Weekly Planned Vs Actual Report-SASRF-06-Jan-2022
Weekly Planned Vs Actual Report-SASRF-06-Jan-2022
1 Civil 42.80% 100.00% 93.22% -6.78% 0.00% 0.30% 0.30% 100.00% 93.52% -6.48%
2 Architect 41.79% 100.00% 56.81% -43.19% 0.00% 0.23% 0.23% 100.00% 57.04% -42.96%
3 Pre Engineering buildings 2.19% 100.00% 98.35% -1.65% 0.00% 0.00% 0.00% 100.00% 98.35% -1.65%
4 Landscape 7.55% 100.00% 62.87% -37.13% 0.00% 2.83% 2.83% 100.00% 65.70% -34.30%
5 Plumbing 3.15% 100.00% 73.50% -26.50% 0.00% 0.82% 0.82% 100.00% 74.32% -25.68%
6 Punch list clearance 2.52% 100.00% 2.54% -97.46% 0.00% 3.20% 3.20% 100.00% 5.74% -94.26%
Overall Progress 100.00% 100.00% 72.92% -27.08% 0.00% 0.54% 0.54% 100.00% 73.46% -26.54%
MCCL ENPPI
1
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF South Area Safety Related Facilities 382 8-Dec-19 24-Feb-21 100.00% 72.91% 0.54% 73.45%
SASRF.5 Construction 305 10-Feb-20 30-Jan-21 97.48% 74.73% 0.47% 75.20%
SASRF.5.1 Package-1 101 10-Jun-20 5-Oct-20 9.28% 74.40% 1.68% 76.08%
SASRF.5.1.1 New Swith Gear House No.11 100 11-Jun-20 5-Oct-20 40.09% 71.79% 0.09% 71.87%
SASRF.5.1.1.1 Architecture 100 11-Jun-20 5-Oct-20 100.00% 71.79% 0.09% 71.87%
SASRF.5.1.1.1.1 CMU wall 44 11-Jun-20 1-Aug-20 29.29% 43.54% 0.00% 43.54%
A-SG-CMU-1000 Erection of Precast wall panel and slab by others 8 11-Jun-20 20-Jun-20 0.00% 100.00% 100.00%
A-SG-CMU-1010 Laying of Block 12 5-Jul-20 18-Jul-20 37.56% 25.00% 0.00% 25.00%
A-SG-CMU-1020 Scaffolding 5 9-Jul-20 14-Jul-20 13.66% 0.00%
A-SG-CMU-1030 Internal Wall Plastering 7 19-Jul-20 26-Jul-20 19.51% 25.00% 0.00% 25.00%
A-SG-CMU-1040 Preparation of Floor For screed Concrete 4 27-Jul-20 30-Jul-20 13.66% 100.00% 0.00% 100.00%
A-SG-CMU-1050 Screed Concrete on Floor 2 30-Jul-20 1-Aug-20 15.61% 100.00% 0.00% 100.00%
SASRF.5.1.1.1.2 Painting 56 2-Aug-20 5-Oct-20 41.29% 72.37% 0.00% 72.37%
A-SG-P-1000 Scaffolding for ceiling & wall 15 2-Aug-20 18-Aug-20 24.22% 100.00% 0.00% 100.00%
A-SG-P-1005 Surface Preparation for Ceiling 9 11-Aug-20 20-Aug-20 7.96% 100.00% 0.00% 100.00%
A-SG-P-1010 Painting for Ceiling 7 16-Aug-20 23-Aug-20 5.54% 100.00% 0.00% 100.00%
A-SG-P-1020 Surface Preparation for Internal wall 11 20-Aug-20 1-Sep-20 15.22% 100.00% 0.00% 100.00%
A-SG-P-1030 Internal Painting for Wall 8 27-Aug-20 5-Sep-20 7.61% 95.00% 0.00% 95.00%
A-SG-P-1033 Surface Preparation for External wall 13 17-Sep-20 1-Oct-20 15.57% 0.00%
A-SG-P-1035 External Painting for Wall 10 24-Sep-20 5-Oct-20 11.42% 0.00%
A-SG-P-1040 Surface Preparation for Floor 8 7-Sep-20 15-Sep-20 7.27% 100.00% 0.00% 100.00%
A-SG-P-1050 Floor Painting 6 10-Sep-20 16-Sep-20 5.19% 95.00% 0.00% 95.00%
SASRF.5.1.1.1.3 Tiles 11 6-Sep-20 17-Sep-20 3.14% 100.00% 0.00% 100.00%
A-SG-T-1000 Installation of Wall tile 7 6-Sep-20 13-Sep-20 63.64% 100.00% 0.00% 100.00%
A-SG-T-1010 Floor tile fixing 4 14-Sep-20 17-Sep-20 36.36% 100.00% 0.00% 100.00%
SASRF.5.1.1.1.4 Water Proofing 22 2-Jul-20 27-Jul-20 18.71% 100.00% 0.00% 100.00%
A-SG-WP-1000 Surface Preparation 2 2-Jul-20 4-Jul-20 7.63% 100.00% 0.00% 100.00%
A-SG-WP-1010 Pouring of Light weight Concrete 1 5-Jul-20 5-Jul-20 9.16% 100.00% 0.00% 100.00%
A-SG-WP-1020 Bituminous Coating 2 8-Jul-20 9-Jul-20 0.76% 100.00% 0.00% 100.00%
A-SG-WP-1030 Installation of EPDM Water proofing membrane 6 11-Jul-20 16-Jul-20 38.17% 100.00% 0.00% 100.00%
A-SG-WP-1040 Leaktest 1 19-Jul-20 19-Jul-20 1.53% 100.00% 0.00% 100.00%
A-SG-WP-1050 Installation of Insulation Board 2 20-Jul-20 21-Jul-20 9.16% 100.00% 0.00% 100.00%
A-SG-WP-1060 Installation of geotextile membrane 1 22-Jul-20 22-Jul-20 7.63% 100.00% 0.00% 100.00%
A-SG-WP-1070 Gravel Filling 2 23-Jul-20 25-Jul-20 18.32% 100.00% 0.00% 100.00%
A-SG-WP-1080 Installation of Steel Flashing 2 26-Jul-20 27-Jul-20 7.63% 100.00% 0.00% 100.00%
SASRF.5.1.1.1.5 General structures 9 17-Sep-20 27-Sep-20 5.57% 96.92% 1.54% 98.46%
A-SG-G-1000 Installation of Handrail 2 17-Sep-20 19-Sep-20 30.77% 95.00% 5.00% 100.00%
A-SG-G-1010 Installation of Steel Guage ladder 2 21-Sep-20 22-Sep-20 30.77% 95.00% 0.00% 95.00%
A-SG-G-1020 Installation of Steel Pre finished Metal coping 3 24-Sep-20 27-Sep-20 38.46% 100.00% 0.00% 100.00%
SASRF.5.1.1.1.6 Doors 5 22-Aug-20 26-Aug-20 2.00% 95.00% 0.00% 95.00%
A-SG-D-1000 Installation of Doors 5 22-Aug-20 26-Aug-20 100.00% 95.00% 0.00% 95.00%
SASRF.5.1.2 New Fire water Pump Building 46 4-Aug-20 26-Sep-20 14.38% 94.98% 0.60% 95.58%
SASRF.5.1.2.1 Architecture 46 4-Aug-20 26-Sep-20 100.00% 94.98% 0.60% 95.58%
SASRF.5.1.2.1.1 Flooring 25 4-Aug-20 1-Sep-20 45.02% 90.71% 1.33% 92.04%
A-FP-F-1000 Preparation of Floor For screed Concrete 6 4-Aug-20 10-Aug-20 35.40% 100.00% 0.00% 100.00%
A-FP-F-1010 Screed Concrete on Floor 2 11-Aug-20 12-Aug-20 22.12% 100.00% 0.00% 100.00%
A-FP-F-1020 Surface Preparation for Floor 7 23-Aug-20 30-Aug-20 26.55% 95.00% 5.00% 100.00%
A-FP-F-1030 Floor Painting 5 27-Aug-20 1-Sep-20 15.93% 50.00% 0.00% 50.00%
SASRF.5.1.2.1.2 Glazing system 16 3-Sep-20 21-Sep-20 38.25% 100.00% 0.00% 100.00%
A-FP-GS-1000 Fabrication and Installation of Frame 16 3-Sep-20 21-Sep-20 66.67% 100.00% 0.00% 100.00%
A-FP-GS-1010 Installation 4 13-Sep-20 16-Sep-20 33.33% 100.00% 0.00% 100.00%
SASRF.5.1.2.1.3 Doors 8 17-Sep-20 26-Sep-20 16.73% 95.00% 0.00% 95.00%
A-FP-D-1000 Installation of Hollow metal Flush Doors 4 17-Sep-20 21-Sep-20 71.43% 95.00% 0.00% 95.00%
A-FP-D-1010 Installation of Rolle up Door 4 22-Sep-20 26-Sep-20 28.57% 95.00% 0.00% 95.00%
SASRF.5.1.3 Landscape Works 65 10-Jun-20 24-Aug-20 33.62% 64.97% 4.65% 69.61%
PKG-1-LS-1000 Finished Grading 25 10-Jun-20 8-Jul-20 38.33% 95.00% 3.00% 98.00%
PKG-1-LS-1010 Interlock concrete block paver 15 4-Jul-20 20-Jul-20 9.20% 50.00% 38.00% 88.00%
PKG-1-LS-1020 Gravel filling 24 15-Jul-20 11-Aug-20 24.53% 0.00% 0.00% 0.00%
PKG-1-LS-1030 Installation of curb stone 30 21-Jul-20 24-Aug-20 25.55% 93.74% 0.00% 93.74%
PKG-1-LS-1040 Installation of wheel stop 2 2-Aug-20 3-Aug-20 0.34% 0.00%
PKG-1-LS-1050 Traffic markings 12 4-Aug-20 17-Aug-20 2.04% 0.00%
SASRF.5.1.4 Plumbing works 50 27-Jul-20 22-Sep-20 11.91% 85.00% 0.00% 85.00%
PKG-1-PL-1000 Supply and install all plumbing accessories 50 27-Jul-20 22-Sep-20 75.00% 90.00% 0.00% 90.00%
PKG-1-PL-1010 Submission of Engineering documents 30 19-Aug-20 22-Sep-20 25.00% 70.00% 0.00% 70.00%
SASRF.5.2 Package-2 225 10-Feb-20 28-Oct-20 30.51% 89.38% 0.24% 89.62%
SASRF.5.2.1 Fire station office 174 24-Feb-20 13-Sep-20 49.35% 91.69% 0.00% 91.69%
SASRF.5.2.1.1 Civil 75 24-Feb-20 20-May-20 30.61% 100.00% 0.00% 100.00%
SASRF.5.2.1.1.1 Sub Structure 13 6-May-20 20-May-20 10.96% 100.00% 0.00% 100.00%
SASRF.5.2.1.1.1.1 Construction of Grade slab 13 6-May-20 20-May-20 100.00% 100.00% 0.00% 100.00%
C-FS-GS-1000 Subgrade Preparation and Compaction 3 6-May-20 9-May-20 12.63% 100.00% 0.00% 100.00%
C-FS-GS-1010 Rebar work 4 9-May-20 12-May-20 37.89% 100.00% 0.00% 100.00%
C-FS-GS-1020 Formwork 4 10-May-20 13-May-20 15.79% 100.00% 0.00% 100.00%
C-FS-GS-1030 Concretre Pouring for Grade slab 1 11-May-20 11-May-20 29.47% 100.00% 0.00% 100.00%
C-FS-GS-1040 Curing 8 12-May-20 20-May-20 4.21% 100.00% 0.00% 100.00%
SASRF.5.2.1.1.2 Super Structure 58 24-Feb-20 30-Apr-20 89.04% 100.00% 0.00% 100.00%
SASRF.5.2.1.1.2.1 Construction of Column from Top of Grade slab to B 28 24-Feb-20 26-Mar-20 34.20% 100.00% 0.00% 100.00%
C-FS-COL-1000 Rebar cutting & bending for column 5 24-Feb-20 29-Feb-20 6.06% 100.00% 0.00% 100.00%
C-FS-COL-1010 Formwork Making 14 27-Feb-20 14-Mar-20 20.45% 100.00% 0.00% 100.00%
C-FS-COL-1020 Scaffolding for Column 4 29-Feb-20 3-Mar-20 16.67% 100.00% 0.00% 100.00%
C-FS-COL-1030 Rebar Fixing 8 1-Mar-20 9-Mar-20 12.12% 100.00% 0.00% 100.00%
C-FS-COL-1040 Formwork fixing 11 3-Mar-20 15-Mar-20 22.73% 100.00% 0.00% 100.00%
C-FS-COL-1050 Concrete Pouring 10 5-Mar-20 16-Mar-20 6.82% 100.00% 0.00% 100.00%
C-FS-COL-1060 Deshuttering 12 7-Mar-20 19-Mar-20 13.64% 100.00% 0.00% 100.00%
C-FS-COL-1070 Curing 18 7-Mar-20 26-Mar-20 1.52% 100.00% 0.00% 100.00%
Page 2 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.2.1.1.2.2 Construction of Roof beam & Slab 45 10-Mar-20 30-Apr-20 65.80% 100.00% 0.00% 100.00%
C-FS-SB-1080 Rebar Cutting and bending 12 10-Mar-20 23-Mar-20 17.32% 100.00% 0.00% 100.00%
C-FS-SB-1090 Scaffolding installation 13 11-Mar-20 25-Mar-20 16.54% 100.00% 0.00% 100.00%
C-FS-SB-1100 Formwork for Beam & Slab 11 18-Mar-20 30-Mar-20 25.98% 100.00% 0.00% 100.00%
C-FS-SB-1110 Rebar work 10 23-Mar-20 2-Apr-20 21.65% 100.00% 0.00% 100.00%
C-FS-SB-1120 Concrete Pouring 2 4-Apr-20 5-Apr-20 3.94% 100.00% 0.00% 100.00%
C-FS-SB-1130 Deshuttering 5 23-Apr-20 28-Apr-20 13.78% 100.00% 0.00% 100.00%
C-FS-SB-1140 Curing 21 7-Apr-20 30-Apr-20 0.79% 100.00% 0.00% 100.00%
SASRF.5.2.1.2 Architecture 107 12-May-20 13-Sep-20 69.39% 88.03% 0.00% 88.03%
SASRF.5.2.1.2.1 Construction of CMU Block 50 12-May-20 8-Jul-20 35.01% 100.00% 0.00% 100.00%
A-FS-CMU-1000 Erection of Precast wall panel by others 6 12-May-20 18-May-20 0.00% 100.00% 0.00% 100.00%
A-FS-CMU-1010 Laying of Block 40 18-May-20 2-Jul-20 75.58% 100.00% 0.00% 100.00%
A-FS-CMU-1020 Internal Wall Plastering 30 4-Jun-20 8-Jul-20 24.42% 100.00% 0.00% 100.00%
SASRF.5.2.1.2.2 Gypsum Board 33 10-Jun-20 18-Jul-20 5.90% 91.21% 0.00% 91.21%
A-FS-GYP-1000 Installation of Stud & Runner 18 10-Jun-20 30-Jun-20 51.72% 100.00% 0.00% 100.00%
A-FS-GYP-1010 Installation of Insulation 15 15-Jun-20 1-Jul-20 15.52% 95.00% 0.00% 95.00%
A-FS-GYP-1020 Gypsum board Fixing 18 18-Jun-20 8-Jul-20 22.41% 95.00% 0.00% 95.00%
A-FS-GYP-1030 Installation of stud and Runner for ceiling 4 9-Jul-20 13-Jul-20 6.90% 50.00% 0.00% 50.00%
A-FS-GYP-1040 Gypsum Ceiling Board 4 14-Jul-20 18-Jul-20 3.45% 0.00%
SASRF.5.2.1.2.3 Painting 63 22-Jun-20 2-Sep-20 10.38% 77.65% 0.00% 77.65%
SASRF.5.2.1.2.3.1 Internal Painting 53 22-Jun-20 22-Aug-20 92.16% 84.26% 0.00% 84.26%
A-FS-IP-1000 Preparation for Ceiling 15 22-Jun-20 8-Jul-20 10.64% 90.00% 0.00% 90.00%
A-FS-IP-1010 Painting for Ceiling 12 29-Jun-20 12-Jul-20 6.38% 80.00% 0.00% 80.00%
A-FS-IP-1020 Painting for wall 25 4-Jul-20 1-Aug-20 42.55% 80.00% 0.00% 80.00%
A-FS-IP-1030 Surface Preparation for Floor 31 15-Jul-20 19-Aug-20 31.91% 90.00% 0.00% 90.00%
A-FS-IP-1040 Painting for Floor 25 25-Jul-20 22-Aug-20 8.51% 80.00% 0.00% 80.00%
SASRF.5.2.1.2.3.2 External Painting 20 11-Aug-20 2-Sep-20 7.84% 0.00% 0.00% 0.00%
A-FS-EP-1000 Paint for Wall 20 11-Aug-20 2-Sep-20 100.00% 0.00%
SASRF.5.2.1.2.4 Acoustic Ceiling Tiles 14 11-Jul-20 26-Jul-20 2.60% 52.35% 0.00% 52.35%
A-FS-ACT-1000 Installation of Supports 12 11-Jul-20 23-Jul-20 58.82% 75.00% 0.00% 75.00%
A-FS-ACT-1010 Installation of Acoustic ceiling Tile 10 15-Jul-20 26-Jul-20 41.18% 20.00% 0.00% 20.00%
SASRF.5.2.1.2.5 Tile Fixing 39 6-Jul-20 19-Aug-20 10.79% 83.87% 0.00% 83.87%
A-FS-T-1000 Installation of Wall tile 34 6-Jul-20 13-Aug-20 64.15% 95.00% 0.00% 95.00%
A-FS-T-1010 Installation of Floor Tile 23 23-Jul-20 18-Aug-20 22.64% 75.00% 0.00% 75.00%
A-FS-T-1020 Tile base 14 4-Aug-20 19-Aug-20 6.60% 75.00% 0.00% 75.00%
A-FS-T-1030 Installation of Granite stone tiles 3 5-Aug-20 8-Aug-20 2.83% 35.00% 0.00% 35.00%
A-FS-T-1040 Granite stone base 2 10-Aug-20 11-Aug-20 1.89% 0.00%
A-FS-T-1050 Granite threshold 2 12-Aug-20 13-Aug-20 1.89% 0.00%
SASRF.5.2.1.2.6 Resilient Work 6 10-Aug-20 16-Aug-20 0.92% 20.00% 0.00% 20.00%
A-FS-R.S-1000 Installation of Vinyl Tiles 5 10-Aug-20 15-Aug-20 66.67% 30.00% 0.00% 30.00%
A-FS-R.S-1010 Vinyl base 3 13-Aug-20 16-Aug-20 33.33% 0.00%
SASRF.5.2.1.2.7 Raised Floor 5 17-Aug-20 22-Aug-20 0.51% 95.00% 0.00% 95.00%
A-FS-RF-1000 Installation of Supports 4 17-Aug-20 20-Aug-20 60.00% 95.00% 0.00% 95.00%
A-FS-RF-1010 Installation of Tile 3 19-Aug-20 22-Aug-20 40.00% 95.00% 0.00% 95.00%
SASRF.5.2.1.2.8 Carpet Flooring 7 23-Aug-20 30-Aug-20 1.12% 0.00% 0.00% 0.00%
A-FS-CF-1000 Fixing of Carpet Roll 3 23-Aug-20 25-Aug-20 27.27% 0.00%
A-FS-CF-1010 Installation of Carpet Tiles 4 26-Aug-20 30-Aug-20 72.73% 0.00%
SASRF.5.2.1.2.9 Wood works 3 21-Jul-20 23-Jul-20 0.51% 80.00% 0.00% 80.00%
A-FS-WW-1000 Installation of Plywood in Telecom Room 2 21-Jul-20 22-Jul-20 80.00% 100.00% 0.00% 100.00%
A-FS-WW-1010 Base 1 23-Jul-20 23-Jul-20 20.00% 0.00%
SASRF.5.2.1.2.10 Water Proofing 28 9-Jun-20 11-Jul-20 7.12% 100.00% 0.00% 100.00%
A-FS-WP-1000 Surface Preparation 2 9-Jun-20 10-Jun-20 7.14% 100.00% 0.00% 100.00%
A-FS-WP-1010 Pouring of Light weight Concrete 2 11-Jun-20 13-Jun-20 7.14% 100.00% 0.00% 100.00%
A-FS-WP-1020 Bituminous Coating 2 16-Jun-20 17-Jun-20 1.43% 100.00% 0.00% 100.00%
A-FS-WP-1030 Installation of EPDM Water proofing membrane 6 18-Jun-20 24-Jun-20 42.86% 100.00% 0.00% 100.00%
A-FS-WP-1040 Leaktest 1 27-Jun-20 27-Jun-20 1.43% 100.00% 0.00% 100.00%
A-FS-WP-1050 Installation of Insulation Board 4 28-Jun-20 1-Jul-20 11.43% 100.00% 0.00% 100.00%
A-FS-WP-1060 Installation of geotextile membrane 2 2-Jul-20 4-Jul-20 2.86% 100.00% 0.00% 100.00%
A-FS-WP-1070 Gravel Filling 4 5-Jul-20 8-Jul-20 20.00% 100.00% 0.00% 100.00%
A-FS-WP-1080 Installation of Steel Flashing 2 9-Jul-20 11-Jul-20 5.71% 100.00% 0.00% 100.00%
SASRF.5.2.1.2.11 Screed concrete 10 24-May-20 3-Jun-20 6.01% 100.00% 0.00% 100.00%
