 Floor Painting 6 10-Sep-20 16-Sep-20 5.19% 95.00% 0.00% 95.00%
SASRF.5.1.1.1.3 Tiles 11 6-Sep-20 17-Sep-20 3.14% 100.00% 0.00% 100.00%
A-SG-T-1000 Installation of Wall tile 7 6-Sep-20 13-Sep-20 63.64% 100.00% 0.00% 100.00%
A-SG-T-1010 Floor tile fixing 4 14-Sep-20 17-Sep-20 36.36% 100.00% 0.00% 100.00%
SASRF.5.1.1.1.4 Water Proofing 22 2-Jul-20 27-Jul-20 18.71% 100.00% 0.00% 100.00%
A-SG-WP-1000 Surface Preparation 2 2-Jul-20 4-Jul-20 7.63% 100.00% 0.00% 100.00%
A-SG-WP-1010 Pouring of Light weight Concrete 1 5-Jul-20 5-Jul-20 9.16% 100.00% 0.00% 100.00%
A-SG-WP-1020 Bituminous Coating 2 8-Jul-20 9-Jul-20 0.76% 100.00% 0.00% 100.00%
A-SG-WP-1030 Installation of EPDM Water proofing membrane 6 11-Jul-20 16-Jul-20 38.17% 100.00% 0.00% 100.00%
A-SG-WP-1040 Leaktest 1 19-Jul-20 19-Jul-20 1.53% 100.00% 0.00% 100.00%
A-SG-WP-1050 Installation of Insulation Board 2 20-Jul-20 21-Jul-20 9.16% 100.00% 0.00% 100.00%
A-SG-WP-1060 Installation of geotextile membrane 1 22-Jul-20 22-Jul-20 7.63% 100.00% 0.00% 100.00%
A-SG-WP-1070 Gravel Filling 2 23-Jul-20 25-Jul-20 18.32% 100.00% 0.00% 100.00%
A-SG-WP-1080 Installation of Steel Flashing 2 26-Jul-20 27-Jul-20 7.63% 100.00% 0.00% 100.00%
SASRF.5.1.1.1.5 General structures 9 17-Sep-20 27-Sep-20 5.57% 96.92% 1.54% 98.46%
A-SG-G-1000 Installation of Handrail 2 17-Sep-20 19-Sep-20 30.77% 95.00% 5.00% 100.00%
A-SG-G-1010 Installation of Steel Guage ladder 2 21-Sep-20 22-Sep-20 30.77% 95.00% 0.00% 95.00%
A-SG-G-1020 Installation of Steel Pre finished Metal coping 3 24-Sep-20 27-Sep-20 38.46% 100.00% 0.00% 100.00%
SASRF.5.1.1.1.6 Doors 5 22-Aug-20 26-Aug-20 2.00% 95.00% 0.00% 95.00%
A-SG-D-1000 Installation of Doors 5 22-Aug-20 26-Aug-20 100.00% 95.00% 0.00% 95.00%
SASRF.5.1.2 New Fire water Pump Building 46 4-Aug-20 26-Sep-20 14.38% 94.98% 0.60% 95.58%
SASRF.5.1.2.1 Architecture 46 4-Aug-20 26-Sep-20 100.00% 94.98% 0.60% 95.58%
SASRF.5.1.2.1.1 Flooring 25 4-Aug-20 1-Sep-20 45.02% 90.71% 1.33% 92.04%
A-FP-F-1000 Preparation of Floor For screed Concrete 6 4-Aug-20 10-Aug-20 35.40% 100.00% 0.00% 100.00%
A-FP-F-1010 Screed Concrete on Floor 2 11-Aug-20 12-Aug-20 22.12% 100.00% 0.00% 100.00%
A-FP-F-1020 Surface Preparation for Floor 7 23-Aug-20 30-Aug-20 26.55% 95.00% 5.00% 100.00%
A-FP-F-1030 Floor Painting 5 27-Aug-20 1-Sep-20 15.93% 50.00% 0.00% 50.00%
SASRF.5.1.2.1.2 Glazing system 16 3-Sep-20 21-Sep-20 38.25% 100.00% 0.00% 100.00%
A-FP-GS-1000 Fabrication and Installation of Frame 16 3-Sep-20 21-Sep-20 66.67% 100.00% 0.00% 100.00%
A-FP-GS-1010 Installation 4 13-Sep-20 16-Sep-20 33.33% 100.00% 0.00% 100.00%
SASRF.5.1.2.1.3 Doors 8 17-Sep-20 26-Sep-20 16.73% 95.00% 0.00% 95.00%
A-FP-D-1000 Installation of Hollow metal Flush Doors 4 17-Sep-20 21-Sep-20 71.43% 95.00% 0.00% 95.00%
A-FP-D-1010 Installation of Rolle up Door 4 22-Sep-20 26-Sep-20 28.57% 95.00% 0.00% 95.00%
SASRF.5.1.3 Landscape Works 65 10-Jun-20 24-Aug-20 33.62% 64.97% 4.65% 69.61%
PKG-1-LS-1000 Finished Grading 25 10-Jun-20 8-Jul-20 38.33% 95.00% 3.00% 98.00%
PKG-1-LS-1010 Interlock concrete block paver 15 4-Jul-20 20-Jul-20 9.20% 50.00% 38.00% 88.00%
PKG-1-LS-1020 Gravel filling 24 15-Jul-20 11-Aug-20 24.53% 0.00% 0.00% 0.00%
PKG-1-LS-1030 Installation of curb stone 30 21-Jul-20 24-Aug-20 25.55% 93.74% 0.00% 93.74%
PKG-1-LS-1040 Installation of wheel stop 2 2-Aug-20 3-Aug-20 0.34% 0.00%
PKG-1-LS-1050 Traffic markings 12 4-Aug-20 17-Aug-20 2.04% 0.00%
SASRF.5.1.4 Plumbing works 50 27-Jul-20 22-Sep-20 11.91% 85.00% 0.00% 85.00%
PKG-1-PL-1000 Supply and install all plumbing accessories 50 27-Jul-20 22-Sep-20 75.00% 90.00% 0.00% 90.00%
PKG-1-PL-1010 Submission of Engineering documents 30 19-Aug-20 22-Sep-20 25.00% 70.00% 0.00% 70.00%
SASRF.5.2 Package-2 225 10-Feb-20 28-Oct-20 30.51% 89.38% 0.24% 89.62%
SASRF.5.2.1 Fire station office 174 24-Feb-20 13-Sep-20 49.35% 91.69% 0.00% 91.69%
SASRF.5.2.1.1 Civil 75 24-Feb-20 20-May-20 30.61% 100.00% 0.00% 100.00%
SASRF.5.2.1.1.1 Sub Structure 13 6-May-20 20-May-20 10.96% 100.00% 0.00% 100.00%
SASRF.5.2.1.1.1.1 Construction of Grade slab 13 6-May-20 20-May-20 100.00% 100.00% 0.00% 100.00%
C-FS-GS-1000 Subgrade Preparation and Compaction 3 6-May-20 9-May-20 12.63% 100.00% 0.00% 100.00%
C-FS-GS-1010 Rebar work 4 9-May-20 12-May-20 37.89% 100.00% 0.00% 100.00%
C-FS-GS-1020 Formwork 4 10-May-20 13-May-20 15.79% 100.00% 0.00% 100.00%
C-FS-GS-1030 Concretre Pouring for Grade slab 1 11-May-20 11-May-20 29.47% 100.00% 0.00% 100.00%
C-FS-GS-1040 Curing 8 12-May-20 20-May-20 4.21% 100.00% 0.00% 100.00%
SASRF.5.2.1.1.2 Super Structure 58 24-Feb-20 30-Apr-20 89.04% 100.00% 0.00% 100.00%
SASRF.5.2.1.1.2.1 Construction of Column from Top of Grade slab to B 28 24-Feb-20 26-Mar-20 34.20% 100.00% 0.00% 100.00%
C-FS-COL-1000 Rebar cutting & bending for column 5 24-Feb-20 29-Feb-20 6.06% 100.00% 0.00% 100.00%
C-FS-COL-1010 Formwork Making 14 27-Feb-20 14-Mar-20 20.45% 100.00% 0.00% 100.00%
C-FS-COL-1020 Scaffolding for Column 4 29-Feb-20 3-Mar-20 16.67% 100.00% 0.00% 100.00%
C-FS-COL-1030 Rebar Fixing 8 1-Mar-20 9-Mar-20 12.12% 100.00% 0.00% 100.00%
C-FS-COL-1040 Formwork fixing 11 3-Mar-20 15-Mar-20 22.73% 100.00% 0.00% 100.00%
C-FS-COL-1050 Concrete Pouring 10 5-Mar-20 16-Mar-20 6.82% 100.00% 0.00% 100.00%
C-FS-COL-1060 Deshuttering 12 7-Mar-20 19-Mar-20 13.64% 100.00% 0.00% 100.00%
C-FS-COL-1070 Curing 18 7-Mar-20 26-Mar-20 1.52% 100.00% 0.00% 100.00%

Page 2 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.2.1.1.2.2 Construction of Roof beam & Slab 45 10-Mar-20 30-Apr-20 65.80% 100.00% 0.00% 100.00%
C-FS-SB-1080 Rebar Cutting and bending 12 10-Mar-20 23-Mar-20 17.32% 100.00% 0.00% 100.00%
C-FS-SB-1090 Scaffolding installation 13 11-Mar-20 25-Mar-20 16.54% 100.00% 0.00% 100.00%
C-FS-SB-1100 Formwork for Beam & Slab 11 18-Mar-20 30-Mar-20 25.98% 100.00% 0.00% 100.00%
C-FS-SB-1110 Rebar work 10 23-Mar-20 2-Apr-20 21.65% 100.00% 0.00% 100.00%
C-FS-SB-1120 Concrete Pouring 2 4-Apr-20 5-Apr-20 3.94% 100.00% 0.00% 100.00%
C-FS-SB-1130 Deshuttering 5 23-Apr-20 28-Apr-20 13.78% 100.00% 0.00% 100.00%
C-FS-SB-1140 Curing 21 7-Apr-20 30-Apr-20 0.79% 100.00% 0.00% 100.00%
SASRF.5.2.1.2 Architecture 107 12-May-20 13-Sep-20 69.39% 88.03% 0.00% 88.03%
SASRF.5.2.1.2.1 Construction of CMU Block 50 12-May-20 8-Jul-20 35.01% 100.00% 0.00% 100.00%
A-FS-CMU-1000 Erection of Precast wall panel by others 6 12-May-20 18-May-20 0.00% 100.00% 0.00% 100.00%
A-FS-CMU-1010 Laying of Block 40 18-May-20 2-Jul-20 75.58% 100.00% 0.00% 100.00%
A-FS-CMU-1020 Internal Wall Plastering 30 4-Jun-20 8-Jul-20 24.42% 100.00% 0.00% 100.00%
SASRF.5.2.1.2.2 Gypsum Board 33 10-Jun-20 18-Jul-20 5.90% 91.21% 0.00% 91.21%
A-FS-GYP-1000 Installation of Stud & Runner 18 10-Jun-20 30-Jun-20 51.72% 100.00% 0.00% 100.00%
A-FS-GYP-1010 Installation of Insulation 15 15-Jun-20 1-Jul-20 15.52% 95.00% 0.00% 95.00%
A-FS-GYP-1020 Gypsum board Fixing 18 18-Jun-20 8-Jul-20 22.41% 95.00% 0.00% 95.00%
A-FS-GYP-1030 Installation of stud and Runner for ceiling 4 9-Jul-20 13-Jul-20 6.90% 50.00% 0.00% 50.00%
A-FS-GYP-1040 Gypsum Ceiling Board 4 14-Jul-20 18-Jul-20 3.45% 0.00%
SASRF.5.2.1.2.3 Painting 63 22-Jun-20 2-Sep-20 10.38% 77.65% 0.00% 77.65%
SASRF.5.2.1.2.3.1 Internal Painting 53 22-Jun-20 22-Aug-20 92.16% 84.26% 0.00% 84.26%
A-FS-IP-1000 Preparation for Ceiling 15 22-Jun-20 8-Jul-20 10.64% 90.00% 0.00% 90.00%
A-FS-IP-1010 Painting for Ceiling 12 29-Jun-20 12-Jul-20 6.38% 80.00% 0.00% 80.00%
A-FS-IP-1020 Painting for wall 25 4-Jul-20 1-Aug-20 42.55% 80.00% 0.00% 80.00%
A-FS-IP-1030 Surface Preparation for Floor 31 15-Jul-20 19-Aug-20 31.91% 90.00% 0.00% 90.00%
A-FS-IP-1040 Painting for Floor 25 25-Jul-20 22-Aug-20 8.51% 80.00% 0.00% 80.00%
SASRF.5.2.1.2.3.2 External Painting 20 11-Aug-20 2-Sep-20 7.84% 0.00% 0.00% 0.00%
A-FS-EP-1000 Paint for Wall 20 11-Aug-20 2-Sep-20 100.00% 0.00%
SASRF.5.2.1.2.4 Acoustic Ceiling Tiles 14 11-Jul-20 26-Jul-20 2.60% 52.35% 0.00% 52.35%
A-FS-ACT-1000 Installation of Supports 12 11-Jul-20 23-Jul-20 58.82% 75.00% 0.00% 75.00%
A-FS-ACT-1010 Installation of Acoustic ceiling Tile 10 15-Jul-20 26-Jul-20 41.18% 20.00% 0.00% 20.00%
SASRF.5.2.1.2.5 Tile Fixing 39 6-Jul-20 19-Aug-20 10.79% 83.87% 0.00% 83.87%
A-FS-T-1000 Installation of Wall tile 34 6-Jul-20 13-Aug-20 64.15% 95.00% 0.00% 95.00%
A-FS-T-1010 Installation of Floor Tile 23 23-Jul-20 18-Aug-20 22.64% 75.00% 0.00% 75.00%
A-FS-T-1020 Tile base 14 4-Aug-20 19-Aug-20 6.60% 75.00% 0.00% 75.00%
A-FS-T-1030 Installation of Granite stone tiles 3 5-Aug-20 8-Aug-20 2.83% 35.00% 0.00% 35.00%
A-FS-T-1040 Granite stone base 2 10-Aug-20 11-Aug-20 1.89% 0.00%
A-FS-T-1050 Granite threshold 2 12-Aug-20 13-Aug-20 1.89% 0.00%
SASRF.5.2.1.2.6 Resilient Work 6 10-Aug-20 16-Aug-20 0.92% 20.00% 0.00% 20.00%
A-FS-R.S-1000 Installation of Vinyl Tiles 5 10-Aug-20 15-Aug-20 66.67% 30.00% 0.00% 30.00%
A-FS-R.S-1010 Vinyl base 3 13-Aug-20 16-Aug-20 33.33% 0.00%
SASRF.5.2.1.2.7 Raised Floor 5 17-Aug-20 22-Aug-20 0.51% 95.00% 0.00% 95.00%
A-FS-RF-1000 Installation of Supports 4 17-Aug-20 20-Aug-20 60.00% 95.00% 0.00% 95.00%
A-FS-RF-1010 Installation of Tile 3 19-Aug-20 22-Aug-20 40.00% 95.00% 0.00% 95.00%
SASRF.5.2.1.2.8 Carpet Flooring 7 23-Aug-20 30-Aug-20 1.12% 0.00% 0.00% 0.00%
A-FS-CF-1000 Fixing of Carpet Roll 3 23-Aug-20 25-Aug-20 27.27% 0.00%
A-FS-CF-1010 Installation of Carpet Tiles 4 26-Aug-20 30-Aug-20 72.73% 0.00%
SASRF.5.2.1.2.9 Wood works 3 21-Jul-20 23-Jul-20 0.51% 80.00% 0.00% 80.00%
A-FS-WW-1000 Installation of Plywood in Telecom Room 2 21-Jul-20 22-Jul-20 80.00% 100.00% 0.00% 100.00%
A-FS-WW-1010 Base 1 23-Jul-20 23-Jul-20 20.00% 0.00%
SASRF.5.2.1.2.10 Water Proofing 28 9-Jun-20 11-Jul-20 7.12% 100.00% 0.00% 100.00%
A-FS-WP-1000 Surface Preparation 2 9-Jun-20 10-Jun-20 7.14% 100.00% 0.00% 100.00%
A-FS-WP-1010 Pouring of Light weight Concrete 2 11-Jun-20 13-Jun-20 7.14% 100.00% 0.00% 100.00%
A-FS-WP-1020 Bituminous Coating 2 16-Jun-20 17-Jun-20 1.43% 100.00% 0.00% 100.00%
A-FS-WP-1030 Installation of EPDM Water proofing membrane 6 18-Jun-20 24-Jun-20 42.86% 100.00% 0.00% 100.00%
A-FS-WP-1040 Leaktest 1 27-Jun-20 27-Jun-20 1.43% 100.00% 0.00% 100.00%
A-FS-WP-1050 Installation of Insulation Board 4 28-Jun-20 1-Jul-20 11.43% 100.00% 0.00% 100.00%
A-FS-WP-1060 Installation of geotextile membrane 2 2-Jul-20 4-Jul-20 2.86% 100.00% 0.00% 100.00%
A-FS-WP-1070 Gravel Filling 4 5-Jul-20 8-Jul-20 20.00% 100.00% 0.00% 100.00%
A-FS-WP-1080 Installation of Steel Flashing 2 9-Jul-20 11-Jul-20 5.71% 100.00% 0.00% 100.00%
SASRF.5.2.1.2.11 Screed concrete 10 24-May-20 3-Jun-20 6.01% 100.00% 0.00% 100.00%
A-FS-SC-1000 Preparation for screed concrete 6 24-May-20 30-May-20 15.25% 100.00% 0.00% 100.00%
A-FS-SC-1010 Pouring screed concrete 8 26-May-20 3-Jun-20 84.75% 100.00% 0.00% 100.00%
SASRF.5.2.1.2.12 Miscellaneous 20 22-Aug-20 13-Sep-20 4.43% 33.91% 0.00% 33.91%
A-FS-MSC-1010 Installation of Solid Phenolic Toilet Compartments 4 22-Aug-20 25-Aug-20 22.99% 0.00%
A-FS-MSC-1020 Supply and install Toilet Accessories 8 26-Aug-20 3-Sep-20 9.20% 25.00% 0.00% 25.00%
A-FS-MSC-1030 Installation of basin 2 31-Aug-20 1-Sep-20 17.24% 50.00% 0.00% 50.00%
A-FS-MSC-1040 Installation of Matwell frame 4 2-Sep-20 6-Sep-20 27.59% 0.00%
A-FS-MSC-1050 Installation of Steel Pre finished Metal coping 6 7-Sep-20 13-Sep-20 22.99% 100.00% 0.00% 100.00%
SASRF.5.2.1.2.13 Doors ,windows and Partitions 30 30-Jul-20 2-Sep-20 8.85% 90.92% 0.00% 90.92%
A-FS-D-1000 Installation of Hollow metal flush doors 8 30-Jul-20 8-Aug-20 39.08% 90.00% 0.00% 90.00%
A-FS-D-1010 Installation of wooden flush doors 4 9-Aug-20 12-Aug-20 11.49% 90.00% 0.00% 90.00%
A-FS-D-1020 Installation of Aluminium doors 2 13-Aug-20 15-Aug-20 1.15% 90.00% 0.00% 90.00%
A-FS-D-1030 Installation of Aluminium windows 5 16-Aug-20 20-Aug-20 11.49% 90.00% 0.00% 90.00%
A-FS-D-1040 Installation of hollow metal windows 2 22-Aug-20 23-Aug-20 2.30% 70.00% 0.00% 70.00%
A-FS-D-1050 Supply and install skyline system 6 24-Aug-20 30-Aug-20 27.59% 100.00% 0.00% 100.00%
A-FS-D-1060 Supply and install stainless steel partitions 3 31-Aug-20 2-Sep-20 6.90% 70.00% 0.00% 70.00%