A-FS-SC-1000 Preparation for screed concrete 6 24-May-20 30-May-20 15.25% 100.00% 0.00% 100.00%
A-FS-SC-1010 Pouring screed concrete 8 26-May-20 3-Jun-20 84.75% 100.00% 0.00% 100.00%
SASRF.5.2.1.2.12 Miscellaneous 20 22-Aug-20 13-Sep-20 4.43% 33.91% 0.00% 33.91%
A-FS-MSC-1010 Installation of Solid Phenolic Toilet Compartments 4 22-Aug-20 25-Aug-20 22.99% 0.00%
A-FS-MSC-1020 Supply and install Toilet Accessories 8 26-Aug-20 3-Sep-20 9.20% 25.00% 0.00% 25.00%
A-FS-MSC-1030 Installation of basin 2 31-Aug-20 1-Sep-20 17.24% 50.00% 0.00% 50.00%
A-FS-MSC-1040 Installation of Matwell frame 4 2-Sep-20 6-Sep-20 27.59% 0.00%
A-FS-MSC-1050 Installation of Steel Pre finished Metal coping 6 7-Sep-20 13-Sep-20 22.99% 100.00% 0.00% 100.00%
SASRF.5.2.1.2.13 Doors ,windows and Partitions 30 30-Jul-20 2-Sep-20 8.85% 90.92% 0.00% 90.92%
A-FS-D-1000 Installation of Hollow metal flush doors 8 30-Jul-20 8-Aug-20 39.08% 90.00% 0.00% 90.00%
A-FS-D-1010 Installation of wooden flush doors 4 9-Aug-20 12-Aug-20 11.49% 90.00% 0.00% 90.00%
A-FS-D-1020 Installation of Aluminium doors 2 13-Aug-20 15-Aug-20 1.15% 90.00% 0.00% 90.00%
A-FS-D-1030 Installation of Aluminium windows 5 16-Aug-20 20-Aug-20 11.49% 90.00% 0.00% 90.00%
A-FS-D-1040 Installation of hollow metal windows 2 22-Aug-20 23-Aug-20 2.30% 70.00% 0.00% 70.00%
A-FS-D-1050 Supply and install skyline system 6 24-Aug-20 30-Aug-20 27.59% 100.00% 0.00% 100.00%
A-FS-D-1060 Supply and install stainless steel partitions 3 31-Aug-20 2-Sep-20 6.90% 70.00% 0.00% 70.00%
Page 3 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.2.1.2.14 External Works 27 21-May-20 21-Jun-20 5.85% 92.35% 0.00% 92.35%
SASRF.5.2.1.2.14.1 Construction of Ramp for Fire station office-5 Nos 21 21-May-20 14-Jun-20 79.13% 100.00% 0.00% 100.00%
A-FS-EX-R-1000 Subgrade Preparation and Compaction 5 21-May-20 26-May-20 10.99% 100.00% 0.00% 100.00%
A-FS-EX-R-1010 Rebar work 8 24-May-20 1-Jun-20 26.37% 100.00% 0.00% 100.00%
A-FS-EX-R-1020 Formwork 7 26-May-20 2-Jun-20 16.48% 100.00% 0.00% 100.00%
A-FS-EX-R-1030 Concrete Pouring for Ramp 7 27-May-20 3-Jun-20 17.58% 100.00% 0.00% 100.00%
A-FS-EX-R-1040 Curing 12 28-May-20 10-Jun-20 13.19% 100.00% 0.00% 100.00%
A-FS-EX-R-1050 Surface Preparation 6 6-Jun-20 11-Jun-20 13.19% 100.00% 0.00% 100.00%
A-FS-EX-R-1060 Coating 4 10-Jun-20 14-Jun-20 2.20% 100.00% 0.00% 100.00%
SASRF.5.2.1.2.14.2 Common Structures 6 15-Jun-20 21-Jun-20 20.87% 63.33% 0.00% 63.33%
A-FS-EX-C-1020 Installation of Handrail 4 15-Jun-20 18-Jun-20 66.67% 45.00% 0.00% 45.00%
A-FS-EX-C-1030 Installatiof of Steel Guage ladder 2 20-Jun-20 21-Jun-20 33.33% 100.00% 0.00% 100.00%
SASRF.5.2.2 Fire Truck Bay building 137 21-Mar-20 26-Aug-20 15.87% 97.36% 0.00% 97.36%
SASRF.5.2.2.1 PRE Engineering Buildings 18 21-Mar-20 9-Apr-20 21.75% 96.46% 0.00% 96.46%
A-FT-PEB-1000 Unloading of Structures 2 21-Mar-20 22-Mar-20 4.04% 100.00% 0.00% 100.00%
A-FT-PEB-1010 Erection of Column & Beam 5 23-Mar-20 28-Mar-20 25.25% 100.00% 0.00% 100.00%
A-FT-PEB-1020 Installation of Sandwich Roof Panels 8 29-Mar-20 6-Apr-20 30.30% 95.00% 0.00% 95.00%
A-FT-PEB-1030 Installation of Eaves Gutter 3 2-Apr-20 5-Apr-20 30.30% 95.00% 0.00% 95.00%
A-FT-PEB-1040 All structural elements 4 6-Apr-20 9-Apr-20 10.10% 95.00% 0.00% 95.00%
SASRF.5.2.2.2 Civil 54 7-Apr-20 8-Jun-20 40.36% 99.13% 0.00% 99.13%
SASRF.5.2.2.2.1 Concrete Floor slab 15 7-Apr-20 23-Apr-20 35.93% 100.00% 0.00% 100.00%
C-FT-FS-1000 Subgrade Preparation and Compaction 8 7-Apr-20 15-Apr-20 18.18% 100.00% 0.00% 100.00%
C-FT-FS-1010 Rebar work & Formwork 12 9-Apr-20 22-Apr-20 54.55% 100.00% 0.00% 100.00%
C-FT-FS-1030 Concretre Pouring for Floor slab 10 13-Apr-20 23-Apr-20 27.27% 100.00% 0.00% 100.00%
SASRF.5.2.2.2.2 Construction of Walkway 24 27-Apr-20 24-May-20 35.49% 97.55% 0.00% 97.55%
C-FT-WW-1000 Subgrade Preparation and Compaction 6 27-Apr-20 3-May-20 15.34% 100.00% 0.00% 100.00%
C-FT-WW-1010 Rebar work 8 29-Apr-20 7-May-20 30.67% 100.00% 0.00% 100.00%
C-FT-WW-1020 Formwork 9 30-Apr-20 10-May-20 15.34% 100.00% 0.00% 100.00%
C-FT-WW-1030 Concrete Pouring 8 3-May-20 11-May-20 15.34% 100.00% 0.00% 100.00%
C-FT-WW-1040 Curing 12 4-May-20 17-May-20 1.84% 100.00% 0.00% 100.00%
C-FT-WW-1050 Surface Preparation 8 13-May-20 21-May-20 18.40% 95.00% 0.00% 95.00%
C-FT-WW-1060 Coating 7 17-May-20 24-May-20 3.07% 50.00% 0.00% 50.00%
SASRF.5.2.2.2.3 Construction of Ramp for Truck Bay Area 23 13-May-20 8-Jun-20 28.58% 100.00% 0.00% 100.00%
C-FT-RP-1000 Subgrade Preparation and Compaction 7 13-May-20 20-May-20 11.43% 100.00% 0.00% 100.00%
C-FT-RP-1010 Rebar work 8 16-May-20 24-May-20 45.71% 100.00% 0.00% 100.00%
C-FT-RP-1020 Formwork 7 18-May-20 25-May-20 17.14% 100.00% 0.00% 100.00%
C-FT-RP-1030 Concrete Pouring for Ramp 8 19-May-20 27-May-20 15.24% 100.00% 0.00% 100.00%
C-FT-RP-1040 Curing 13 20-May-20 3-Jun-20 1.90% 100.00% 0.00% 100.00%
C-FT-RP-1050 Surface Preparation 7 31-May-20 7-Jun-20 5.71% 100.00% 0.00% 100.00%
C-FT-RP-1060 Coating 6 2-Jun-20 8-Jun-20 2.86% 100.00% 0.00% 100.00%
SASRF.5.2.2.3 Architecture 46 5-Jul-20 26-Aug-20 37.90% 95.99% 0.00% 95.99%
SASRF.5.2.2.3.1 CMU Wall 44 5-Jul-20 24-Aug-20 61.74% 96.61% 0.00% 96.61%
A-FT-CMU-1000 Laying of block 10 5-Jul-20 15-Jul-20 51.64% 100.00% 0.00% 100.00%
A-FT-CMU-1010 Plastering 6 16-Jul-20 22-Jul-20 26.29% 98.00% 0.00% 98.00%
A-FT-CMU-1020 Preparation for wall 9 23-Jul-20 2-Aug-20 7.51% 85.00% 0.00% 85.00%
A-FT-CMU-1030 Painting for wall 5 3-Aug-20 8-Aug-20 1.41% 70.00% 0.00% 70.00%
A-FT-CMU-1040 Installation of Tiles 14 9-Aug-20 24-Aug-20 13.15% 90.00% 0.00% 90.00%
SASRF.5.2.2.3.2 Door 16 9-Aug-20 26-Aug-20 38.26% 95.00% 0.00% 95.00%
A-FT-D-1000 Installation of Doors 3 9-Aug-20 11-Aug-20 9.09% 95.00% 0.00% 95.00%
A-FT-D-1010 Installation of Roll up doors 12 13-Aug-20 26-Aug-20 90.91% 95.00% 0.00% 95.00%
SASRF.5.2.3 Emergency Generator Building 155 10-Feb-20 8-Aug-20 11.22% 99.26% 0.00% 99.26%
SASRF.5.2.3.1 Civil 60 10-Feb-20 19-Apr-20 45.34% 100.00% 0.00% 100.00%
SASRF.5.2.3.1.1 Substructure 12 6-Apr-20 19-Apr-20 7.88% 100.00% 0.00% 100.00%
SASRF.5.2.3.1.1.1 Construction of Grade slab 12 6-Apr-20 19-Apr-20 100.00% 100.00% 0.00% 100.00%
C-EGB-GS-1000 Subgrade Preparation and Compaction 2 6-Apr-20 7-Apr-20 26.09% 100.00% 0.00% 100.00%
C-EGB-GS-1010 Rebar work 2 8-Apr-20 9-Apr-20 43.48% 100.00% 0.00% 100.00%
C-EGB-GS-1020 Formwork 1 9-Apr-20 9-Apr-20 8.70% 100.00% 0.00% 100.00%
C-EGB-GS-1030 Concretre Pouring for Grade slab 1 11-Apr-20 11-Apr-20 17.39% 100.00% 0.00% 100.00%
C-EGB-GS-1040 Curing 7 12-Apr-20 19-Apr-20 4.35% 100.00% 0.00% 100.00%
SASRF.5.2.3.1.2 Super structure 50 10-Feb-20 7-Apr-20 92.12% 100.00% 0.00% 100.00%
SASRF.5.2.3.1.2.1 Construction of Column from Top of Grade slab to B 23 10-Feb-20 7-Mar-20 40.52% 100.00% 0.00% 100.00%
C-EGB-C-1000 Rebar cutting & bending 4 10-Feb-20 13-Feb-20 11.01% 100.00% 0.00% 100.00%
C-EGB-C-1010 Formwork Making 3 15-Feb-20 17-Feb-20 16.51% 100.00% 0.00% 100.00%
C-EGB-C-1020 Scaffolding for Column 3 16-Feb-20 18-Feb-20 14.68% 100.00% 0.00% 100.00%
C-EGB-C-1030 Rebar Fixing 3 22-Feb-20 24-Feb-20 16.51% 100.00% 0.00% 100.00%
C-EGB-C-1040 Formwork 3 24-Feb-20 26-Feb-20 18.35% 100.00% 0.00% 100.00%
C-EGB-C-1050 Concrete Pouring 1 27-Feb-20 27-Feb-20 5.50% 100.00% 0.00% 100.00%
C-EGB-C-1060 Deshuttering 2 29-Feb-20 1-Mar-20 16.51% 100.00% 0.00% 100.00%
C-EGB-C-1070 Curing 7 29-Feb-20 7-Mar-20 0.92% 100.00% 0.00% 100.00%
SASRF.5.2.3.1.2.2 Construction of Roof beam & Slab 45 16-Feb-20 7-Apr-20 59.48% 100.00% 0.00% 100.00%
C-EGB-B&S-1000 Rebar Cutting and bending 12 16-Feb-20 29-Feb-20 15.00% 100.00% 0.00% 100.00%
C-EGB-B&S-1010 Scaffolding installation 2 5-Mar-20 7-Mar-20 12.50% 100.00% 0.00% 100.00%
C-EGB-B&S-1020 Formwork for Beam & Slab 3 8-Mar-20 10-Mar-20 11.25% 100.00% 0.00% 100.00%
C-EGB-B&S-1030 Rebar work 3 10-Mar-20 12-Mar-20 13.13% 100.00% 0.00% 100.00%
C-EGB-B&S-1040 Concrete Pouring 1 14-Mar-20 14-Mar-20 6.25% 100.00% 0.00% 100.00%
C-EGB-B&S-1050 Deshuttering 3 31-Mar-20 2-Apr-20 23.13% 100.00% 0.00% 100.00%
C-EGB-B&S-1060 Curing 14 15-Mar-20 30-Mar-20 2.50% 100.00% 0.00% 100.00%
C-EGB-B&S-1070 Construction of Parapet wall 4 4-Apr-20 7-Apr-20 16.25% 100.00% 0.00% 100.00%
SASRF.5.2.3.2 Architecture 101 13-Apr-20 8-Aug-20 54.66% 98.65% 0.00% 98.65%
SASRF.5.2.3.2.1 CMU block 29 13-Apr-20 16-May-20 51.70% 100.00% 0.00% 100.00%
A-EGB-CMU-1000 Laying of Block 12 13-Apr-20 26-Apr-20 42.31% 100.00% 0.00% 100.00%
A-EGB-CMU-1010 Plastering for Internal wall 8 27-Apr-20 5-May-20 24.73% 100.00% 0.00% 100.00%
A-EGB-CMU-1020 Plastering for External wall 9 6-May-20 16-May-20 29.67% 100.00% 0.00% 100.00%
A-EGB-CMU-1030 Screed concrete 2 10-May-20 11-May-20 3.30% 100.00% 0.00% 100.00%
Page 4 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.2.3.2.2 Painting 32 13-May-20 18-Jun-20 19.32% 95.88% 0.00% 95.88%
A-EGB-P-1000 Preparation for ceiling 4 13-May-20 17-May-20 8.82% 100.00% 0.00% 100.00%
A-EGB-P-1010 Painting for ceiling 3 18-May-20 20-May-20 5.88% 90.00% 0.00% 90.00%
A-EGB-P-1020 Preparation for wall 6 21-May-20 27-May-20 17.65% 100.00% 0.00% 100.00%
A-EGB-P-1030 Internal Painting for wall 6 26-May-20 1-Jun-20 13.24% 90.00% 0.00% 90.00%
A-EGB-P-1060 Floor Preparation 4 2-Jun-20 6-Jun-20 8.82% 100.00% 0.00% 100.00%
A-EGB-P-1070 Floor Painting 2 4-Jun-20 6-Jun-20 4.41% 90.00% 0.00% 90.00%
A-EGB-P-1080 Preparation for External Painting 7 7-Jun-20 14-Jun-20 23.53% 100.00% 0.00% 100.00%
A-EGB-P-1090 External Painting 4 15-Jun-20 18-Jun-20 17.65% 90.00% 0.00% 90.00%
SASRF.5.2.3.2.3 Tile 6 3-Jun-20 9-Jun-20 2.84% 98.00% 0.00% 98.00%
A-EGB-T-1000 Installation of wall tile 4 3-Jun-20 7-Jun-20 60.00% 100.00% 0.00% 100.00%
A-EGB-T-1010 Floor tile 2 8-Jun-20 9-Jun-20 40.00% 95.00% 0.00% 95.00%
SASRF.5.2.3.2.4 Water Proofing 15 12-May-20 28-May-20 16.19% 100.00% 0.00% 100.00%
A-EGB-WP-1000 Surface Preparation 2 12-May-20 13-May-20 10.53% 100.00% 0.00% 100.00%
A-EGB-WP-1010 Pouring of Light weight Concrete 1 14-May-20 14-May-20 8.77% 100.00% 0.00% 100.00%
A-EGB-WP-1020 Bituminous Coating 2 16-May-20 17-May-20 3.51% 100.00% 0.00% 100.00%
A-EGB-WP-1030 Installation of EPDM Water proofing membrane 2 18-May-20 19-May-20 26.32% 100.00% 0.00% 100.00%
A-EGB-WP-1040 Leaktest 1 20-May-20 20-May-20 3.51% 100.00% 0.00% 100.00%
A-EGB-WP-1050 Installation of Insulation Board 2 21-May-20 23-May-20 5.26% 100.00% 0.00% 100.00%
A-EGB-WP-1060 Installation of geotextile membrane 2 24-May-20 25-May-20 7.02% 100.00% 0.00% 100.00%
A-EGB-WP-1070 Gravel Filling 1 26-May-20 26-May-20 21.05% 100.00% 0.00% 100.00%
A-EGB-WP-1080 Installation of Steel Flashing 2 27-May-20 28-May-20 14.04% 100.00% 0.00% 100.00%
SASRF.5.2.3.2.5 Door 7 1-Aug-20 8-Aug-20 9.94% 95.00% 0.00% 95.00%
A-EGB-D-1000 Installation of Door 4 1-Aug-20 4-Aug-20 57.14% 95.00% 0.00% 95.00%
A-EGB-D-1010 Installation of Handrail 3 5-Aug-20 8-Aug-20 42.86% 95.00% 0.00% 95.00%
SASRF.5.2.4 Vehical washing facility shed 46 4-Mar-20 26-Apr-20 2.40% 99.82% 0.00% 99.82%
SASRF.5.2.4.1 PRE Engineering Buildings 9 4-Mar-20 14-Mar-20 64.73% 100.00% 0.00% 100.00%
A-VWF-PEB-1000 Unloading of Structures 2 4-Mar-20 5-Mar-20 4.49% 100.00% 0.00% 100.00%
A-VWF-PEB-1010 Erection of Column & Beam 2 7-Mar-20 8-Mar-20 44.94% 100.00% 0.00% 100.00%
A-VWF-PEB-1020 Installation of Sandwich Roof Panels 3 9-Mar-20 11-Mar-20 28.09% 100.00% 0.00% 100.00%
A-VWF-PEB-1030 Installation of Eaves Gutter 2 12-Mar-20 14-Mar-20 22.47% 100.00% 0.00% 100.00%
SASRF.5.2.4.2 Civil 12 30-Mar-20 12-Apr-20 24.36% 100.00% 0.00% 100.00%
SASRF.5.2.4.2.1 Floor slab 6 30-Mar-20 5-Apr-20 59.70% 100.00% 0.00% 100.00%
C-VWF-S-1000 Subgrade preparation 2 30-Mar-20 31-Mar-20 20.00% 100.00% 0.00% 100.00%
C-VWF-S-1010 Rebar work 2 1-Apr-20 2-Apr-20 50.00% 100.00% 0.00% 100.00%
C-VWF-S-1020 Form work 1 4-Apr-20 4-Apr-20 10.00% 100.00% 0.00% 100.00%
C-VWF-S-1030 Concrete Pouring 1 5-Apr-20 5-Apr-20 20.00% 100.00% 0.00% 100.00%
SASRF.5.2.4.2.2 Construction of Ramp 6 6-Apr-20 12-Apr-20 40.30% 100.00% 0.00% 100.00%
C-VWF-R-1000 Subgrade preparation 2 6-Apr-20 7-Apr-20 22.22% 100.00% 0.00% 100.00%
C-VWF-R-1010 Rebar work 2 8-Apr-20 9-Apr-20 37.04% 100.00% 0.00% 100.00%
C-VWF-R-1020 Form work 1 11-Apr-20 11-Apr-20 22.22% 100.00% 0.00% 100.00%
C-VWF-R-1030 Concrete Pouring 1 12-Apr-20 12-Apr-20 18.52% 100.00% 0.00% 100.00%
SASRF.5.2.4.3 Architecture 5 21-Apr-20 26-Apr-20 10.91% 98.33% 0.00% 98.33%
SASRF.5.2.4.3.1 Floor Painting 5 21-Apr-20 26-Apr-20 100.00% 98.33% 0.00% 98.33%
A-VWF-1000 Preparation for floor painting 3 21-Apr-20 23-Apr-20 66.67% 100.00% 0.00% 100.00%
A-VWF-1010 Painting on Floor 2 25-Apr-20 26-Apr-20 33.33% 95.00% 0.00% 95.00%
SASRF.5.2.5 Water Filling station 58 9-Mar-20 14-May-20 4.76% 98.15% 0.00% 98.15%
SASRF.5.2.5.1 PRE Engineering Buildings 12 9-Mar-20 22-Mar-20 49.82% 100.00% 0.00% 100.00%
A-WFS-PEB-1000 Unloading of Structures 2 9-Mar-20 10-Mar-20 4.41% 100.00% 0.00% 100.00%
A-WFS-PEB-1010 Erection of Column & Beam 3 12-Mar-20 15-Mar-20 22.06% 100.00% 0.00% 100.00%
A-WFS-PEB-1020 Installation of Sandwich Roof Panels 4 16-Mar-20 19-Mar-20 36.76% 100.00% 0.00% 100.00%
A-WFS-PEB-1030 Installation of Eaves Gutter 2 21-Mar-20 22-Mar-20 36.76% 100.00% 0.00% 100.00%