Page 3 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.2.1.2.14 External Works 27 21-May-20 21-Jun-20 5.85% 92.35% 0.00% 92.35%
SASRF.5.2.1.2.14.1 Construction of Ramp for Fire station office-5 Nos 21 21-May-20 14-Jun-20 79.13% 100.00% 0.00% 100.00%
A-FS-EX-R-1000 Subgrade Preparation and Compaction 5 21-May-20 26-May-20 10.99% 100.00% 0.00% 100.00%
A-FS-EX-R-1010 Rebar work 8 24-May-20 1-Jun-20 26.37% 100.00% 0.00% 100.00%
A-FS-EX-R-1020 Formwork 7 26-May-20 2-Jun-20 16.48% 100.00% 0.00% 100.00%
A-FS-EX-R-1030 Concrete Pouring for Ramp 7 27-May-20 3-Jun-20 17.58% 100.00% 0.00% 100.00%
A-FS-EX-R-1040 Curing 12 28-May-20 10-Jun-20 13.19% 100.00% 0.00% 100.00%
A-FS-EX-R-1050 Surface Preparation 6 6-Jun-20 11-Jun-20 13.19% 100.00% 0.00% 100.00%
A-FS-EX-R-1060 Coating 4 10-Jun-20 14-Jun-20 2.20% 100.00% 0.00% 100.00%
SASRF.5.2.1.2.14.2 Common Structures 6 15-Jun-20 21-Jun-20 20.87% 63.33% 0.00% 63.33%
A-FS-EX-C-1020 Installation of Handrail 4 15-Jun-20 18-Jun-20 66.67% 45.00% 0.00% 45.00%
A-FS-EX-C-1030 Installatiof of Steel Guage ladder 2 20-Jun-20 21-Jun-20 33.33% 100.00% 0.00% 100.00%
SASRF.5.2.2 Fire Truck Bay building 137 21-Mar-20 26-Aug-20 15.87% 97.36% 0.00% 97.36%
SASRF.5.2.2.1 PRE Engineering Buildings 18 21-Mar-20 9-Apr-20 21.75% 96.46% 0.00% 96.46%
A-FT-PEB-1000 Unloading of Structures 2 21-Mar-20 22-Mar-20 4.04% 100.00% 0.00% 100.00%
A-FT-PEB-1010 Erection of Column & Beam 5 23-Mar-20 28-Mar-20 25.25% 100.00% 0.00% 100.00%
A-FT-PEB-1020 Installation of Sandwich Roof Panels 8 29-Mar-20 6-Apr-20 30.30% 95.00% 0.00% 95.00%
A-FT-PEB-1030 Installation of Eaves Gutter 3 2-Apr-20 5-Apr-20 30.30% 95.00% 0.00% 95.00%
A-FT-PEB-1040 All structural elements 4 6-Apr-20 9-Apr-20 10.10% 95.00% 0.00% 95.00%
SASRF.5.2.2.2 Civil 54 7-Apr-20 8-Jun-20 40.36% 99.13% 0.00% 99.13%
SASRF.5.2.2.2.1 Concrete Floor slab 15 7-Apr-20 23-Apr-20 35.93% 100.00% 0.00% 100.00%
C-FT-FS-1000 Subgrade Preparation and Compaction 8 7-Apr-20 15-Apr-20 18.18% 100.00% 0.00% 100.00%
C-FT-FS-1010 Rebar work & Formwork 12 9-Apr-20 22-Apr-20 54.55% 100.00% 0.00% 100.00%
C-FT-FS-1030 Concretre Pouring for Floor slab 10 13-Apr-20 23-Apr-20 27.27% 100.00% 0.00% 100.00%
SASRF.5.2.2.2.2 Construction of Walkway 24 27-Apr-20 24-May-20 35.49% 97.55% 0.00% 97.55%
C-FT-WW-1000 Subgrade Preparation and Compaction 6 27-Apr-20 3-May-20 15.34% 100.00% 0.00% 100.00%
C-FT-WW-1010 Rebar work 8 29-Apr-20 7-May-20 30.67% 100.00% 0.00% 100.00%
C-FT-WW-1020 Formwork 9 30-Apr-20 10-May-20 15.34% 100.00% 0.00% 100.00%
C-FT-WW-1030 Concrete Pouring 8 3-May-20 11-May-20 15.34% 100.00% 0.00% 100.00%
C-FT-WW-1040 Curing 12 4-May-20 17-May-20 1.84% 100.00% 0.00% 100.00%
C-FT-WW-1050 Surface Preparation 8 13-May-20 21-May-20 18.40% 95.00% 0.00% 95.00%
C-FT-WW-1060 Coating 7 17-May-20 24-May-20 3.07% 50.00% 0.00% 50.00%
SASRF.5.2.2.2.3 Construction of Ramp for Truck Bay Area 23 13-May-20 8-Jun-20 28.58% 100.00% 0.00% 100.00%
C-FT-RP-1000 Subgrade Preparation and Compaction 7 13-May-20 20-May-20 11.43% 100.00% 0.00% 100.00%
C-FT-RP-1010 Rebar work 8 16-May-20 24-May-20 45.71% 100.00% 0.00% 100.00%
C-FT-RP-1020 Formwork 7 18-May-20 25-May-20 17.14% 100.00% 0.00% 100.00%
C-FT-RP-1030 Concrete Pouring for Ramp 8 19-May-20 27-May-20 15.24% 100.00% 0.00% 100.00%
C-FT-RP-1040 Curing 13 20-May-20 3-Jun-20 1.90% 100.00% 0.00% 100.00%
C-FT-RP-1050 Surface Preparation 7 31-May-20 7-Jun-20 5.71% 100.00% 0.00% 100.00%
C-FT-RP-1060 Coating 6 2-Jun-20 8-Jun-20 2.86% 100.00% 0.00% 100.00%
SASRF.5.2.2.3 Architecture 46 5-Jul-20 26-Aug-20 37.90% 95.99% 0.00% 95.99%
SASRF.5.2.2.3.1 CMU Wall 44 5-Jul-20 24-Aug-20 61.74% 96.61% 0.00% 96.61%
A-FT-CMU-1000 Laying of block 10 5-Jul-20 15-Jul-20 51.64% 100.00% 0.00% 100.00%
A-FT-CMU-1010 Plastering 6 16-Jul-20 22-Jul-20 26.29% 98.00% 0.00% 98.00%
A-FT-CMU-1020 Preparation for wall 9 23-Jul-20 2-Aug-20 7.51% 85.00% 0.00% 85.00%
A-FT-CMU-1030 Painting for wall 5 3-Aug-20 8-Aug-20 1.41% 70.00% 0.00% 70.00%
A-FT-CMU-1040 Installation of Tiles 14 9-Aug-20 24-Aug-20 13.15% 90.00% 0.00% 90.00%
SASRF.5.2.2.3.2 Door 16 9-Aug-20 26-Aug-20 38.26% 95.00% 0.00% 95.00%
A-FT-D-1000 Installation of Doors 3 9-Aug-20 11-Aug-20 9.09% 95.00% 0.00% 95.00%
A-FT-D-1010 Installation of Roll up doors 12 13-Aug-20 26-Aug-20 90.91% 95.00% 0.00% 95.00%
SASRF.5.2.3 Emergency Generator Building 155 10-Feb-20 8-Aug-20 11.22% 99.26% 0.00% 99.26%
SASRF.5.2.3.1 Civil 60 10-Feb-20 19-Apr-20 45.34% 100.00% 0.00% 100.00%
SASRF.5.2.3.1.1 Substructure 12 6-Apr-20 19-Apr-20 7.88% 100.00% 0.00% 100.00%
SASRF.5.2.3.1.1.1 Construction of Grade slab 12 6-Apr-20 19-Apr-20 100.00% 100.00% 0.00% 100.00%
C-EGB-GS-1000 Subgrade Preparation and Compaction 2 6-Apr-20 7-Apr-20 26.09% 100.00% 0.00% 100.00%
C-EGB-GS-1010 Rebar work 2 8-Apr-20 9-Apr-20 43.48% 100.00% 0.00% 100.00%
C-EGB-GS-1020 Formwork 1 9-Apr-20 9-Apr-20 8.70% 100.00% 0.00% 100.00%
C-EGB-GS-1030 Concretre Pouring for Grade slab 1 11-Apr-20 11-Apr-20 17.39% 100.00% 0.00% 100.00%
C-EGB-GS-1040 Curing 7 12-Apr-20 19-Apr-20 4.35% 100.00% 0.00% 100.00%
SASRF.5.2.3.1.2 Super structure 50 10-Feb-20 7-Apr-20 92.12% 100.00% 0.00% 100.00%
SASRF.5.2.3.1.2.1 Construction of Column from Top of Grade slab to B 23 10-Feb-20 7-Mar-20 40.52% 100.00% 0.00% 100.00%
C-EGB-C-1000 Rebar cutting & bending 4 10-Feb-20 13-Feb-20 11.01% 100.00% 0.00% 100.00%
C-EGB-C-1010 Formwork Making 3 15-Feb-20 17-Feb-20 16.51% 100.00% 0.00% 100.00%
C-EGB-C-1020 Scaffolding for Column 3 16-Feb-20 18-Feb-20 14.68% 100.00% 0.00% 100.00%
C-EGB-C-1030 Rebar Fixing 3 22-Feb-20 24-Feb-20 16.51% 100.00% 0.00% 100.00%
C-EGB-C-1040 Formwork 3 24-Feb-20 26-Feb-20 18.35% 100.00% 0.00% 100.00%
C-EGB-C-1050 Concrete Pouring 1 27-Feb-20 27-Feb-20 5.50% 100.00% 0.00% 100.00%
C-EGB-C-1060 Deshuttering 2 29-Feb-20 1-Mar-20 16.51% 100.00% 0.00% 100.00%
C-EGB-C-1070 Curing 7 29-Feb-20 7-Mar-20 0.92% 100.00% 0.00% 100.00%
SASRF.5.2.3.1.2.2 Construction of Roof beam & Slab 45 16-Feb-20 7-Apr-20 59.48% 100.00% 0.00% 100.00%
C-EGB-B&S-1000 Rebar Cutting and bending 12 16-Feb-20 29-Feb-20 15.00% 100.00% 0.00% 100.00%
C-EGB-B&S-1010 Scaffolding installation 2 5-Mar-20 7-Mar-20 12.50% 100.00% 0.00% 100.00%
C-EGB-B&S-1020 Formwork for Beam & Slab 3 8-Mar-20 10-Mar-20 11.25% 100.00% 0.00% 100.00%
C-EGB-B&S-1030 Rebar work 3 10-Mar-20 12-Mar-20 13.13% 100.00% 0.00% 100.00%
C-EGB-B&S-1040 Concrete Pouring 1 14-Mar-20 14-Mar-20 6.25% 100.00% 0.00% 100.00%
C-EGB-B&S-1050 Deshuttering 3 31-Mar-20 2-Apr-20 23.13% 100.00% 0.00% 100.00%
C-EGB-B&S-1060 Curing 14 15-Mar-20 30-Mar-20 2.50% 100.00% 0.00% 100.00%
C-EGB-B&S-1070 Construction of Parapet wall 4 4-Apr-20 7-Apr-20 16.25% 100.00% 0.00% 100.00%
SASRF.5.2.3.2 Architecture 101 13-Apr-20 8-Aug-20 54.66% 98.65% 0.00% 98.65%
SASRF.5.2.3.2.1 CMU block 29 13-Apr-20 16-May-20 51.70% 100.00% 0.00% 100.00%
A-EGB-CMU-1000 Laying of Block 12 13-Apr-20 26-Apr-20 42.31% 100.00% 0.00% 100.00%
A-EGB-CMU-1010 Plastering for Internal wall 8 27-Apr-20 5-May-20 24.73% 100.00% 0.00% 100.00%
A-EGB-CMU-1020 Plastering for External wall 9 6-May-20 16-May-20 29.67% 100.00% 0.00% 100.00%
A-EGB-CMU-1030 Screed concrete 2 10-May-20 11-May-20 3.30% 100.00% 0.00% 100.00%

Page 4 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.2.3.2.2 Painting 32 13-May-20 18-Jun-20 19.32% 95.88% 0.00% 95.88%
A-EGB-P-1000 Preparation for ceiling 4 13-May-20 17-May-20 8.82% 100.00% 0.00% 100.00%
A-EGB-P-1010 Painting for ceiling 3 18-May-20 20-May-20 5.88% 90.00% 0.00% 90.00%
A-EGB-P-1020 Preparation for wall 6 21-May-20 27-May-20 17.65% 100.00% 0.00% 100.00%
A-EGB-P-1030 Internal Painting for wall 6 26-May-20 1-Jun-20 13.24% 90.00% 0.00% 90.00%
A-EGB-P-1060 Floor Preparation 4 2-Jun-20 6-Jun-20 8.82% 100.00% 0.00% 100.00%
A-EGB-P-1070 Floor Painting 2 4-Jun-20 6-Jun-20 4.41% 90.00% 0.00% 90.00%
A-EGB-P-1080 Preparation for External Painting 7 7-Jun-20 14-Jun-20 23.53% 100.00% 0.00% 100.00%
A-EGB-P-1090 External Painting 4 15-Jun-20 18-Jun-20 17.65% 90.00% 0.00% 90.00%
SASRF.5.2.3.2.3 Tile 6 3-Jun-20 9-Jun-20 2.84% 98.00% 0.00% 98.00%
A-EGB-T-1000 Installation of wall tile 4 3-Jun-20 7-Jun-20 60.00% 100.00% 0.00% 100.00%
A-EGB-T-1010 Floor tile 2 8-Jun-20 9-Jun-20 40.00% 95.00% 0.00% 95.00%
SASRF.5.2.3.2.4 Water Proofing 15 12-May-20 28-May-20 16.19% 100.00% 0.00% 100.00%
A-EGB-WP-1000 Surface Preparation 2 12-May-20 13-May-20 10.53% 100.00% 0.00% 100.00%
A-EGB-WP-1010 Pouring of Light weight Concrete 1 14-May-20 14-May-20 8.77% 100.00% 0.00% 100.00%
A-EGB-WP-1020 Bituminous Coating 2 16-May-20 17-May-20 3.51% 100.00% 0.00% 100.00%
A-EGB-WP-1030 Installation of EPDM Water proofing membrane 2 18-May-20 19-May-20 26.32% 100.00% 0.00% 100.00%
A-EGB-WP-1040 Leaktest 1 20-May-20 20-May-20 3.51% 100.00% 0.00% 100.00%
A-EGB-WP-1050 Installation of Insulation Board 2 21-May-20 23-May-20 5.26% 100.00% 0.00% 100.00%
A-EGB-WP-1060 Installation of geotextile membrane 2 24-May-20 25-May-20 7.02% 100.00% 0.00% 100.00%
A-EGB-WP-1070 Gravel Filling 1 26-May-20 26-May-20 21.05% 100.00% 0.00% 100.00%
A-EGB-WP-1080 Installation of Steel Flashing 2 27-May-20 28-May-20 14.04% 100.00% 0.00% 100.00%
SASRF.5.2.3.2.5 Door 7 1-Aug-20 8-Aug-20 9.94% 95.00% 0.00% 95.00%
A-EGB-D-1000 Installation of Door 4 1-Aug-20 4-Aug-20 57.14% 95.00% 0.00% 95.00%
A-EGB-D-1010 Installation of Handrail 3 5-Aug-20 8-Aug-20 42.86% 95.00% 0.00% 95.00%
SASRF.5.2.4 Vehical washing facility shed 46 4-Mar-20 26-Apr-20 2.40% 99.82% 0.00% 99.82%
SASRF.5.2.4.1 PRE Engineering Buildings 9 4-Mar-20 14-Mar-20 64.73% 100.00% 0.00% 100.00%
A-VWF-PEB-1000 Unloading of Structures 2 4-Mar-20 5-Mar-20 4.49% 100.00% 0.00% 100.00%
A-VWF-PEB-1010 Erection of Column & Beam 2 7-Mar-20 8-Mar-20 44.94% 100.00% 0.00% 100.00%
A-VWF-PEB-1020 Installation of Sandwich Roof Panels 3 9-Mar-20 11-Mar-20 28.09% 100.00% 0.00% 100.00%
A-VWF-PEB-1030 Installation of Eaves Gutter 2 12-Mar-20 14-Mar-20 22.47% 100.00% 0.00% 100.00%
SASRF.5.2.4.2 Civil 12 30-Mar-20 12-Apr-20 24.36% 100.00% 0.00% 100.00%
SASRF.5.2.4.2.1 Floor slab 6 30-Mar-20 5-Apr-20 59.70% 100.00% 0.00% 100.00%
C-VWF-S-1000 Subgrade preparation 2 30-Mar-20 31-Mar-20 20.00% 100.00% 0.00% 100.00%
C-VWF-S-1010 Rebar work 2 1-Apr-20 2-Apr-20 50.00% 100.00% 0.00% 100.00%
C-VWF-S-1020 Form work 1 4-Apr-20 4-Apr-20 10.00% 100.00% 0.00% 100.00%
C-VWF-S-1030 Concrete Pouring 1 5-Apr-20 5-Apr-20 20.00% 100.00% 0.00% 100.00%
SASRF.5.2.4.2.2 Construction of Ramp 6 6-Apr-20 12-Apr-20 40.30% 100.00% 0.00% 100.00%
C-VWF-R-1000 Subgrade preparation 2 6-Apr-20 7-Apr-20 22.22% 100.00% 0.00% 100.00%
C-VWF-R-1010 Rebar work 2 8-Apr-20 9-Apr-20 37.04% 100.00% 0.00% 100.00%
C-VWF-R-1020 Form work 1 11-Apr-20 11-Apr-20 22.22% 100.00% 0.00% 100.00%
C-VWF-R-1030 Concrete Pouring 1 12-Apr-20 12-Apr-20 18.52% 100.00% 0.00% 100.00%
SASRF.5.2.4.3 Architecture 5 21-Apr-20 26-Apr-20 10.91% 98.33% 0.00% 98.33%
SASRF.5.2.4.3.1 Floor Painting 5 21-Apr-20 26-Apr-20 100.00% 98.33% 0.00% 98.33%
A-VWF-1000 Preparation for floor painting 3 21-Apr-20 23-Apr-20 66.67% 100.00% 0.00% 100.00%
A-VWF-1010 Painting on Floor 2 25-Apr-20 26-Apr-20 33.33% 95.00% 0.00% 95.00%
SASRF.5.2.5 Water Filling station 58 9-Mar-20 14-May-20 4.76% 98.15% 0.00% 98.15%
SASRF.5.2.5.1 PRE Engineering Buildings 12 9-Mar-20 22-Mar-20 49.82% 100.00% 0.00% 100.00%
A-WFS-PEB-1000 Unloading of Structures 2 9-Mar-20 10-Mar-20 4.41% 100.00% 0.00% 100.00%
A-WFS-PEB-1010 Erection of Column & Beam 3 12-Mar-20 15-Mar-20 22.06% 100.00% 0.00% 100.00%
A-WFS-PEB-1020 Installation of Sandwich Roof Panels 4 16-Mar-20 19-Mar-20 36.76% 100.00% 0.00% 100.00%
A-WFS-PEB-1030 Installation of Eaves Gutter 2 21-Mar-20 22-Mar-20 36.76% 100.00% 0.00% 100.00%
SASRF.5.2.5.2 Civil 17 4-Apr-20 22-Apr-20 33.70% 96.96% 0.00% 96.96%
SASRF.5.2.5.2.1 Floor slab 9 4-Apr-20 13-Apr-20 69.57% 100.00% 0.00% 100.00%
C-WFS-S-1000 Subgrade preparation 2 4-Apr-20 5-Apr-20 18.75% 100.00% 0.00% 100.00%
C-WFS-S-1010 Rebar work 4 6-Apr-20 9-Apr-20 50.00% 100.00% 0.00% 100.00%
C-WFS-S-1020 Form work 2 11-Apr-20 12-Apr-20 15.63% 100.00% 0.00% 100.00%
C-WFS-S-1030 Concrete Pouring 1 13-Apr-20 13-Apr-20 15.63% 100.00% 0.00% 100.00%
SASRF.5.2.5.2.2 Construction of Ramp 8 14-Apr-20 22-Apr-20 30.43% 90.00% 0.00% 90.00%
C-WFS-R-1000 Subgrade preparation 2 14-Apr-20 15-Apr-20 14.29% 90.00% 0.00% 90.00%
C-WFS-R-1010 Rebar work 3 16-Apr-20 19-Apr-20 53.57% 90.00% 0.00% 90.00%
C-WFS-R-1020 Form work 2 20-Apr-20 21-Apr-20 10.71% 90.00% 0.00% 90.00%
C-WFS-R-1030 Concrete Pouring 1 22-Apr-20 22-Apr-20 21.43% 90.00% 0.00% 90.00%
SASRF.5.2.5.3 Architecture 12 2-May-20 14-May-20 16.48% 95.00% 0.00% 95.00%
SASRF.5.2.5.3.1 Floor Painting 12 2-May-20 14-May-20 100.00% 95.00% 0.00% 95.00%
A-WFS-1000 Preparation for floor painting 7 2-May-20 9-May-20 73.33% 95.00% 0.00% 95.00%
A-WFS-1010 Painting on Floor 5 10-May-20 14-May-20 26.67% 95.00% 0.00% 95.00%
SASRF.5.2.6 Foam Storage Tank shed 45 26-Apr-20 16-Jun-20 1.25% 93.71% 0.00% 93.71%
SASRF.5.2.6.1 Civil 30 26-Apr-20 30-May-20 74.83% 99.07% 0.00% 99.07%
SASRF.5.2.6.1.1 Construction of Foundation 30 26-Apr-20 30-May-20 100.00% 99.07% 0.00% 99.07%
C-FST-1000 Excavation and subgrade preparation 2 26-Apr-20 27-Apr-20 11.21% 100.00% 0.00% 100.00%
C-FST-1005 Lean concrete 1 28-Apr-20 28-Apr-20 3.74% 100.00% 0.00% 100.00%
C-FST-1010 Rebar and formwork for footing 3 29-Apr-20 2-May-20 18.69% 100.00% 0.00% 100.00%
C-FST-1020 Concrete pouring for footing 1 3-May-20 3-May-20 5.61% 100.00% 0.00% 100.00%
C-FST-1030 Rebar and formwork for pedestal 3 7-May-20 10-May-20 22.43% 100.00% 0.00% 100.00%
C-FST-1040 Concrete pouring for pedestal 1 11-May-20 11-May-20 5.61% 100.00% 0.00% 100.00%
C-FST-1050 Curing 4 19-May-20 23-May-20 0.93% 100.00% 0.00% 100.00%
C-FST-1060 Surface preparation and coating 3 25-May-20 27-May-20 9.35% 90.00% 0.00% 90.00%
C-FST-1070 Backfilling 2 28-May-20 30-May-20 22.43% 100.00% 0.00% 100.00%
SASRF.5.2.6.2 Architect 5 11-Jun-20 16-Jun-20 25.17% 77.78% 0.00% 77.78%
SASRF.5.2.6.2.1 Painting 5 11-Jun-20 16-Jun-20 100.00% 77.78% 0.00% 77.78%
A-FST-1000 Preparation for floor painting 3 11-Jun-20 14-Jun-20 55.56% 80.00% 0.00% 80.00%
A-FST-1010 Floor painting 2 15-Jun-20 16-Jun-20 44.44% 75.00% 0.00% 75.00%
SASRF.5.2.7 Landscape 74 4-Aug-20 28-Oct-20 15.16% 61.44% 1.61% 63.05%

Page 5 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
PKG-2-LS-1000 Finished Grading 25 4-Aug-20 1-Sep-20 22.99% 95.00% 0.00% 95.00%
PKG-2-LS-1010 Fixing Red solid bricks 10 25-Aug-20 5-Sep-20 4.60% 0.00%
PKG-2-LS-1020 Interlock concrete block paver 28 31-Aug-20 1-Oct-20 17.24% 70.00% 0.00% 70.00%
PKG-2-LS-1030 Installation of Gravel 15 23-Sep-20 10-Oct-20 8.05% 5.00% 20.00% 25.00%
PKG-2-LS-1040 Installation of curb stone 26 29-Sep-20 28-Oct-20 6.90% 95.00% 0.00% 95.00%
PKG-2-LS-1050 Wheel stopper 2 1-Oct-20 3-Oct-20 0.92% 0.00%
PKG-2-LS-1060 Installation of Aluminium Grills 12 4-Oct-20 17-Oct-20 11.49% 90.00% 0.00% 90.00%
PKG-2-LS-1070 Construction of Volley ball court 30 17-Sep-20 21-Oct-20 20.46% 50.00% 0.00% 50.00%
PKG-2-LS-1080 Traffic marking 15 6-Sep-20 22-Sep-20 7.36% 0.00%
SASRF.5.3 Package-3 300 16-Feb-20 30-Jan-21 55.95% 69.10% 0.28% 69.37%

Page 6 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.1 Aviation Control Building (No.100) 115 29-Jul-20 9-Dec-20 3.88% 81.15% 0.00% 81.15%
SASRF.5.3.1.1 Civil 51 12-Oct-20 9-Dec-20 80.17% 100.00% 0.00% 100.00%
SASRF.5.3.1.1.1 Demolition 22 12-Oct-20 5-Nov-20 50.69% 100.00% 0.00% 100.00%
C-BDLG-100-1000 Demolition of Existing structures 22 12-Oct-20 5-Nov-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.1.1.2 Construction of AHU & ACCU Foundation 32 29-Oct-20 5-Dec-20 41.98% 100.00% 0.00% 100.00%
C-BDLG-100-1010 Excavation 4 29-Oct-20 2-Nov-20 16.00% 100.00% 0.00% 100.00%
C-BDLG-100-1020 Subgrade preparation and Lean concrete 2 3-Nov-20 4-Nov-20 2.18% 100.00% 0.00% 100.00%
C-BDLG-100-1030 Rebar work 4 5-Nov-20 9-Nov-20 14.55% 100.00% 0.00% 100.00%
C-BDLG-100-1040 Formwork 3 8-Nov-20 10-Nov-20 36.36% 100.00% 0.00% 100.00%
C-BDLG-100-1050 Anchorbolt Fixing 2 10-Nov-20 11-Nov-20 0.73% 100.00% 0.00% 100.00%
C-BDLG-100-1060 Concrete Pouring 5 12-Nov-20 17-Nov-20 14.55% 100.00% 0.00% 100.00%
C-BDLG-100-1070 Curing 11 12-Nov-20 24-Nov-20 0.73% 100.00% 0.00% 100.00%
C-BDLG-100-1080 Surface Preparation 4 22-Nov-20 25-Nov-20 8.73% 100.00% 0.00% 100.00%
C-BDLG-100-1090 Coating 4 25-Nov-20 29-Nov-20 4.36% 100.00% 0.00% 100.00%
C-BDLG-100-1100 Backfilling 2 30-Nov-20 1-Dec-20 1.09% 100.00% 0.00% 100.00%
C-BDLG-100-1110 Grouting 1 5-Dec-20 5-Dec-20 0.73% 100.00% 0.00% 100.00%
SASRF.5.3.1.1.3 Concrete Grade slab 7 2-Dec-20 9-Dec-20 7.33% 100.00% 0.00% 100.00%
C-BDLG-100-1120 Subgrade Preparation 2 2-Dec-20 3-Dec-20 12.50% 100.00% 0.00% 100.00%
C-BDLG-100-1130 Rebar for slab 2 5-Dec-20 6-Dec-20 41.67% 100.00% 0.00% 100.00%
C-BDLG-100-1140 Formwork for slab 2 7-Dec-20 8-Dec-20 20.83% 100.00% 0.00% 100.00%
C-BDLG-100-1150 Concrete Pouring for slab 1 9-Dec-20 9-Dec-20 25.00% 100.00% 0.00% 100.00%
SASRF.5.3.1.2 Architecture 95 29-Jul-20 16-Nov-20 19.83% 4.94% 0.00% 4.94%
SASRF.5.3.1.2.1 General Modification works 8 17-Oct-20 25-Oct-20 23.46% 21.05% 0.00% 21.05%
A-BDLG-100-1000 Demolishing cement screed on Epoxy paint 1 17-Oct-20 17-Oct-20 10.53% 0.00%
A-BDLG-100-1010 Demolishing Existing Interlock paving 2 18-Oct-20 19-Oct-20 21.05% 100.00% 0.00% 100.00%
A-BDLG-100-1020 Repair of Doors 2 20-Oct-20 21-Oct-20 31.58% 0.00%
A-BDLG-100-1030 Pouring screed concrete 1 22-Oct-20 22-Oct-20 15.79% 0.00%
A-BDLG-100-1035 Installation of Interlocking Concrete Blocks paver 2 24-Oct-20 25-Oct-20 21.05% 0.00%
SASRF.5.3.1.2.2 Painting 95 29-Jul-20 16-Nov-20 76.54% 0.00% 0.00% 0.00%
A-BDLG-100-1040 Preparation for External wall 3 2-Nov-20 4-Nov-20 16.13% 0.00%
A-BDLG-100-1050 Painting on External wall 3 4-Nov-20 7-Nov-20 8.06% 0.00%
A-BDLG-100-1060 Preparation for Internal wall 4 8-Nov-20 11-Nov-20 25.81% 0.00%
A-BDLG-100-1070 Painting for Internal wall 3 10-Nov-20 12-Nov-20 12.90% 0.00%
A-BDLG-100-1080 Surface preparation for floor painting 1 14-Nov-20 14-Nov-20 3.23% 0.00%
A-BDLG-100-1090 Floor painting 2 15-Nov-20 16-Nov-20 1.61% 0.00%
A-BDLG-100-1100 Installation of Door 3 29-Jul-20 1-Aug-20 32.26% 0.00%
SASRF.5.3.2 FDP-1 OME Building (No.24) 81 13-Apr-20 15-Jul-20 2.93% 39.06% 7.92% 46.98%
SASRF.5.3.2.1 Civil 63 13-Apr-20 24-Jun-20 74.84% 52.19% 10.59% 62.78%
SASRF.5.3.2.1.1 Demolition 12 21-Apr-20 4-May-20 26.03% 70.00% 0.00% 70.00%
C-BDLG-24-1000 Demolition of Existing structures 12 21-Apr-20 4-May-20 100.00% 70.00% 0.00% 70.00%
SASRF.5.3.2.1.2 Construction of AHU & ACCU Foundation 40 5-May-20 20-Jun-20 48.81% 36.71% 21.69% 58.40%
C-BDLG-24-1010 Excavation 4 5-May-20 9-May-20 21.33% 70.00% 20.00% 90.00%
C-BDLG-24-1015 Subgrade preparation and Lean concrete 1 10-May-20 10-May-20 2.67% 50.00% 40.00% 90.00%
C-BDLG-24-1020 Rebar work 4 11-May-20 14-May-20 23.11% 50.00% 40.00% 90.00%
C-BDLG-24-1030 Formwork 3 16-May-20 18-May-20 17.78% 50.00% 40.00% 90.00%
C-BDLG-24-1040 Concrete Pouring 4 18-May-20 21-May-20 22.22% 0.00%
C-BDLG-24-1050 Curing 11 19-May-20 31-May-20 0.89% 0.00%
C-BDLG-24-1060 Surface Preparation 4 10-Jun-20 14-Jun-20 6.22% 0.00%
C-BDLG-24-1070 Coating 4 13-Jun-20 16-Jun-20 3.56% 0.00%
C-BDLG-24-1080 Backfilling 2 17-Jun-20 18-Jun-20 1.33% 0.00%
C-BDLG-24-1085 Grouting 1 20-Jun-20 20-Jun-20 0.89% 0.00%
SASRF.5.3.2.1.3 Concrete Grade slab 5 20-Jun-20 24-Jun-20 5.64% 0.00% 0.00% 0.00%
C-BDLG-24-1088 Subgrade Preparation 1 20-Jun-20 20-Jun-20 7.69% 0.00%
C-BDLG-24-1090 Rebar for slab 2 21-Jun-20 22-Jun-20 38.46% 0.00%
C-BDLG-24-1100 Formwork for slab 1 23-Jun-20 23-Jun-20 7.69% 0.00%
C-BDLG-24-1110 Concrete Pouring for slab 1 24-Jun-20 24-Jun-20 46.15% 0.00%
SASRF.5.3.2.1.4 Diesel Generator Foundation 18 13-Apr-20 3-May-20 19.52% 82.22% 0.00% 82.22%
C-BDLG-24-1120 Excavation and Subgrade Preparation 3 13-Apr-20 15-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-24-1130 Rebar work 2 16-Apr-20 18-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-24-1140 Formwork 1 19-Apr-20 19-Apr-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-24-1150 Concrete Pouring 1 20-Apr-20 20-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-24-1160 Surface preparation 2 26-Apr-20 27-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-24-1170 Coating 2 28-Apr-20 29-Apr-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-24-1180 Backfilling 2 30-Apr-20 2-May-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-24-1190 Grouting 1 3-May-20 3-May-20 17.78% 0.00%
SASRF.5.3.2.2 Architecture 30 11-Jun-20 15-Jul-20 25.16% 0.00% 0.00% 0.00%
SASRF.5.3.2.2.1 General Modification works 14 11-Jun-20 27-Jun-20 53.55% 0.00% 0.00% 0.00%
A-BDLG-24-1000 Demolish Existing Epoxt paint on cement screed 2 11-Jun-20 13-Jun-20 19.28% 0.00%
A-BDLG-24-1010 Demolish wall for Hvac opening 2 14-Jun-20 15-Jun-20 6.02% 0.00%
A-BDLG-24-1020 Repair plaster for Hvac opening 1 20-Jun-20 20-Jun-20 2.41% 0.00%
A-BDLG-24-1025 Floor preparation for screed concrete 3 21-Jun-20 23-Jun-20 28.92% 0.00%
A-BDLG-24-1028 Pouring Screed concrete 1 24-Jun-20 24-Jun-20 14.46% 0.00%
A-BDLG-24-1029 Repair of Doors 2 25-Jun-20 27-Jun-20 28.92% 0.00%
SASRF.5.3.2.2.2 Painting 15 29-Jun-20 15-Jul-20 46.45% 0.00% 0.00% 0.00%
A-BDLG-24-1030 Preparation for Ceiling painting 3 29-Jun-20 1-Jul-20 22.22% 0.00%
A-BDLG-24-1040 Painting on ceiling 2 2-Jul-20 4-Jul-20 11.11% 0.00%
A-BDLG-24-1050 Preparation for wall painting 3 5-Jul-20 7-Jul-20 22.22% 0.00%
A-BDLG-24-1060 Painting for wall 2 8-Jul-20 9-Jul-20 11.11% 0.00%
A-BDLG-24-1070 Preparation for Floor painting 3 11-Jul-20 13-Jul-20 22.22% 0.00%
A-BDLG-24-1080 Floor painting 2 14-Jul-20 15-Jul-20 11.11% 0.00%
SASRF.5.3.3 FDP-1 PIB & Operation shelter Building (No.25) 89 23-Apr-20 4-Aug-20 4.38% 91.00% 0.00% 91.00%
SASRF.5.3.3.1 Civil 57 23-Apr-20 28-Jun-20 90.89% 98.09% 0.00% 98.09%
SASRF.5.3.3.1.1 Demolition 22 5-May-20 30-May-20 40.57% 100.00% 0.00% 100.00%
C-BDLG-25-1000 Demolition of Existing structures 22 5-May-20 30-May-20 100.00% 100.00% 0.00% 100.00%

Page 7 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.3.1.2 Construction of AHU & ACCU Foundation 28 23-May-20 23-Jun-20 42.00% 100.00% 0.00% 100.00%
C-BDLG-25-1010 Excavation 7 23-May-20 30-May-20 23.86% 100.00% 0.00% 100.00%
C-BDLG-25-1020 Subgrade preparation and Lean concrete 2 28-May-20 30-May-20 1.70% 100.00% 0.00% 100.00%
C-BDLG-25-1030 Rebar 5 30-May-20 3-Jun-20 28.41% 100.00% 0.00% 100.00%
C-BDLG-25-1040 Formwork 4 1-Jun-20 4-Jun-20 13.64% 100.00% 0.00% 100.00%
C-BDLG-25-1060 Concrete pouring 4 3-Jun-20 7-Jun-20 17.05% 100.00% 0.00% 100.00%
C-BDLG-25-1070 Curing 11 4-Jun-20 16-Jun-20 0.57% 100.00% 0.00% 100.00%
C-BDLG-25-1080 Surface Preparation 4 14-Jun-20 17-Jun-20 7.95% 100.00% 0.00% 100.00%
C-BDLG-25-1090 Coating 3 17-Jun-20 20-Jun-20 3.98% 100.00% 0.00% 100.00%
C-BDLG-25-1100 Backfilling 2 21-Jun-20 22-Jun-20 2.27% 100.00% 0.00% 100.00%
C-BDLG-25-1110 Grouting 1 23-Jun-20 23-Jun-20 0.57% 100.00% 0.00% 100.00%
SASRF.5.3.3.1.3 Concrete Grade slab 5 23-Jun-20 28-Jun-20 6.68% 100.00% 0.00% 100.00%
C-BDLG-25-1115 Subgrade Preparation 1 23-Jun-20 23-Jun-20 28.57% 100.00% 0.00% 100.00%
C-BDLG-25-1120 Rebar for slab 2 24-Jun-20 25-Jun-20 28.57% 100.00% 0.00% 100.00%
C-BDLG-25-1130 Formwork for slab 2 25-Jun-20 27-Jun-20 14.29% 100.00% 0.00% 100.00%
C-BDLG-25-1140 Concrete Pouring for slab 1 28-Jun-20 28-Jun-20 28.57% 100.00% 0.00% 100.00%
SASRF.5.3.3.1.4 Diesel Generator Foundation 18 23-Apr-20 13-May-20 10.74% 82.22% 0.00% 82.22%
C-BDLG-25-1150 Excavation and Subgrade Preparation 3 23-Apr-20 26-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-25-1160 Rebar work 2 27-Apr-20 28-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-25-1170 Formwork 1 29-Apr-20 29-Apr-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-25-1180 Concrete Pouring 1 30-Apr-20 30-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-25-1190 Surface preparation 2 6-May-20 7-May-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-25-1200 Coating 2 9-May-20 10-May-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-25-1210 Backfilling 2 11-May-20 12-May-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-25-1220 Grouting 1 13-May-20 13-May-20 17.78% 0.00%
SASRF.5.3.3.2 Architecture 17 16-Jul-20 4-Aug-20 9.11% 20.24% 0.00% 20.24%
SASRF.5.3.3.2.1 Painting 17 16-Jul-20 4-Aug-20 100.00% 20.24% 0.00% 20.24%
A-BDLG-25-1000 Preparation for External wall 2 16-Jul-20 18-Jul-20 9.52% 0.00%
A-BDLG-25-1010 Painting on External wall 2 19-Jul-20 20-Jul-20 4.76% 0.00%
A-BDLG-25-1020 Preparation for Internal wall 2 21-Jul-20 22-Jul-20 9.52% 0.00%
A-BDLG-25-1030 Painting for Internal wall 2 23-Jul-20 25-Jul-20 4.76% 0.00%
A-BDLG-25-1040 Preaparation for Floor painting 4 26-Jul-20 29-Jul-20 33.33% 0.00%
A-BDLG-25-1050 Floor painting 5 28-Jul-20 2-Aug-20 23.81% 85.00% 0.00% 85.00%
A-BDLG-25-1060 Paint on Floor base 2 3-Aug-20 4-Aug-20 14.29% 0.00%
SASRF.5.3.4 FDP-1 Mosque Building (No.23) 43 31-May-20 19-Jul-20 2.39% 74.90% 0.00% 74.90%
SASRF.5.3.4.1 Civil 43 31-May-20 19-Jul-20 76.89% 97.41% 0.00% 97.41%
SASRF.5.3.4.1.1 Demolition 20 31-May-20 22-Jun-20 51.81% 95.00% 0.00% 95.00%
C-BDLG-23-1000 Demolition of Existing structures 20 31-May-20 22-Jun-20 100.00% 95.00% 0.00% 95.00%
SASRF.5.3.4.1.2 Construction of SPU & EC-01 Foundation 22 23-Jun-20 18-Jul-20 36.79% 100.00% 0.00% 100.00%
C-BDLG-23-1010 Excavation 3 23-Jun-20 25-Jun-20 19.72% 100.00% 0.00% 100.00%
C-BDLG-23-1020 Subgrade preparation and Lean concrete 1 27-Jun-20 27-Jun-20 5.63% 100.00% 0.00% 100.00%
C-BDLG-23-1030 Rebar 3 28-Jun-20 30-Jun-20 22.54% 100.00% 0.00% 100.00%
C-BDLG-23-1040 Formwork 3 29-Jun-20 1-Jul-20 16.90% 100.00% 0.00% 100.00%
C-BDLG-23-1060 Concrete pouring 3 1-Jul-20 4-Jul-20 15.49% 100.00% 0.00% 100.00%
C-BDLG-23-1070 Curing 9 1-Jul-20 11-Jul-20 1.41% 100.00% 0.00% 100.00%
C-BDLG-23-1080 Surface Preparation 3 6-Jul-20 8-Jul-20 8.45% 100.00% 0.00% 100.00%
C-BDLG-23-1090 Coating 2 9-Jul-20 11-Jul-20 2.82% 100.00% 0.00% 100.00%
C-BDLG-23-1100 Backfilling 2 12-Jul-20 13-Jul-20 5.63% 100.00% 0.00% 100.00%
C-BDLG-23-1110 Grouting 4 14-Jul-20 18-Jul-20 1.41% 100.00% 0.00% 100.00%
SASRF.5.3.4.1.3 Concrete Grade slab 5 14-Jul-20 19-Jul-20 11.40% 100.00% 0.00% 100.00%
C-BDLG-23-1120 Subgrade Preparation 1 14-Jul-20 14-Jul-20 13.64% 100.00% 0.00% 100.00%
C-BDLG-23-1130 Rebar for slab 2 15-Jul-20 16-Jul-20 27.27% 100.00% 0.00% 100.00%
C-BDLG-23-1140 Formwork for slab 1 18-Jul-20 18-Jul-20 18.18% 100.00% 0.00% 100.00%
C-BDLG-23-1150 Concrete Pouring for slab 1 19-Jul-20 19-Jul-20 40.91% 100.00% 0.00% 100.00%
SASRF.5.3.4.2 Architecture 18 23-Jun-20 13-Jul-20 23.11% 0.00% 0.00% 0.00%
SASRF.5.3.4.2.1 General Modification works 9 23-Jun-20 2-Jul-20 68.97% 0.00% 0.00% 0.00%
A-BDLG-23-1000 Demolish Existing Interlock Paving 3 23-Jun-20 25-Jun-20 45.00% 0.00%
A-BDLG-23-1010 Subgrade Preparation for Laying Interlocking blocks 2 27-Jun-20 28-Jun-20 15.00% 0.00%
A-BDLG-23-1020 Laying of Interlocking blocks 4 29-Jun-20 2-Jul-20 40.00% 0.00%
SASRF.5.3.4.2.2 Painting 9 4-Jul-20 13-Jul-20 31.03% 0.00% 0.00% 0.00%
A-BDLG-23-1030 Preparation for External wall 4 4-Jul-20 7-Jul-20 66.67% 0.00%
A-BDLG-23-1040 Painting for External wall 3 7-Jul-20 9-Jul-20 22.22% 0.00%
A-BDLG-23-1050 Preaparation for Floor painting 1 11-Jul-20 11-Jul-20 5.56% 0.00%
A-BDLG-23-1060 Floor painting 2 12-Jul-20 13-Jul-20 5.56% 0.00%
SASRF.5.3.5 Heliport office Building (No.11) 40 23-Jun-20 8-Aug-20 4.61% 32.56% 0.00% 32.56%
SASRF.5.3.5.1 Civil 40 23-Jun-20 8-Aug-20 52.62% 61.87% 0.00% 61.87%
SASRF.5.3.5.1.1 Demolition 15 23-Jun-20 9-Jul-20 47.06% 50.00% 0.00% 50.00%
C-BDLG-11-1000 Demolition of Existing structures 15 23-Jun-20 9-Jul-20 100.00% 50.00% 0.00% 50.00%
SASRF.5.3.5.1.2 Construction of AHU & ACCU Foundation 21 11-Jul-20 3-Aug-20 46.27% 68.44% 0.00% 68.44%
C-BDLG-11-1010 Excavation 2 11-Jul-20 12-Jul-20 25.42% 81.73% 0.00% 81.73%
C-BDLG-11-1020 Subgrade preparation and Lean concrete 1 13-Jul-20 13-Jul-20 1.69% 81.73% 0.00% 81.73%
C-BDLG-11-1030 Rebar 3 14-Jul-20 16-Jul-20 25.42% 81.73% 0.00% 81.73%
C-BDLG-11-1040 Formwork 2 16-Jul-20 18-Jul-20 8.47% 81.73% 0.00% 81.73%
C-BDLG-11-1060 Concrete pouring 1 19-Jul-20 19-Jul-20 11.02% 81.73% 0.00% 81.73%
C-BDLG-11-1070 Curing 7 20-Jul-20 27-Jul-20 0.85% 81.73% 0.00% 81.73%
C-BDLG-11-1080 Surface Preparation 3 25-Jul-20 27-Jul-20 6.78% 81.73% 0.00% 81.73%
C-BDLG-11-1090 Coating 2 28-Jul-20 29-Jul-20 2.54% 61.29% 0.00% 61.29%
C-BDLG-11-1100 Backfilling 2 30-Jul-20 1-Aug-20 2.54% 70.00% 0.00% 70.00%
C-BDLG-11-1110 Grouting 2 2-Aug-20 3-Aug-20 15.25% 0.00%
SASRF.5.3.5.1.3 Concrete Grade slab 6 2-Aug-20 8-Aug-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-11-1120 Subgrade Preparation 2 2-Aug-20 3-Aug-20 17.65% 100.00% 0.00% 100.00%
C-BDLG-11-1130 Rebar for slab 2 4-Aug-20 5-Aug-20 35.29% 100.00% 0.00% 100.00%
C-BDLG-11-1140 Formwork for slab 1 6-Aug-20 6-Aug-20 23.53% 100.00% 0.00% 100.00%
C-BDLG-11-1150 Concrete Pouring for slab 1 8-Aug-20 8-Aug-20 23.53% 100.00% 0.00% 100.00%

Page 8 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.5.2 Architecture 31 4-Jul-20 8-Aug-20 47.38% 0.00% 0.00% 0.00%

Page 9 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.5.2.1 Demolition works 7 4-Jul-20 11-Jul-20 10.45% 0.00% 0.00% 0.00%
A-BDLG-11-1000 Demolition of Existing Gypsum Ceiling Board 2 4-Jul-20 5-Jul-20 29.17% 0.00%
A-BDLG-11-1010 Demolition of existing Acoustic Tiles 2 6-Jul-20 7-Jul-20 29.17% 0.00%
A-BDLG-11-1020 Demolition of existing Vinyl floor tiles 2 8-Jul-20 9-Jul-20 33.33% 0.00%
A-BDLG-11-1030 Demolition of existing Vinyl base 1 11-Jul-20 11-Jul-20 8.33% 0.00%
SASRF.5.3.5.2.2 General Modification works 24 12-Jul-20 8-Aug-20 71.86% 0.00% 0.00% 0.00%
A-BDLG-11-1040 Screed concrete on floors 3 12-Jul-20 14-Jul-20 10.91% 0.00%
A-BDLG-11-1050 Installation of Acoustic ceiling Tiles 4 15-Jul-20 19-Jul-20 12.12% 0.00%
A-BDLG-11-1060 Installation of Vinyl tile 4 20-Jul-20 23-Jul-20 9.70% 0.00%
A-BDLG-11-1070 Installation of vinyl base 1 25-Jul-20 25-Jul-20 1.82% 0.00%
A-BDLG-11-1080 Repair of Doors 12 26-Jul-20 8-Aug-20 58.18% 0.00%
A-BDLG-11-1090 Opening for Hvac Duct 4 1-Aug-20 4-Aug-20 7.27% 0.00%