SASRF.5.2.5.2 Civil 17 4-Apr-20 22-Apr-20 33.70% 96.96% 0.00% 96.96%
SASRF.5.2.5.2.1 Floor slab 9 4-Apr-20 13-Apr-20 69.57% 100.00% 0.00% 100.00%
C-WFS-S-1000 Subgrade preparation 2 4-Apr-20 5-Apr-20 18.75% 100.00% 0.00% 100.00%
C-WFS-S-1010 Rebar work 4 6-Apr-20 9-Apr-20 50.00% 100.00% 0.00% 100.00%
C-WFS-S-1020 Form work 2 11-Apr-20 12-Apr-20 15.63% 100.00% 0.00% 100.00%
C-WFS-S-1030 Concrete Pouring 1 13-Apr-20 13-Apr-20 15.63% 100.00% 0.00% 100.00%
SASRF.5.2.5.2.2 Construction of Ramp 8 14-Apr-20 22-Apr-20 30.43% 90.00% 0.00% 90.00%
C-WFS-R-1000 Subgrade preparation 2 14-Apr-20 15-Apr-20 14.29% 90.00% 0.00% 90.00%
C-WFS-R-1010 Rebar work 3 16-Apr-20 19-Apr-20 53.57% 90.00% 0.00% 90.00%
C-WFS-R-1020 Form work 2 20-Apr-20 21-Apr-20 10.71% 90.00% 0.00% 90.00%
C-WFS-R-1030 Concrete Pouring 1 22-Apr-20 22-Apr-20 21.43% 90.00% 0.00% 90.00%
SASRF.5.2.5.3 Architecture 12 2-May-20 14-May-20 16.48% 95.00% 0.00% 95.00%
SASRF.5.2.5.3.1 Floor Painting 12 2-May-20 14-May-20 100.00% 95.00% 0.00% 95.00%
A-WFS-1000 Preparation for floor painting 7 2-May-20 9-May-20 73.33% 95.00% 0.00% 95.00%
A-WFS-1010 Painting on Floor 5 10-May-20 14-May-20 26.67% 95.00% 0.00% 95.00%
SASRF.5.2.6 Foam Storage Tank shed 45 26-Apr-20 16-Jun-20 1.25% 93.71% 0.00% 93.71%
SASRF.5.2.6.1 Civil 30 26-Apr-20 30-May-20 74.83% 99.07% 0.00% 99.07%
SASRF.5.2.6.1.1 Construction of Foundation 30 26-Apr-20 30-May-20 100.00% 99.07% 0.00% 99.07%
C-FST-1000 Excavation and subgrade preparation 2 26-Apr-20 27-Apr-20 11.21% 100.00% 0.00% 100.00%
C-FST-1005 Lean concrete 1 28-Apr-20 28-Apr-20 3.74% 100.00% 0.00% 100.00%
C-FST-1010 Rebar and formwork for footing 3 29-Apr-20 2-May-20 18.69% 100.00% 0.00% 100.00%
C-FST-1020 Concrete pouring for footing 1 3-May-20 3-May-20 5.61% 100.00% 0.00% 100.00%
C-FST-1030 Rebar and formwork for pedestal 3 7-May-20 10-May-20 22.43% 100.00% 0.00% 100.00%
C-FST-1040 Concrete pouring for pedestal 1 11-May-20 11-May-20 5.61% 100.00% 0.00% 100.00%
C-FST-1050 Curing 4 19-May-20 23-May-20 0.93% 100.00% 0.00% 100.00%
C-FST-1060 Surface preparation and coating 3 25-May-20 27-May-20 9.35% 90.00% 0.00% 90.00%
C-FST-1070 Backfilling 2 28-May-20 30-May-20 22.43% 100.00% 0.00% 100.00%
SASRF.5.2.6.2 Architect 5 11-Jun-20 16-Jun-20 25.17% 77.78% 0.00% 77.78%
SASRF.5.2.6.2.1 Painting 5 11-Jun-20 16-Jun-20 100.00% 77.78% 0.00% 77.78%
A-FST-1000 Preparation for floor painting 3 11-Jun-20 14-Jun-20 55.56% 80.00% 0.00% 80.00%
A-FST-1010 Floor painting 2 15-Jun-20 16-Jun-20 44.44% 75.00% 0.00% 75.00%
SASRF.5.2.7 Landscape 74 4-Aug-20 28-Oct-20 15.16% 61.44% 1.61% 63.05%
Page 5 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
PKG-2-LS-1000 Finished Grading 25 4-Aug-20 1-Sep-20 22.99% 95.00% 0.00% 95.00%
PKG-2-LS-1010 Fixing Red solid bricks 10 25-Aug-20 5-Sep-20 4.60% 0.00%
PKG-2-LS-1020 Interlock concrete block paver 28 31-Aug-20 1-Oct-20 17.24% 70.00% 0.00% 70.00%
PKG-2-LS-1030 Installation of Gravel 15 23-Sep-20 10-Oct-20 8.05% 5.00% 20.00% 25.00%
PKG-2-LS-1040 Installation of curb stone 26 29-Sep-20 28-Oct-20 6.90% 95.00% 0.00% 95.00%
PKG-2-LS-1050 Wheel stopper 2 1-Oct-20 3-Oct-20 0.92% 0.00%
PKG-2-LS-1060 Installation of Aluminium Grills 12 4-Oct-20 17-Oct-20 11.49% 90.00% 0.00% 90.00%
PKG-2-LS-1070 Construction of Volley ball court 30 17-Sep-20 21-Oct-20 20.46% 50.00% 0.00% 50.00%
PKG-2-LS-1080 Traffic marking 15 6-Sep-20 22-Sep-20 7.36% 0.00%
SASRF.5.3 Package-3 300 16-Feb-20 30-Jan-21 55.95% 69.10% 0.28% 69.37%
Page 6 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.1 Aviation Control Building (No.100) 115 29-Jul-20 9-Dec-20 3.88% 81.15% 0.00% 81.15%
SASRF.5.3.1.1 Civil 51 12-Oct-20 9-Dec-20 80.17% 100.00% 0.00% 100.00%
SASRF.5.3.1.1.1 Demolition 22 12-Oct-20 5-Nov-20 50.69% 100.00% 0.00% 100.00%
C-BDLG-100-1000 Demolition of Existing structures 22 12-Oct-20 5-Nov-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.1.1.2 Construction of AHU & ACCU Foundation 32 29-Oct-20 5-Dec-20 41.98% 100.00% 0.00% 100.00%
C-BDLG-100-1010 Excavation 4 29-Oct-20 2-Nov-20 16.00% 100.00% 0.00% 100.00%
C-BDLG-100-1020 Subgrade preparation and Lean concrete 2 3-Nov-20 4-Nov-20 2.18% 100.00% 0.00% 100.00%
C-BDLG-100-1030 Rebar work 4 5-Nov-20 9-Nov-20 14.55% 100.00% 0.00% 100.00%
C-BDLG-100-1040 Formwork 3 8-Nov-20 10-Nov-20 36.36% 100.00% 0.00% 100.00%
C-BDLG-100-1050 Anchorbolt Fixing 2 10-Nov-20 11-Nov-20 0.73% 100.00% 0.00% 100.00%
C-BDLG-100-1060 Concrete Pouring 5 12-Nov-20 17-Nov-20 14.55% 100.00% 0.00% 100.00%
C-BDLG-100-1070 Curing 11 12-Nov-20 24-Nov-20 0.73% 100.00% 0.00% 100.00%
C-BDLG-100-1080 Surface Preparation 4 22-Nov-20 25-Nov-20 8.73% 100.00% 0.00% 100.00%
C-BDLG-100-1090 Coating 4 25-Nov-20 29-Nov-20 4.36% 100.00% 0.00% 100.00%
C-BDLG-100-1100 Backfilling 2 30-Nov-20 1-Dec-20 1.09% 100.00% 0.00% 100.00%
C-BDLG-100-1110 Grouting 1 5-Dec-20 5-Dec-20 0.73% 100.00% 0.00% 100.00%
SASRF.5.3.1.1.3 Concrete Grade slab 7 2-Dec-20 9-Dec-20 7.33% 100.00% 0.00% 100.00%
C-BDLG-100-1120 Subgrade Preparation 2 2-Dec-20 3-Dec-20 12.50% 100.00% 0.00% 100.00%
C-BDLG-100-1130 Rebar for slab 2 5-Dec-20 6-Dec-20 41.67% 100.00% 0.00% 100.00%
C-BDLG-100-1140 Formwork for slab 2 7-Dec-20 8-Dec-20 20.83% 100.00% 0.00% 100.00%
C-BDLG-100-1150 Concrete Pouring for slab 1 9-Dec-20 9-Dec-20 25.00% 100.00% 0.00% 100.00%
SASRF.5.3.1.2 Architecture 95 29-Jul-20 16-Nov-20 19.83% 4.94% 0.00% 4.94%
SASRF.5.3.1.2.1 General Modification works 8 17-Oct-20 25-Oct-20 23.46% 21.05% 0.00% 21.05%
A-BDLG-100-1000 Demolishing cement screed on Epoxy paint 1 17-Oct-20 17-Oct-20 10.53% 0.00%
A-BDLG-100-1010 Demolishing Existing Interlock paving 2 18-Oct-20 19-Oct-20 21.05% 100.00% 0.00% 100.00%
A-BDLG-100-1020 Repair of Doors 2 20-Oct-20 21-Oct-20 31.58% 0.00%
A-BDLG-100-1030 Pouring screed concrete 1 22-Oct-20 22-Oct-20 15.79% 0.00%
A-BDLG-100-1035 Installation of Interlocking Concrete Blocks paver 2 24-Oct-20 25-Oct-20 21.05% 0.00%
SASRF.5.3.1.2.2 Painting 95 29-Jul-20 16-Nov-20 76.54% 0.00% 0.00% 0.00%
A-BDLG-100-1040 Preparation for External wall 3 2-Nov-20 4-Nov-20 16.13% 0.00%
A-BDLG-100-1050 Painting on External wall 3 4-Nov-20 7-Nov-20 8.06% 0.00%
A-BDLG-100-1060 Preparation for Internal wall 4 8-Nov-20 11-Nov-20 25.81% 0.00%
A-BDLG-100-1070 Painting for Internal wall 3 10-Nov-20 12-Nov-20 12.90% 0.00%
A-BDLG-100-1080 Surface preparation for floor painting 1 14-Nov-20 14-Nov-20 3.23% 0.00%
A-BDLG-100-1090 Floor painting 2 15-Nov-20 16-Nov-20 1.61% 0.00%
A-BDLG-100-1100 Installation of Door 3 29-Jul-20 1-Aug-20 32.26% 0.00%
SASRF.5.3.2 FDP-1 OME Building (No.24) 81 13-Apr-20 15-Jul-20 2.93% 39.06% 7.92% 46.98%
SASRF.5.3.2.1 Civil 63 13-Apr-20 24-Jun-20 74.84% 52.19% 10.59% 62.78%
SASRF.5.3.2.1.1 Demolition 12 21-Apr-20 4-May-20 26.03% 70.00% 0.00% 70.00%
C-BDLG-24-1000 Demolition of Existing structures 12 21-Apr-20 4-May-20 100.00% 70.00% 0.00% 70.00%
SASRF.5.3.2.1.2 Construction of AHU & ACCU Foundation 40 5-May-20 20-Jun-20 48.81% 36.71% 21.69% 58.40%
C-BDLG-24-1010 Excavation 4 5-May-20 9-May-20 21.33% 70.00% 20.00% 90.00%
C-BDLG-24-1015 Subgrade preparation and Lean concrete 1 10-May-20 10-May-20 2.67% 50.00% 40.00% 90.00%
C-BDLG-24-1020 Rebar work 4 11-May-20 14-May-20 23.11% 50.00% 40.00% 90.00%
C-BDLG-24-1030 Formwork 3 16-May-20 18-May-20 17.78% 50.00% 40.00% 90.00%
C-BDLG-24-1040 Concrete Pouring 4 18-May-20 21-May-20 22.22% 0.00%
C-BDLG-24-1050 Curing 11 19-May-20 31-May-20 0.89% 0.00%
C-BDLG-24-1060 Surface Preparation 4 10-Jun-20 14-Jun-20 6.22% 0.00%
C-BDLG-24-1070 Coating 4 13-Jun-20 16-Jun-20 3.56% 0.00%
C-BDLG-24-1080 Backfilling 2 17-Jun-20 18-Jun-20 1.33% 0.00%
C-BDLG-24-1085 Grouting 1 20-Jun-20 20-Jun-20 0.89% 0.00%
SASRF.5.3.2.1.3 Concrete Grade slab 5 20-Jun-20 24-Jun-20 5.64% 0.00% 0.00% 0.00%
C-BDLG-24-1088 Subgrade Preparation 1 20-Jun-20 20-Jun-20 7.69% 0.00%
C-BDLG-24-1090 Rebar for slab 2 21-Jun-20 22-Jun-20 38.46% 0.00%
C-BDLG-24-1100 Formwork for slab 1 23-Jun-20 23-Jun-20 7.69% 0.00%
C-BDLG-24-1110 Concrete Pouring for slab 1 24-Jun-20 24-Jun-20 46.15% 0.00%
SASRF.5.3.2.1.4 Diesel Generator Foundation 18 13-Apr-20 3-May-20 19.52% 82.22% 0.00% 82.22%
C-BDLG-24-1120 Excavation and Subgrade Preparation 3 13-Apr-20 15-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-24-1130 Rebar work 2 16-Apr-20 18-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-24-1140 Formwork 1 19-Apr-20 19-Apr-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-24-1150 Concrete Pouring 1 20-Apr-20 20-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-24-1160 Surface preparation 2 26-Apr-20 27-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-24-1170 Coating 2 28-Apr-20 29-Apr-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-24-1180 Backfilling 2 30-Apr-20 2-May-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-24-1190 Grouting 1 3-May-20 3-May-20 17.78% 0.00%
SASRF.5.3.2.2 Architecture 30 11-Jun-20 15-Jul-20 25.16% 0.00% 0.00% 0.00%
SASRF.5.3.2.2.1 General Modification works 14 11-Jun-20 27-Jun-20 53.55% 0.00% 0.00% 0.00%
A-BDLG-24-1000 Demolish Existing Epoxt paint on cement screed 2 11-Jun-20 13-Jun-20 19.28% 0.00%
A-BDLG-24-1010 Demolish wall for Hvac opening 2 14-Jun-20 15-Jun-20 6.02% 0.00%
A-BDLG-24-1020 Repair plaster for Hvac opening 1 20-Jun-20 20-Jun-20 2.41% 0.00%
A-BDLG-24-1025 Floor preparation for screed concrete 3 21-Jun-20 23-Jun-20 28.92% 0.00%
A-BDLG-24-1028 Pouring Screed concrete 1 24-Jun-20 24-Jun-20 14.46% 0.00%
A-BDLG-24-1029 Repair of Doors 2 25-Jun-20 27-Jun-20 28.92% 0.00%
SASRF.5.3.2.2.2 Painting 15 29-Jun-20 15-Jul-20 46.45% 0.00% 0.00% 0.00%
A-BDLG-24-1030 Preparation for Ceiling painting 3 29-Jun-20 1-Jul-20 22.22% 0.00%
A-BDLG-24-1040 Painting on ceiling 2 2-Jul-20 4-Jul-20 11.11% 0.00%
A-BDLG-24-1050 Preparation for wall painting 3 5-Jul-20 7-Jul-20 22.22% 0.00%
A-BDLG-24-1060 Painting for wall 2 8-Jul-20 9-Jul-20 11.11% 0.00%
A-BDLG-24-1070 Preparation for Floor painting 3 11-Jul-20 13-Jul-20 22.22% 0.00%
A-BDLG-24-1080 Floor painting 2 14-Jul-20 15-Jul-20 11.11% 0.00%
SASRF.5.3.3 FDP-1 PIB & Operation shelter Building (No.25) 89 23-Apr-20 4-Aug-20 4.38% 91.00% 0.00% 91.00%
SASRF.5.3.3.1 Civil 57 23-Apr-20 28-Jun-20 90.89% 98.09% 0.00% 98.09%
SASRF.5.3.3.1.1 Demolition 22 5-May-20 30-May-20 40.57% 100.00% 0.00% 100.00%
C-BDLG-25-1000 Demolition of Existing structures 22 5-May-20 30-May-20 100.00% 100.00% 0.00% 100.00%
Page 7 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.3.1.2 Construction of AHU & ACCU Foundation 28 23-May-20 23-Jun-20 42.00% 100.00% 0.00% 100.00%
C-BDLG-25-1010 Excavation 7 23-May-20 30-May-20 23.86% 100.00% 0.00% 100.00%
C-BDLG-25-1020 Subgrade preparation and Lean concrete 2 28-May-20 30-May-20 1.70% 100.00% 0.00% 100.00%
C-BDLG-25-1030 Rebar 5 30-May-20 3-Jun-20 28.41% 100.00% 0.00% 100.00%
C-BDLG-25-1040 Formwork 4 1-Jun-20 4-Jun-20 13.64% 100.00% 0.00% 100.00%
C-BDLG-25-1060 Concrete pouring 4 3-Jun-20 7-Jun-20 17.05% 100.00% 0.00% 100.00%
C-BDLG-25-1070 Curing 11 4-Jun-20 16-Jun-20 0.57% 100.00% 0.00% 100.00%
C-BDLG-25-1080 Surface Preparation 4 14-Jun-20 17-Jun-20 7.95% 100.00% 0.00% 100.00%
C-BDLG-25-1090 Coating 3 17-Jun-20 20-Jun-20 3.98% 100.00% 0.00% 100.00%
C-BDLG-25-1100 Backfilling 2 21-Jun-20 22-Jun-20 2.27% 100.00% 0.00% 100.00%
C-BDLG-25-1110 Grouting 1 23-Jun-20 23-Jun-20 0.57% 100.00% 0.00% 100.00%
SASRF.5.3.3.1.3 Concrete Grade slab 5 23-Jun-20 28-Jun-20 6.68% 100.00% 0.00% 100.00%
C-BDLG-25-1115 Subgrade Preparation 1 23-Jun-20 23-Jun-20 28.57% 100.00% 0.00% 100.00%
C-BDLG-25-1120 Rebar for slab 2 24-Jun-20 25-Jun-20 28.57% 100.00% 0.00% 100.00%
C-BDLG-25-1130 Formwork for slab 2 25-Jun-20 27-Jun-20 14.29% 100.00% 0.00% 100.00%
C-BDLG-25-1140 Concrete Pouring for slab 1 28-Jun-20 28-Jun-20 28.57% 100.00% 0.00% 100.00%
SASRF.5.3.3.1.4 Diesel Generator Foundation 18 23-Apr-20 13-May-20 10.74% 82.22% 0.00% 82.22%
C-BDLG-25-1150 Excavation and Subgrade Preparation 3 23-Apr-20 26-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-25-1160 Rebar work 2 27-Apr-20 28-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-25-1170 Formwork 1 29-Apr-20 29-Apr-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-25-1180 Concrete Pouring 1 30-Apr-20 30-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-25-1190 Surface preparation 2 6-May-20 7-May-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-25-1200 Coating 2 9-May-20 10-May-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-25-1210 Backfilling 2 11-May-20 12-May-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-25-1220 Grouting 1 13-May-20 13-May-20 17.78% 0.00%
SASRF.5.3.3.2 Architecture 17 16-Jul-20 4-Aug-20 9.11% 20.24% 0.00% 20.24%
SASRF.5.3.3.2.1 Painting 17 16-Jul-20 4-Aug-20 100.00% 20.24% 0.00% 20.24%
A-BDLG-25-1000 Preparation for External wall 2 16-Jul-20 18-Jul-20 9.52% 0.00%
A-BDLG-25-1010 Painting on External wall 2 19-Jul-20 20-Jul-20 4.76% 0.00%
A-BDLG-25-1020 Preparation for Internal wall 2 21-Jul-20 22-Jul-20 9.52% 0.00%
A-BDLG-25-1030 Painting for Internal wall 2 23-Jul-20 25-Jul-20 4.76% 0.00%
A-BDLG-25-1040 Preaparation for Floor painting 4 26-Jul-20 29-Jul-20 33.33% 0.00%
A-BDLG-25-1050 Floor painting 5 28-Jul-20 2-Aug-20 23.81% 85.00% 0.00% 85.00%