Page 10 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.5.2.3 Painting 14 14-Jul-20 29-Jul-20 17.68% 0.00% 0.00% 0.00%
A-BDLG-11-1100 Preparation for Internal Ceiling 1 14-Jul-20 14-Jul-20 9.85% 0.00%
A-BDLG-11-1110 Internal Painting on Ceiling 2 15-Jul-20 16-Jul-20 3.94% 0.00%
A-BDLG-11-1120 Preparation for wall 5 18-Jul-20 22-Jul-20 49.26% 0.00%
A-BDLG-11-1130 Internal Painting for wall 4 21-Jul-20 25-Jul-20 22.17% 0.00%
A-BDLG-11-1140 Preaparation for Floor painting 1 26-Jul-20 26-Jul-20 7.39% 0.00%
A-BDLG-11-1150 Floor painting 2 27-Jul-20 28-Jul-20 2.46% 0.00%
A-BDLG-11-1160 Paint on Floor base 1 29-Jul-20 29-Jul-20 4.93% 0.00%
SASRF.5.3.6 Hout crude control Building (No.26) 110 27-Apr-20 1-Sep-20 3.66% 91.43% 0.00% 91.43%
SASRF.5.3.6.1 Civil 110 27-Apr-20 1-Sep-20 92.21% 96.34% 0.00% 96.34%
SASRF.5.3.6.1.1 Demolition 20 11-Jul-20 2-Aug-20 40.56% 100.00% 0.00% 100.00%
C-BDLG-26-1000 Demolition of Existing structures 20 11-Jul-20 2-Aug-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.6.1.2 Construction of AHU & ACCU Foundation 22 3-Aug-20 27-Aug-20 41.69% 96.62% 0.00% 96.62%
C-BDLG-26-1010 Excavation 4 3-Aug-20 6-Aug-20 16.22% 100.00% 0.00% 100.00%
C-BDLG-26-1020 Subgrade preparation and Lean concrete 2 8-Aug-20 9-Aug-20 1.35% 100.00% 0.00% 100.00%
C-BDLG-26-1030 Rebar 5 10-Aug-20 15-Aug-20 16.22% 100.00% 0.00% 100.00%
C-BDLG-26-1040 Formwork 4 12-Aug-20 16-Aug-20 13.51% 100.00% 0.00% 100.00%
C-BDLG-26-1050 Anchorbolt Fixing 2 15-Aug-20 16-Aug-20 2.70% 100.00% 0.00% 100.00%
C-BDLG-26-1060 Concrete pouring 3 16-Aug-20 18-Aug-20 33.78% 100.00% 0.00% 100.00%
C-BDLG-26-1070 Curing 9 16-Aug-20 25-Aug-20 0.68% 100.00% 0.00% 100.00%
C-BDLG-26-1080 Surface Preparation 2 20-Aug-20 22-Aug-20 8.11% 100.00% 0.00% 100.00%
C-BDLG-26-1090 Coating 2 23-Aug-20 24-Aug-20 2.70% 100.00% 0.00% 100.00%
C-BDLG-26-1100 Backfilling 2 25-Aug-20 26-Aug-20 1.35% 100.00% 0.00% 100.00%
C-BDLG-26-1110 Grouting 1 27-Aug-20 27-Aug-20 3.38% 0.00%
SASRF.5.3.6.1.3 Concrete Grade slab 5 27-Aug-20 1-Sep-20 5.07% 100.00% 0.00% 100.00%
C-BDLG-26-1120 Subgrade Preparation 2 27-Aug-20 29-Aug-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-26-1130 Rebar for slab 1 30-Aug-20 30-Aug-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-26-1140 Formwork for slab 1 31-Aug-20 31-Aug-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-26-1150 Concrete Pouring for slab 1 1-Sep-20 1-Sep-20 33.33% 100.00% 0.00% 100.00%
SASRF.5.3.6.1.4 Diesel Generator Foundation 18 27-Apr-20 17-May-20 12.68% 82.22% 0.00% 82.22%
C-BDLG-26-1160 Excavation and Subgrade Preparation 3 27-Apr-20 29-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-26-1170 Rebar work 2 30-Apr-20 2-May-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-26-1180 Formwork 1 3-May-20 3-May-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-26-1190 Concrete Pouring 1 4-May-20 4-May-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-26-1200 Surface preparation 2 10-May-20 11-May-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-26-1210 Coating 2 12-May-20 13-May-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-26-1220 Backfilling 2 14-May-20 16-May-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-26-1230 Grouting 1 17-May-20 17-May-20 17.78% 0.00%
SASRF.5.3.6.2 Architecture 10 6-Aug-20 17-Aug-20 7.79% 33.33% 0.00% 33.33%
SASRF.5.3.6.2.1 General Modification works 10 6-Aug-20 17-Aug-20 100.00% 33.33% 0.00% 33.33%
A-BDLG-26-1000 Demolish Existing Epoxt paint on cement screed 2 6-Aug-20 8-Aug-20 20.00% 100.00% 0.00% 100.00%
A-BDLG-26-1010 Demolish wall for Hvac opening 2 9-Aug-20 10-Aug-20 6.67% 0.00%
A-BDLG-26-1020 Repair plaster for Hvac opening 1 11-Aug-20 11-Aug-20 6.67% 0.00%
A-BDLG-26-1030 Floor preparation for screed concrete 2 12-Aug-20 13-Aug-20 13.33% 100.00% 0.00% 100.00%
A-BDLG-26-1040 Pouring Screed concrete 1 15-Aug-20 15-Aug-20 13.33% 0.00%
A-BDLG-26-1050 Repair of Doors 2 16-Aug-20 17-Aug-20 40.00% 0.00%
SASRF.5.3.7 ISD security control center Building (No.7) 60 23-Mar-20 31-May-20 4.42% 94.14% 0.00% 94.14%
SASRF.5.3.7.1 Civil 48 23-Mar-20 17-May-20 85.67% 94.42% 0.00% 94.42%
SASRF.5.3.7.1.1 Demolition 25 24-Mar-20 21-Apr-20 38.69% 100.00% 0.00% 100.00%
C-BDLG-07-1000 Demolition of Existing structures 25 24-Mar-20 21-Apr-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.7.1.2 Construction of AHU & ACCU Foundation 30 11-Apr-20 14-May-20 44.97% 92.06% 0.00% 92.06%
C-BDLG-07-1010 Excavation 5 11-Apr-20 15-Apr-20 16.76% 100.00% 0.00% 100.00%
C-BDLG-07-1020 Subgrade preparation and Lean concrete 2 16-Apr-20 18-Apr-20 3.35% 100.00% 0.00% 100.00%
C-BDLG-07-1030 Rebar 5 19-Apr-20 23-Apr-20 18.99% 100.00% 0.00% 100.00%
C-BDLG-07-1040 Formwork 4 22-Apr-20 26-Apr-20 13.41% 100.00% 0.00% 100.00%
C-BDLG-07-1050 Anchorbolt Fixing 3 25-Apr-20 27-Apr-20 1.12% 100.00% 0.00% 100.00%
C-BDLG-07-1060 Concrete pouring 4 26-Apr-20 29-Apr-20 25.70% 100.00% 0.00% 100.00%
C-BDLG-07-1070 Curing 8 27-Apr-20 5-May-20 0.56% 100.00% 0.00% 100.00%
C-BDLG-07-1080 Surface Preparation 3 2-May-20 4-May-20 4.47% 95.00% 0.00% 95.00%
C-BDLG-07-1090 Coating 2 5-May-20 6-May-20 2.23% 95.00% 0.00% 95.00%
C-BDLG-07-1100 Backfilling 3 7-May-20 10-May-20 3.35% 98.00% 0.00% 98.00%
C-BDLG-07-1110 Grouting 2 13-May-20 14-May-20 10.06% 25.00% 0.00% 25.00%
SASRF.5.3.7.1.3 Concrete Grade slab 6 11-May-20 17-May-20 5.03% 100.00% 0.00% 100.00%
C-BDLG-07-1120 Subgrade Preparation 2 11-May-20 12-May-20 20.00% 100.00% 0.00% 100.00%
C-BDLG-07-1130 Rebar for slab 2 13-May-20 14-May-20 30.00% 100.00% 0.00% 100.00%
C-BDLG-07-1140 Formwork for slab 1 16-May-20 16-May-20 15.00% 100.00% 0.00% 100.00%
C-BDLG-07-1150 Concrete Pouring for slab 1 17-May-20 17-May-20 35.00% 100.00% 0.00% 100.00%
SASRF.5.3.7.1.4 Diesel Generator Foundation 18 23-Mar-20 12-Apr-20 11.31% 82.22% 0.00% 82.22%
C-BDLG-07-1160 Excavation and Subgrade Preparation 3 23-Mar-20 25-Mar-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-07-1170 Rebar work 2 26-Mar-20 28-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-07-1180 Formwork 1 29-Mar-20 29-Mar-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-07-1190 Concrete Pouring 1 30-Mar-20 30-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-07-1200 Surface preparation 2 5-Apr-20 6-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-07-1210 Coating 2 7-Apr-20 8-Apr-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-07-1220 Backfilling 2 9-Apr-20 11-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-07-1230 Grouting 1 12-Apr-20 12-Apr-20 17.78% 0.00%
SASRF.5.3.7.2 Architecture 18 11-May-20 31-May-20 14.33% 92.49% 0.00% 92.49%
SASRF.5.3.7.2.1 General Modification works 14 13-May-20 28-May-20 51.95% 93.35% 0.00% 93.35%
A-BDLG-07-1000 Demolish Existing Epoxt paint on cement screed 2 13-May-20 14-May-20 23.12% 100.00% 0.00% 100.00%
A-BDLG-07-1010 Demolish wall for Hvac opening 1 16-May-20 16-May-20 4.62% 50.00% 0.00% 50.00%
A-BDLG-07-1020 Repair plaster for Hvac opening 4 17-May-20 20-May-20 8.67% 50.00% 0.00% 50.00%
A-BDLG-07-1030 Floor preparation for screed concrete 2 21-May-20 23-May-20 11.56% 100.00% 0.00% 100.00%
A-BDLG-07-1040 Pouring Screed concrete 1 24-May-20 24-May-20 17.34% 100.00% 0.00% 100.00%
A-BDLG-07-1050 Repair of Doors 4 25-May-20 28-May-20 34.68% 100.00% 0.00% 100.00%

Page 11 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.7.2.2 Painting 18 11-May-20 31-May-20 48.05% 91.56% 0.00% 91.56%
A-BDLG-07-1060 Preparation for Ceiling painting 2 11-May-20 12-May-20 9.38% 100.00% 0.00% 100.00%
A-BDLG-07-1070 Painting on ceiling 2 13-May-20 14-May-20 6.25% 75.00% 0.00% 75.00%
A-BDLG-07-1080 Preparation for External wall painting 3 16-May-20 18-May-20 21.88% 100.00% 0.00% 100.00%
A-BDLG-07-1090 Painting for External wall 2 19-May-20 20-May-20 12.50% 75.00% 0.00% 75.00%
A-BDLG-07-1100 Preparation for Internal wall painting 3 21-May-20 24-May-20 21.88% 100.00% 0.00% 100.00%
A-BDLG-07-1110 Painting for Internal wall 2 25-May-20 26-May-20 12.50% 75.00% 0.00% 75.00%
A-BDLG-07-1120 Preparation for Floor painting 2 27-May-20 28-May-20 9.38% 100.00% 0.00% 100.00%
A-BDLG-07-1130 Floor painting 2 30-May-20 31-May-20 6.25% 90.00% 0.00% 90.00%
SASRF.5.3.8 Khafji crude PMCR mechanical Building (No.28) 74 18-Mar-20 11-Jun-20 3.77% 95.77% 0.00% 95.77%
SASRF.5.3.8.1 Civil 74 18-Mar-20 11-Jun-20 90.05% 97.54% 0.00% 97.54%
SASRF.5.3.8.1.1 Demolition 20 22-Apr-20 14-May-20 36.36% 100.00% 0.00% 100.00%
C-BDLG-28-1000 Demolition of Existing structures 20 22-Apr-20 14-May-20 100.00% 100.00% 0.00% 100.0%
SASRF.5.3.8.1.2 Construction of AHU & ACCU Foundation 27 10-May-20 9-Jun-20 44.06% 99.51% 0.00% 99.51%
C-BDLG-28-1010 Excavation 4 10-May-20 13-May-20 16.51% 100.00% 0.00% 100.00%
C-BDLG-28-1020 Subgrade preparation and Lean concrete 1 14-May-20 14-May-20 5.08% 100.00% 0.00% 100.00%
C-BDLG-28-1030 Rebar 4 16-May-20 19-May-20 19.05% 100.00% 0.00% 100.00%
C-BDLG-28-1040 Formwork 3 18-May-20 20-May-20 19.05% 100.00% 0.00% 100.00%
C-BDLG-28-1050 Anchorbolt Fixing 2 20-May-20 21-May-20 1.27% 100.00% 0.00% 100.00%
C-BDLG-28-1060 Concrete pouring 3 21-May-20 24-May-20 19.37% 100.00% 0.00% 100.00%
C-BDLG-28-1070 Curing 8 21-May-20 30-May-20 0.63% 100.00% 0.00% 100.00%
C-BDLG-28-1080 Surface Preparation 4 26-May-20 30-May-20 5.08% 100.00% 0.00% 100.00%
C-BDLG-28-1090 Coating 3 31-May-20 2-Jun-20 2.54% 80.53% 0.00% 80.53%
C-BDLG-28-1100 Backfilling 2 3-Jun-20 4-Jun-20 2.54% 100.00% 0.00% 100.00%
C-BDLG-28-1110 Grouting 2 8-Jun-20 9-Jun-20 8.89% 100.00% 0.00% 100.00%
SASRF.5.3.8.1.3 Concrete Grade slab 6 6-Jun-20 11-Jun-20 6.99% 100.00% 0.00% 100.00%
C-BDLG-28-1120 Subgrade Preparation 2 6-Jun-20 7-Jun-20 20.00% 100.00% 0.00% 100.00%
C-BDLG-28-1130 Rebar for slab 2 8-Jun-20 9-Jun-20 32.00% 100.00% 0.00% 100.00%
C-BDLG-28-1140 Formwork for slab 1 10-Jun-20 10-Jun-20 16.00% 100.00% 0.00% 100.00%
C-BDLG-28-1150 Concrete Pouring for slab 1 11-Jun-20 11-Jun-20 32.00% 100.00% 0.00% 100.00%
SASRF.5.3.8.1.4 Diesel Generator Foundation 18 18-Mar-20 7-Apr-20 12.59% 82.22% 0.00% 82.22%
C-BDLG-28-1160 Excavation and Subgrade Preparation 3 18-Mar-20 21-Mar-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-28-1170 Rebar work 2 22-Mar-20 23-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-28-1180 Formwork 1 24-Mar-20 24-Mar-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-28-1190 Concrete Pouring 1 25-Mar-20 25-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-28-1200 Surface preparation 2 31-Mar-20 1-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-28-1210 Coating 2 2-Apr-20 4-Apr-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-28-1220 Backfilling 2 5-Apr-20 6-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-28-1230 Grouting 1 7-Apr-20 7-Apr-20 17.78% 0.00%
SASRF.5.3.8.2 Architecture 11 30-May-20 10-Jun-20 9.95% 79.75% 0.00% 79.75%
SASRF.5.3.8.2.1 General Modification works 11 30-May-20 10-Jun-20 100.00% 79.75% 0.00% 79.75%
A-BDLG-28-1000 Demolish cement screed 2 30-May-20 31-May-20 17.72% 100.00% 0.00% 100.00%
A-BDLG-28-1010 Disassemble hollow metal door 3 1-Jun-20 3-Jun-20 40.51% 50.00% 0.00% 50.00%
A-BDLG-28-1020 Floor preparation for screed concrete 2 4-Jun-20 6-Jun-20 10.13% 100.00% 0.00% 100.00%
A-BDLG-28-1030 Pouring Screed concrete 1 7-Jun-20 7-Jun-20 20.25% 100.00% 0.00% 100.00%
A-BDLG-28-1040 Preparation for Floor painting 1 8-Jun-20 8-Jun-20 7.59% 100.00% 0.00% 100.00%
A-BDLG-28-1050 Floor painting 2 9-Jun-20 10-Jun-20 3.80% 100.00% 0.00% 100.00%
SASRF.5.3.9 Metrological Building (No.12) 75 16-Feb-20 12-May-20 4.90% 81.93% 0.00% 81.93%
SASRF.5.3.9.1 Civil 55 16-Feb-20 19-Apr-20 79.26% 96.32% 0.00% 96.32%
SASRF.5.3.9.1.1 Retaining Wall 26 16-Feb-20 16-Mar-20 25.43% 99.81% 0.00% 99.81%
C-BDLG-12-1000 Excavation 3 16-Feb-20 18-Feb-20 13.46% 100.00% 0.00% 100.00%
C-BDLG-12-1010 Subgrade preparation and Lean concrete 2 19-Feb-20 20-Feb-20 7.69% 100.00% 0.00% 100.00%
C-BDLG-12-1020 Rebar for base 2 22-Feb-20 23-Feb-20 9.62% 100.00% 0.00% 100.00%
C-BDLG-12-1030 Formwork for base 2 23-Feb-20 24-Feb-20 5.77% 100.00% 0.00% 100.00%
C-BDLG-12-1040 Concrete pouring for base 1 25-Feb-20 25-Feb-20 7.69% 100.00% 0.00% 100.00%
C-BDLG-12-1050 Rebar for wall 2 26-Feb-20 27-Feb-20 13.46% 100.00% 0.00% 100.00%
C-BDLG-12-1060 Formwork for wall 2 29-Feb-20 1-Mar-20 13.46% 100.00% 0.00% 100.00%
C-BDLG-12-1070 Concrete pouring for wall 1 2-Mar-20 2-Mar-20 11.54% 100.00% 0.00% 100.00%
C-BDLG-12-1080 Surface preparation 3 9-Mar-20 11-Mar-20 5.77% 100.00% 0.00% 100.00%
C-BDLG-12-1090 Coating 2 12-Mar-20 14-Mar-20 3.85% 95.00% 0.00% 95.00%
C-BDLG-12-1100 Backfilling 2 15-Mar-20 16-Mar-20 7.69% 100.00% 0.00% 100.00%
SASRF.5.3.9.1.2 Demolition 18 3-Mar-20 23-Mar-20 34.23% 95.00% 0.00% 95.00%
C-BDLG-12-1110 Demolition of Existing structures 18 3-Mar-20 23-Mar-20 100.00% 95.00% 0.00% 95.00%
SASRF.5.3.9.1.3 Construction of AHU & ACCU Foundation 23 21-Mar-20 15-Apr-20 34.47% 94.44% 0.00% 94.44%
C-BDLG-12-1120 Excavation 3 21-Mar-20 23-Mar-20 11.35% 100.00% 0.00% 100.00%
C-BDLG-12-1130 Subgrade preparation and Lean concrete 1 24-Mar-20 24-Mar-20 4.26% 100.00% 0.00% 100.00%
C-BDLG-12-1140 Rebar 3 25-Mar-20 28-Mar-20 31.21% 100.00% 0.00% 100.00%
C-BDLG-12-1150 Formwork 3 28-Mar-20 30-Mar-20 9.93% 100.00% 0.00% 100.00%
C-BDLG-12-1160 Anchorbolt Fixing 2 29-Mar-20 30-Mar-20 1.42% 100.00% 0.00% 100.00%
C-BDLG-12-1170 Concrete pouring 4 30-Mar-20 2-Apr-20 18.44% 100.00% 0.00% 100.00%
C-BDLG-12-1180 Curing 8 31-Mar-20 8-Apr-20 0.71% 100.00% 0.00% 100.00%
C-BDLG-12-1190 Surface Preparation 3 5-Apr-20 7-Apr-20 8.51% 100.00% 0.00% 100.00%
C-BDLG-12-1200 Coating 2 8-Apr-20 9-Apr-20 2.84% 91.43% 0.00% 91.43%
C-BDLG-12-1210 Backfilling 2 11-Apr-20 12-Apr-20 4.26% 100.00% 0.00% 100.00%
C-BDLG-12-1220 Grouting 1 15-Apr-20 15-Apr-20 7.09% 25.00% 0.00% 25.00%
SASRF.5.3.9.1.4 Concrete Grade slab 6 13-Apr-20 19-Apr-20 5.87% 100.00% 0.00% 100.00%
C-BDLG-12-1230 Subgrade Preparation 2 13-Apr-20 14-Apr-20 12.50% 100.00% 0.00% 100.00%
C-BDLG-12-1240 Rebar for slab 2 15-Apr-20 16-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-12-1250 Formwork for slab 1 18-Apr-20 18-Apr-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-12-1260 Concrete Pouring for slab 1 19-Apr-20 19-Apr-20 37.50% 100.00% 0.00% 100.00%
SASRF.5.3.9.2 Architecture 61 3-Mar-20 12-May-20 20.74% 26.92% 0.00% 26.92%
SASRF.5.3.9.2.1 Demolition works 9 3-Mar-20 12-Mar-20 42.99% 6.52% 0.00% 6.52%
A-BDLG-12-1000 Demolition of Existing CMU Block walls 3 3-Mar-20 5-Mar-20 21.74% 30.00% 0.00% 30.00%
A-BDLG-12-1010 Demolish existing mosique flooring tiles 2 7-Mar-20 8-Mar-20 26.09% 0.00%