A-BDLG-25-1060 Paint on Floor base 2 3-Aug-20 4-Aug-20 14.29% 0.00%
SASRF.5.3.4 FDP-1 Mosque Building (No.23) 43 31-May-20 19-Jul-20 2.39% 74.90% 0.00% 74.90%
SASRF.5.3.4.1 Civil 43 31-May-20 19-Jul-20 76.89% 97.41% 0.00% 97.41%
SASRF.5.3.4.1.1 Demolition 20 31-May-20 22-Jun-20 51.81% 95.00% 0.00% 95.00%
C-BDLG-23-1000 Demolition of Existing structures 20 31-May-20 22-Jun-20 100.00% 95.00% 0.00% 95.00%
SASRF.5.3.4.1.2 Construction of SPU & EC-01 Foundation 22 23-Jun-20 18-Jul-20 36.79% 100.00% 0.00% 100.00%
C-BDLG-23-1010 Excavation 3 23-Jun-20 25-Jun-20 19.72% 100.00% 0.00% 100.00%
C-BDLG-23-1020 Subgrade preparation and Lean concrete 1 27-Jun-20 27-Jun-20 5.63% 100.00% 0.00% 100.00%
C-BDLG-23-1030 Rebar 3 28-Jun-20 30-Jun-20 22.54% 100.00% 0.00% 100.00%
C-BDLG-23-1040 Formwork 3 29-Jun-20 1-Jul-20 16.90% 100.00% 0.00% 100.00%
C-BDLG-23-1060 Concrete pouring 3 1-Jul-20 4-Jul-20 15.49% 100.00% 0.00% 100.00%
C-BDLG-23-1070 Curing 9 1-Jul-20 11-Jul-20 1.41% 100.00% 0.00% 100.00%
C-BDLG-23-1080 Surface Preparation 3 6-Jul-20 8-Jul-20 8.45% 100.00% 0.00% 100.00%
C-BDLG-23-1090 Coating 2 9-Jul-20 11-Jul-20 2.82% 100.00% 0.00% 100.00%
C-BDLG-23-1100 Backfilling 2 12-Jul-20 13-Jul-20 5.63% 100.00% 0.00% 100.00%
C-BDLG-23-1110 Grouting 4 14-Jul-20 18-Jul-20 1.41% 100.00% 0.00% 100.00%
SASRF.5.3.4.1.3 Concrete Grade slab 5 14-Jul-20 19-Jul-20 11.40% 100.00% 0.00% 100.00%
C-BDLG-23-1120 Subgrade Preparation 1 14-Jul-20 14-Jul-20 13.64% 100.00% 0.00% 100.00%
C-BDLG-23-1130 Rebar for slab 2 15-Jul-20 16-Jul-20 27.27% 100.00% 0.00% 100.00%
C-BDLG-23-1140 Formwork for slab 1 18-Jul-20 18-Jul-20 18.18% 100.00% 0.00% 100.00%
C-BDLG-23-1150 Concrete Pouring for slab 1 19-Jul-20 19-Jul-20 40.91% 100.00% 0.00% 100.00%
SASRF.5.3.4.2 Architecture 18 23-Jun-20 13-Jul-20 23.11% 0.00% 0.00% 0.00%
SASRF.5.3.4.2.1 General Modification works 9 23-Jun-20 2-Jul-20 68.97% 0.00% 0.00% 0.00%
A-BDLG-23-1000 Demolish Existing Interlock Paving 3 23-Jun-20 25-Jun-20 45.00% 0.00%
A-BDLG-23-1010 Subgrade Preparation for Laying Interlocking blocks 2 27-Jun-20 28-Jun-20 15.00% 0.00%
A-BDLG-23-1020 Laying of Interlocking blocks 4 29-Jun-20 2-Jul-20 40.00% 0.00%
SASRF.5.3.4.2.2 Painting 9 4-Jul-20 13-Jul-20 31.03% 0.00% 0.00% 0.00%
A-BDLG-23-1030 Preparation for External wall 4 4-Jul-20 7-Jul-20 66.67% 0.00%
A-BDLG-23-1040 Painting for External wall 3 7-Jul-20 9-Jul-20 22.22% 0.00%
A-BDLG-23-1050 Preaparation for Floor painting 1 11-Jul-20 11-Jul-20 5.56% 0.00%
A-BDLG-23-1060 Floor painting 2 12-Jul-20 13-Jul-20 5.56% 0.00%
SASRF.5.3.5 Heliport office Building (No.11) 40 23-Jun-20 8-Aug-20 4.61% 32.56% 0.00% 32.56%
SASRF.5.3.5.1 Civil 40 23-Jun-20 8-Aug-20 52.62% 61.87% 0.00% 61.87%
SASRF.5.3.5.1.1 Demolition 15 23-Jun-20 9-Jul-20 47.06% 50.00% 0.00% 50.00%
C-BDLG-11-1000 Demolition of Existing structures 15 23-Jun-20 9-Jul-20 100.00% 50.00% 0.00% 50.00%
SASRF.5.3.5.1.2 Construction of AHU & ACCU Foundation 21 11-Jul-20 3-Aug-20 46.27% 68.44% 0.00% 68.44%
C-BDLG-11-1010 Excavation 2 11-Jul-20 12-Jul-20 25.42% 81.73% 0.00% 81.73%
C-BDLG-11-1020 Subgrade preparation and Lean concrete 1 13-Jul-20 13-Jul-20 1.69% 81.73% 0.00% 81.73%
C-BDLG-11-1030 Rebar 3 14-Jul-20 16-Jul-20 25.42% 81.73% 0.00% 81.73%
C-BDLG-11-1040 Formwork 2 16-Jul-20 18-Jul-20 8.47% 81.73% 0.00% 81.73%
C-BDLG-11-1060 Concrete pouring 1 19-Jul-20 19-Jul-20 11.02% 81.73% 0.00% 81.73%
C-BDLG-11-1070 Curing 7 20-Jul-20 27-Jul-20 0.85% 81.73% 0.00% 81.73%
C-BDLG-11-1080 Surface Preparation 3 25-Jul-20 27-Jul-20 6.78% 81.73% 0.00% 81.73%
C-BDLG-11-1090 Coating 2 28-Jul-20 29-Jul-20 2.54% 61.29% 0.00% 61.29%
C-BDLG-11-1100 Backfilling 2 30-Jul-20 1-Aug-20 2.54% 70.00% 0.00% 70.00%
C-BDLG-11-1110 Grouting 2 2-Aug-20 3-Aug-20 15.25% 0.00%
SASRF.5.3.5.1.3 Concrete Grade slab 6 2-Aug-20 8-Aug-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-11-1120 Subgrade Preparation 2 2-Aug-20 3-Aug-20 17.65% 100.00% 0.00% 100.00%
C-BDLG-11-1130 Rebar for slab 2 4-Aug-20 5-Aug-20 35.29% 100.00% 0.00% 100.00%
C-BDLG-11-1140 Formwork for slab 1 6-Aug-20 6-Aug-20 23.53% 100.00% 0.00% 100.00%
C-BDLG-11-1150 Concrete Pouring for slab 1 8-Aug-20 8-Aug-20 23.53% 100.00% 0.00% 100.00%
Page 8 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.5.2 Architecture 31 4-Jul-20 8-Aug-20 47.38% 0.00% 0.00% 0.00%
Page 9 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.5.2.1 Demolition works 7 4-Jul-20 11-Jul-20 10.45% 0.00% 0.00% 0.00%
A-BDLG-11-1000 Demolition of Existing Gypsum Ceiling Board 2 4-Jul-20 5-Jul-20 29.17% 0.00%
A-BDLG-11-1010 Demolition of existing Acoustic Tiles 2 6-Jul-20 7-Jul-20 29.17% 0.00%
A-BDLG-11-1020 Demolition of existing Vinyl floor tiles 2 8-Jul-20 9-Jul-20 33.33% 0.00%
A-BDLG-11-1030 Demolition of existing Vinyl base 1 11-Jul-20 11-Jul-20 8.33% 0.00%
SASRF.5.3.5.2.2 General Modification works 24 12-Jul-20 8-Aug-20 71.86% 0.00% 0.00% 0.00%
A-BDLG-11-1040 Screed concrete on floors 3 12-Jul-20 14-Jul-20 10.91% 0.00%
A-BDLG-11-1050 Installation of Acoustic ceiling Tiles 4 15-Jul-20 19-Jul-20 12.12% 0.00%
A-BDLG-11-1060 Installation of Vinyl tile 4 20-Jul-20 23-Jul-20 9.70% 0.00%
A-BDLG-11-1070 Installation of vinyl base 1 25-Jul-20 25-Jul-20 1.82% 0.00%
A-BDLG-11-1080 Repair of Doors 12 26-Jul-20 8-Aug-20 58.18% 0.00%
A-BDLG-11-1090 Opening for Hvac Duct 4 1-Aug-20 4-Aug-20 7.27% 0.00%
Page 10 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.5.2.3 Painting 14 14-Jul-20 29-Jul-20 17.68% 0.00% 0.00% 0.00%
A-BDLG-11-1100 Preparation for Internal Ceiling 1 14-Jul-20 14-Jul-20 9.85% 0.00%
A-BDLG-11-1110 Internal Painting on Ceiling 2 15-Jul-20 16-Jul-20 3.94% 0.00%
A-BDLG-11-1120 Preparation for wall 5 18-Jul-20 22-Jul-20 49.26% 0.00%
A-BDLG-11-1130 Internal Painting for wall 4 21-Jul-20 25-Jul-20 22.17% 0.00%
A-BDLG-11-1140 Preaparation for Floor painting 1 26-Jul-20 26-Jul-20 7.39% 0.00%
A-BDLG-11-1150 Floor painting 2 27-Jul-20 28-Jul-20 2.46% 0.00%
A-BDLG-11-1160 Paint on Floor base 1 29-Jul-20 29-Jul-20 4.93% 0.00%
SASRF.5.3.6 Hout crude control Building (No.26) 110 27-Apr-20 1-Sep-20 3.66% 91.43% 0.00% 91.43%
SASRF.5.3.6.1 Civil 110 27-Apr-20 1-Sep-20 92.21% 96.34% 0.00% 96.34%
SASRF.5.3.6.1.1 Demolition 20 11-Jul-20 2-Aug-20 40.56% 100.00% 0.00% 100.00%
C-BDLG-26-1000 Demolition of Existing structures 20 11-Jul-20 2-Aug-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.6.1.2 Construction of AHU & ACCU Foundation 22 3-Aug-20 27-Aug-20 41.69% 96.62% 0.00% 96.62%
C-BDLG-26-1010 Excavation 4 3-Aug-20 6-Aug-20 16.22% 100.00% 0.00% 100.00%
C-BDLG-26-1020 Subgrade preparation and Lean concrete 2 8-Aug-20 9-Aug-20 1.35% 100.00% 0.00% 100.00%
C-BDLG-26-1030 Rebar 5 10-Aug-20 15-Aug-20 16.22% 100.00% 0.00% 100.00%
C-BDLG-26-1040 Formwork 4 12-Aug-20 16-Aug-20 13.51% 100.00% 0.00% 100.00%
C-BDLG-26-1050 Anchorbolt Fixing 2 15-Aug-20 16-Aug-20 2.70% 100.00% 0.00% 100.00%
C-BDLG-26-1060 Concrete pouring 3 16-Aug-20 18-Aug-20 33.78% 100.00% 0.00% 100.00%
C-BDLG-26-1070 Curing 9 16-Aug-20 25-Aug-20 0.68% 100.00% 0.00% 100.00%
C-BDLG-26-1080 Surface Preparation 2 20-Aug-20 22-Aug-20 8.11% 100.00% 0.00% 100.00%
C-BDLG-26-1090 Coating 2 23-Aug-20 24-Aug-20 2.70% 100.00% 0.00% 100.00%
C-BDLG-26-1100 Backfilling 2 25-Aug-20 26-Aug-20 1.35% 100.00% 0.00% 100.00%
C-BDLG-26-1110 Grouting 1 27-Aug-20 27-Aug-20 3.38% 0.00%
SASRF.5.3.6.1.3 Concrete Grade slab 5 27-Aug-20 1-Sep-20 5.07% 100.00% 0.00% 100.00%
C-BDLG-26-1120 Subgrade Preparation 2 27-Aug-20 29-Aug-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-26-1130 Rebar for slab 1 30-Aug-20 30-Aug-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-26-1140 Formwork for slab 1 31-Aug-20 31-Aug-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-26-1150 Concrete Pouring for slab 1 1-Sep-20 1-Sep-20 33.33% 100.00% 0.00% 100.00%
SASRF.5.3.6.1.4 Diesel Generator Foundation 18 27-Apr-20 17-May-20 12.68% 82.22% 0.00% 82.22%
C-BDLG-26-1160 Excavation and Subgrade Preparation 3 27-Apr-20 29-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-26-1170 Rebar work 2 30-Apr-20 2-May-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-26-1180 Formwork 1 3-May-20 3-May-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-26-1190 Concrete Pouring 1 4-May-20 4-May-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-26-1200 Surface preparation 2 10-May-20 11-May-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-26-1210 Coating 2 12-May-20 13-May-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-26-1220 Backfilling 2 14-May-20 16-May-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-26-1230 Grouting 1 17-May-20 17-May-20 17.78% 0.00%
SASRF.5.3.6.2 Architecture 10 6-Aug-20 17-Aug-20 7.79% 33.33% 0.00% 33.33%
SASRF.5.3.6.2.1 General Modification works 10 6-Aug-20 17-Aug-20 100.00% 33.33% 0.00% 33.33%
A-BDLG-26-1000 Demolish Existing Epoxt paint on cement screed 2 6-Aug-20 8-Aug-20 20.00% 100.00% 0.00% 100.00%
A-BDLG-26-1010 Demolish wall for Hvac opening 2 9-Aug-20 10-Aug-20 6.67% 0.00%
A-BDLG-26-1020 Repair plaster for Hvac opening 1 11-Aug-20 11-Aug-20 6.67% 0.00%
A-BDLG-26-1030 Floor preparation for screed concrete 2 12-Aug-20 13-Aug-20 13.33% 100.00% 0.00% 100.00%
A-BDLG-26-1040 Pouring Screed concrete 1 15-Aug-20 15-Aug-20 13.33% 0.00%
A-BDLG-26-1050 Repair of Doors 2 16-Aug-20 17-Aug-20 40.00% 0.00%
SASRF.5.3.7 ISD security control center Building (No.7) 60 23-Mar-20 31-May-20 4.42% 94.14% 0.00% 94.14%
SASRF.5.3.7.1 Civil 48 23-Mar-20 17-May-20 85.67% 94.42% 0.00% 94.42%
SASRF.5.3.7.1.1 Demolition 25 24-Mar-20 21-Apr-20 38.69% 100.00% 0.00% 100.00%
C-BDLG-07-1000 Demolition of Existing structures 25 24-Mar-20 21-Apr-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.7.1.2 Construction of AHU & ACCU Foundation 30 11-Apr-20 14-May-20 44.97% 92.06% 0.00% 92.06%
C-BDLG-07-1010 Excavation 5 11-Apr-20 15-Apr-20 16.76% 100.00% 0.00% 100.00%
C-BDLG-07-1020 Subgrade preparation and Lean concrete 2 16-Apr-20 18-Apr-20 3.35% 100.00% 0.00% 100.00%
C-BDLG-07-1030 Rebar 5 19-Apr-20 23-Apr-20 18.99% 100.00% 0.00% 100.00%
C-BDLG-07-1040 Formwork 4 22-Apr-20 26-Apr-20 13.41% 100.00% 0.00% 100.00%
C-BDLG-07-1050 Anchorbolt Fixing 3 25-Apr-20 27-Apr-20 1.12% 100.00% 0.00% 100.00%
C-BDLG-07-1060 Concrete pouring 4 26-Apr-20 29-Apr-20 25.70% 100.00% 0.00% 100.00%
C-BDLG-07-1070 Curing 8 27-Apr-20 5-May-20 0.56% 100.00% 0.00% 100.00%
C-BDLG-07-1080 Surface Preparation 3 2-May-20 4-May-20 4.47% 95.00% 0.00% 95.00%
C-BDLG-07-1090 Coating 2 5-May-20 6-May-20 2.23% 95.00% 0.00% 95.00%
C-BDLG-07-1100 Backfilling 3 7-May-20 10-May-20 3.35% 98.00% 0.00% 98.00%
C-BDLG-07-1110 Grouting 2 13-May-20 14-May-20 10.06% 25.00% 0.00% 25.00%
SASRF.5.3.7.1.3 Concrete Grade slab 6 11-May-20 17-May-20 5.03% 100.00% 0.00% 100.00%
C-BDLG-07-1120 Subgrade Preparation 2 11-May-20 12-May-20 20.00% 100.00% 0.00% 100.00%
C-BDLG-07-1130 Rebar for slab 2 13-May-20 14-May-20 30.00% 100.00% 0.00% 100.00%
C-BDLG-07-1140 Formwork for slab 1 16-May-20 16-May-20 15.00% 100.00% 0.00% 100.00%
C-BDLG-07-1150 Concrete Pouring for slab 1 17-May-20 17-May-20 35.00% 100.00% 0.00% 100.00%
SASRF.5.3.7.1.4 Diesel Generator Foundation 18 23-Mar-20 12-Apr-20 11.31% 82.22% 0.00% 82.22%
C-BDLG-07-1160 Excavation and Subgrade Preparation 3 23-Mar-20 25-Mar-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-07-1170 Rebar work 2 26-Mar-20 28-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-07-1180 Formwork 1 29-Mar-20 29-Mar-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-07-1190 Concrete Pouring 1 30-Mar-20 30-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-07-1200 Surface preparation 2 5-Apr-20 6-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-07-1210 Coating 2 7-Apr-20 8-Apr-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-07-1220 Backfilling 2 9-Apr-20 11-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-07-1230 Grouting 1 12-Apr-20 12-Apr-20 17.78% 0.00%
SASRF.5.3.7.2 Architecture 18 11-May-20 31-May-20 14.33% 92.49% 0.00% 92.49%
SASRF.5.3.7.2.1 General Modification works 14 13-May-20 28-May-20 51.95% 93.35% 0.00% 93.35%
A-BDLG-07-1000 Demolish Existing Epoxt paint on cement screed 2 13-May-20 14-May-20 23.12% 100.00% 0.00% 100.00%
A-BDLG-07-1010 Demolish wall for Hvac opening 1 16-May-20 16-May-20 4.62% 50.00% 0.00% 50.00%
A-BDLG-07-1020 Repair plaster for Hvac opening 4 17-May-20 20-May-20 8.67% 50.00% 0.00% 50.00%
A-BDLG-07-1030 Floor preparation for screed concrete 2 21-May-20 23-May-20 11.56% 100.00% 0.00% 100.00%
A-BDLG-07-1040 Pouring Screed concrete 1 24-May-20 24-May-20 17.34% 100.00% 0.00% 100.00%
A-BDLG-07-1050 Repair of Doors 4 25-May-20 28-May-20 34.68% 100.00% 0.00% 100.00%
Page 11 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.7.2.2 Painting 18 11-May-20 31-May-20 48.05% 91.56% 0.00% 91.56%
A-BDLG-07-1060 Preparation for Ceiling painting 2 11-May-20 12-May-20 9.38% 100.00% 0.00% 100.00%
A-BDLG-07-1070 Painting on ceiling 2 13-May-20 14-May-20 6.25% 75.00% 0.00% 75.00%
A-BDLG-07-1080 Preparation for External wall painting 3 16-May-20 18-May-20 21.88% 100.00% 0.00% 100.00%
A-BDLG-07-1090 Painting for External wall 2 19-May-20 20-May-20 12.50% 75.00% 0.00% 75.00%