Page 12 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
A-BDLG-12-1020 Disassemble existing hollow metal doors 4 9-Mar-20 12-Mar-20 52.17% 0.00%
SASRF.5.3.9.2.2 General Modification works 11 14-Mar-20 25-Mar-20 36.45% 29.23% 0.00% 29.23%
A-BDLG-12-1030 Construction of CMU wall 1 14-Mar-20 14-Mar-20 12.82% 0.00%
A-BDLG-12-1040 External Plastering 1 15-Mar-20 15-Mar-20 5.13% 0.00%
A-BDLG-12-1050 Internal Plastering 1 16-Mar-20 16-Mar-20 5.13% 0.00%
A-BDLG-12-1060 Floor preparation for screed concrete 2 17-Mar-20 18-Mar-20 10.26% 0.00%
A-BDLG-12-1070 Pouring screed concrete 1 19-Mar-20 19-Mar-20 10.26% 0.00%
A-BDLG-12-1080 Repair of Doors 2 21-Mar-20 22-Mar-20 20.51% 0.00%
A-BDLG-12-1090 Supply and Installation of Aluminium threshold 1 23-Mar-20 23-Mar-20 5.13% 0.00%
A-BDLG-12-1100 Installation of Steel guard post 2 24-Mar-20 25-Mar-20 30.77% 95.00% 0.00% 95.00%
SASRF.5.3.9.2.3 Painting 21 19-Apr-20 12-May-20 20.56% 65.45% 0.00% 65.45%
A-BDLG-12-1120 Preparation for Ceiling painting 1 19-Apr-20 19-Apr-20 9.09% 100.00% 0.00% 100.00%
A-BDLG-12-1130 Painting on ceiling 2 20-Apr-20 21-Apr-20 4.55% 100.00% 0.00% 100.00%
A-BDLG-12-1140 Preparation for External wall painting 1 22-Apr-20 22-Apr-20 4.55% 0.00%
A-BDLG-12-1150 Painting for External wall 1 23-Apr-20 23-Apr-20 4.55% 0.00%
A-BDLG-12-1160 Preparation for Internal wall painting 3 25-Apr-20 27-Apr-20 36.36% 95.00% 0.00% 95.00%
A-BDLG-12-1170 Painting for Internal wall 2 28-Apr-20 29-Apr-20 18.18% 95.00% 0.00% 95.00%
A-BDLG-12-1180 Preparation for Floor painting 1 7-May-20 7-May-20 9.09% 0.00%
A-BDLG-12-1190 Floor painting 2 9-May-20 10-May-20 4.55% 0.00%
A-BDLG-12-1200 Epoxy painting for Ramp 2 11-May-20 12-May-20 9.09% 0.00%
SASRF.5.3.10 MSS Administration Building (No.15) 64 4-Apr-20 16-Jun-20 2.62% 83.95% 0.00% 83.95%
SASRF.5.3.10.1 Civil 50 4-Apr-20 31-May-20 94.56% 88.79% 0.00% 88.79%
SASRF.5.3.10.1.1 Construction of AHU & ACCU Foundation 27 28-Apr-20 28-May-20 66.60% 87.77% 0.00% 87.77%
C-BDLG-15-1000 Excavation 4 28-Apr-20 2-May-20 17.29% 100.00% 0.00% 100.00%
C-BDLG-15-1010 Subgrade preparation and Lean concrete 2 2-May-20 3-May-20 3.46% 100.00% 0.00% 100.00%
C-BDLG-15-1020 Rebar 5 4-May-20 9-May-20 17.29% 100.00% 0.00% 100.00%
C-BDLG-15-1030 Formwork 4 6-May-20 10-May-20 13.83% 100.00% 0.00% 100.00%
C-BDLG-15-1040 Anchorbolt Fixing 2 7-May-20 9-May-20 1.15% 100.00% 0.00% 100.00%
C-BDLG-15-1050 Concrete pouring 5 9-May-20 13-May-20 22.48% 100.00% 0.00% 100.00%
C-BDLG-15-1060 Curing 10 10-May-20 20-May-20 0.86% 100.00% 0.00% 100.00%
C-BDLG-15-1070 Surface Preparation 3 14-May-20 17-May-20 4.61% 100.00% 0.00% 100.00%
C-BDLG-15-1080 Coating 2 18-May-20 19-May-20 2.88% 75.78% 0.00% 75.78%
C-BDLG-15-1090 Backfilling 2 23-May-20 24-May-20 4.61% 100.00% 0.00% 100.00%
C-BDLG-15-1100 Grouting 2 27-May-20 28-May-20 11.53% 0.00%
SASRF.5.3.10.1.2 Concrete Grade slab 6 25-May-20 31-May-20 16.12% 100.00% 0.00% 100.00%
C-BDLG-15-1110 Subgrade Preparation 2 25-May-20 26-May-20 19.05% 100.00% 0.00% 100.00%
C-BDLG-15-1120 Rebar for slab 2 27-May-20 28-May-20 28.57% 100.00% 0.00% 100.00%
C-BDLG-15-1130 Formwork for slab 1 30-May-20 30-May-20 14.29% 100.00% 0.00% 100.00%
C-BDLG-15-1140 Concrete Pouring for slab 1 31-May-20 31-May-20 38.10% 100.00% 0.00% 100.00%
SASRF.5.3.10.1.3 Diesel Generator Foundation 18 4-Apr-20 23-Apr-20 17.27% 82.22% 0.00% 82.22%
C-BDLG-15-1150 Excavation and Subgrade Preparation 3 4-Apr-20 6-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-15-1160 Rebar work 2 7-Apr-20 8-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-15-1170 Formwork 1 9-Apr-20 9-Apr-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-15-1180 Concrete Pouring 1 11-Apr-20 11-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-15-1190 Surface preparation 2 16-Apr-20 18-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-15-1200 Coating 2 19-Apr-20 20-Apr-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-15-1210 Backfilling 2 21-Apr-20 22-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-15-1220 Grouting 1 23-Apr-20 23-Apr-20 17.78% 0.00%
SASRF.5.3.10.2 Architecture 5 11-Jun-20 16-Jun-20 5.44% 0.00% 0.00% 0.00%
SASRF.5.3.10.2.1 General Modification works 5 11-Jun-20 16-Jun-20 100.00% 0.00% 0.00% 0.00%
A-BDLG-15-1000 Preparation for Internal wall painting 2 11-Jun-20 13-Jun-20 40.00% 0.00%
A-BDLG-15-1010 Painting for Internal wall 2 14-Jun-20 15-Jun-20 26.67% 0.00%
A-BDLG-15-1020 Repair of Doors 1 16-Jun-20 16-Jun-20 33.33% 0.00%
SASRF.5.3.11 MSS central workshop & office Building (No.59) 34 3-Aug-20 10-Sep-20 2.29% 99.17% 0.00% 99.17%
SASRF.5.3.11.1 Civil 34 3-Aug-20 10-Sep-20 94.19% 100.00% 0.00% 100.00%
SASRF.5.3.11.1.1 Demolition 8 3-Aug-20 11-Aug-20 24.23% 100.00% 0.00% 100.00%
C-BDLG-59-1000 Demolition of Existing structures 8 3-Aug-20 11-Aug-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.11.1.2 Construction of SPU & EC Foundation 23 12-Aug-20 7-Sep-20 56.83% 100.00% 0.00% 100.00%
C-BDLG-59-1010 Excavation 4 12-Aug-20 16-Aug-20 15.50% 100.00% 0.00% 100.00%
C-BDLG-59-1020 Subgrade preparation and Lean concrete 1 17-Aug-20 17-Aug-20 1.55% 100.00% 0.00% 100.00%
C-BDLG-59-1030 Rebar 4 18-Aug-20 22-Aug-20 10.85% 100.00% 0.00% 100.00%
C-BDLG-59-1040 Formwork 3 20-Aug-20 23-Aug-20 23.26% 100.00% 0.00% 100.00%
C-BDLG-59-1050 Anchorbolt Fixing 2 22-Aug-20 23-Aug-20 1.55% 100.00% 0.00% 100.00%
C-BDLG-59-1060 Concrete pouring 4 22-Aug-20 25-Aug-20 22.48% 100.00% 0.00% 100.00%
C-BDLG-59-1070 Curing 8 23-Aug-20 31-Aug-20 0.78% 100.00% 0.00% 100.00%
C-BDLG-59-1080 Surface Preparation 3 27-Aug-20 30-Aug-20 6.20% 100.00% 0.00% 100.00%
C-BDLG-59-1090 Coating 3 30-Aug-20 1-Sep-20 3.88% 100.00% 0.00% 100.00%
C-BDLG-59-1100 Backfilling 2 2-Sep-20 3-Sep-20 6.20% 100.00% 0.00% 100.00%
C-BDLG-59-1110 Grouting 1 7-Sep-20 7-Sep-20 7.75% 100.00% 0.00% 100.00%
SASRF.5.3.11.1.3 Concrete Grade slab 6 5-Sep-20 10-Sep-20 18.94% 100.00% 0.00% 100.00%
C-BDLG-59-1120 Subgrade Preparation 2 5-Sep-20 6-Sep-20 13.95% 100.00% 0.00% 100.00%
C-BDLG-59-1130 Rebar for slab 2 7-Sep-20 8-Sep-20 34.88% 100.00% 0.00% 100.00%
C-BDLG-59-1140 Formwork for slab 2 8-Sep-20 9-Sep-20 11.63% 100.00% 0.00% 100.00%
C-BDLG-59-1150 Concrete Pouring for slab 1 10-Sep-20 10-Sep-20 39.53% 100.00% 0.00% 100.00%
SASRF.5.3.11.2 Architecture 8 18-Aug-20 26-Aug-20 5.81% 85.71% 0.00% 85.71%
SASRF.5.3.11.2.1 Painting 8 18-Aug-20 26-Aug-20 100.00% 85.71% 0.00% 85.71%
A-BDLG-59-1000 Preparation for Internal wall painting 3 18-Aug-20 20-Aug-20 57.14% 100.00% 0.00% 100.00%
A-BDLG-59-1010 Painting for Internal wall 3 20-Aug-20 23-Aug-20 28.57% 100.00% 0.00% 100.00%
A-BDLG-59-1020 Preparation for Floor painting 1 24-Aug-20 24-Aug-20 7.14% 0.00%
A-BDLG-59-1030 Floor painting 2 25-Aug-20 26-Aug-20 7.14% 0.00%
SASRF.5.3.12 MSS Mosque Building (No.16) 38 12-Aug-20 24-Sep-20 2.47% 79.60% 0.00% 79.60%
SASRF.5.3.12.1 Civil 38 12-Aug-20 24-Sep-20 84.97% 93.68% 0.00% 93.68%
SASRF.5.3.12.1.1 Demolition 12 12-Aug-20 25-Aug-20 24.94% 100.00% 0.00% 100.00%
C-BDLG-16-1000 Demolition of Existing structures 12 12-Aug-20 25-Aug-20 100.00% 100.00% 0.00% 100.00%

Page 13 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.12.1.2 Construction of SPU & EC Foundation 24 26-Aug-20 22-Sep-20 62.36% 89.87% 0.00% 89.87%
C-BDLG-16-1010 Excavation 3 26-Aug-20 29-Aug-20 10.18% 100.00% 0.00% 100.00%
C-BDLG-16-1020 Subgrade preparation and Lean concrete 2 30-Aug-20 31-Aug-20 3.64% 100.00% 0.00% 100.00%
C-BDLG-16-1030 Rebar 4 1-Sep-20 5-Sep-20 14.55% 100.00% 0.00% 100.00%
C-BDLG-16-1040 Formwork 3 3-Sep-20 6-Sep-20 17.45% 100.00% 0.00% 100.00%
C-BDLG-16-1050 Anchorbolt Fixing 1 6-Sep-20 6-Sep-20 0.73% 100.00% 0.00% 100.00%
C-BDLG-16-1060 Concrete pouring 3 7-Sep-20 9-Sep-20 19.64% 100.00% 0.00% 100.00%
C-BDLG-16-1070 Curing 8 8-Sep-20 16-Sep-20 1.09% 100.00% 0.00% 100.00%
C-BDLG-16-1080 Surface Preparation 4 13-Sep-20 16-Sep-20 11.64% 100.00% 0.00% 100.00%
C-BDLG-16-1090 Coating 2 15-Sep-20 16-Sep-20 6.55% 78.54% 0.00% 78.54%
C-BDLG-16-1100 Backfilling 2 17-Sep-20 19-Sep-20 5.82% 100.00% 0.00% 100.00%
C-BDLG-16-1110 Grouting 1 22-Sep-20 22-Sep-20 8.73% 0.00%
SASRF.5.3.12.1.3 Concrete Grade slab 5 20-Sep-20 24-Sep-20 12.70% 100.00% 0.00% 100.00%
C-BDLG-16-1120 Subgrade Preparation 2 20-Sep-20 21-Sep-20 14.29% 100.00% 0.00% 100.00%
C-BDLG-16-1130 Rebar for slab 2 22-Sep-20 23-Sep-20 28.57% 100.00% 0.00% 100.00%
C-BDLG-16-1140 Formwork for slab 1 23-Sep-20 23-Sep-20 21.43% 100.00% 0.00% 100.00%
C-BDLG-16-1150 Concrete Pouring for slab 1 24-Sep-20 24-Sep-20 35.71% 100.00% 0.00% 100.00%
SASRF.5.3.12.2 Architecture 12 27-Aug-20 9-Sep-20 15.03% 0.00% 0.00% 0.00%
SASRF.5.3.12.2.1 Painting 12 27-Aug-20 9-Sep-20 100.00% 0.00% 0.00% 0.00%
A-BDLG-16-1000 Preparation for External wall painting 5 27-Aug-20 1-Sep-20 41.03% 0.00%
A-BDLG-16-1010 Painting for External wall 4 30-Aug-20 2-Sep-20 25.64% 0.00%
A-BDLG-16-1020 Preparation for Internal wall painting 3 1-Sep-20 3-Sep-20 15.38% 0.00%
A-BDLG-16-1030 Painting for Internal wall 2 5-Sep-20 6-Sep-20 10.26% 0.00%
A-BDLG-16-1040 Preparation for Floor painting 1 7-Sep-20 7-Sep-20 5.13% 0.00%
A-BDLG-16-1050 Floor painting 2 8-Sep-20 9-Sep-20 2.56% 0.00%
SASRF.5.3.13 New Power plant Control Building (No.30) 92 27-Feb-20 13-Jun-20 5.44% 71.33% 0.00% 71.33%
SASRF.5.3.13.1 Civil 92 27-Feb-20 13-Jun-20 82.34% 85.99% 0.00% 85.99%
SASRF.5.3.13.1.1 Demolition 16 2-May-20 19-May-20 28.66% 100.00% 0.00% 100.00%
C-BDLG-30-1000 Demolition of Existing structures 16 2-May-20 19-May-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.13.1.2 Construction of AHU & ACCU Foundation 25 13-May-20 10-Jun-20 46.50% 85.84% 0.00% 85.84%
C-BDLG-30-1010 Excavation 5 13-May-20 18-May-20 14.61% 99.74% 0.00% 99.74%
C-BDLG-30-1020 Subgrade preparation and Lean concrete 3 17-May-20 19-May-20 2.74% 99.74% 0.00% 99.74%
C-BDLG-30-1030 Rebar 5 18-May-20 23-May-20 15.98% 99.74% 0.00% 99.74%
C-BDLG-30-1040 Formwork 4 20-May-20 24-May-20 9.13% 99.74% 0.00% 99.74%
C-BDLG-30-1050 Anchorbolt Fixing 2 23-May-20 24-May-20 0.91% 100.00% 0.00% 100.00%
C-BDLG-30-1060 Concrete pouring 4 24-May-20 27-May-20 31.96% 99.74% 0.00% 99.74%
C-BDLG-30-1070 Curing 8 25-May-20 2-Jun-20 0.46% 99.74% 0.00% 99.74%
C-BDLG-30-1080 Surface Preparation 3 28-May-20 31-May-20 4.57% 99.74% 0.00% 99.74%
C-BDLG-30-1090 Coating 3 31-May-20 2-Jun-20 2.28% 74.99% 0.00% 74.99%
C-BDLG-30-1100 Backfilling 3 3-Jun-20 6-Jun-20 3.65% 59.11% 0.00% 59.11%
C-BDLG-30-1110 Grouting 2 9-Jun-20 10-Jun-20 13.70% 13.22% 0.00% 13.22%
SASRF.5.3.13.1.3 Fence 8 28-May-20 6-Jun-20 8.28% 25.64% 0.00% 25.64%
C-BDLG-30-1113 Excavation and concrete pouring 3 28-May-20 31-May-20 51.28% 50.00% 0.00% 50.00%
C-BDLG-30-1116 Post & mesh installation 3 1-Jun-20 3-Jun-20 38.46% 0.00%
C-BDLG-30-1119 Gate fixing 2 4-Jun-20 6-Jun-20 10.26% 0.00%
SASRF.5.3.13.1.4 Concrete Grade slab 6 7-Jun-20 13-Jun-20 7.01% 100.00% 0.00% 100.00%
C-BDLG-30-1120 Subgrade Preparation 2 7-Jun-20 8-Jun-20 9.09% 100.00% 0.00% 100.00%
C-BDLG-30-1130 Rebar for slab 2 9-Jun-20 10-Jun-20 30.30% 100.00% 0.00% 100.00%
C-BDLG-30-1140 Formwork for slab 1 11-Jun-20 11-Jun-20 12.12% 100.00% 0.00% 100.00%
C-BDLG-30-1150 Concrete Pouring for slab 1 13-Jun-20 13-Jun-20 48.48% 100.00% 0.00% 100.00%
SASRF.5.3.13.1.5 Diesel Generator Foundation 18 27-Feb-20 18-Mar-20 9.55% 86.67% 0.00% 86.67%
C-BDLG-30-1160 Excavation and Subgrade Preparation 3 27-Feb-20 1-Mar-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-30-1170 Rebar work 2 2-Mar-20 3-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-30-1180 Formwork 1 4-Mar-20 4-Mar-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-30-1190 Concrete Pouring 1 5-Mar-20 5-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-30-1200 Surface preparation 2 11-Mar-20 12-Mar-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-30-1210 Coating 2 14-Mar-20 15-Mar-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-30-1220 Backfilling 2 16-Mar-20 17-Mar-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-30-1230 Grouting 1 18-Mar-20 18-Mar-20 17.78% 25.00% 0.00% 25.00%
SASRF.5.3.13.2 Architecture 26 4-May-20 2-Jun-20 17.66% 2.97% 0.00% 2.97%
SASRF.5.3.13.2.1 General Modification works 9 4-May-20 13-May-20 52.48% 0.00% 0.00% 0.00%
A-BDLG-30-1000 Demolish cement screed on Epoxt paint 4 4-May-20 7-May-20 45.28% 0.00%
A-BDLG-30-1010 Demolish wall for Hvac opening 2 6-May-20 7-May-20 5.66% 0.00%
A-BDLG-30-1020 Repair plaster for Hvac opening 1 10-May-20 10-May-20 1.89% 0.00%
A-BDLG-30-1030 Floor preparation for screed concrete 2 11-May-20 12-May-20 16.98% 0.00%
A-BDLG-30-1040 Pouring Screed concrete 1 13-May-20 13-May-20 30.19% 0.00%
SASRF.5.3.13.2.2 Painting 17 14-May-20 2-Jun-20 47.52% 6.25% 0.00% 6.25%
A-BDLG-30-1050 Preparation for External wall 3 14-May-20 17-May-20 20.83% 0.00%
A-BDLG-30-1060 Painting on External wall 2 18-May-20 19-May-20 8.33% 0.00%
A-BDLG-30-1070 Preparation for Internal ceiling 2 19-May-20 20-May-20 12.50% 0.00%
A-BDLG-30-1080 Painting for ceiling 2 21-May-20 23-May-20 8.33% 0.00%
A-BDLG-30-1090 Preparation for Internal wall 3 24-May-20 26-May-20 20.83% 0.00%
A-BDLG-30-1100 Painting for Internal wall 3 26-May-20 28-May-20 10.42% 0.00%
A-BDLG-30-1110 Preaparation for Floor painting 2 30-May-20 31-May-20 12.50% 0.00%
A-BDLG-30-1120 Floor painting 2 1-Jun-20 2-Jun-20 6.25% 100.00% 0.00% 100.00%
SASRF.5.3.14 New Power plant Maintenence Building (No.34) 263 30-Mar-20 30-Jan-21 12.71% 88.34% 0.00% 88.34%
SASRF.5.3.14.1 Civil 244 30-Mar-20 7-Jan-21 52.01% 98.85% 0.00% 98.85%
SASRF.5.3.14.1.1 Sub structure 78 16-Sep-20 15-Dec-20 41.22% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.1.1 Demolition 10 16-Sep-20 27-Sep-20 33.12% 100.00% 0.00% 100.00%
C-BDLG-34-1000 Demolition of Existing structure 10 16-Sep-20 27-Sep-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.1.2 Excavation(Mechanical room) 4 26-Sep-20 29-Sep-20 8.02% 100.00% 0.00% 100.00%
C-BDLG-34-1010 Excavation 2 26-Sep-20 27-Sep-20 52.17% 100.00% 0.00% 100.00%
C-BDLG-34-1020 Levelling and compaction 1 28-Sep-20 28-Sep-20 43.48% 100.00% 0.00% 100.00%
C-BDLG-34-1030 Lean concrete 1 29-Sep-20 29-Sep-20 4.35% 100.00% 0.00% 100.00%

Page 14 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.14.1.1.3 Construction of column upto Bottom of grade bea 10 30-Sep-20 11-Oct-20 14.30% 100.00% 0.00% 100.00%
C-BDLG-34-1033 Rebar for footing 2 30-Sep-20 1-Oct-20 39.02% 100.00% 0.00% 100.00%
C-BDLG-34-1036 Formwork for footing 1 1-Oct-20 1-Oct-20 19.51% 100.00% 0.00% 100.00%
C-BDLG-34-1039 Concrete pouring for footing 1 3-Oct-20 3-Oct-20 7.32% 100.00% 0.00% 100.00%
C-BDLG-34-1040 Curing 7 4-Oct-20 11-Oct-20 2.44% 100.00% 0.00% 100.00%
C-BDLG-34-1050 Rebar for column upto Grade beam 2 8-Oct-20 10-Oct-20 14.63% 100.00% 0.00% 100.00%
C-BDLG-34-1060 Formwork for column upto Grade beam 1 10-Oct-20 10-Oct-20 9.76% 100.00% 0.00% 100.00%
C-BDLG-34-1070 Concrete pouring for column upto bottom of Grade 1 11-Oct-20 11-Oct-20 7.32% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.1.4 Backfilling of Foundation((Mechanical room) 8 19-Oct-20 27-Oct-20 14.30% 100.00% 0.00% 100.00%
C-BDLG-34-1080 Surface preparation 3 19-Oct-20 21-Oct-20 29.27% 100.00% 0.00% 100.00%
C-BDLG-34-1090 Coating 2 22-Oct-20 24-Oct-20 9.76% 100.00% 0.00% 100.00%
C-BDLG-34-1100 Backfilling 3 25-Oct-20 27-Oct-20 60.98% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.1.5 Construction of Grade beam(Mechanical room) 15 28-Oct-20 14-Nov-20 21.55% 100.00% 0.00% 100.00%
C-BDLG-34-1110 Lean concrete 1 28-Oct-20 28-Oct-20 6.47% 100.00% 0.00% 100.00%
C-BDLG-34-1120 Rebar for Grade beam 2 29-Oct-20 31-Oct-20 19.42% 100.00% 0.00% 100.00%
C-BDLG-34-1130 Formwork for Grade beam 1 31-Oct-20 31-Oct-20 9.71% 100.00% 0.00% 100.00%
C-BDLG-34-1140 Concrete Pouring for Grade beam 1 1-Nov-20 1-Nov-20 12.94% 100.00% 0.00% 100.00%
C-BDLG-34-1150 Curing 7 2-Nov-20 9-Nov-20 1.29% 100.00% 0.00% 100.00%
C-BDLG-34-1160 Surface Preparation 2 8-Nov-20 9-Nov-20 16.18% 100.00% 0.00% 100.00%
C-BDLG-34-1170 Coating 2 10-Nov-20 11-Nov-20 9.71% 100.00% 0.00% 100.00%
C-BDLG-34-1180 Backfilling 2 12-Nov-20 14-Nov-20 24.27% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.1.6 Construction of Grade slab(Mechanical room) 5 10-Dec-20 15-Dec-20 8.72% 100.00% 0.00% 100.00%
C-BDLG-34-1190 Subgrade Preparation and Compaction 1 10-Dec-20 10-Dec-20 24.00% 100.00% 0.00% 100.00%
C-BDLG-34-1200 Rebar work 2 12-Dec-20 13-Dec-20 24.00% 100.00% 0.00% 100.00%
C-BDLG-34-1210 Formwork 1 14-Dec-20 14-Dec-20 20.00% 100.00% 0.00% 100.00%
C-BDLG-34-1220 Concretre Pouring for Grade slab 1 15-Dec-20 15-Dec-20 32.00% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.2 Super structure 34 1-Nov-20 9-Dec-20 28.74% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.2.1 Construction of Column from Top of Grade slab t 16 1-Nov-20 18-Nov-20 40.50% 100.00% 0.00% 100.00%
C-BDLG-34-1240 Rebar cutting & bending 2 1-Nov-20 2-Nov-20 14.81% 100.00% 0.00% 100.00%
C-BDLG-34-1250 Formwork Making 2 2-Nov-20 3-Nov-20 9.88% 100.00% 0.00% 100.00%
C-BDLG-34-1260 Scaffolding for Column 1 4-Nov-20 4-Nov-20 9.88% 100.00% 0.00% 100.00%
C-BDLG-34-1270 Rebar Fixing 2 5-Nov-20 7-Nov-20 19.75% 100.00% 0.00% 100.00%
C-BDLG-34-1280 Formwork 2 8-Nov-20 9-Nov-20 19.75% 100.00% 0.00% 100.00%
C-BDLG-34-1290 Concrete Pouring 1 10-Nov-20 10-Nov-20 14.81% 100.00% 0.00% 100.00%
C-BDLG-34-1300 Deshuttering 2 11-Nov-20 12-Nov-20 9.88% 100.00% 0.00% 100.00%
C-BDLG-34-1310 Curing 7 11-Nov-20 18-Nov-20 1.23% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.2.2 Construction of Roof beam & Slab(Mechanical room) 25 11-Nov-20 9-Dec-20 47.50% 100.00% 0.00% 100.00%
C-BDLG-34-1320 Rebar Cutting and bending 2 11-Nov-20 12-Nov-20 12.63% 100.00% 0.00% 100.00%
C-BDLG-34-1330 Scaffolding installation 2 14-Nov-20 15-Nov-20 25.26% 100.00% 0.00% 100.00%
C-BDLG-34-1340 Formwork for Beam & Slab 3 16-Nov-20 18-Nov-20 12.63% 100.00% 0.00% 100.00%
C-BDLG-34-1350 Rebar work 2 18-Nov-20 19-Nov-20 18.95% 100.00% 0.00% 100.00%
C-BDLG-34-1360 Concrete Pouring 1 21-Nov-20 21-Nov-20 8.42% 100.00% 0.00% 100.00%
C-BDLG-34-1370 Deshuttering 2 8-Dec-20 9-Dec-20 17.89% 100.00% 0.00% 100.00%
C-BDLG-34-1380 Curing 14 23-Nov-20 8-Dec-20 4.21% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.2.3 Parapet wall (Mechanical room) 4 30-Nov-20 3-Dec-20 12.00% 100.00% 0.00% 100.00%
C-BDLG-34-1383 Rebar work 2 30-Nov-20 1-Dec-20 41.67% 100.00% 0.00% 100.00%
C-BDLG-34-1386 Formwork for Parapet wall 1 2-Dec-20 2-Dec-20 37.50% 100.00% 0.00% 100.00%
C-BDLG-34-1389 Concrete Pouring 1 3-Dec-20 3-Dec-20 20.83% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.3 Construction of AHU & ACCU Foundation 25 10-Dec-20 7-Jan-21 19.26% 100.00% 0.00% 100.00%
C-BDLG-34-1390 Excavation 3 10-Dec-20 13-Dec-20 17.91% 100.00% 0.00% 100.00%
C-BDLG-34-1400 Subgrade preparation and Lean concrete 2 14-Dec-20 15-Dec-20 2.99% 100.00% 0.00% 100.00%
C-BDLG-34-1410 Rebar 4 16-Dec-20 20-Dec-20 23.88% 100.00% 0.00% 100.00%
C-BDLG-34-1420 Formwork 3 19-Dec-20 21-Dec-20 17.91% 100.00% 0.00% 100.00%
C-BDLG-34-1440 Concrete pouring 3 20-Dec-20 22-Dec-20 6.72% 100.00% 0.00% 100.00%
C-BDLG-34-1450 Curing 7 23-Dec-20 30-Dec-20 0.75% 100.00% 0.00% 100.00%
C-BDLG-34-1460 Surface Preparation 4 28-Dec-20 31-Dec-20 8.96% 100.00% 0.00% 100.00%
C-BDLG-34-1470 Coating 3 31-Dec-20 3-Jan-21 4.48% 100.00% 0.00% 100.00%
C-BDLG-34-1480 Backfilling 2 3-Jan-21 4-Jan-21 8.96% 100.00% 0.00% 100.00%
C-BDLG-34-1490 Grouting 1 7-Jan-21 7-Jan-21 7.46% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.4 Diesel Generator Foundation 18 30-Mar-20 19-Apr-20 6.47% 82.22% 0.00% 82.22%
C-BDLG-34-1650 Excavation and Subgrade Preparation 3 30-Mar-20 1-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-34-1660 Rebar work 2 2-Apr-20 4-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-34-1670 Formwork 1 5-Apr-20 5-Apr-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-34-1680 Concrete Pouring 1 6-Apr-20 6-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-34-1690 Surface preparation 2 12-Apr-20 13-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-34-1700 Coating 2 14-Apr-20 15-Apr-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-34-1710 Backfilling 2 16-Apr-20 18-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-34-1720 Grouting 1 19-Apr-20 19-Apr-20 17.78% 0.00%
SASRF.5.3.14.1.5 Construction of walkway 5 10-Dec-20 15-Dec-20 2.59% 100.00% 0.00% 100.00%
C-BDLG-34-1570 Subgrade Preparation 1 10-Dec-20 10-Dec-20 22.22% 100.00% 0.00% 100.00%
C-BDLG-34-1580 Rebar 2 12-Dec-20 13-Dec-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-34-1590 Formwork 2 13-Dec-20 14-Dec-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-34-1600 Concrete Pouring for walkway 1 15-Dec-20 15-Dec-20 27.78% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.6 Construction of Ramp 5 16-Dec-20 21-Dec-20 1.72% 100.00% 0.00% 100.00%
C-BDLG-34-1610 Subgrade Preparation 1 16-Dec-20 16-Dec-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-34-1620 Rebar for Ramp 2 17-Dec-20 19-Dec-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-34-1630 Formwork for Ramp 1 20-Dec-20 20-Dec-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-34-1640 Concrete Pouring for Ramp 1 21-Dec-20 21-Dec-20 33.33% 100.00% 0.00% 100.00%
SASRF.5.3.14.2 Architecture 43 12-Dec-20 30-Jan-21 47.99% 76.95% 0.00% 76.95%
SASRF.5.3.14.2.1 Mechanical room 30 16-Dec-20 19-Jan-21 25.86% 95.84% 0.00% 95.84%
A-BDLG-34-1000 Laying of Block 6 16-Dec-20 22-Dec-20 28.92% 100.00% 0.00% 100.00%
A-BDLG-34-1010 External Plastering 5 21-Dec-20 26-Dec-20 22.89% 100.00% 0.00% 100.00%
A-BDLG-34-1012 Internal Plastering 4 27-Dec-20 30-Dec-20 12.05% 100.00% 0.00% 100.00%
A-BDLG-34-1015 Painting for ceiling 3 7-Jan-21 10-Jan-21 6.02% 85.00% 0.00% 85.00%

Page 15 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
A-BDLG-34-1020 Internal Painting 4 11-Jan-21 14-Jan-21 8.43% 85.00% 0.00% 85.00%
A-BDLG-34-1030 External Painting 4 16-Jan-21 19-Jan-21 10.84% 85.00% 0.00% 85.00%
A-BDLG-34-1035 Cement screed on floor 2 31-Dec-20 2-Jan-21 7.23% 100.00% 0.00% 100.00%
A-BDLG-34-1040 Painting on Floor 4 16-Jan-21 19-Jan-21 3.61% 90.00% 0.00% 90.00%
SASRF.5.3.14.2.2 Water proofing 20 12-Dec-20 3-Jan-21 11.37% 100.00% 0.00% 100.00%
A-BDLG-34-1050 Surface Preparation 2 12-Dec-20 13-Dec-20 5.48% 100.00% 0.00% 100.00%
A-BDLG-34-1060 Pouring of Light weight Concrete 1 14-Dec-20 14-Dec-20 13.70% 100.00% 0.00% 100.00%
A-BDLG-34-1070 Bituminous Coating 2 20-Dec-20 21-Dec-20 2.74% 100.00% 0.00% 100.00%
A-BDLG-34-1080 Installation of EPDM Water proofing membrane 3 22-Dec-20 24-Dec-20 32.88% 100.00% 0.00% 100.00%
A-BDLG-34-1090 Leaktest 1 26-Dec-20 26-Dec-20 2.74% 100.00% 0.00% 100.00%
A-BDLG-34-1100 Installation of Insulation Board 2 27-Dec-20 28-Dec-20 10.96% 100.00% 0.00% 100.00%
A-BDLG-34-1110 Installation of geotextile membrane 1 29-Dec-20 29-Dec-20 1.37% 100.00% 0.00% 100.00%
A-BDLG-34-1120 Gravel Filling 2 30-Dec-20 31-Dec-20 21.92% 100.00% 0.00% 100.00%
A-BDLG-34-1130 Installation of Steel Flashing 2 2-Jan-21 3-Jan-21 8.22% 100.00% 0.00% 100.00%

Page 16 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.14.2.3 Demolition works 10 23-Dec-20 3-Jan-21 7.94% 83.33% 0.00% 83.33%
A-BDLG-34-1140 Demolish CMU block walls openining for hvac duct 3 23-Dec-20 26-Dec-20 29.41% 70.00% 0.00% 70.00%
A-BDLG-34-1150 Disassemble existing hollow metal window 2 27-Dec-20 28-Dec-20 7.84% 0.00%
A-BDLG-34-1160 Demolish existing false ceiling acoustic tiles 5 29-Dec-20 3-Jan-21 58.82% 100.00% 0.00% 100.00%
A-BDLG-34-1170 Demolish existing Gypsum Ceiling Board 1 3-Jan-21 3-Jan-21 3.92% 100.00% 0.00% 100.00%
SASRF.5.3.14.2.4 General Modification works 25 2-Jan-21 30-Jan-21 54.83% 62.33% 0.00% 62.33%
A-BDLG-34-1180 Installation of Acoustic ceiling Tiles 5 2-Jan-21 6-Jan-21 12.78% 90.00% 0.00% 90.00%
A-BDLG-34-1190 Installatin of Gypsum celing board 2 7-Jan-21 9-Jan-21 0.85% 90.00% 0.00% 90.00%
A-BDLG-34-1200 Preparation for internal painting 8 10-Jan-21 18-Jan-21 7.95% 50.00% 0.00% 50.00%
A-BDLG-34-1210 Internal paint for wall 6 14-Jan-21 20-Jan-21 4.55% 50.00% 0.00% 50.00%
A-BDLG-34-1220 Preparation for External painting 10 17-Jan-21 27-Jan-21 12.50% 15.00% 0.00% 15.00%
A-BDLG-34-1230 External paint for wall 9 20-Jan-21 30-Jan-21 6.82% 15.00% 0.00% 15.00%
A-BDLG-34-1240 Repair of Doors 10 4-Jan-21 14-Jan-21 51.14% 75.00% 0.00% 75.00%
A-BDLG-34-1250 Installation of Door 2 5-Jan-21 6-Jan-21 3.41% 75.00% 0.00% 75.00%
SASRF.5.3.15 New water plant Control room Building (No.31) 183 12-Mar-20 11-Oct-20 6.02% 52.77% 0.00% 52.77%
SASRF.5.3.15.1 Civil 183 12-Mar-20 11-Oct-20 61.93% 85.21% 0.00% 85.21%
SASRF.5.3.15.1.1 Demolition 18 26-Aug-20 15-Sep-20 30.10% 100.00% 0.00% 100.00%
C-BDLG-31-1000 Demolition of Existing structures 18 26-Aug-20 15-Sep-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.15.1.2 Construction of AHU & ACCU Foundation 28 7-Sep-20 8-Oct-20 53.32% 83.27% 0.00% 83.27%
C-BDLG-31-1010 Excavation 9 7-Sep-20 16-Sep-20 16.75% 100.00% 0.00% 100.00%
C-BDLG-31-1020 Subgrade preparation and Lean concrete 7 12-Sep-20 19-Sep-20 3.35% 100.00% 0.00% 100.00%
C-BDLG-31-1030 Rebar 7 13-Sep-20 20-Sep-20 19.14% 95.00% 0.00% 95.00%
C-BDLG-31-1040 Formwork 5 16-Sep-20 21-Sep-20 11.48% 95.00% 0.00% 95.00%
C-BDLG-31-1050 Anchorbolt Fixing 4 17-Sep-20 21-Sep-20 0.96% 100.00% 0.00% 100.00%
C-BDLG-31-1060 Concrete pouring 4 19-Sep-20 22-Sep-20 19.14% 95.00% 0.00% 95.00%
C-BDLG-31-1070 Curing 7 20-Sep-20 27-Sep-20 0.48% 28.91% 0.00% 28.91%
C-BDLG-31-1080 Surface Preparation 5 24-Sep-20 29-Sep-20 7.66% 28.91% 0.00% 28.91%
C-BDLG-31-1090 Coating 4 27-Sep-20 30-Sep-20 3.83% 28.91% 0.00% 28.91%
C-BDLG-31-1100 Backfilling 3 1-Oct-20 4-Oct-20 5.74% 0.00%
C-BDLG-31-1110 Grouting 2 7-Oct-20 8-Oct-20 11.48% 100.00% 0.00% 100.00%
SASRF.5.3.15.1.3 Concrete Grade slab 6 5-Oct-20 11-Oct-20 5.10% 25.00% 0.00% 25.00%
C-BDLG-31-1120 Subgrade Preparation 2 5-Oct-20 6-Oct-20 15.00% 25.00% 0.00% 25.00%
C-BDLG-31-1130 Rebar for slab 2 7-Oct-20 8-Oct-20 30.00% 25.00% 0.00% 25.00%
C-BDLG-31-1140 Formwork for slab 1 10-Oct-20 10-Oct-20 15.00% 25.00% 0.00% 25.00%
C-BDLG-31-1150 Concrete Pouring for slab 1 11-Oct-20 11-Oct-20 40.00% 25.00% 0.00% 25.00%
SASRF.5.3.15.1.4 Diesel Generator Foundation 18 12-Mar-20 1-Apr-20 11.48% 82.22% 0.00% 82.22%
C-BDLG-31-1160 Excavation and Subgrade Preparation 3 12-Mar-20 15-Mar-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-31-1170 Rebar work 2 16-Mar-20 17-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-31-1180 Formwork 1 18-Mar-20 18-Mar-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-31-1190 Concrete Pouring 1 19-Mar-20 19-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-31-1200 Surface preparation 2 25-Mar-20 26-Mar-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-31-1210 Coating 2 28-Mar-20 29-Mar-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-31-1220 Backfilling 2 30-Mar-20 31-Mar-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-31-1230 Grouting 1 1-Apr-20 1-Apr-20 17.78% 0.00%
SASRF.5.3.15.2 Architecture 27 10-Sep-20 11-Oct-20 38.07% 0.00% 0.00% 0.00%
SASRF.5.3.15.2.1 General Modification works 17 10-Sep-20 29-Sep-20 43.57% 0.00% 0.00% 0.00%
A-BDLG-31-1000 Demolish Existing Epoxt paint on cement screed 3 10-Sep-20 13-Sep-20 17.14% 0.00%
A-BDLG-31-1010 Demolish wall for Hvac opening 2 14-Sep-20 15-Sep-20 4.76% 0.00%
A-BDLG-31-1020 Repair plaster for Hvac opening 1 16-Sep-20 16-Sep-20 1.90% 0.00%
A-BDLG-31-1030 Floor preparation for screed concrete 3 17-Sep-20 20-Sep-20 9.52% 0.00%
A-BDLG-31-1040 Pouring Screed concrete 4 21-Sep-20 24-Sep-20 9.52% 0.00%
A-BDLG-31-1045 Repair of Doors 4 26-Sep-20 29-Sep-20 57.14% 0.00%
SASRF.5.3.15.2.2 Painting 21 17-Sep-20 11-Oct-20 56.43% 0.00% 0.00% 0.00%
A-BDLG-31-1050 Preparation for External wall 10 17-Sep-20 28-Sep-20 26.47% 0.00%
A-BDLG-31-1060 Painting on External wall 8 22-Sep-20 30-Sep-20 16.18% 0.00%
A-BDLG-31-1070 Preparation for ceiling 3 24-Sep-20 27-Sep-20 4.41% 0.00%
A-BDLG-31-1080 Painting for ceiling 2 28-Sep-20 29-Sep-20 2.94% 0.00%
A-BDLG-31-1090 Preparation for Internal wall 8 27-Sep-20 5-Oct-20 26.47% 0.00%
A-BDLG-31-1100 Painting for Internal wall 6 1-Oct-20 7-Oct-20 14.71% 0.00%
A-BDLG-31-1110 Preparation for Floor painting 3 6-Oct-20 8-Oct-20 5.88% 0.00%
A-BDLG-31-1120 Floor painting 3 8-Oct-20 11-Oct-20 2.94% 0.00%
SASRF.5.3.16 Service group Building (No.32) 190 7-Mar-20 13-Oct-20 11.92% 91.85% 0.00% 91.85%
SASRF.5.3.16.1 Civil 159 7-Mar-20 7-Sep-20 61.58% 94.92% 0.00% 94.92%
SASRF.5.3.16.1.1 Sub structure 109 28-Apr-20 1-Sep-20 33.07% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.1.1 Demolition 11 28-Apr-20 10-May-20 19.57% 100.00% 0.00% 100.00%
C-BDLG-32-1000 Demolition of Existing structure 11 28-Apr-20 10-May-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.1.2 Excavation(Mechanical room) 5 5-May-20 10-May-20 10.57% 100.00% 0.00% 100.00%
C-BDLG-32-1010 Excavation 3 5-May-20 7-May-20 66.67% 100.00% 0.00% 100.00%
C-BDLG-32-1020 Levelling and compaction 1 9-May-20 9-May-20 22.22% 100.00% 0.00% 100.00%
C-BDLG-32-1030 Lean concrete 1 10-May-20 10-May-20 11.11% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.1.3 Construction of column upto Bottom of grade bea 10 11-May-20 21-May-20 25.24% 100.00% 0.00% 100.00%
C-BDLG-32-1033 Rebar for footing 2 11-May-20 12-May-20 37.21% 100.00% 0.00% 100.00%
C-BDLG-32-1036 Formwork for footing 1 12-May-20 12-May-20 18.60% 100.00% 0.00% 100.00%
C-BDLG-32-1039 Concrete pouring for footing 1 13-May-20 13-May-20 7.75% 100.00% 0.00% 100.00%
C-BDLG-32-1040 Curing 7 14-May-20 21-May-20 1.55% 100.00% 0.00% 100.00%
C-BDLG-32-1050 Rebar for column upto Grade beam 2 19-May-20 20-May-20 18.60% 100.00% 0.00% 100.00%
C-BDLG-32-1060 Formwork for column upto Grade beam 1 20-May-20 20-May-20 9.30% 100.00% 0.00% 100.00%
C-BDLG-32-1070 Concrete pouring for column upto bottom of Grade 1 21-May-20 21-May-20 6.98% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.1.4 Backfilling of Foundation((Mechanical room) 7 27-May-20 3-Jun-20 14.09% 100.00% 0.00% 100.00%
C-BDLG-32-1080 Surface preparation 3 27-May-20 30-May-20 50.00% 100.00% 0.00% 100.00%
C-BDLG-32-1090 Coating 2 31-May-20 1-Jun-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-32-1100 Backfilling 2 2-Jun-20 3-Jun-20 33.33% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.1.5 Construction of Grade beam(Mechanical room) 16 4-Jun-20 22-Jun-20 20.35% 100.00% 0.00% 100.00%
C-BDLG-32-1110 Lean concrete 1 4-Jun-20 4-Jun-20 7.69% 100.00% 0.00% 100.00%

Page 17 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
C-BDLG-32-1120 Rebar for Grade beam 2 7-Jun-20 8-Jun-20 23.08% 100.00% 0.00% 100.00%
C-BDLG-32-1130 Formwork for Grade beam 2 8-Jun-20 9-Jun-20 13.46% 100.00% 0.00% 100.00%
C-BDLG-32-1140 Concrete Pouring for Grade beam 1 10-Jun-20 10-Jun-20 11.54% 100.00% 0.00% 100.00%
C-BDLG-32-1150 Curing 7 11-Jun-20 18-Jun-20 1.92% 100.00% 0.00% 100.00%
C-BDLG-32-1160 Surface Preparation 3 16-Jun-20 18-Jun-20 11.54% 100.00% 0.00% 100.00%
C-BDLG-32-1170 Coating 2 18-Jun-20 20-Jun-20 7.69% 100.00% 0.00% 100.00%
C-BDLG-32-1180 Backfilling 2 21-Jun-20 22-Jun-20 23.08% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.1.6 Construction of Grade slab(Mechanical room) 14 17-Aug-20 1-Sep-20 10.18% 100.00% 0.00% 100.00%
C-BDLG-32-1190 Subgrade Preparation and Compaction 2 17-Aug-20 18-Aug-20 23.08% 100.00% 0.00% 100.00%
C-BDLG-32-1200 Rebar work 2 19-Aug-20 20-Aug-20 23.08% 100.00% 0.00% 100.00%
C-BDLG-32-1210 Formwork 1 22-Aug-20 22-Aug-20 19.23% 100.00% 0.00% 100.00%
C-BDLG-32-1220 Concretre Pouring for Grade slab 1 23-Aug-20 23-Aug-20 30.77% 100.00% 0.00% 100.00%
C-BDLG-32-1230 Curing 8 24-Aug-20 1-Sep-20 3.85% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.2 Super structure 43 11-Jun-20 30-Jul-20 29.99% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.2.1 Construction of Column from Top of Grade slab t 22 11-Jun-20 6-Jul-20 43.89% 100.00% 0.00% 100.00%
C-BDLG-32-1240 Rebar cutting & bending 2 11-Jun-20 13-Jun-20 14.75% 100.00% 0.00% 100.00%
C-BDLG-32-1250 Formwork Making 3 14-Jun-20 16-Jun-20 17.70% 100.00% 0.00% 100.00%
C-BDLG-32-1260 Scaffolding for Column 2 17-Jun-20 18-Jun-20 11.80% 100.00% 0.00% 100.00%
C-BDLG-32-1270 Rebar Fixing 2 20-Jun-20 21-Jun-20 17.70% 100.00% 0.00% 100.00%
C-BDLG-32-1280 Formwork 3 22-Jun-20 24-Jun-20 17.70% 100.00% 0.00% 100.00%
C-BDLG-32-1290 Concrete Pouring 1 25-Jun-20 25-Jun-20 7.87% 100.00% 0.00% 100.00%
C-BDLG-32-1300 Deshuttering 2 27-Jun-20 28-Jun-20 11.80% 100.00% 0.00% 100.00%
C-BDLG-32-1310 Curing 7 29-Jun-20 6-Jul-20 0.69% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.2.2 Construction of Roof beam & Slab(Mechanical room) 25 27-Jun-20 25-Jul-20 48.77% 100.00% 0.00% 100.00%
C-BDLG-32-1320 Rebar Cutting and bending 2 27-Jun-20 28-Jun-20 14.16% 100.00% 0.00% 100.00%
C-BDLG-32-1330 Scaffolding installation 2 29-Jun-20 30-Jun-20 21.24% 100.00% 0.00% 100.00%
C-BDLG-32-1340 Formwork for Beam & Slab 3 1-Jul-20 4-Jul-20 15.93% 100.00% 0.00% 100.00%
C-BDLG-32-1350 Rebar work 2 4-Jul-20 5-Jul-20 21.24% 100.00% 0.00% 100.00%
C-BDLG-32-1360 Concrete Pouring 1 6-Jul-20 6-Jul-20 7.96% 100.00% 0.00% 100.00%
C-BDLG-32-1370 Deshuttering 2 23-Jul-20 25-Jul-20 15.93% 100.00% 0.00% 100.00%
C-BDLG-32-1380 Curing 14 8-Jul-20 23-Jul-20 3.54% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.2.3 Parapet wall (Mechanical room) 5 26-Jul-20 30-Jul-20 7.34% 100.00% 0.00% 100.00%
C-BDLG-32-1390 Rebar work 2 26-Jul-20 27-Jul-20 29.41% 100.00% 0.00% 100.00%
C-BDLG-32-1400 Formwork for Parapet wall 2 28-Jul-20 29-Jul-20 47.06% 100.00% 0.00% 100.00%
C-BDLG-32-1410 Concrete Pouring 1 30-Jul-20 30-Jul-20 23.53% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.3 Construction of AHU & ACCU Foundation 23 25-Jul-20 19-Aug-20 27.05% 100.00% 0.00% 100.00%
C-BDLG-32-1420 Excavation 5 25-Jul-20 29-Jul-20 13.40% 100.00% 0.00% 100.00%
C-BDLG-32-1430 Subgrade preparation and Lean concrete 2 27-Jul-20 28-Jul-20 3.35% 100.00% 0.00% 100.00%
C-BDLG-32-1440 Rebar 4 29-Jul-20 2-Aug-20 11.96% 100.00% 0.00% 100.00%
C-BDLG-32-1450 Formwork 5 1-Aug-20 5-Aug-20 14.83% 100.00% 0.00% 100.00%
C-BDLG-32-1460 Anchorbolt Fixing 4 2-Aug-20 5-Aug-20 1.91% 100.00% 0.00% 100.00%
C-BDLG-32-1470 Concrete pouring 5 3-Aug-20 8-Aug-20 21.53% 100.00% 0.00% 100.00%
C-BDLG-32-1480 Curing 7 3-Aug-20 10-Aug-20 0.48% 100.00% 0.00% 100.00%
C-BDLG-32-1490 Surface Preparation 4 8-Aug-20 11-Aug-20 7.18% 100.00% 0.00% 100.00%
C-BDLG-32-1500 Coating 3 10-Aug-20 12-Aug-20 3.83% 100.00% 0.00% 100.00%
C-BDLG-32-1510 Backfilling 3 13-Aug-20 16-Aug-20 11.96% 100.00% 0.00% 100.00%
C-BDLG-32-1520 Grouting 1 19-Aug-20 19-Aug-20 9.57% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.4 Diesel Generator Foundation 18 7-Mar-20 26-Mar-20 5.82% 82.22% 0.00% 82.22%
C-BDLG-32-1680 Excavation and Subgrade Preparation 3 7-Mar-20 9-Mar-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-32-1690 Rebar work 2 10-Mar-20 11-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-32-1700 Formwork 1 12-Mar-20 12-Mar-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-32-1710 Concrete Pouring 1 14-Mar-20 14-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-32-1720 Surface preparation 2 19-Mar-20 21-Mar-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-32-1730 Coating 2 22-Mar-20 23-Mar-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-32-1740 Backfilling 2 24-Mar-20 25-Mar-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-32-1750 Grouting 1 26-Mar-20 26-Mar-20 17.78% 0.00%
SASRF.5.3.16.1.5 Construction of walkway 8 24-Aug-20 1-Sep-20 2.72% 100.00% 0.00% 100.00%
C-BDLG-32-1600 Subgrade Preparation 2 24-Aug-20 25-Aug-20 23.81% 100.00% 0.00% 100.00%
C-BDLG-32-1610 Rebar 3 26-Aug-20 29-Aug-20 28.57% 100.00% 0.00% 100.00%
C-BDLG-32-1620 Formwork 2 30-Aug-20 31-Aug-20 19.05% 100.00% 0.00% 100.00%
C-BDLG-32-1630 Concrete Pouring for walkway 1 1-Sep-20 1-Sep-20 28.57% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.6 Construction of Ramp 5 2-Sep-20 7-Sep-20 1.36% 100.00% 0.00% 100.00%
C-BDLG-32-1640 Subgrade Preparation 1 2-Sep-20 2-Sep-20 19.05% 100.00% 0.00% 100.00%
C-BDLG-32-1650 Rebar for Ramp 2 3-Sep-20 5-Sep-20 38.10% 100.00% 0.00% 100.00%
C-BDLG-32-1660 Formwork for Ramp 1 6-Sep-20 6-Sep-20 28.57% 100.00% 0.00% 100.00%
C-BDLG-32-1670 Concrete Pouring for Ramp 1 7-Sep-20 7-Sep-20 14.29% 100.00% 0.00% 100.00%
SASRF.5.3.16.2 Architecture 49 18-Aug-20 13-Oct-20 38.42% 86.91% 0.00% 86.91%
SASRF.5.3.16.2.1 Mechanical room 39 24-Aug-20 7-Oct-20 35.48% 98.74% 0.00% 98.74%
A-BDLG-32-1000 Laying of Block 8 24-Aug-20 1-Sep-20 28.07% 100.00% 0.00% 100.00%
A-BDLG-32-1010 External Plastering 6 2-Sep-20 8-Sep-20 18.71% 100.00% 0.00% 100.00%
A-BDLG-32-1020 Internal Plastering 5 9-Sep-20 14-Sep-20 10.53% 100.00% 0.00% 100.00%
A-BDLG-32-1025 Cement screed on floor 2 15-Sep-20 16-Sep-20 5.85% 100.00% 0.00% 100.00%
A-BDLG-32-1030 Painting for ceiling 3 21-Sep-20 23-Sep-20 2.92% 95.00% 0.00% 95.00%
A-BDLG-32-1040 Internal Painting 4 24-Sep-20 28-Sep-20 7.02% 95.00% 0.00% 95.00%
A-BDLG-32-1050 External Painting 6 29-Sep-20 5-Oct-20 11.70% 95.00% 0.00% 95.00%
A-BDLG-32-1070 Painting on Floor 3 3-Oct-20 5-Oct-20 3.51% 95.00% 0.00% 95.00%
A-BDLG-32-1075 Installation of Metal coping on Parapet 2 6-Oct-20 7-Oct-20 4.68% 100.00% 0.00% 100.00%
A-BDLG-32-1078 Installation of Door 2 24-Sep-20 26-Sep-20 7.02% 100.00% 0.00% 100.00%
SASRF.5.3.16.2.2 Water proofing 16 18-Aug-20 5-Sep-20 17.43% 100.00% 0.00% 100.00%
A-BDLG-32-1080 Surface Preparation 2 18-Aug-20 19-Aug-20 7.14% 100.00% 0.00% 100.00%
A-BDLG-32-1090 Pouring of Light weight Concrete 1 20-Aug-20 20-Aug-20 11.90% 100.00% 0.00% 100.00%
A-BDLG-32-1100 Bituminous Coating 2 22-Aug-20 23-Aug-20 2.38% 100.00% 0.00% 100.00%
A-BDLG-32-1110 Installation of EPDM Water proofing membrane 3 24-Aug-20 26-Aug-20 29.76% 100.00% 0.00% 100.00%
A-BDLG-32-1120 Leaktest 1 27-Aug-20 27-Aug-20 2.38% 100.00% 0.00% 100.00%