A-BDLG-07-1100 Preparation for Internal wall painting 3 21-May-20 24-May-20 21.88% 100.00% 0.00% 100.00%
A-BDLG-07-1110 Painting for Internal wall 2 25-May-20 26-May-20 12.50% 75.00% 0.00% 75.00%
A-BDLG-07-1120 Preparation for Floor painting 2 27-May-20 28-May-20 9.38% 100.00% 0.00% 100.00%
A-BDLG-07-1130 Floor painting 2 30-May-20 31-May-20 6.25% 90.00% 0.00% 90.00%
SASRF.5.3.8 Khafji crude PMCR mechanical Building (No.28) 74 18-Mar-20 11-Jun-20 3.77% 95.77% 0.00% 95.77%
SASRF.5.3.8.1 Civil 74 18-Mar-20 11-Jun-20 90.05% 97.54% 0.00% 97.54%
SASRF.5.3.8.1.1 Demolition 20 22-Apr-20 14-May-20 36.36% 100.00% 0.00% 100.00%
C-BDLG-28-1000 Demolition of Existing structures 20 22-Apr-20 14-May-20 100.00% 100.00% 0.00% 100.0%
SASRF.5.3.8.1.2 Construction of AHU & ACCU Foundation 27 10-May-20 9-Jun-20 44.06% 99.51% 0.00% 99.51%
C-BDLG-28-1010 Excavation 4 10-May-20 13-May-20 16.51% 100.00% 0.00% 100.00%
C-BDLG-28-1020 Subgrade preparation and Lean concrete 1 14-May-20 14-May-20 5.08% 100.00% 0.00% 100.00%
C-BDLG-28-1030 Rebar 4 16-May-20 19-May-20 19.05% 100.00% 0.00% 100.00%
C-BDLG-28-1040 Formwork 3 18-May-20 20-May-20 19.05% 100.00% 0.00% 100.00%
C-BDLG-28-1050 Anchorbolt Fixing 2 20-May-20 21-May-20 1.27% 100.00% 0.00% 100.00%
C-BDLG-28-1060 Concrete pouring 3 21-May-20 24-May-20 19.37% 100.00% 0.00% 100.00%
C-BDLG-28-1070 Curing 8 21-May-20 30-May-20 0.63% 100.00% 0.00% 100.00%
C-BDLG-28-1080 Surface Preparation 4 26-May-20 30-May-20 5.08% 100.00% 0.00% 100.00%
C-BDLG-28-1090 Coating 3 31-May-20 2-Jun-20 2.54% 80.53% 0.00% 80.53%
C-BDLG-28-1100 Backfilling 2 3-Jun-20 4-Jun-20 2.54% 100.00% 0.00% 100.00%
C-BDLG-28-1110 Grouting 2 8-Jun-20 9-Jun-20 8.89% 100.00% 0.00% 100.00%
SASRF.5.3.8.1.3 Concrete Grade slab 6 6-Jun-20 11-Jun-20 6.99% 100.00% 0.00% 100.00%
C-BDLG-28-1120 Subgrade Preparation 2 6-Jun-20 7-Jun-20 20.00% 100.00% 0.00% 100.00%
C-BDLG-28-1130 Rebar for slab 2 8-Jun-20 9-Jun-20 32.00% 100.00% 0.00% 100.00%
C-BDLG-28-1140 Formwork for slab 1 10-Jun-20 10-Jun-20 16.00% 100.00% 0.00% 100.00%
C-BDLG-28-1150 Concrete Pouring for slab 1 11-Jun-20 11-Jun-20 32.00% 100.00% 0.00% 100.00%
SASRF.5.3.8.1.4 Diesel Generator Foundation 18 18-Mar-20 7-Apr-20 12.59% 82.22% 0.00% 82.22%
C-BDLG-28-1160 Excavation and Subgrade Preparation 3 18-Mar-20 21-Mar-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-28-1170 Rebar work 2 22-Mar-20 23-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-28-1180 Formwork 1 24-Mar-20 24-Mar-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-28-1190 Concrete Pouring 1 25-Mar-20 25-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-28-1200 Surface preparation 2 31-Mar-20 1-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-28-1210 Coating 2 2-Apr-20 4-Apr-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-28-1220 Backfilling 2 5-Apr-20 6-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-28-1230 Grouting 1 7-Apr-20 7-Apr-20 17.78% 0.00%
SASRF.5.3.8.2 Architecture 11 30-May-20 10-Jun-20 9.95% 79.75% 0.00% 79.75%
SASRF.5.3.8.2.1 General Modification works 11 30-May-20 10-Jun-20 100.00% 79.75% 0.00% 79.75%
A-BDLG-28-1000 Demolish cement screed 2 30-May-20 31-May-20 17.72% 100.00% 0.00% 100.00%
A-BDLG-28-1010 Disassemble hollow metal door 3 1-Jun-20 3-Jun-20 40.51% 50.00% 0.00% 50.00%
A-BDLG-28-1020 Floor preparation for screed concrete 2 4-Jun-20 6-Jun-20 10.13% 100.00% 0.00% 100.00%
A-BDLG-28-1030 Pouring Screed concrete 1 7-Jun-20 7-Jun-20 20.25% 100.00% 0.00% 100.00%
A-BDLG-28-1040 Preparation for Floor painting 1 8-Jun-20 8-Jun-20 7.59% 100.00% 0.00% 100.00%
A-BDLG-28-1050 Floor painting 2 9-Jun-20 10-Jun-20 3.80% 100.00% 0.00% 100.00%
SASRF.5.3.9 Metrological Building (No.12) 75 16-Feb-20 12-May-20 4.90% 81.93% 0.00% 81.93%
SASRF.5.3.9.1 Civil 55 16-Feb-20 19-Apr-20 79.26% 96.32% 0.00% 96.32%
SASRF.5.3.9.1.1 Retaining Wall 26 16-Feb-20 16-Mar-20 25.43% 99.81% 0.00% 99.81%
C-BDLG-12-1000 Excavation 3 16-Feb-20 18-Feb-20 13.46% 100.00% 0.00% 100.00%
C-BDLG-12-1010 Subgrade preparation and Lean concrete 2 19-Feb-20 20-Feb-20 7.69% 100.00% 0.00% 100.00%
C-BDLG-12-1020 Rebar for base 2 22-Feb-20 23-Feb-20 9.62% 100.00% 0.00% 100.00%
C-BDLG-12-1030 Formwork for base 2 23-Feb-20 24-Feb-20 5.77% 100.00% 0.00% 100.00%
C-BDLG-12-1040 Concrete pouring for base 1 25-Feb-20 25-Feb-20 7.69% 100.00% 0.00% 100.00%
C-BDLG-12-1050 Rebar for wall 2 26-Feb-20 27-Feb-20 13.46% 100.00% 0.00% 100.00%
C-BDLG-12-1060 Formwork for wall 2 29-Feb-20 1-Mar-20 13.46% 100.00% 0.00% 100.00%
C-BDLG-12-1070 Concrete pouring for wall 1 2-Mar-20 2-Mar-20 11.54% 100.00% 0.00% 100.00%
C-BDLG-12-1080 Surface preparation 3 9-Mar-20 11-Mar-20 5.77% 100.00% 0.00% 100.00%
C-BDLG-12-1090 Coating 2 12-Mar-20 14-Mar-20 3.85% 95.00% 0.00% 95.00%
C-BDLG-12-1100 Backfilling 2 15-Mar-20 16-Mar-20 7.69% 100.00% 0.00% 100.00%
SASRF.5.3.9.1.2 Demolition 18 3-Mar-20 23-Mar-20 34.23% 95.00% 0.00% 95.00%
C-BDLG-12-1110 Demolition of Existing structures 18 3-Mar-20 23-Mar-20 100.00% 95.00% 0.00% 95.00%
SASRF.5.3.9.1.3 Construction of AHU & ACCU Foundation 23 21-Mar-20 15-Apr-20 34.47% 94.44% 0.00% 94.44%
C-BDLG-12-1120 Excavation 3 21-Mar-20 23-Mar-20 11.35% 100.00% 0.00% 100.00%
C-BDLG-12-1130 Subgrade preparation and Lean concrete 1 24-Mar-20 24-Mar-20 4.26% 100.00% 0.00% 100.00%
C-BDLG-12-1140 Rebar 3 25-Mar-20 28-Mar-20 31.21% 100.00% 0.00% 100.00%
C-BDLG-12-1150 Formwork 3 28-Mar-20 30-Mar-20 9.93% 100.00% 0.00% 100.00%
C-BDLG-12-1160 Anchorbolt Fixing 2 29-Mar-20 30-Mar-20 1.42% 100.00% 0.00% 100.00%
C-BDLG-12-1170 Concrete pouring 4 30-Mar-20 2-Apr-20 18.44% 100.00% 0.00% 100.00%
C-BDLG-12-1180 Curing 8 31-Mar-20 8-Apr-20 0.71% 100.00% 0.00% 100.00%
C-BDLG-12-1190 Surface Preparation 3 5-Apr-20 7-Apr-20 8.51% 100.00% 0.00% 100.00%
C-BDLG-12-1200 Coating 2 8-Apr-20 9-Apr-20 2.84% 91.43% 0.00% 91.43%
C-BDLG-12-1210 Backfilling 2 11-Apr-20 12-Apr-20 4.26% 100.00% 0.00% 100.00%
C-BDLG-12-1220 Grouting 1 15-Apr-20 15-Apr-20 7.09% 25.00% 0.00% 25.00%
SASRF.5.3.9.1.4 Concrete Grade slab 6 13-Apr-20 19-Apr-20 5.87% 100.00% 0.00% 100.00%
C-BDLG-12-1230 Subgrade Preparation 2 13-Apr-20 14-Apr-20 12.50% 100.00% 0.00% 100.00%
C-BDLG-12-1240 Rebar for slab 2 15-Apr-20 16-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-12-1250 Formwork for slab 1 18-Apr-20 18-Apr-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-12-1260 Concrete Pouring for slab 1 19-Apr-20 19-Apr-20 37.50% 100.00% 0.00% 100.00%
SASRF.5.3.9.2 Architecture 61 3-Mar-20 12-May-20 20.74% 26.92% 0.00% 26.92%
SASRF.5.3.9.2.1 Demolition works 9 3-Mar-20 12-Mar-20 42.99% 6.52% 0.00% 6.52%
A-BDLG-12-1000 Demolition of Existing CMU Block walls 3 3-Mar-20 5-Mar-20 21.74% 30.00% 0.00% 30.00%
A-BDLG-12-1010 Demolish existing mosique flooring tiles 2 7-Mar-20 8-Mar-20 26.09% 0.00%
Page 12 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
A-BDLG-12-1020 Disassemble existing hollow metal doors 4 9-Mar-20 12-Mar-20 52.17% 0.00%
SASRF.5.3.9.2.2 General Modification works 11 14-Mar-20 25-Mar-20 36.45% 29.23% 0.00% 29.23%
A-BDLG-12-1030 Construction of CMU wall 1 14-Mar-20 14-Mar-20 12.82% 0.00%
A-BDLG-12-1040 External Plastering 1 15-Mar-20 15-Mar-20 5.13% 0.00%
A-BDLG-12-1050 Internal Plastering 1 16-Mar-20 16-Mar-20 5.13% 0.00%
A-BDLG-12-1060 Floor preparation for screed concrete 2 17-Mar-20 18-Mar-20 10.26% 0.00%
A-BDLG-12-1070 Pouring screed concrete 1 19-Mar-20 19-Mar-20 10.26% 0.00%
A-BDLG-12-1080 Repair of Doors 2 21-Mar-20 22-Mar-20 20.51% 0.00%
A-BDLG-12-1090 Supply and Installation of Aluminium threshold 1 23-Mar-20 23-Mar-20 5.13% 0.00%
A-BDLG-12-1100 Installation of Steel guard post 2 24-Mar-20 25-Mar-20 30.77% 95.00% 0.00% 95.00%
SASRF.5.3.9.2.3 Painting 21 19-Apr-20 12-May-20 20.56% 65.45% 0.00% 65.45%
A-BDLG-12-1120 Preparation for Ceiling painting 1 19-Apr-20 19-Apr-20 9.09% 100.00% 0.00% 100.00%
A-BDLG-12-1130 Painting on ceiling 2 20-Apr-20 21-Apr-20 4.55% 100.00% 0.00% 100.00%
A-BDLG-12-1140 Preparation for External wall painting 1 22-Apr-20 22-Apr-20 4.55% 0.00%
A-BDLG-12-1150 Painting for External wall 1 23-Apr-20 23-Apr-20 4.55% 0.00%
A-BDLG-12-1160 Preparation for Internal wall painting 3 25-Apr-20 27-Apr-20 36.36% 95.00% 0.00% 95.00%
A-BDLG-12-1170 Painting for Internal wall 2 28-Apr-20 29-Apr-20 18.18% 95.00% 0.00% 95.00%
A-BDLG-12-1180 Preparation for Floor painting 1 7-May-20 7-May-20 9.09% 0.00%
A-BDLG-12-1190 Floor painting 2 9-May-20 10-May-20 4.55% 0.00%
A-BDLG-12-1200 Epoxy painting for Ramp 2 11-May-20 12-May-20 9.09% 0.00%
SASRF.5.3.10 MSS Administration Building (No.15) 64 4-Apr-20 16-Jun-20 2.62% 83.95% 0.00% 83.95%
SASRF.5.3.10.1 Civil 50 4-Apr-20 31-May-20 94.56% 88.79% 0.00% 88.79%
SASRF.5.3.10.1.1 Construction of AHU & ACCU Foundation 27 28-Apr-20 28-May-20 66.60% 87.77% 0.00% 87.77%
C-BDLG-15-1000 Excavation 4 28-Apr-20 2-May-20 17.29% 100.00% 0.00% 100.00%
C-BDLG-15-1010 Subgrade preparation and Lean concrete 2 2-May-20 3-May-20 3.46% 100.00% 0.00% 100.00%
C-BDLG-15-1020 Rebar 5 4-May-20 9-May-20 17.29% 100.00% 0.00% 100.00%
C-BDLG-15-1030 Formwork 4 6-May-20 10-May-20 13.83% 100.00% 0.00% 100.00%
C-BDLG-15-1040 Anchorbolt Fixing 2 7-May-20 9-May-20 1.15% 100.00% 0.00% 100.00%
C-BDLG-15-1050 Concrete pouring 5 9-May-20 13-May-20 22.48% 100.00% 0.00% 100.00%
C-BDLG-15-1060 Curing 10 10-May-20 20-May-20 0.86% 100.00% 0.00% 100.00%
C-BDLG-15-1070 Surface Preparation 3 14-May-20 17-May-20 4.61% 100.00% 0.00% 100.00%
C-BDLG-15-1080 Coating 2 18-May-20 19-May-20 2.88% 75.78% 0.00% 75.78%
C-BDLG-15-1090 Backfilling 2 23-May-20 24-May-20 4.61% 100.00% 0.00% 100.00%
C-BDLG-15-1100 Grouting 2 27-May-20 28-May-20 11.53% 0.00%
SASRF.5.3.10.1.2 Concrete Grade slab 6 25-May-20 31-May-20 16.12% 100.00% 0.00% 100.00%
C-BDLG-15-1110 Subgrade Preparation 2 25-May-20 26-May-20 19.05% 100.00% 0.00% 100.00%
C-BDLG-15-1120 Rebar for slab 2 27-May-20 28-May-20 28.57% 100.00% 0.00% 100.00%
C-BDLG-15-1130 Formwork for slab 1 30-May-20 30-May-20 14.29% 100.00% 0.00% 100.00%
C-BDLG-15-1140 Concrete Pouring for slab 1 31-May-20 31-May-20 38.10% 100.00% 0.00% 100.00%
SASRF.5.3.10.1.3 Diesel Generator Foundation 18 4-Apr-20 23-Apr-20 17.27% 82.22% 0.00% 82.22%
C-BDLG-15-1150 Excavation and Subgrade Preparation 3 4-Apr-20 6-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-15-1160 Rebar work 2 7-Apr-20 8-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-15-1170 Formwork 1 9-Apr-20 9-Apr-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-15-1180 Concrete Pouring 1 11-Apr-20 11-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-15-1190 Surface preparation 2 16-Apr-20 18-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-15-1200 Coating 2 19-Apr-20 20-Apr-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-15-1210 Backfilling 2 21-Apr-20 22-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-15-1220 Grouting 1 23-Apr-20 23-Apr-20 17.78% 0.00%
SASRF.5.3.10.2 Architecture 5 11-Jun-20 16-Jun-20 5.44% 0.00% 0.00% 0.00%
SASRF.5.3.10.2.1 General Modification works 5 11-Jun-20 16-Jun-20 100.00% 0.00% 0.00% 0.00%
A-BDLG-15-1000 Preparation for Internal wall painting 2 11-Jun-20 13-Jun-20 40.00% 0.00%
A-BDLG-15-1010 Painting for Internal wall 2 14-Jun-20 15-Jun-20 26.67% 0.00%
A-BDLG-15-1020 Repair of Doors 1 16-Jun-20 16-Jun-20 33.33% 0.00%
SASRF.5.3.11 MSS central workshop & office Building (No.59) 34 3-Aug-20 10-Sep-20 2.29% 99.17% 0.00% 99.17%
SASRF.5.3.11.1 Civil 34 3-Aug-20 10-Sep-20 94.19% 100.00% 0.00% 100.00%
SASRF.5.3.11.1.1 Demolition 8 3-Aug-20 11-Aug-20 24.23% 100.00% 0.00% 100.00%
C-BDLG-59-1000 Demolition of Existing structures 8 3-Aug-20 11-Aug-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.11.1.2 Construction of SPU & EC Foundation 23 12-Aug-20 7-Sep-20 56.83% 100.00% 0.00% 100.00%
C-BDLG-59-1010 Excavation 4 12-Aug-20 16-Aug-20 15.50% 100.00% 0.00% 100.00%
C-BDLG-59-1020 Subgrade preparation and Lean concrete 1 17-Aug-20 17-Aug-20 1.55% 100.00% 0.00% 100.00%
C-BDLG-59-1030 Rebar 4 18-Aug-20 22-Aug-20 10.85% 100.00% 0.00% 100.00%
C-BDLG-59-1040 Formwork 3 20-Aug-20 23-Aug-20 23.26% 100.00% 0.00% 100.00%
C-BDLG-59-1050 Anchorbolt Fixing 2 22-Aug-20 23-Aug-20 1.55% 100.00% 0.00% 100.00%
C-BDLG-59-1060 Concrete pouring 4 22-Aug-20 25-Aug-20 22.48% 100.00% 0.00% 100.00%
C-BDLG-59-1070 Curing 8 23-Aug-20 31-Aug-20 0.78% 100.00% 0.00% 100.00%
C-BDLG-59-1080 Surface Preparation 3 27-Aug-20 30-Aug-20 6.20% 100.00% 0.00% 100.00%
C-BDLG-59-1090 Coating 3 30-Aug-20 1-Sep-20 3.88% 100.00% 0.00% 100.00%
C-BDLG-59-1100 Backfilling 2 2-Sep-20 3-Sep-20 6.20% 100.00% 0.00% 100.00%
C-BDLG-59-1110 Grouting 1 7-Sep-20 7-Sep-20 7.75% 100.00% 0.00% 100.00%
SASRF.5.3.11.1.3 Concrete Grade slab 6 5-Sep-20 10-Sep-20 18.94% 100.00% 0.00% 100.00%
C-BDLG-59-1120 Subgrade Preparation 2 5-Sep-20 6-Sep-20 13.95% 100.00% 0.00% 100.00%
C-BDLG-59-1130 Rebar for slab 2 7-Sep-20 8-Sep-20 34.88% 100.00% 0.00% 100.00%
C-BDLG-59-1140 Formwork for slab 2 8-Sep-20 9-Sep-20 11.63% 100.00% 0.00% 100.00%
C-BDLG-59-1150 Concrete Pouring for slab 1 10-Sep-20 10-Sep-20 39.53% 100.00% 0.00% 100.00%
SASRF.5.3.11.2 Architecture 8 18-Aug-20 26-Aug-20 5.81% 85.71% 0.00% 85.71%