Page 18 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
A-BDLG-32-1130 Installation of Insulation Board 2 29-Aug-20 30-Aug-20 9.52% 100.00% 0.00% 100.00%
A-BDLG-32-1140 Installation of geotextile membrane 1 31-Aug-20 31-Aug-20 2.38% 100.00% 0.00% 100.00%
A-BDLG-32-1150 Gravel Filling 2 1-Sep-20 2-Sep-20 28.57% 100.00% 0.00% 100.00%
A-BDLG-32-1160 Installation of Steel Flashing 2 3-Sep-20 5-Sep-20 5.95% 100.00% 0.00% 100.00%
SASRF.5.3.16.2.3 General Modification works 25 15-Sep-20 13-Oct-20 47.10% 73.15% 0.00% 73.15%
A-BDLG-32-1170 Installation of Acoustic ceiling Tiles 6 15-Sep-20 21-Sep-20 10.57% 95.00% 0.00% 95.00%
A-BDLG-32-1180 Installatin of Gypsum celing board 4 19-Sep-20 22-Sep-20 7.05% 0.00%
A-BDLG-32-1190 Preparation for internal painting 6 23-Sep-20 29-Sep-20 9.69% 100.00% 0.00% 100.00%
A-BDLG-32-1200 Internal paint for wall 4 30-Sep-20 4-Oct-20 6.61% 75.00% 0.00% 75.00%
A-BDLG-32-1210 Preparation for External painting 7 5-Oct-20 12-Oct-20 10.57% 0.00%
A-BDLG-32-1220 External paint for wall 5 8-Oct-20 13-Oct-20 7.05% 0.00%
A-BDLG-32-1230 Repair of Doors 11 26-Sep-20 7-Oct-20 48.46% 100.00% 0.00% 100.00%
SASRF.5.3.17 Water Treatment facilities Building (No.33) 182 8-Apr-20 5-Nov-20 5.59% 71.14% 0.00% 71.14%
SASRF.5.3.17.1 Civil 182 8-Apr-20 5-Nov-20 81.12% 87.69% 0.00% 87.69%
SASRF.5.3.17.1.1 Demolition 22 16-Sep-20 11-Oct-20 37.74% 100.00% 0.00% 100.00%
C-BDLG-33-1000 Demolition of Existing structures 22 16-Sep-20 11-Oct-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.17.1.2 Construction of AHU & ACCU Foundation 26 7-Oct-20 5-Nov-20 45.70% 78.30% 0.00% 78.30%
C-BDLG-33-1010 Excavation 5 7-Oct-20 12-Oct-20 12.84% 95.00% 0.00% 95.00%
C-BDLG-33-1020 Subgrade preparation and Lean concrete 3 11-Oct-20 13-Oct-20 3.67% 95.00% 0.00% 95.00%
C-BDLG-33-1030 Rebar 7 12-Oct-20 19-Oct-20 13.76% 100.00% 0.00% 100.00%
C-BDLG-33-1040 Formwork 7 14-Oct-20 21-Oct-20 16.51% 100.00% 0.00% 100.00%
C-BDLG-33-1050 Anchorbolt Fixing 5 17-Oct-20 21-Oct-20 2.75% 100.00% 0.00% 100.00%
C-BDLG-33-1060 Concrete pouring 5 18-Oct-20 22-Oct-20 25.23% 100.00% 0.00% 100.00%
C-BDLG-33-1070 Curing 7 19-Oct-20 26-Oct-20 0.46% 50.00% 0.00% 50.00%
C-BDLG-33-1080 Surface Preparation 5 24-Oct-20 28-Oct-20 5.50% 50.00% 0.00% 50.00%
C-BDLG-33-1090 Coating 4 26-Oct-20 29-Oct-20 2.75% 50.00% 0.00% 50.00%
C-BDLG-33-1100 Backfilling 4 28-Oct-20 1-Nov-20 3.67% 0.00%
C-BDLG-33-1110 Grouting 2 4-Nov-20 5-Nov-20 12.84% 0.00%
SASRF.5.3.17.1.3 Concrete Grade slab 4 2-Nov-20 5-Nov-20 7.13% 90.00% 0.00% 90.00%
C-BDLG-33-1120 Rebar for slab 2 2-Nov-20 3-Nov-20 35.29% 90.00% 0.00% 90.00%
C-BDLG-33-1130 Formwork for slab 2 3-Nov-20 4-Nov-20 17.65% 90.00% 0.00% 90.00%
C-BDLG-33-1140 Concrete Pouring for slab 1 5-Nov-20 5-Nov-20 47.06% 90.00% 0.00% 90.00%
SASRF.5.3.17.1.4 Diesel Generator Foundation 18 8-Apr-20 28-Apr-20 9.43% 82.22% 0.00% 82.22%
C-BDLG-33-1150 Excavation and Subgrade Preparation 3 8-Apr-20 11-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-33-1160 Rebar work 2 12-Apr-20 13-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-33-1170 Formwork 1 14-Apr-20 14-Apr-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-33-1180 Concrete Pouring 1 15-Apr-20 15-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-33-1190 Surface preparation 2 21-Apr-20 22-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-33-1200 Coating 2 23-Apr-20 25-Apr-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-33-1210 Backfilling 2 26-Apr-20 27-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-33-1220 Grouting 1 28-Apr-20 28-Apr-20 17.78% 0.00%
SASRF.5.3.17.2 Architecture 28 30-Sep-20 1-Nov-20 18.88% 0.00% 0.00% 0.00%
SASRF.5.3.17.2.1 General Modification works 14 30-Sep-20 15-Oct-20 57.66% 0.00% 0.00% 0.00%
A-BDLG-33-1000 Demolish Existing Epoxt paint on cement screed 3 30-Sep-20 3-Oct-20 9.38% 0.00%
A-BDLG-33-1010 Demolish existing false ceiling accoustic tiles 4 4-Oct-20 7-Oct-20 37.50% 0.00%
A-BDLG-33-1020 Floor preparation for screed concrete 2 8-Oct-20 10-Oct-20 9.38% 0.00%
A-BDLG-33-1030 Pouring Screed concrete 1 11-Oct-20 11-Oct-20 6.25% 0.00%
A-BDLG-33-1040 Repair of Doors 4 12-Oct-20 15-Oct-20 37.50% 0.00%
SASRF.5.3.17.2.2 Painting 14 17-Oct-20 1-Nov-20 42.34% 0.00% 0.00% 0.00%
A-BDLG-33-1050 Preparation for ceiling 2 17-Oct-20 18-Oct-20 6.38% 0.00%
A-BDLG-33-1060 Painting for ceiling 2 19-Oct-20 20-Oct-20 4.26% 0.00%
A-BDLG-33-1070 Preparation for Internal wall 7 19-Oct-20 26-Oct-20 51.06% 0.00%
A-BDLG-33-1080 Painting for Internal wall 5 22-Oct-20 27-Oct-20 29.79% 0.00%
A-BDLG-33-1090 Preaparation for Floor painting 2 28-Oct-20 29-Oct-20 4.26% 0.00%
A-BDLG-33-1100 Floor painting 2 31-Oct-20 1-Nov-20 4.26% 0.00%
SASRF.5.3.18 Boiler house and control Building (No.91) 13 25-May-20 8-Jun-20 0.35% 0.00% 0.00% 0.00%
A-BDLG-91-1000 Preparation for External wall 3 25-May-20 27-May-20 24.32% 0.00%
A-BDLG-91-1010 Painting for External wall 2 28-May-20 30-May-20 13.51% 0.00%
A-BDLG-91-1020 Preparation for Internal wall 5 31-May-20 4-Jun-20 40.54% 0.00%
A-BDLG-91-1030 Painting for Internal wall 3 6-Jun-20 8-Jun-20 21.62% 0.00%
SASRF.5.3.19 CBD Car Pool Office Building (No.1) 8 10-Jun-20 18-Jun-20 0.20% 5.95% 0.00% 5.95%
A-BDLG-01-1000 Preparation for External wall 2 10-Jun-20 11-Jun-20 4.76% 100.00% 0.00% 100.00%
A-BDLG-01-1010 Painting for External wall 1 13-Jun-20 13-Jun-20 2.38% 50.00% 0.00% 50.00%
A-BDLG-01-1020 Preparation for Internal wall 2 10-Jun-20 11-Jun-20 4.76% 0.00%
A-BDLG-01-1030 Painting for Internal wall 1 13-Jun-20 13-Jun-20 2.38% 0.00%
A-BDLG-01-1040 Repair of Doors 2 14-Jun-20 15-Jun-20 28.57% 0.00%
A-BDLG-01-1050 Repair of Aluminium windows 3 16-Jun-20 18-Jun-20 57.14% 0.00%
SASRF.5.3.20 Chemical storage Building (No.89) 3 15-Jun-20 17-Jun-20 0.01% 0.00% 0.00% 0.00%
A-BDLG-89-1000 Preparation for Internal wall 2 15-Jun-20 16-Jun-20 66.67% 0.00%
A-BDLG-89-1010 Painting for Internal wall 1 17-Jun-20 17-Jun-20 33.33% 0.00%
SASRF.5.3.21 Coast Guard power Building (No.53) 38 18-Jun-20 1-Aug-20 0.15% 0.00% 0.00% 0.00%
A-BDLG-53-1000 Demolish Existing false ceiling accoustic tiles 1 20-Jun-20 20-Jun-20 12.50% 0.00%
A-BDLG-53-1010 Disassemble existing hollow metal single door 2 21-Jun-20 22-Jun-20 18.75% 0.00%
A-BDLG-53-1020 External Painting 2 18-Jun-20 20-Jun-20 6.25% 0.00%
A-BDLG-53-1030 Internal Painting 2 18-Jun-20 20-Jun-20 6.25% 0.00%
A-BDLG-53-1040 Installation of Vinyl tile on Floor 1 23-Jun-20 23-Jun-20 6.25% 0.00%
A-BDLG-53-1050 Installation of Acoustic ceiling tile 2 24-Jun-20 25-Jun-20 12.50% 0.00%
A-BDLG-53-1060 Installation of Door 2 30-Jul-20 1-Aug-20 37.50% 0.00%
SASRF.5.3.22 Control room and Recreation building 16 22-Jun-20 9-Jul-20 0.43% 0.00% 0.00% 0.00%
A-BDLG-CR-1000 Preparation for Internal wall 3 22-Jun-20 24-Jun-20 17.78% 0.00%
A-BDLG-CR-1010 Painting for Internal wall 2 25-Jun-20 27-Jun-20 8.89% 0.00%
A-BDLG-CR-1020 Preparation for External wall 5 28-Jun-20 2-Jul-20 44.44% 0.00%
A-BDLG-CR-1030 Painting for External wall 3 4-Jul-20 6-Jul-20 22.22% 0.00%
A-BDLG-CR-1040 Surface preparation for floor 1 7-Jul-20 7-Jul-20 4.44% 0.00%

Page 19 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
A-BDLG-CR-1050 Painting on Floor 2 8-Jul-20 9-Jul-20 2.22% 0.00%
SASRF.5.3.23 EX-Refinery control Building 33 27-Jun-20 3-Aug-20 1.44% 12.50% 0.00% 12.50%
A-BDLG-EX-RCB-1000 Demolish existing artficial stone 10 27-Jun-20 7-Jul-20 32.89% 0.00%
A-BDLG-EX-RCB-1010 Disassemble existing hollow metal door 2 6-Jul-20 7-Jul-20 1.97% 0.00%
A-BDLG-EX-RCB-1020 Demolish existing falsce ceiling 5 8-Jul-20 13-Jul-20 13.16% 95.00% 0.00% 95.00%
A-BDLG-EX-RCB-1030 Installation of Artificial stone 13 11-Jul-20 25-Jul-20 34.21% 0.00%
A-BDLG-EX-RCB-1040 Installation of Acoustic ceiling Tile 8 16-Jul-20 25-Jul-20 15.79% 0.00%
A-BDLG-EX-RCB-1050 Installation of Door 2 2-Aug-20 3-Aug-20 1.97% 0.00%
SASRF.5.3.24 FDP-1 Central control room Building (No.55) 6 12-Jul-20 18-Jul-20 0.21% 0.00% 0.00% 0.00%
A-BDLG-55-1000 Preparation for Internal wall 5 12-Jul-20 16-Jul-20 68.18% 0.00%
A-BDLG-55-1010 Painting for Internal wall 3 15-Jul-20 18-Jul-20 31.82% 0.00%
SASRF.5.3.25 FDP-1 Substation -8 Building (No.65) 13 19-Jul-20 2-Aug-20 0.19% 0.00% 0.00% 0.00%
A-BDLG-65-1000 Preparation for ceiling 3 19-Jul-20 21-Jul-20 29.27% 0.00%
A-BDLG-65-1010 Painting for ceiling 2 22-Jul-20 23-Jul-20 9.76% 0.00%
A-BDLG-65-1020 Preparation for Internal wall 2 25-Jul-20 26-Jul-20 14.63% 0.00%
A-BDLG-65-1030 Painting for Internal wall 2 27-Jul-20 28-Jul-20 4.88% 0.00%
A-BDLG-65-1040 Floor painting on cement screed 2 29-Jul-20 30-Jul-20 12.20% 0.00%
A-BDLG-65-1050 Repair of Doors 2 1-Aug-20 2-Aug-20 29.27% 0.00%
SASRF.5.3.26 FDP-1 Substation -9 Building (No.66) 13 1-Aug-20 15-Aug-20 0.19% 0.00% 0.00% 0.00%
A-BDLG-66-1000 Preparation for ceiling 3 1-Aug-20 3-Aug-20 29.27% 0.00%
A-BDLG-66-1010 Painting for ceiling 2 4-Aug-20 5-Aug-20 9.76% 0.00%
A-BDLG-66-1020 Preparation for Internal wall 2 6-Aug-20 8-Aug-20 14.63% 0.00%
A-BDLG-66-1030 Painting for Internal wall 2 9-Aug-20 10-Aug-20 4.88% 0.00%
A-BDLG-66-1040 Floor painting on cement screed 2 11-Aug-20 12-Aug-20 12.20% 0.00%
A-BDLG-66-1050 Repair of Doors 2 13-Aug-20 15-Aug-20 29.27% 0.00%
SASRF.5.3.27 FDP-1 Swithgear -50 Building (No.62) 26 13-Aug-20 12-Sep-20 1.24% 0.00% 0.00% 0.00%
A-BDLG-62-1000 Preparation for Internal wall 16 13-Aug-20 31-Aug-20 43.08% 0.00%
A-BDLG-62-1010 Painting for Internal wall 14 18-Aug-20 2-Sep-20 20.00% 0.00%
A-BDLG-62-1020 Floor preparation on cement screed 12 27-Aug-20 9-Sep-20 23.08% 0.00%
A-BDLG-62-1030 Floor painting on cement screed 10 1-Sep-20 12-Sep-20 13.85% 0.00%
SASRF.5.3.28 FDP-1 Workshop Building (No.64) 13 30-Aug-20 13-Sep-20 0.16% 0.00% 0.00% 0.00%
A-BDLG-64-1000 Demolish existing artficial stone 3 30-Aug-20 1-Sep-20 23.53% 0.00%
A-BDLG-64-1010 Installation of Artificial stone 3 2-Sep-20 5-Sep-20 23.53% 0.00%
A-BDLG-64-1020 Preparation for Internal wall 4 6-Sep-20 9-Sep-20 35.29% 0.00%
A-BDLG-64-1030 Painting for Internal wall 3 10-Sep-20 13-Sep-20 17.65% 0.00%
SASRF.5.3.29 Heliport Guard House Building (No.101) 19 6-Sep-20 27-Sep-20 0.38% 0.00% 0.00% 0.00%
A-BDLG-101-1000 Remove and Reinstallation of Acousctc ceiling tiles 3 6-Sep-20 8-Sep-20 12.50% 0.00%
A-BDLG-101-1010 Preparation for External wall 2 14-Sep-20 15-Sep-20 15.00% 0.00%
A-BDLG-101-1020 Painting for External wall 2 16-Sep-20 17-Sep-20 10.00% 0.00%
A-BDLG-101-1030 Preparation for Internal wall 3 19-Sep-20 21-Sep-20 15.00% 0.00%
A-BDLG-101-1040 Painting for Internal wall 2 22-Sep-20 23-Sep-20 7.50% 0.00%
A-BDLG-101-1050 Repair of Aluminium window 3 24-Sep-20 27-Sep-20 40.00% 0.00%
SASRF.5.3.30 Maintenence Contractor Building (No.29) 16 24-Sep-20 12-Oct-20 0.70% 0.00% 0.00% 0.00%
A-BDLG-29-1000 Preparation for External wall 3 24-Sep-20 27-Sep-20 8.11% 0.00%
A-BDLG-29-1010 Painting on External wall 2 28-Sep-20 29-Sep-20 4.05% 0.00%
A-BDLG-29-1020 Preparation for ceiling 2 30-Sep-20 1-Oct-20 5.41% 0.00%
A-BDLG-29-1030 Painting for ceiling 2 3-Oct-20 4-Oct-20 2.70% 0.00%
A-BDLG-29-1040 Preparation for Internal wall 3 5-Oct-20 7-Oct-20 12.16% 0.00%
A-BDLG-29-1050 Painting for Internal wall 2 8-Oct-20 10-Oct-20 5.41% 0.00%
A-BDLG-29-1060 Repair of Doors 5 30-Sep-20 5-Oct-20 24.32% 0.00%
A-BDLG-29-1070 Repair of windows 6 6-Oct-20 12-Oct-20 37.84% 0.00%
SASRF.5.3.31 MSS Guard House-1 Building (No.68) 10 11-Oct-20 21-Oct-20 0.40% 0.00% 0.00% 0.00%
A-BDLG-68-1000 Preparation for External wall 3 11-Oct-20 13-Oct-20 14.29% 0.00%
A-BDLG-68-1010 Painting on External wall 2 14-Oct-20 15-Oct-20 7.14% 0.00%
A-BDLG-68-1020 Preparation for Internal wall 3 14-Oct-20 17-Oct-20 14.29% 0.00%
A-BDLG-68-1030 Painting for Internal wall 2 18-Oct-20 19-Oct-20 7.14% 0.00%
A-BDLG-68-1040 Repair of Doors 3 14-Oct-20 17-Oct-20 28.57% 0.00%
A-BDLG-68-1050 Repair of windows 4 18-Oct-20 21-Oct-20 28.57% 0.00%
SASRF.5.3.32 MSS Guard House-2 Building (No.69) 10 20-Oct-20 31-Oct-20 0.40% 0.00% 0.00% 0.00%
A-BDLG-69-1000 Preparation for External wall 3 20-Oct-20 22-Oct-20 14.29% 0.00%
A-BDLG-69-1010 Painting on External wall 2 24-Oct-20 25-Oct-20 7.14% 0.00%
A-BDLG-69-1020 Preparation for Internal wall 3 24-Oct-20 26-Oct-20 14.29% 0.00%
A-BDLG-69-1030 Painting for Internal wall 2 27-Oct-20 28-Oct-20 7.14% 0.00%
A-BDLG-69-1040 Repair of Doors 3 24-Oct-20 26-Oct-20 28.57% 0.00%
A-BDLG-69-1050 Repair of windows 4 27-Oct-20 31-Oct-20 28.57% 0.00%
SASRF.5.3.33 MSS Overhaul store-224 Building (No.67) 11 29-Oct-20 10-Nov-20 0.27% 0.00% 0.00% 0.00%
A-BDLG-67-1010 Preparation for External wall 2 29-Oct-20 31-Oct-20 14.23% 0.00%
A-BDLG-67-1020 Painting on External wall 4 1-Nov-20 4-Nov-20 5.69% 0.00%
A-BDLG-67-1030 Preparation for Internal wall 3 5-Nov-20 8-Nov-20 28.47% 0.00%
A-BDLG-67-1040 Painting for Internal wall 2 9-Nov-20 10-Nov-20 14.23% 0.00%
A-BDLG-67-1050 Installation of Acoustic ceiling tiles 5 3-Nov-20 8-Nov-20 37.37% 0.00%
SASRF.5.3.34 Security operation Building (No.8) 10 11-Nov-20 22-Nov-20 0.13% 0.00% 0.00% 0.00%
A-BDLG-08-1000 Preparation for External wall 3 11-Nov-20 14-Nov-20 56.39% 0.00%
A-BDLG-08-1010 Painting on External wall 4 15-Nov-20 18-Nov-20 30.08% 0.00%
A-BDLG-08-1020 Preparation for Internal wall 1 19-Nov-20 19-Nov-20 7.52% 0.00%
A-BDLG-08-1030 Painting for Internal wall 2 21-Nov-20 22-Nov-20 6.02% 0.00%
SASRF.5.3.35 South Area Main Gatehouse Building (No.9) 9 23-Nov-20 2-Dec-20 0.16% 0.00% 0.00% 0.00%
A-BDLG-09-1000 Preparation for External wall 3 23-Nov-20 25-Nov-20 42.17% 0.00%
A-BDLG-09-1010 Painting on External wall 2 26-Nov-20 28-Nov-20 24.10% 0.00%
A-BDLG-09-1020 Preparation for Internal wall 2 29-Nov-20 30-Nov-20 24.10% 0.00%
A-BDLG-09-1030 Painting for Internal wall 2 1-Dec-20 2-Dec-20 9.64% 0.00%
SASRF.5.3.36 Swith Gear 10.A Building (No.87) 27 11-Nov-20 12-Dec-20 1.70% 0.00% 0.00% 0.00%
A-BDLG-87-1000 Demolish existing artficial stone 15 11-Nov-20 28-Nov-20 41.90% 0.00%
A-BDLG-87-1010 Installation of Artificial stone 19 18-Nov-20 9-Dec-20 42.46% 0.00%