SASRF.5.3.11.2.1 Painting 8 18-Aug-20 26-Aug-20 100.00% 85.71% 0.00% 85.71%
A-BDLG-59-1000 Preparation for Internal wall painting 3 18-Aug-20 20-Aug-20 57.14% 100.00% 0.00% 100.00%
A-BDLG-59-1010 Painting for Internal wall 3 20-Aug-20 23-Aug-20 28.57% 100.00% 0.00% 100.00%
A-BDLG-59-1020 Preparation for Floor painting 1 24-Aug-20 24-Aug-20 7.14% 0.00%
A-BDLG-59-1030 Floor painting 2 25-Aug-20 26-Aug-20 7.14% 0.00%
SASRF.5.3.12 MSS Mosque Building (No.16) 38 12-Aug-20 24-Sep-20 2.47% 79.60% 0.00% 79.60%
SASRF.5.3.12.1 Civil 38 12-Aug-20 24-Sep-20 84.97% 93.68% 0.00% 93.68%
SASRF.5.3.12.1.1 Demolition 12 12-Aug-20 25-Aug-20 24.94% 100.00% 0.00% 100.00%
C-BDLG-16-1000 Demolition of Existing structures 12 12-Aug-20 25-Aug-20 100.00% 100.00% 0.00% 100.00%
Page 13 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.12.1.2 Construction of SPU & EC Foundation 24 26-Aug-20 22-Sep-20 62.36% 89.87% 0.00% 89.87%
C-BDLG-16-1010 Excavation 3 26-Aug-20 29-Aug-20 10.18% 100.00% 0.00% 100.00%
C-BDLG-16-1020 Subgrade preparation and Lean concrete 2 30-Aug-20 31-Aug-20 3.64% 100.00% 0.00% 100.00%
C-BDLG-16-1030 Rebar 4 1-Sep-20 5-Sep-20 14.55% 100.00% 0.00% 100.00%
C-BDLG-16-1040 Formwork 3 3-Sep-20 6-Sep-20 17.45% 100.00% 0.00% 100.00%
C-BDLG-16-1050 Anchorbolt Fixing 1 6-Sep-20 6-Sep-20 0.73% 100.00% 0.00% 100.00%
C-BDLG-16-1060 Concrete pouring 3 7-Sep-20 9-Sep-20 19.64% 100.00% 0.00% 100.00%
C-BDLG-16-1070 Curing 8 8-Sep-20 16-Sep-20 1.09% 100.00% 0.00% 100.00%
C-BDLG-16-1080 Surface Preparation 4 13-Sep-20 16-Sep-20 11.64% 100.00% 0.00% 100.00%
C-BDLG-16-1090 Coating 2 15-Sep-20 16-Sep-20 6.55% 78.54% 0.00% 78.54%
C-BDLG-16-1100 Backfilling 2 17-Sep-20 19-Sep-20 5.82% 100.00% 0.00% 100.00%
C-BDLG-16-1110 Grouting 1 22-Sep-20 22-Sep-20 8.73% 0.00%
SASRF.5.3.12.1.3 Concrete Grade slab 5 20-Sep-20 24-Sep-20 12.70% 100.00% 0.00% 100.00%
C-BDLG-16-1120 Subgrade Preparation 2 20-Sep-20 21-Sep-20 14.29% 100.00% 0.00% 100.00%
C-BDLG-16-1130 Rebar for slab 2 22-Sep-20 23-Sep-20 28.57% 100.00% 0.00% 100.00%
C-BDLG-16-1140 Formwork for slab 1 23-Sep-20 23-Sep-20 21.43% 100.00% 0.00% 100.00%
C-BDLG-16-1150 Concrete Pouring for slab 1 24-Sep-20 24-Sep-20 35.71% 100.00% 0.00% 100.00%
SASRF.5.3.12.2 Architecture 12 27-Aug-20 9-Sep-20 15.03% 0.00% 0.00% 0.00%
SASRF.5.3.12.2.1 Painting 12 27-Aug-20 9-Sep-20 100.00% 0.00% 0.00% 0.00%
A-BDLG-16-1000 Preparation for External wall painting 5 27-Aug-20 1-Sep-20 41.03% 0.00%
A-BDLG-16-1010 Painting for External wall 4 30-Aug-20 2-Sep-20 25.64% 0.00%
A-BDLG-16-1020 Preparation for Internal wall painting 3 1-Sep-20 3-Sep-20 15.38% 0.00%
A-BDLG-16-1030 Painting for Internal wall 2 5-Sep-20 6-Sep-20 10.26% 0.00%
A-BDLG-16-1040 Preparation for Floor painting 1 7-Sep-20 7-Sep-20 5.13% 0.00%
A-BDLG-16-1050 Floor painting 2 8-Sep-20 9-Sep-20 2.56% 0.00%
SASRF.5.3.13 New Power plant Control Building (No.30) 92 27-Feb-20 13-Jun-20 5.44% 71.33% 0.00% 71.33%
SASRF.5.3.13.1 Civil 92 27-Feb-20 13-Jun-20 82.34% 85.99% 0.00% 85.99%
SASRF.5.3.13.1.1 Demolition 16 2-May-20 19-May-20 28.66% 100.00% 0.00% 100.00%
C-BDLG-30-1000 Demolition of Existing structures 16 2-May-20 19-May-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.13.1.2 Construction of AHU & ACCU Foundation 25 13-May-20 10-Jun-20 46.50% 85.84% 0.00% 85.84%
C-BDLG-30-1010 Excavation 5 13-May-20 18-May-20 14.61% 99.74% 0.00% 99.74%
C-BDLG-30-1020 Subgrade preparation and Lean concrete 3 17-May-20 19-May-20 2.74% 99.74% 0.00% 99.74%
C-BDLG-30-1030 Rebar 5 18-May-20 23-May-20 15.98% 99.74% 0.00% 99.74%
C-BDLG-30-1040 Formwork 4 20-May-20 24-May-20 9.13% 99.74% 0.00% 99.74%
C-BDLG-30-1050 Anchorbolt Fixing 2 23-May-20 24-May-20 0.91% 100.00% 0.00% 100.00%
C-BDLG-30-1060 Concrete pouring 4 24-May-20 27-May-20 31.96% 99.74% 0.00% 99.74%
C-BDLG-30-1070 Curing 8 25-May-20 2-Jun-20 0.46% 99.74% 0.00% 99.74%
C-BDLG-30-1080 Surface Preparation 3 28-May-20 31-May-20 4.57% 99.74% 0.00% 99.74%
C-BDLG-30-1090 Coating 3 31-May-20 2-Jun-20 2.28% 74.99% 0.00% 74.99%
C-BDLG-30-1100 Backfilling 3 3-Jun-20 6-Jun-20 3.65% 59.11% 0.00% 59.11%
C-BDLG-30-1110 Grouting 2 9-Jun-20 10-Jun-20 13.70% 13.22% 0.00% 13.22%
SASRF.5.3.13.1.3 Fence 8 28-May-20 6-Jun-20 8.28% 25.64% 0.00% 25.64%
C-BDLG-30-1113 Excavation and concrete pouring 3 28-May-20 31-May-20 51.28% 50.00% 0.00% 50.00%
C-BDLG-30-1116 Post & mesh installation 3 1-Jun-20 3-Jun-20 38.46% 0.00%
C-BDLG-30-1119 Gate fixing 2 4-Jun-20 6-Jun-20 10.26% 0.00%
SASRF.5.3.13.1.4 Concrete Grade slab 6 7-Jun-20 13-Jun-20 7.01% 100.00% 0.00% 100.00%
C-BDLG-30-1120 Subgrade Preparation 2 7-Jun-20 8-Jun-20 9.09% 100.00% 0.00% 100.00%
C-BDLG-30-1130 Rebar for slab 2 9-Jun-20 10-Jun-20 30.30% 100.00% 0.00% 100.00%
C-BDLG-30-1140 Formwork for slab 1 11-Jun-20 11-Jun-20 12.12% 100.00% 0.00% 100.00%
C-BDLG-30-1150 Concrete Pouring for slab 1 13-Jun-20 13-Jun-20 48.48% 100.00% 0.00% 100.00%
SASRF.5.3.13.1.5 Diesel Generator Foundation 18 27-Feb-20 18-Mar-20 9.55% 86.67% 0.00% 86.67%
C-BDLG-30-1160 Excavation and Subgrade Preparation 3 27-Feb-20 1-Mar-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-30-1170 Rebar work 2 2-Mar-20 3-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-30-1180 Formwork 1 4-Mar-20 4-Mar-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-30-1190 Concrete Pouring 1 5-Mar-20 5-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-30-1200 Surface preparation 2 11-Mar-20 12-Mar-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-30-1210 Coating 2 14-Mar-20 15-Mar-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-30-1220 Backfilling 2 16-Mar-20 17-Mar-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-30-1230 Grouting 1 18-Mar-20 18-Mar-20 17.78% 25.00% 0.00% 25.00%
SASRF.5.3.13.2 Architecture 26 4-May-20 2-Jun-20 17.66% 2.97% 0.00% 2.97%
SASRF.5.3.13.2.1 General Modification works 9 4-May-20 13-May-20 52.48% 0.00% 0.00% 0.00%
A-BDLG-30-1000 Demolish cement screed on Epoxt paint 4 4-May-20 7-May-20 45.28% 0.00%
A-BDLG-30-1010 Demolish wall for Hvac opening 2 6-May-20 7-May-20 5.66% 0.00%
A-BDLG-30-1020 Repair plaster for Hvac opening 1 10-May-20 10-May-20 1.89% 0.00%
A-BDLG-30-1030 Floor preparation for screed concrete 2 11-May-20 12-May-20 16.98% 0.00%
A-BDLG-30-1040 Pouring Screed concrete 1 13-May-20 13-May-20 30.19% 0.00%
SASRF.5.3.13.2.2 Painting 17 14-May-20 2-Jun-20 47.52% 6.25% 0.00% 6.25%
A-BDLG-30-1050 Preparation for External wall 3 14-May-20 17-May-20 20.83% 0.00%
A-BDLG-30-1060 Painting on External wall 2 18-May-20 19-May-20 8.33% 0.00%
A-BDLG-30-1070 Preparation for Internal ceiling 2 19-May-20 20-May-20 12.50% 0.00%
A-BDLG-30-1080 Painting for ceiling 2 21-May-20 23-May-20 8.33% 0.00%
A-BDLG-30-1090 Preparation for Internal wall 3 24-May-20 26-May-20 20.83% 0.00%
A-BDLG-30-1100 Painting for Internal wall 3 26-May-20 28-May-20 10.42% 0.00%
A-BDLG-30-1110 Preaparation for Floor painting 2 30-May-20 31-May-20 12.50% 0.00%
A-BDLG-30-1120 Floor painting 2 1-Jun-20 2-Jun-20 6.25% 100.00% 0.00% 100.00%
SASRF.5.3.14 New Power plant Maintenence Building (No.34) 263 30-Mar-20 30-Jan-21 12.71% 88.34% 0.00% 88.34%
SASRF.5.3.14.1 Civil 244 30-Mar-20 7-Jan-21 52.01% 98.85% 0.00% 98.85%
SASRF.5.3.14.1.1 Sub structure 78 16-Sep-20 15-Dec-20 41.22% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.1.1 Demolition 10 16-Sep-20 27-Sep-20 33.12% 100.00% 0.00% 100.00%
C-BDLG-34-1000 Demolition of Existing structure 10 16-Sep-20 27-Sep-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.1.2 Excavation(Mechanical room) 4 26-Sep-20 29-Sep-20 8.02% 100.00% 0.00% 100.00%
C-BDLG-34-1010 Excavation 2 26-Sep-20 27-Sep-20 52.17% 100.00% 0.00% 100.00%
C-BDLG-34-1020 Levelling and compaction 1 28-Sep-20 28-Sep-20 43.48% 100.00% 0.00% 100.00%
C-BDLG-34-1030 Lean concrete 1 29-Sep-20 29-Sep-20 4.35% 100.00% 0.00% 100.00%
Page 14 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.14.1.1.3 Construction of column upto Bottom of grade bea 10 30-Sep-20 11-Oct-20 14.30% 100.00% 0.00% 100.00%
C-BDLG-34-1033 Rebar for footing 2 30-Sep-20 1-Oct-20 39.02% 100.00% 0.00% 100.00%
C-BDLG-34-1036 Formwork for footing 1 1-Oct-20 1-Oct-20 19.51% 100.00% 0.00% 100.00%
C-BDLG-34-1039 Concrete pouring for footing 1 3-Oct-20 3-Oct-20 7.32% 100.00% 0.00% 100.00%
C-BDLG-34-1040 Curing 7 4-Oct-20 11-Oct-20 2.44% 100.00% 0.00% 100.00%
C-BDLG-34-1050 Rebar for column upto Grade beam 2 8-Oct-20 10-Oct-20 14.63% 100.00% 0.00% 100.00%
C-BDLG-34-1060 Formwork for column upto Grade beam 1 10-Oct-20 10-Oct-20 9.76% 100.00% 0.00% 100.00%
C-BDLG-34-1070 Concrete pouring for column upto bottom of Grade 1 11-Oct-20 11-Oct-20 7.32% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.1.4 Backfilling of Foundation((Mechanical room) 8 19-Oct-20 27-Oct-20 14.30% 100.00% 0.00% 100.00%
C-BDLG-34-1080 Surface preparation 3 19-Oct-20 21-Oct-20 29.27% 100.00% 0.00% 100.00%
C-BDLG-34-1090 Coating 2 22-Oct-20 24-Oct-20 9.76% 100.00% 0.00% 100.00%
C-BDLG-34-1100 Backfilling 3 25-Oct-20 27-Oct-20 60.98% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.1.5 Construction of Grade beam(Mechanical room) 15 28-Oct-20 14-Nov-20 21.55% 100.00% 0.00% 100.00%
C-BDLG-34-1110 Lean concrete 1 28-Oct-20 28-Oct-20 6.47% 100.00% 0.00% 100.00%
C-BDLG-34-1120 Rebar for Grade beam 2 29-Oct-20 31-Oct-20 19.42% 100.00% 0.00% 100.00%
C-BDLG-34-1130 Formwork for Grade beam 1 31-Oct-20 31-Oct-20 9.71% 100.00% 0.00% 100.00%
C-BDLG-34-1140 Concrete Pouring for Grade beam 1 1-Nov-20 1-Nov-20 12.94% 100.00% 0.00% 100.00%
C-BDLG-34-1150 Curing 7 2-Nov-20 9-Nov-20 1.29% 100.00% 0.00% 100.00%
C-BDLG-34-1160 Surface Preparation 2 8-Nov-20 9-Nov-20 16.18% 100.00% 0.00% 100.00%
C-BDLG-34-1170 Coating 2 10-Nov-20 11-Nov-20 9.71% 100.00% 0.00% 100.00%
C-BDLG-34-1180 Backfilling 2 12-Nov-20 14-Nov-20 24.27% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.1.6 Construction of Grade slab(Mechanical room) 5 10-Dec-20 15-Dec-20 8.72% 100.00% 0.00% 100.00%
C-BDLG-34-1190 Subgrade Preparation and Compaction 1 10-Dec-20 10-Dec-20 24.00% 100.00% 0.00% 100.00%
C-BDLG-34-1200 Rebar work 2 12-Dec-20 13-Dec-20 24.00% 100.00% 0.00% 100.00%
C-BDLG-34-1210 Formwork 1 14-Dec-20 14-Dec-20 20.00% 100.00% 0.00% 100.00%
C-BDLG-34-1220 Concretre Pouring for Grade slab 1 15-Dec-20 15-Dec-20 32.00% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.2 Super structure 34 1-Nov-20 9-Dec-20 28.74% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.2.1 Construction of Column from Top of Grade slab t 16 1-Nov-20 18-Nov-20 40.50% 100.00% 0.00% 100.00%
C-BDLG-34-1240 Rebar cutting & bending 2 1-Nov-20 2-Nov-20 14.81% 100.00% 0.00% 100.00%
C-BDLG-34-1250 Formwork Making 2 2-Nov-20 3-Nov-20 9.88% 100.00% 0.00% 100.00%
C-BDLG-34-1260 Scaffolding for Column 1 4-Nov-20 4-Nov-20 9.88% 100.00% 0.00% 100.00%
C-BDLG-34-1270 Rebar Fixing 2 5-Nov-20 7-Nov-20 19.75% 100.00% 0.00% 100.00%
C-BDLG-34-1280 Formwork 2 8-Nov-20 9-Nov-20 19.75% 100.00% 0.00% 100.00%
C-BDLG-34-1290 Concrete Pouring 1 10-Nov-20 10-Nov-20 14.81% 100.00% 0.00% 100.00%
C-BDLG-34-1300 Deshuttering 2 11-Nov-20 12-Nov-20 9.88% 100.00% 0.00% 100.00%
C-BDLG-34-1310 Curing 7 11-Nov-20 18-Nov-20 1.23% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.2.2 Construction of Roof beam & Slab(Mechanical room) 25 11-Nov-20 9-Dec-20 47.50% 100.00% 0.00% 100.00%
C-BDLG-34-1320 Rebar Cutting and bending 2 11-Nov-20 12-Nov-20 12.63% 100.00% 0.00% 100.00%
C-BDLG-34-1330 Scaffolding installation 2 14-Nov-20 15-Nov-20 25.26% 100.00% 0.00% 100.00%
C-BDLG-34-1340 Formwork for Beam & Slab 3 16-Nov-20 18-Nov-20 12.63% 100.00% 0.00% 100.00%
C-BDLG-34-1350 Rebar work 2 18-Nov-20 19-Nov-20 18.95% 100.00% 0.00% 100.00%
C-BDLG-34-1360 Concrete Pouring 1 21-Nov-20 21-Nov-20 8.42% 100.00% 0.00% 100.00%
C-BDLG-34-1370 Deshuttering 2 8-Dec-20 9-Dec-20 17.89% 100.00% 0.00% 100.00%
C-BDLG-34-1380 Curing 14 23-Nov-20 8-Dec-20 4.21% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.2.3 Parapet wall (Mechanical room) 4 30-Nov-20 3-Dec-20 12.00% 100.00% 0.00% 100.00%
C-BDLG-34-1383 Rebar work 2 30-Nov-20 1-Dec-20 41.67% 100.00% 0.00% 100.00%
C-BDLG-34-1386 Formwork for Parapet wall 1 2-Dec-20 2-Dec-20 37.50% 100.00% 0.00% 100.00%
C-BDLG-34-1389 Concrete Pouring 1 3-Dec-20 3-Dec-20 20.83% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.3 Construction of AHU & ACCU Foundation 25 10-Dec-20 7-Jan-21 19.26% 100.00% 0.00% 100.00%
C-BDLG-34-1390 Excavation 3 10-Dec-20 13-Dec-20 17.91% 100.00% 0.00% 100.00%
C-BDLG-34-1400 Subgrade preparation and Lean concrete 2 14-Dec-20 15-Dec-20 2.99% 100.00% 0.00% 100.00%
C-BDLG-34-1410 Rebar 4 16-Dec-20 20-Dec-20 23.88% 100.00% 0.00% 100.00%
C-BDLG-34-1420 Formwork 3 19-Dec-20 21-Dec-20 17.91% 100.00% 0.00% 100.00%
C-BDLG-34-1440 Concrete pouring 3 20-Dec-20 22-Dec-20 6.72% 100.00% 0.00% 100.00%
C-BDLG-34-1450 Curing 7 23-Dec-20 30-Dec-20 0.75% 100.00% 0.00% 100.00%
C-BDLG-34-1460 Surface Preparation 4 28-Dec-20 31-Dec-20 8.96% 100.00% 0.00% 100.00%
C-BDLG-34-1470 Coating 3 31-Dec-20 3-Jan-21 4.48% 100.00% 0.00% 100.00%
C-BDLG-34-1480 Backfilling 2 3-Jan-21 4-Jan-21 8.96% 100.00% 0.00% 100.00%
C-BDLG-34-1490 Grouting 1 7-Jan-21 7-Jan-21 7.46% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.4 Diesel Generator Foundation 18 30-Mar-20 19-Apr-20 6.47% 82.22% 0.00% 82.22%
C-BDLG-34-1650 Excavation and Subgrade Preparation 3 30-Mar-20 1-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-34-1660 Rebar work 2 2-Apr-20 4-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-34-1670 Formwork 1 5-Apr-20 5-Apr-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-34-1680 Concrete Pouring 1 6-Apr-20 6-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-34-1690 Surface preparation 2 12-Apr-20 13-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-34-1700 Coating 2 14-Apr-20 15-Apr-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-34-1710 Backfilling 2 16-Apr-20 18-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-34-1720 Grouting 1 19-Apr-20 19-Apr-20 17.78% 0.00%
SASRF.5.3.14.1.5 Construction of walkway 5 10-Dec-20 15-Dec-20 2.59% 100.00% 0.00% 100.00%
C-BDLG-34-1570 Subgrade Preparation 1 10-Dec-20 10-Dec-20 22.22% 100.00% 0.00% 100.00%
C-BDLG-34-1580 Rebar 2 12-Dec-20 13-Dec-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-34-1590 Formwork 2 13-Dec-20 14-Dec-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-34-1600 Concrete Pouring for walkway 1 15-Dec-20 15-Dec-20 27.78% 100.00% 0.00% 100.00%
SASRF.5.3.14.1.6 Construction of Ramp 5 16-Dec-20 21-Dec-20 1.72% 100.00% 0.00% 100.00%
C-BDLG-34-1610 Subgrade Preparation 1 16-Dec-20 16-Dec-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-34-1620 Rebar for Ramp 2 17-Dec-20 19-Dec-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-34-1630 Formwork for Ramp 1 20-Dec-20 20-Dec-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-34-1640 Concrete Pouring for Ramp 1 21-Dec-20 21-Dec-20 33.33% 100.00% 0.00% 100.00%
SASRF.5.3.14.2 Architecture 43 12-Dec-20 30-Jan-21 47.99% 76.95% 0.00% 76.95%
SASRF.5.3.14.2.1 Mechanical room 30 16-Dec-20 19-Jan-21 25.86% 95.84% 0.00% 95.84%
A-BDLG-34-1000 Laying of Block 6 16-Dec-20 22-Dec-20 28.92% 100.00% 0.00% 100.00%
A-BDLG-34-1010 External Plastering 5 21-Dec-20 26-Dec-20 22.89% 100.00% 0.00% 100.00%
A-BDLG-34-1012 Internal Plastering 4 27-Dec-20 30-Dec-20 12.05% 100.00% 0.00% 100.00%
A-BDLG-34-1015 Painting for ceiling 3 7-Jan-21 10-Jan-21 6.02% 85.00% 0.00% 85.00%
Page 15 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
A-BDLG-34-1020 Internal Painting 4 11-Jan-21 14-Jan-21 8.43% 85.00% 0.00% 85.00%
A-BDLG-34-1030 External Painting 4 16-Jan-21 19-Jan-21 10.84% 85.00% 0.00% 85.00%
A-BDLG-34-1035 Cement screed on floor 2 31-Dec-20 2-Jan-21 7.23% 100.00% 0.00% 100.00%
A-BDLG-34-1040 Painting on Floor 4 16-Jan-21 19-Jan-21 3.61% 90.00% 0.00% 90.00%
SASRF.5.3.14.2.2 Water proofing 20 12-Dec-20 3-Jan-21 11.37% 100.00% 0.00% 100.00%
A-BDLG-34-1050 Surface Preparation 2 12-Dec-20 13-Dec-20 5.48% 100.00% 0.00% 100.00%
A-BDLG-34-1060 Pouring of Light weight Concrete 1 14-Dec-20 14-Dec-20 13.70% 100.00% 0.00% 100.00%
A-BDLG-34-1070 Bituminous Coating 2 20-Dec-20 21-Dec-20 2.74% 100.00% 0.00% 100.00%
A-BDLG-34-1080 Installation of EPDM Water proofing membrane 3 22-Dec-20 24-Dec-20 32.88% 100.00% 0.00% 100.00%
A-BDLG-34-1090 Leaktest 1 26-Dec-20 26-Dec-20 2.74% 100.00% 0.00% 100.00%
A-BDLG-34-1100 Installation of Insulation Board 2 27-Dec-20 28-Dec-20 10.96% 100.00% 0.00% 100.00%
A-BDLG-34-1110 Installation of geotextile membrane 1 29-Dec-20 29-Dec-20 1.37% 100.00% 0.00% 100.00%
A-BDLG-34-1120 Gravel Filling 2 30-Dec-20 31-Dec-20 21.92% 100.00% 0.00% 100.00%
A-BDLG-34-1130 Installation of Steel Flashing 2 2-Jan-21 3-Jan-21 8.22% 100.00% 0.00% 100.00%
Page 16 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
SASRF.5.3.14.2.3 Demolition works 10 23-Dec-20 3-Jan-21 7.94% 83.33% 0.00% 83.33%
A-BDLG-34-1140 Demolish CMU block walls openining for hvac duct 3 23-Dec-20 26-Dec-20 29.41% 70.00% 0.00% 70.00%
A-BDLG-34-1150 Disassemble existing hollow metal window 2 27-Dec-20 28-Dec-20 7.84% 0.00%
A-BDLG-34-1160 Demolish existing false ceiling acoustic tiles 5 29-Dec-20 3-Jan-21 58.82% 100.00% 0.00% 100.00%
A-BDLG-34-1170 Demolish existing Gypsum Ceiling Board 1 3-Jan-21 3-Jan-21 3.92% 100.00% 0.00% 100.00%
SASRF.5.3.14.2.4 General Modification works 25 2-Jan-21 30-Jan-21 54.83% 62.33% 0.00% 62.33%
A-BDLG-34-1180 Installation of Acoustic ceiling Tiles 5 2-Jan-21 6-Jan-21 12.78% 90.00% 0.00% 90.00%
A-BDLG-34-1190 Installatin of Gypsum celing board 2 7-Jan-21 9-Jan-21 0.85% 90.00% 0.00% 90.00%
A-BDLG-34-1200 Preparation for internal painting 8 10-Jan-21 18-Jan-21 7.95% 50.00% 0.00% 50.00%
A-BDLG-34-1210 Internal paint for wall 6 14-Jan-21 20-Jan-21 4.55% 50.00% 0.00% 50.00%
A-BDLG-34-1220 Preparation for External painting 10 17-Jan-21 27-Jan-21 12.50% 15.00% 0.00% 15.00%
A-BDLG-34-1230 External paint for wall 9 20-Jan-21 30-Jan-21 6.82% 15.00% 0.00% 15.00%
A-BDLG-34-1240 Repair of Doors 10 4-Jan-21 14-Jan-21 51.14% 75.00% 0.00% 75.00%
A-BDLG-34-1250 Installation of Door 2 5-Jan-21 6-Jan-21 3.41% 75.00% 0.00% 75.00%
SASRF.5.3.15 New water plant Control room Building (No.31) 183 12-Mar-20 11-Oct-20 6.02% 52.77% 0.00% 52.77%
SASRF.5.3.15.1 Civil 183 12-Mar-20 11-Oct-20 61.93% 85.21% 0.00% 85.21%
SASRF.5.3.15.1.1 Demolition 18 26-Aug-20 15-Sep-20 30.10% 100.00% 0.00% 100.00%
C-BDLG-31-1000 Demolition of Existing structures 18 26-Aug-20 15-Sep-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.15.1.2 Construction of AHU & ACCU Foundation 28 7-Sep-20 8-Oct-20 53.32% 83.27% 0.00% 83.27%
C-BDLG-31-1010 Excavation 9 7-Sep-20 16-Sep-20 16.75% 100.00% 0.00% 100.00%
C-BDLG-31-1020 Subgrade preparation and Lean concrete 7 12-Sep-20 19-Sep-20 3.35% 100.00% 0.00% 100.00%
C-BDLG-31-1030 Rebar 7 13-Sep-20 20-Sep-20 19.14% 95.00% 0.00% 95.00%
C-BDLG-31-1040 Formwork 5 16-Sep-20 21-Sep-20 11.48% 95.00% 0.00% 95.00%
C-BDLG-31-1050 Anchorbolt Fixing 4 17-Sep-20 21-Sep-20 0.96% 100.00% 0.00% 100.00%
C-BDLG-31-1060 Concrete pouring 4 19-Sep-20 22-Sep-20 19.14% 95.00% 0.00% 95.00%
C-BDLG-31-1070 Curing 7 20-Sep-20 27-Sep-20 0.48% 28.91% 0.00% 28.91%
C-BDLG-31-1080 Surface Preparation 5 24-Sep-20 29-Sep-20 7.66% 28.91% 0.00% 28.91%
C-BDLG-31-1090 Coating 4 27-Sep-20 30-Sep-20 3.83% 28.91% 0.00% 28.91%
C-BDLG-31-1100 Backfilling 3 1-Oct-20 4-Oct-20 5.74% 0.00%
C-BDLG-31-1110 Grouting 2 7-Oct-20 8-Oct-20 11.48% 100.00% 0.00% 100.00%
SASRF.5.3.15.1.3 Concrete Grade slab 6 5-Oct-20 11-Oct-20 5.10% 25.00% 0.00% 25.00%
C-BDLG-31-1120 Subgrade Preparation 2 5-Oct-20 6-Oct-20 15.00% 25.00% 0.00% 25.00%
C-BDLG-31-1130 Rebar for slab 2 7-Oct-20 8-Oct-20 30.00% 25.00% 0.00% 25.00%
C-BDLG-31-1140 Formwork for slab 1 10-Oct-20 10-Oct-20 15.00% 25.00% 0.00% 25.00%
C-BDLG-31-1150 Concrete Pouring for slab 1 11-Oct-20 11-Oct-20 40.00% 25.00% 0.00% 25.00%
SASRF.5.3.15.1.4 Diesel Generator Foundation 18 12-Mar-20 1-Apr-20 11.48% 82.22% 0.00% 82.22%
C-BDLG-31-1160 Excavation and Subgrade Preparation 3 12-Mar-20 15-Mar-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-31-1170 Rebar work 2 16-Mar-20 17-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-31-1180 Formwork 1 18-Mar-20 18-Mar-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-31-1190 Concrete Pouring 1 19-Mar-20 19-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-31-1200 Surface preparation 2 25-Mar-20 26-Mar-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-31-1210 Coating 2 28-Mar-20 29-Mar-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-31-1220 Backfilling 2 30-Mar-20 31-Mar-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-31-1230 Grouting 1 1-Apr-20 1-Apr-20 17.78% 0.00%
SASRF.5.3.15.2 Architecture 27 10-Sep-20 11-Oct-20 38.07% 0.00% 0.00% 0.00%
SASRF.5.3.15.2.1 General Modification works 17 10-Sep-20 29-Sep-20 43.57% 0.00% 0.00% 0.00%
A-BDLG-31-1000 Demolish Existing Epoxt paint on cement screed 3 10-Sep-20 13-Sep-20 17.14% 0.00%
A-BDLG-31-1010 Demolish wall for Hvac opening 2 14-Sep-20 15-Sep-20 4.76% 0.00%
A-BDLG-31-1020 Repair plaster for Hvac opening 1 16-Sep-20 16-Sep-20 1.90% 0.00%
A-BDLG-31-1030 Floor preparation for screed concrete 3 17-Sep-20 20-Sep-20 9.52% 0.00%
A-BDLG-31-1040 Pouring Screed concrete 4 21-Sep-20 24-Sep-20 9.52% 0.00%
A-BDLG-31-1045 Repair of Doors 4 26-Sep-20 29-Sep-20 57.14% 0.00%
SASRF.5.3.15.2.2 Painting 21 17-Sep-20 11-Oct-20 56.43% 0.00% 0.00% 0.00%
A-BDLG-31-1050 Preparation for External wall 10 17-Sep-20 28-Sep-20 26.47% 0.00%
A-BDLG-31-1060 Painting on External wall 8 22-Sep-20 30-Sep-20 16.18% 0.00%
A-BDLG-31-1070 Preparation for ceiling 3 24-Sep-20 27-Sep-20 4.41% 0.00%
A-BDLG-31-1080 Painting for ceiling 2 28-Sep-20 29-Sep-20 2.94% 0.00%
A-BDLG-31-1090 Preparation for Internal wall 8 27-Sep-20 5-Oct-20 26.47% 0.00%
A-BDLG-31-1100 Painting for Internal wall 6 1-Oct-20 7-Oct-20 14.71% 0.00%
A-BDLG-31-1110 Preparation for Floor painting 3 6-Oct-20 8-Oct-20 5.88% 0.00%
A-BDLG-31-1120 Floor painting 3 8-Oct-20 11-Oct-20 2.94% 0.00%
SASRF.5.3.16 Service group Building (No.32) 190 7-Mar-20 13-Oct-20 11.92% 91.85% 0.00% 91.85%
SASRF.5.3.16.1 Civil 159 7-Mar-20 7-Sep-20 61.58% 94.92% 0.00% 94.92%
SASRF.5.3.16.1.1 Sub structure 109 28-Apr-20 1-Sep-20 33.07% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.1.1 Demolition 11 28-Apr-20 10-May-20 19.57% 100.00% 0.00% 100.00%
C-BDLG-32-1000 Demolition of Existing structure 11 28-Apr-20 10-May-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.1.2 Excavation(Mechanical room) 5 5-May-20 10-May-20 10.57% 100.00% 0.00% 100.00%
C-BDLG-32-1010 Excavation 3 5-May-20 7-May-20 66.67% 100.00% 0.00% 100.00%
C-BDLG-32-1020 Levelling and compaction 1 9-May-20 9-May-20 22.22% 100.00% 0.00% 100.00%
C-BDLG-32-1030 Lean concrete 1 10-May-20 10-May-20 11.11% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.1.3 Construction of column upto Bottom of grade bea 10 11-May-20 21-May-20 25.24% 100.00% 0.00% 100.00%
C-BDLG-32-1033 Rebar for footing 2 11-May-20 12-May-20 37.21% 100.00% 0.00% 100.00%
C-BDLG-32-1036 Formwork for footing 1 12-May-20 12-May-20 18.60% 100.00% 0.00% 100.00%
C-BDLG-32-1039 Concrete pouring for footing 1 13-May-20 13-May-20 7.75% 100.00% 0.00% 100.00%
C-BDLG-32-1040 Curing 7 14-May-20 21-May-20 1.55% 100.00% 0.00% 100.00%
C-BDLG-32-1050 Rebar for column upto Grade beam 2 19-May-20 20-May-20 18.60% 100.00% 0.00% 100.00%
C-BDLG-32-1060 Formwork for column upto Grade beam 1 20-May-20 20-May-20 9.30% 100.00% 0.00% 100.00%
C-BDLG-32-1070 Concrete pouring for column upto bottom of Grade 1 21-May-20 21-May-20 6.98% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.1.4 Backfilling of Foundation((Mechanical room) 7 27-May-20 3-Jun-20 14.09% 100.00% 0.00% 100.00%
C-BDLG-32-1080 Surface preparation 3 27-May-20 30-May-20 50.00% 100.00% 0.00% 100.00%
C-BDLG-32-1090 Coating 2 31-May-20 1-Jun-20 16.67% 100.00% 0.00% 100.00%
C-BDLG-32-1100 Backfilling 2 2-Jun-20 3-Jun-20 33.33% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.1.5 Construction of Grade beam(Mechanical room) 16 4-Jun-20 22-Jun-20 20.35% 100.00% 0.00% 100.00%
C-BDLG-32-1110 Lean concrete 1 4-Jun-20 4-Jun-20 7.69% 100.00% 0.00% 100.00%
Page 17 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
C-BDLG-32-1120 Rebar for Grade beam 2 7-Jun-20 8-Jun-20 23.08% 100.00% 0.00% 100.00%
C-BDLG-32-1130 Formwork for Grade beam 2 8-Jun-20 9-Jun-20 13.46% 100.00% 0.00% 100.00%
C-BDLG-32-1140 Concrete Pouring for Grade beam 1 10-Jun-20 10-Jun-20 11.54% 100.00% 0.00% 100.00%
C-BDLG-32-1150 Curing 7 11-Jun-20 18-Jun-20 1.92% 100.00% 0.00% 100.00%
C-BDLG-32-1160 Surface Preparation 3 16-Jun-20 18-Jun-20 11.54% 100.00% 0.00% 100.00%
C-BDLG-32-1170 Coating 2 18-Jun-20 20-Jun-20 7.69% 100.00% 0.00% 100.00%
C-BDLG-32-1180 Backfilling 2 21-Jun-20 22-Jun-20 23.08% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.1.6 Construction of Grade slab(Mechanical room) 14 17-Aug-20 1-Sep-20 10.18% 100.00% 0.00% 100.00%
C-BDLG-32-1190 Subgrade Preparation and Compaction 2 17-Aug-20 18-Aug-20 23.08% 100.00% 0.00% 100.00%
C-BDLG-32-1200 Rebar work 2 19-Aug-20 20-Aug-20 23.08% 100.00% 0.00% 100.00%
C-BDLG-32-1210 Formwork 1 22-Aug-20 22-Aug-20 19.23% 100.00% 0.00% 100.00%
C-BDLG-32-1220 Concretre Pouring for Grade slab 1 23-Aug-20 23-Aug-20 30.77% 100.00% 0.00% 100.00%
C-BDLG-32-1230 Curing 8 24-Aug-20 1-Sep-20 3.85% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.2 Super structure 43 11-Jun-20 30-Jul-20 29.99% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.2.1 Construction of Column from Top of Grade slab t 22 11-Jun-20 6-Jul-20 43.89% 100.00% 0.00% 100.00%
C-BDLG-32-1240 Rebar cutting & bending 2 11-Jun-20 13-Jun-20 14.75% 100.00% 0.00% 100.00%
C-BDLG-32-1250 Formwork Making 3 14-Jun-20 16-Jun-20 17.70% 100.00% 0.00% 100.00%
C-BDLG-32-1260 Scaffolding for Column 2 17-Jun-20 18-Jun-20 11.80% 100.00% 0.00% 100.00%
C-BDLG-32-1270 Rebar Fixing 2 20-Jun-20 21-Jun-20 17.70% 100.00% 0.00% 100.00%
C-BDLG-32-1280 Formwork 3 22-Jun-20 24-Jun-20 17.70% 100.00% 0.00% 100.00%
C-BDLG-32-1290 Concrete Pouring 1 25-Jun-20 25-Jun-20 7.87% 100.00% 0.00% 100.00%
C-BDLG-32-1300 Deshuttering 2 27-Jun-20 28-Jun-20 11.80% 100.00% 0.00% 100.00%
C-BDLG-32-1310 Curing 7 29-Jun-20 6-Jul-20 0.69% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.2.2 Construction of Roof beam & Slab(Mechanical room) 25 27-Jun-20 25-Jul-20 48.77% 100.00% 0.00% 100.00%