Page 20 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION

WEEKLY PROGRESS MEASUREMENT REPORT

Project: South Area safety Related Facilities Cut off Date 06-Jan-2022

Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
A-BDLG-87-1020 Preparation for Internal wall 6 3-Dec-20 9-Dec-20 10.06% 0.00%
A-BDLG-87-1030 Painting for Internal wall 4 8-Dec-20 12-Dec-20 5.59% 0.00%
SASRF.5.3.37 Swith Gear House-1 Building (No.75) 22 10-Dec-20 4-Jan-21 0.62% 0.00% 0.00% 0.00%
A-BDLG-75-1000 Demolish Epoxy paint on cement screed 5 10-Dec-20 15-Dec-20 22.90% 0.00%
A-BDLG-75-1010 Disassemble Existing aluminium doors 3 16-Dec-20 19-Dec-20 9.16% 0.00%
A-BDLG-75-1020 Floor preparation for cement screed 2 17-Dec-20 19-Dec-20 9.16% 0.00%
A-BDLG-75-1030 Screed concrete 1 20-Dec-20 20-Dec-20 3.82% 0.00%
A-BDLG-75-1040 Preparation for External wall 2 13-Dec-20 14-Dec-20 6.11% 0.00%
A-BDLG-75-1050 Painting on External wall 2 15-Dec-20 16-Dec-20 3.05% 0.00%
A-BDLG-75-1060 Preparation for Internal wall 2 23-Dec-20 24-Dec-20 6.11% 0.00%
A-BDLG-75-1070 Painting for Internal wall 2 26-Dec-20 27-Dec-20 3.05% 0.00%
A-BDLG-75-1080 Preparation for floor painting 3 28-Dec-20 30-Dec-20 9.16% 0.00%
A-BDLG-75-1090 Floor painting 2 31-Dec-20 2-Jan-21 6.11% 0.00%
A-BDLG-75-1100 Installation of Doors 2 3-Jan-21 4-Jan-21 21.37% 0.00%
SASRF.5.3.38 Swith Gear House-4 Building (No.76) 21 21-Dec-20 13-Jan-21 0.53% 0.00% 0.00% 0.00%
A-BDLG-76-1000 Demolish Epoxy paint on cement screed 3 21-Dec-20 23-Dec-20 16.07% 0.00%
A-BDLG-76-1010 Disassemble existing aluminum doors 3 24-Dec-20 27-Dec-20 14.29% 0.00%
A-BDLG-76-1020 Pouring screed concrete 3 28-Dec-20 30-Dec-20 10.71% 0.00%
A-BDLG-76-1030 Laying of Granite tiles 1 31-Dec-20 31-Dec-20 1.79% 0.00%
A-BDLG-76-1040 Preparation for External wall 1 3-Jan-21 3-Jan-21 3.57% 0.00%
A-BDLG-76-1050 Painting on External wall 2 4-Jan-21 5-Jan-21 1.79% 0.00%
A-BDLG-76-1060 Preparation for Internal wall 1 6-Jan-21 6-Jan-21 3.57% 0.00%
A-BDLG-76-1070 Painting for Internal wall 2 7-Jan-21 9-Jan-21 1.79% 0.00%
A-BDLG-76-1080 Preparation for floor painting 2 10-Jan-21 11-Jan-21 7.14% 0.00%
A-BDLG-76-1090 Floor painting 2 12-Jan-21 13-Jan-21 3.57% 0.00%
A-BDLG-76-1100 Installation of Doors 3 6-Jan-21 9-Jan-21 35.71% 0.00%
SASRF.5.3.39 Swith Gear House No-40 (86) 19 19-Nov-20 10-Dec-20 0.70% 0.00% 0.00% 0.00%
A-BDLG-86-1000 Preparation for External wall 13 19-Nov-20 3-Dec-20 64.86% 0.00%
A-BDLG-86-1010 Painting on External wall 10 25-Nov-20 6-Dec-20 27.03% 0.00%
A-BDLG-86-1020 Preparation for Internal wall 2 7-Dec-20 8-Dec-20 5.41% 0.00%
A-BDLG-86-1030 Painting for Internal wall 2 9-Dec-20 10-Dec-20 2.70% 0.00%
SASRF.5.3.40 Swith Gear House Building (No-2A) 18 7-Dec-20 27-Dec-20 0.68% 0.00% 0.00% 0.00%
A-BDLG-2A-1000 Preparation for External wall 11 7-Dec-20 19-Dec-20 50.00% 0.00%
A-BDLG-2A-1010 Painting on External wall 8 12-Dec-20 20-Dec-20 25.00% 0.00%
A-BDLG-2A-1020 Preparation for Internal wall 5 20-Dec-20 24-Dec-20 16.67% 0.00%
A-BDLG-2A-1030 Painting for Internal wall 4 23-Dec-20 27-Dec-20 8.33% 0.00%
SASRF.5.3.41 Swith Gear 7A-Building (No-71) 12 26-Dec-20 7-Jan-21 0.34% 0.00% 0.00% 0.00%
A-BDLG-71-1000 Preparation for Internal wall 9 26-Dec-20 4-Jan-21 66.67% 0.00%
A-BDLG-71-1010 Painting for Internal wall 6 2-Jan-21 7-Jan-21 33.33% 0.00%
SASRF.5.3.42 Swith Gear 98-Building (No-70) 9 2-Jan-21 11-Jan-21 0.26% 0.00% 0.00% 0.00%
A-BDLG-70-1000 Preparation for Internal wall 7 2-Jan-21 9-Jan-21 66.67% 0.00%
A-BDLG-70-1010 Painting for Internal wall 5 6-Jan-21 11-Jan-21 33.33% 0.00%
SASRF.5.3.43 Emergency Control Center-2-Building (No-6) 7 12-Jan-21 19-Jan-21 0.36% 0.00% 0.00% 0.00%
A-BDLG-06-1000 Installation of Acoustic ceiling tiles 4 12-Jan-21 16-Jan-21 52.63% 0.00%
A-BDLG-06-1010 Preparation for Internal wall 5 13-Jan-21 18-Jan-21 31.58% 0.00%
A-BDLG-06-1020 Painting for Internal wall 4 16-Jan-21 19-Jan-21 15.79% 0.00%
SASRF.5.3.44 Plumbing works 85 23-Sep-20 30-Dec-20 3.80% 67.50% 1.25% 68.75%
PKG-3-PL-1000 Supply and install all plumbing accessories 75 23-Sep-20 19-Dec-20 75.00% 80.00% 0.00% 80.00%
PKG-3-PL-1010 Submission of all engineering documents 55 28-Oct-20 30-Dec-20 25.00% 30.00% 5.00% 35.00%
SASRF.5.4 General structures 150 5-Apr-20 26-Sep-20 4.25% 44.47% 2.01% 46.48%
SASRF.5.4.1 Bollards 116 5-Apr-20 17-Aug-20 92.49% 48.09% 2.17% 50.26%
A-BDS-1000 Formwork fixing 24 5-Apr-20 2-May-20 13.80% 65.00% 5.00% 70.00%
A-BDS-1010 Installation of pipe 27 8-Apr-20 9-May-20 12.86% 65.00% 5.00% 70.00%
A-BDS-1020 Concrete pouring 26 12-Apr-20 11-May-20 16.78% 65.00% 5.00% 70.00%
A-BDS-1030 Curing 32 13-Apr-20 19-May-20 0.41% 50.00% 0.00% 50.00%
A-BDS-1040 Surface preparation 40 21-Apr-20 6-Jun-20 27.06% 30.00% 0.00% 30.00%
A-BDS-1050 Coating 39 27-Apr-20 10-Jun-20 13.53% 30.00% 0.00% 30.00%
A-BDS-1060 Excavation 80 25-Apr-20 26-Jul-20 10.15% 48.00% 0.00% 48.00%
A-BDS-1070 Installation of bollards 95 29-Apr-20 17-Aug-20 5.41% 48.00% 0.00% 48.00%
SASRF.5.4.2 Signs 20 3-Sep-20 26-Sep-20 7.51% 0.00% 0.00% 0.00%
A-S-1000 Installation of Sign board 20 3-Sep-20 26-Sep-20 100.00% 0.00%
SASRF.6 Punch list clearance & Demobilization 38 12-Jan-21 24-Feb-21 2.52% 2.54% 3.20% 5.74%
A1000 Walkthrough for punch list 12 12-Jan-21 25-Jan-21 7.41% 3.00% 12.00% 15.00%
A1010 Punch list clearance 33 16-Jan-21 22-Feb-21 92.59% 2.50% 2.50% 5.00%
A1020 Demobilization of Manpower & Equipment 20 2-Feb-21 24-Feb-21 0.00% 0.00%

Page 21 of 23
MANARAH AL-JUBAIL CONT. CO. LTD.

Project Name: South Area Safety Related Facilities


Owner: KJO
Progress S-Curve
Client: ENPPI
Location: Khafji

4.00% 120.00%

3.50% 100.00%
Plan % Linear (Plan %) Actual % Cum Plan % Cum Actual % 100.00%

3.00%

72.91%
80.00%

2.50%

2.00% 60.00%

1.50%

40.00%

1.00%

20.00%

0.50%

0.00% 0.00%

13-Feb-20

20-Feb-20

27-Feb-20

5-Mar-20

12-Mar-20

19-Mar-20

26-Mar-20

2-Apr-20

9-Apr-20

16-Apr-20

23-Apr-20

30-Apr-20

7-May-20

14-May-20

21-May-20

28-May-20

4-Jun-20

11-Jun-20

18-Jun-20

25-Jun-20

2-Jul-20

9-Jul-20

16-Jul-20

23-Jul-20

30-Jul-20

6-Aug-20

13-Aug-20

20-Aug-20

27-Aug-20

3-Sep-20

10-Sep-20

17-Sep-20

24-Sep-20

1-Oct-20

8-Oct-20

15-Oct-20

22-Oct-20

29-Oct-20

5-Nov-20

12-Nov-20

19-Nov-20

26-Nov-20

3-Dec-20

10-Dec-20

17-Dec-20

24-Dec-20

31-Dec-20

7-Jan-21

14-Jan-21

21-Jan-21

28-Jan-21

4-Feb-21

11-Feb-21

18-Feb-21

25-Feb-21

4-Mar-21

11-Mar-21

18-Mar-21

25-Mar-21

1-Apr-21

8-Apr-21

15-Apr-21

22-Apr-21

29-Apr-21

6-May-21

13-May-21

20-May-21

27-May-21

3-Jun-21

10-Jun-21

17-Jun-21

24-Jun-21

1-Jul-21

8-Jul-21

15-Jul-21

22-Jul-21

29-Jul-21

5-Aug-21

12-Aug-21

19-Aug-21

26-Aug-21

2-Sep-21

9-Sep-21

16-Sep-21

23-Sep-21

30-Sep-21

7-Oct-21

14-Oct-21

21-Oct-21

28-Oct-21

4-Nov-21

11-Nov-21

18-Nov-21

25-Nov-21

2-Dec-21

9-Dec-21

16-Dec-21

23-Dec-21

30-Dec-21

6-Jan-22

13-Jan-22
14-May-20

21-May-20

28-May-20

13-May-21

20-May-21

27-May-21
12-Mar-20

19-Mar-20

26-Mar-20

12-Nov-20

19-Nov-20

26-Nov-20

11-Mar-21

18-Mar-21

25-Mar-21

11-Nov-21
13-Aug-20

20-Aug-20

27-Aug-20

12-Aug-21

19-Aug-21

26-Aug-21
10-Sep-20

17-Sep-20

24-Sep-20

10-Dec-20

17-Dec-20

24-Dec-20

31-Dec-20

16-Sep-21

23-Sep-21

30-Sep-21
13-Feb-20

20-Feb-20

27-Feb-20

16-Apr-20

23-Apr-20

30-Apr-20

11-Jun-20

18-Jun-20

25-Jun-20

11-Feb-21

18-Feb-21

25-Feb-21

15-Apr-21

22-Apr-21

29-Apr-21

10-Jun-21

17-Jun-21

24-Jun-21
15-Oct-20

22-Oct-20

29-Oct-20

14-Jan-21

21-Jan-21

28-Jan-21

14-Oct-21

21-Oct-21

28-Oct-21
7-May-20

6-May-21
5-Mar-20

5-Nov-20

4-Mar-21

4-Nov-21
16-Jul-20

23-Jul-20

30-Jul-20

6-Aug-20

15-Jul-21

22-Jul-21

29-Jul-21

5-Aug-21
3-Sep-20

3-Dec-20

2-Sep-21

9-Sep-21
2-Apr-20

9-Apr-20

4-Jun-20

4-Feb-21

1-Apr-21

8-Apr-21

3-Jun-21
1-Oct-20

8-Oct-20

7-Jan-21

7-Oct-21
2-Jul-20

9-Jul-20

1-Jul-21

8-Jul-21
Week

Plan % 0.09% 0.38% 0.75% 1.31% 2.14% 1.87% 2.20% 1.90% 1.84% 1.84% 2.10% 2.68% 3.05% 3.45% 3.05% 3.42% 2.60% 2.33% 2.16% 2.56% 2.53% 2.64% 2.71% 2.55% 2.63% 3.11% 2.61% 2.87% 2.77% 2.58% 2.13% 2.61% 3.01% 2.80% 2.40% 1.68% 1.48% 1.12% 1.27% 1.31% 0.80% 0.76% 0.72% 0.90% 1.08% 1.03% 0.85% 1.34% 1.06% 0.93% 0.63% 0.42% 0.42% 0.42% 0.14%

Actual % 0.20% 0.44% 0.51% 0.67% 0.85% 0.73% 1.40% 1.02% 0.00% 0.66% 0.90% 0.96% 0.78% 1.35% 1.08% 0.39% 0.88% 0.47% 0.96% 1.03% 1.22% 0.77% 1.13% 1.49% 0.92% 1.03% 2.65% 1.36% 1.22% 1.35% 1.69% 1.37% 1.24% 1.85% 0.82% 1.23% 1.23% 1.20% 1.23% 0.77% 1.08% 1.51% 0.59% 0.86% 0.48% 0.66% 0.57% 0.46% 0.60% 0.31% 0.70% 1.12% 0.73% 1.48% 0.84% 0.77% 0.54% 0.39% 0.91% 0.82% 0.44% 0.12% 0.63% 0.18% 0.52% 0.19% 0.47% 0.26% 0.31% 1.27% 0.16% 0.32% 0.20% 0.27% 0.55% 0.22% 0.35% 0.96% 0.75% 0.70% 0.48% 0.46% 0.26% 0.42% 0.24% 0.31% 0.59% 0.42% 0.19% 0.56% 0.18% 1.01%

Variance % 0.11% 0.06% -0.23% -0.64% -1.29% -1.14% -0.79% -0.88% -1.84% -1.19% -1.20% -1.72% -2.26% -2.09% -1.96% -3.03% -1.72% -1.86% -1.20% -1.53% -1.31% -1.87% -1.58% -1.06% -1.72% -2.08% 0.04% -1.51% -1.55% -1.23% -0.43% -1.23% -1.76% -0.96% -1.59% -0.44% -0.24% 0.08% -0.04% -0.55% 0.28% 0.75% -0.13% -0.04% -0.60% -0.37% -0.28% -0.88% -0.46% -0.62% 0.07% 0.70% 0.31% 1.06% 0.69% 0.77% 0.54% 0.39% 0.91% 0.82% 0.44% 0.12% 0.63% 0.18% 0.52% 0.19% 0.47% 0.26% 0.31% 1.27% 0.16% 0.32% 0.20% 0.27% 0.55% 0.22% 0.35% 0.96% 0.75% 0.70% 0.48% 0.46% 0.26% 0.42% 0.24% 0.31% 0.59% 0.42% 0.19% 0.56% 0.18% 1.01%

Cum Plan % 0.09% 0.47% 1.22% 2.53% 4.66% 6.53% 8.73% 10.62% 12.46% 14.30% 16.40% 19.08% 22.13% 25.57% 28.62% 32.04% 34.65% 36.97% 39.13% 41.69% 44.23% 46.87% 49.58% 52.13% 54.76% 57.87% 60.48% 63.35% 66.12% 68.71% 70.83% 73.44% 76.44% 79.24% 81.65% 83.32% 84.80% 85.92% 87.19% 88.50% 89.30% 90.06% 90.78% 91.68% 92.75% 93.78% 94.63% 95.97% 97.03% 97.96% 98.59% 99.01% 99.43% 99.86% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%

Cum Actual % 0.20% 0.65% 1.16% 1.83% 2.68% 3.41% 4.81% 5.83% 5.83% 6.49% 7.39% 8.35% 9.13% 10.48% 11.57% 11.96% 12.84% 13.31% 14.27% 15.30% 16.52% 17.29% 18.42% 19.91% 20.82% 21.86% 24.51% 25.87% 27.09% 28.44% 30.14% 31.51% 32.75% 34.60% 35.41% 36.65% 37.88% 39.09% 40.31% 41.08% 42.15% 43.67% 44.26% 45.12% 45.60% 46.26% 46.82% 47.28% 47.88% 48.19% 48.89% 50.01% 50.74% 52.23% 53.06% 53.83% 54.38% 54.77% 55.68% 56.50% 56.94% 57.06% 57.69% 57.87% 58.39% 58.57% 59.04% 59.31% 59.62% 60.89% 61.04% 61.36% 61.56% 61.83% 62.39% 62.61% 62.96% 63.91% 64.66% 65.36% 65.84% 66.30% 66.56% 66.98% 67.22% 67.53% 68.12% 68.54% 68.73% 69.29% 69.47% 70.48%

Cum Variance % 0.11% 0.17% -0.06% -0.70% -1.98% -3.12% -3.91% -4.79% -6.63% -7.81% -9.02% -10.73% -13.00% -15.09% -17.06% -20.08% -21.80% -23.66% -24.86% -26.39% -27.71% -29.58% -31.16% -32.22% -33.94% -36.02% -35.97% -37.48% -39.03% -40.26% -40.69% -41.93% -43.69% -44.65% -46.23% -46.67% -46.92% -46.84% -46.88% -47.42% -47.14% -46.39% -46.51% -46.55% -47.15% -47.53% -47.81% -48.69% -49.15% -49.77% -49.70% -49.00% -48.69% -47.63% -46.94% -46.17% -45.62% -45.23% -44.32% -43.50% -43.06% -42.94% -42.31% -42.13% -41.61% -41.43% -40.96% -40.69% -40.38% -39.11% -38.96% -38.64% -38.44% -38.17% -37.61% -37.39% -37.04% -36.09% -35.34% -34.64% -34.16% -33.70% -33.44% -33.02% -32.78% -32.47% -31.88% -31.46% -31.27% -30.71% -30.53% -29.52%
0.00%
0.50%
1.00%
1.50%
2.00%
2.50%
3.00%
3.50%
4.00%
13-Feb-20

20-Feb-20

27-Feb-20

5-Mar-20

12-Mar-20

19-Mar-20
MANARAH AL-JUBAIL CONT. CO. LTD.

26-Mar-20

2-Apr-20 Plan %

9-Apr-20

16-Apr-20

23-Apr-20
Linear (Plan %)

30-Apr-20

7-May-20

14-May-20
Actual %

21-May-20

28-May-20

4-Jun-20
Cum Plan %

11-Jun-20

18-Jun-20

25-Jun-20
Cum Actual %

2-Jul-20

9-Jul-20

16-Jul-20

23-Jul-20

30-Jul-20

6-Aug-20

13-Aug-20

20-Aug-20

27-Aug-20

3-Sep-20

10-Sep-20

17-Sep-20

24-Sep-20

1-Oct-20

8-Oct-20

15-Oct-20

22-Oct-20

29-Oct-20

5-Nov-20

12-Nov-20

19-Nov-20

26-Nov-20

3-Dec-20

10-Dec-20

17-Dec-20

24-Dec-20

31-Dec-20

7-Jan-21

14-Jan-21

21-Jan-21

28-Jan-21

4-Feb-21

11-Feb-21

18-Feb-21

25-Feb-21

4-Mar-21

11-Mar-21

18-Mar-21

25-Mar-21

1-Apr-21

8-Apr-21

15-Apr-21

22-Apr-21

29-Apr-21

6-May-21

13-May-21

20-May-21

27-May-21

3-Jun-21

10-Jun-21

17-Jun-21

24-Jun-21

1-Jul-21

8-Jul-21

15-Jul-21

22-Jul-21

29-Jul-21

5-Aug-21

12-Aug-21

19-Aug-21

26-Aug-21

2-Sep-21

9-Sep-21

16-Sep-21

23-Sep-21

30-Sep-21

7-Oct-21

14-Oct-21

21-Oct-21

28-Oct-21

4-Nov-21

11-Nov-21

18-Nov-21

18-Nov-21
25-Nov-21
-28.66%
71.34%
0.86%
0.86%

25-Nov-21
2-Dec-21
-28.43%
71.57%
0.23%
0.23%

2-Dec-21
9-Dec-21
-28.17%
71.83%
0.26%
0.26%

9-Dec-21
16-Dec-21
-27.97%
72.03%
0.20%
0.20%

16-Dec-21 23-Dec-21
-27.69%
72.31%
0.28%
0.28%
End Date

30-Dec-21
Start Date:

23-Dec-21
Cut Off Date
Contract No:

-27.52%
72.48%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
0.17%
0.17%

6-Jan-22
72.91%

30-Dec-21
3940-200
30-Dec-2021
30-Apr-22
8-Dec-19

-27.09%
72.91%
0.43%
0.43%

13-Jan-22
100.00%

6-Jan-22
0.00%

-26.55%
73.45%
100.00% 100.00%
0.54%
0.54%
20.00%
40.00%
60.00%
80.00%
100.00%
120.00%

13-Jan-22