C-BDLG-32-1320 Rebar Cutting and bending 2 27-Jun-20 28-Jun-20 14.16% 100.00% 0.00% 100.00%
C-BDLG-32-1330 Scaffolding installation 2 29-Jun-20 30-Jun-20 21.24% 100.00% 0.00% 100.00%
C-BDLG-32-1340 Formwork for Beam & Slab 3 1-Jul-20 4-Jul-20 15.93% 100.00% 0.00% 100.00%
C-BDLG-32-1350 Rebar work 2 4-Jul-20 5-Jul-20 21.24% 100.00% 0.00% 100.00%
C-BDLG-32-1360 Concrete Pouring 1 6-Jul-20 6-Jul-20 7.96% 100.00% 0.00% 100.00%
C-BDLG-32-1370 Deshuttering 2 23-Jul-20 25-Jul-20 15.93% 100.00% 0.00% 100.00%
C-BDLG-32-1380 Curing 14 8-Jul-20 23-Jul-20 3.54% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.2.3 Parapet wall (Mechanical room) 5 26-Jul-20 30-Jul-20 7.34% 100.00% 0.00% 100.00%
C-BDLG-32-1390 Rebar work 2 26-Jul-20 27-Jul-20 29.41% 100.00% 0.00% 100.00%
C-BDLG-32-1400 Formwork for Parapet wall 2 28-Jul-20 29-Jul-20 47.06% 100.00% 0.00% 100.00%
C-BDLG-32-1410 Concrete Pouring 1 30-Jul-20 30-Jul-20 23.53% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.3 Construction of AHU & ACCU Foundation 23 25-Jul-20 19-Aug-20 27.05% 100.00% 0.00% 100.00%
C-BDLG-32-1420 Excavation 5 25-Jul-20 29-Jul-20 13.40% 100.00% 0.00% 100.00%
C-BDLG-32-1430 Subgrade preparation and Lean concrete 2 27-Jul-20 28-Jul-20 3.35% 100.00% 0.00% 100.00%
C-BDLG-32-1440 Rebar 4 29-Jul-20 2-Aug-20 11.96% 100.00% 0.00% 100.00%
C-BDLG-32-1450 Formwork 5 1-Aug-20 5-Aug-20 14.83% 100.00% 0.00% 100.00%
C-BDLG-32-1460 Anchorbolt Fixing 4 2-Aug-20 5-Aug-20 1.91% 100.00% 0.00% 100.00%
C-BDLG-32-1470 Concrete pouring 5 3-Aug-20 8-Aug-20 21.53% 100.00% 0.00% 100.00%
C-BDLG-32-1480 Curing 7 3-Aug-20 10-Aug-20 0.48% 100.00% 0.00% 100.00%
C-BDLG-32-1490 Surface Preparation 4 8-Aug-20 11-Aug-20 7.18% 100.00% 0.00% 100.00%
C-BDLG-32-1500 Coating 3 10-Aug-20 12-Aug-20 3.83% 100.00% 0.00% 100.00%
C-BDLG-32-1510 Backfilling 3 13-Aug-20 16-Aug-20 11.96% 100.00% 0.00% 100.00%
C-BDLG-32-1520 Grouting 1 19-Aug-20 19-Aug-20 9.57% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.4 Diesel Generator Foundation 18 7-Mar-20 26-Mar-20 5.82% 82.22% 0.00% 82.22%
C-BDLG-32-1680 Excavation and Subgrade Preparation 3 7-Mar-20 9-Mar-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-32-1690 Rebar work 2 10-Mar-20 11-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-32-1700 Formwork 1 12-Mar-20 12-Mar-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-32-1710 Concrete Pouring 1 14-Mar-20 14-Mar-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-32-1720 Surface preparation 2 19-Mar-20 21-Mar-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-32-1730 Coating 2 22-Mar-20 23-Mar-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-32-1740 Backfilling 2 24-Mar-20 25-Mar-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-32-1750 Grouting 1 26-Mar-20 26-Mar-20 17.78% 0.00%
SASRF.5.3.16.1.5 Construction of walkway 8 24-Aug-20 1-Sep-20 2.72% 100.00% 0.00% 100.00%
C-BDLG-32-1600 Subgrade Preparation 2 24-Aug-20 25-Aug-20 23.81% 100.00% 0.00% 100.00%
C-BDLG-32-1610 Rebar 3 26-Aug-20 29-Aug-20 28.57% 100.00% 0.00% 100.00%
C-BDLG-32-1620 Formwork 2 30-Aug-20 31-Aug-20 19.05% 100.00% 0.00% 100.00%
C-BDLG-32-1630 Concrete Pouring for walkway 1 1-Sep-20 1-Sep-20 28.57% 100.00% 0.00% 100.00%
SASRF.5.3.16.1.6 Construction of Ramp 5 2-Sep-20 7-Sep-20 1.36% 100.00% 0.00% 100.00%
C-BDLG-32-1640 Subgrade Preparation 1 2-Sep-20 2-Sep-20 19.05% 100.00% 0.00% 100.00%
C-BDLG-32-1650 Rebar for Ramp 2 3-Sep-20 5-Sep-20 38.10% 100.00% 0.00% 100.00%
C-BDLG-32-1660 Formwork for Ramp 1 6-Sep-20 6-Sep-20 28.57% 100.00% 0.00% 100.00%
C-BDLG-32-1670 Concrete Pouring for Ramp 1 7-Sep-20 7-Sep-20 14.29% 100.00% 0.00% 100.00%
SASRF.5.3.16.2 Architecture 49 18-Aug-20 13-Oct-20 38.42% 86.91% 0.00% 86.91%
SASRF.5.3.16.2.1 Mechanical room 39 24-Aug-20 7-Oct-20 35.48% 98.74% 0.00% 98.74%
A-BDLG-32-1000 Laying of Block 8 24-Aug-20 1-Sep-20 28.07% 100.00% 0.00% 100.00%
A-BDLG-32-1010 External Plastering 6 2-Sep-20 8-Sep-20 18.71% 100.00% 0.00% 100.00%
A-BDLG-32-1020 Internal Plastering 5 9-Sep-20 14-Sep-20 10.53% 100.00% 0.00% 100.00%
A-BDLG-32-1025 Cement screed on floor 2 15-Sep-20 16-Sep-20 5.85% 100.00% 0.00% 100.00%
A-BDLG-32-1030 Painting for ceiling 3 21-Sep-20 23-Sep-20 2.92% 95.00% 0.00% 95.00%
A-BDLG-32-1040 Internal Painting 4 24-Sep-20 28-Sep-20 7.02% 95.00% 0.00% 95.00%
A-BDLG-32-1050 External Painting 6 29-Sep-20 5-Oct-20 11.70% 95.00% 0.00% 95.00%
A-BDLG-32-1070 Painting on Floor 3 3-Oct-20 5-Oct-20 3.51% 95.00% 0.00% 95.00%
A-BDLG-32-1075 Installation of Metal coping on Parapet 2 6-Oct-20 7-Oct-20 4.68% 100.00% 0.00% 100.00%
A-BDLG-32-1078 Installation of Door 2 24-Sep-20 26-Sep-20 7.02% 100.00% 0.00% 100.00%
SASRF.5.3.16.2.2 Water proofing 16 18-Aug-20 5-Sep-20 17.43% 100.00% 0.00% 100.00%
A-BDLG-32-1080 Surface Preparation 2 18-Aug-20 19-Aug-20 7.14% 100.00% 0.00% 100.00%
A-BDLG-32-1090 Pouring of Light weight Concrete 1 20-Aug-20 20-Aug-20 11.90% 100.00% 0.00% 100.00%
A-BDLG-32-1100 Bituminous Coating 2 22-Aug-20 23-Aug-20 2.38% 100.00% 0.00% 100.00%
A-BDLG-32-1110 Installation of EPDM Water proofing membrane 3 24-Aug-20 26-Aug-20 29.76% 100.00% 0.00% 100.00%
A-BDLG-32-1120 Leaktest 1 27-Aug-20 27-Aug-20 2.38% 100.00% 0.00% 100.00%
Page 18 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
A-BDLG-32-1130 Installation of Insulation Board 2 29-Aug-20 30-Aug-20 9.52% 100.00% 0.00% 100.00%
A-BDLG-32-1140 Installation of geotextile membrane 1 31-Aug-20 31-Aug-20 2.38% 100.00% 0.00% 100.00%
A-BDLG-32-1150 Gravel Filling 2 1-Sep-20 2-Sep-20 28.57% 100.00% 0.00% 100.00%
A-BDLG-32-1160 Installation of Steel Flashing 2 3-Sep-20 5-Sep-20 5.95% 100.00% 0.00% 100.00%
SASRF.5.3.16.2.3 General Modification works 25 15-Sep-20 13-Oct-20 47.10% 73.15% 0.00% 73.15%
A-BDLG-32-1170 Installation of Acoustic ceiling Tiles 6 15-Sep-20 21-Sep-20 10.57% 95.00% 0.00% 95.00%
A-BDLG-32-1180 Installatin of Gypsum celing board 4 19-Sep-20 22-Sep-20 7.05% 0.00%
A-BDLG-32-1190 Preparation for internal painting 6 23-Sep-20 29-Sep-20 9.69% 100.00% 0.00% 100.00%
A-BDLG-32-1200 Internal paint for wall 4 30-Sep-20 4-Oct-20 6.61% 75.00% 0.00% 75.00%
A-BDLG-32-1210 Preparation for External painting 7 5-Oct-20 12-Oct-20 10.57% 0.00%
A-BDLG-32-1220 External paint for wall 5 8-Oct-20 13-Oct-20 7.05% 0.00%
A-BDLG-32-1230 Repair of Doors 11 26-Sep-20 7-Oct-20 48.46% 100.00% 0.00% 100.00%
SASRF.5.3.17 Water Treatment facilities Building (No.33) 182 8-Apr-20 5-Nov-20 5.59% 71.14% 0.00% 71.14%
SASRF.5.3.17.1 Civil 182 8-Apr-20 5-Nov-20 81.12% 87.69% 0.00% 87.69%
SASRF.5.3.17.1.1 Demolition 22 16-Sep-20 11-Oct-20 37.74% 100.00% 0.00% 100.00%
C-BDLG-33-1000 Demolition of Existing structures 22 16-Sep-20 11-Oct-20 100.00% 100.00% 0.00% 100.00%
SASRF.5.3.17.1.2 Construction of AHU & ACCU Foundation 26 7-Oct-20 5-Nov-20 45.70% 78.30% 0.00% 78.30%
C-BDLG-33-1010 Excavation 5 7-Oct-20 12-Oct-20 12.84% 95.00% 0.00% 95.00%
C-BDLG-33-1020 Subgrade preparation and Lean concrete 3 11-Oct-20 13-Oct-20 3.67% 95.00% 0.00% 95.00%
C-BDLG-33-1030 Rebar 7 12-Oct-20 19-Oct-20 13.76% 100.00% 0.00% 100.00%
C-BDLG-33-1040 Formwork 7 14-Oct-20 21-Oct-20 16.51% 100.00% 0.00% 100.00%
C-BDLG-33-1050 Anchorbolt Fixing 5 17-Oct-20 21-Oct-20 2.75% 100.00% 0.00% 100.00%
C-BDLG-33-1060 Concrete pouring 5 18-Oct-20 22-Oct-20 25.23% 100.00% 0.00% 100.00%
C-BDLG-33-1070 Curing 7 19-Oct-20 26-Oct-20 0.46% 50.00% 0.00% 50.00%
C-BDLG-33-1080 Surface Preparation 5 24-Oct-20 28-Oct-20 5.50% 50.00% 0.00% 50.00%
C-BDLG-33-1090 Coating 4 26-Oct-20 29-Oct-20 2.75% 50.00% 0.00% 50.00%
C-BDLG-33-1100 Backfilling 4 28-Oct-20 1-Nov-20 3.67% 0.00%
C-BDLG-33-1110 Grouting 2 4-Nov-20 5-Nov-20 12.84% 0.00%
SASRF.5.3.17.1.3 Concrete Grade slab 4 2-Nov-20 5-Nov-20 7.13% 90.00% 0.00% 90.00%
C-BDLG-33-1120 Rebar for slab 2 2-Nov-20 3-Nov-20 35.29% 90.00% 0.00% 90.00%
C-BDLG-33-1130 Formwork for slab 2 3-Nov-20 4-Nov-20 17.65% 90.00% 0.00% 90.00%
C-BDLG-33-1140 Concrete Pouring for slab 1 5-Nov-20 5-Nov-20 47.06% 90.00% 0.00% 90.00%
SASRF.5.3.17.1.4 Diesel Generator Foundation 18 8-Apr-20 28-Apr-20 9.43% 82.22% 0.00% 82.22%
C-BDLG-33-1150 Excavation and Subgrade Preparation 3 8-Apr-20 11-Apr-20 33.33% 100.00% 0.00% 100.00%
C-BDLG-33-1160 Rebar work 2 12-Apr-20 13-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-33-1170 Formwork 1 14-Apr-20 14-Apr-20 8.89% 100.00% 0.00% 100.00%
C-BDLG-33-1180 Concrete Pouring 1 15-Apr-20 15-Apr-20 11.11% 100.00% 0.00% 100.00%
C-BDLG-33-1190 Surface preparation 2 21-Apr-20 22-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-33-1200 Coating 2 23-Apr-20 25-Apr-20 4.44% 100.00% 0.00% 100.00%
C-BDLG-33-1210 Backfilling 2 26-Apr-20 27-Apr-20 6.67% 100.00% 0.00% 100.00%
C-BDLG-33-1220 Grouting 1 28-Apr-20 28-Apr-20 17.78% 0.00%
SASRF.5.3.17.2 Architecture 28 30-Sep-20 1-Nov-20 18.88% 0.00% 0.00% 0.00%
SASRF.5.3.17.2.1 General Modification works 14 30-Sep-20 15-Oct-20 57.66% 0.00% 0.00% 0.00%
A-BDLG-33-1000 Demolish Existing Epoxt paint on cement screed 3 30-Sep-20 3-Oct-20 9.38% 0.00%
A-BDLG-33-1010 Demolish existing false ceiling accoustic tiles 4 4-Oct-20 7-Oct-20 37.50% 0.00%
A-BDLG-33-1020 Floor preparation for screed concrete 2 8-Oct-20 10-Oct-20 9.38% 0.00%
A-BDLG-33-1030 Pouring Screed concrete 1 11-Oct-20 11-Oct-20 6.25% 0.00%
A-BDLG-33-1040 Repair of Doors 4 12-Oct-20 15-Oct-20 37.50% 0.00%
SASRF.5.3.17.2.2 Painting 14 17-Oct-20 1-Nov-20 42.34% 0.00% 0.00% 0.00%
A-BDLG-33-1050 Preparation for ceiling 2 17-Oct-20 18-Oct-20 6.38% 0.00%
A-BDLG-33-1060 Painting for ceiling 2 19-Oct-20 20-Oct-20 4.26% 0.00%
A-BDLG-33-1070 Preparation for Internal wall 7 19-Oct-20 26-Oct-20 51.06% 0.00%
A-BDLG-33-1080 Painting for Internal wall 5 22-Oct-20 27-Oct-20 29.79% 0.00%
A-BDLG-33-1090 Preaparation for Floor painting 2 28-Oct-20 29-Oct-20 4.26% 0.00%
A-BDLG-33-1100 Floor painting 2 31-Oct-20 1-Nov-20 4.26% 0.00%
SASRF.5.3.18 Boiler house and control Building (No.91) 13 25-May-20 8-Jun-20 0.35% 0.00% 0.00% 0.00%
A-BDLG-91-1000 Preparation for External wall 3 25-May-20 27-May-20 24.32% 0.00%
A-BDLG-91-1010 Painting for External wall 2 28-May-20 30-May-20 13.51% 0.00%
A-BDLG-91-1020 Preparation for Internal wall 5 31-May-20 4-Jun-20 40.54% 0.00%
A-BDLG-91-1030 Painting for Internal wall 3 6-Jun-20 8-Jun-20 21.62% 0.00%
SASRF.5.3.19 CBD Car Pool Office Building (No.1) 8 10-Jun-20 18-Jun-20 0.20% 5.95% 0.00% 5.95%
A-BDLG-01-1000 Preparation for External wall 2 10-Jun-20 11-Jun-20 4.76% 100.00% 0.00% 100.00%
A-BDLG-01-1010 Painting for External wall 1 13-Jun-20 13-Jun-20 2.38% 50.00% 0.00% 50.00%
A-BDLG-01-1020 Preparation for Internal wall 2 10-Jun-20 11-Jun-20 4.76% 0.00%
A-BDLG-01-1030 Painting for Internal wall 1 13-Jun-20 13-Jun-20 2.38% 0.00%
A-BDLG-01-1040 Repair of Doors 2 14-Jun-20 15-Jun-20 28.57% 0.00%
A-BDLG-01-1050 Repair of Aluminium windows 3 16-Jun-20 18-Jun-20 57.14% 0.00%
SASRF.5.3.20 Chemical storage Building (No.89) 3 15-Jun-20 17-Jun-20 0.01% 0.00% 0.00% 0.00%
A-BDLG-89-1000 Preparation for Internal wall 2 15-Jun-20 16-Jun-20 66.67% 0.00%
A-BDLG-89-1010 Painting for Internal wall 1 17-Jun-20 17-Jun-20 33.33% 0.00%
SASRF.5.3.21 Coast Guard power Building (No.53) 38 18-Jun-20 1-Aug-20 0.15% 0.00% 0.00% 0.00%
A-BDLG-53-1000 Demolish Existing false ceiling accoustic tiles 1 20-Jun-20 20-Jun-20 12.50% 0.00%
A-BDLG-53-1010 Disassemble existing hollow metal single door 2 21-Jun-20 22-Jun-20 18.75% 0.00%
A-BDLG-53-1020 External Painting 2 18-Jun-20 20-Jun-20 6.25% 0.00%
A-BDLG-53-1030 Internal Painting 2 18-Jun-20 20-Jun-20 6.25% 0.00%
A-BDLG-53-1040 Installation of Vinyl tile on Floor 1 23-Jun-20 23-Jun-20 6.25% 0.00%
A-BDLG-53-1050 Installation of Acoustic ceiling tile 2 24-Jun-20 25-Jun-20 12.50% 0.00%
A-BDLG-53-1060 Installation of Door 2 30-Jul-20 1-Aug-20 37.50% 0.00%
SASRF.5.3.22 Control room and Recreation building 16 22-Jun-20 9-Jul-20 0.43% 0.00% 0.00% 0.00%
A-BDLG-CR-1000 Preparation for Internal wall 3 22-Jun-20 24-Jun-20 17.78% 0.00%
A-BDLG-CR-1010 Painting for Internal wall 2 25-Jun-20 27-Jun-20 8.89% 0.00%
A-BDLG-CR-1020 Preparation for External wall 5 28-Jun-20 2-Jul-20 44.44% 0.00%
A-BDLG-CR-1030 Painting for External wall 3 4-Jul-20 6-Jul-20 22.22% 0.00%
A-BDLG-CR-1040 Surface preparation for floor 1 7-Jul-20 7-Jul-20 4.44% 0.00%
Page 19 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
A-BDLG-CR-1050 Painting on Floor 2 8-Jul-20 9-Jul-20 2.22% 0.00%
SASRF.5.3.23 EX-Refinery control Building 33 27-Jun-20 3-Aug-20 1.44% 12.50% 0.00% 12.50%
A-BDLG-EX-RCB-1000 Demolish existing artficial stone 10 27-Jun-20 7-Jul-20 32.89% 0.00%
A-BDLG-EX-RCB-1010 Disassemble existing hollow metal door 2 6-Jul-20 7-Jul-20 1.97% 0.00%
A-BDLG-EX-RCB-1020 Demolish existing falsce ceiling 5 8-Jul-20 13-Jul-20 13.16% 95.00% 0.00% 95.00%
A-BDLG-EX-RCB-1030 Installation of Artificial stone 13 11-Jul-20 25-Jul-20 34.21% 0.00%
A-BDLG-EX-RCB-1040 Installation of Acoustic ceiling Tile 8 16-Jul-20 25-Jul-20 15.79% 0.00%
A-BDLG-EX-RCB-1050 Installation of Door 2 2-Aug-20 3-Aug-20 1.97% 0.00%
SASRF.5.3.24 FDP-1 Central control room Building (No.55) 6 12-Jul-20 18-Jul-20 0.21% 0.00% 0.00% 0.00%
A-BDLG-55-1000 Preparation for Internal wall 5 12-Jul-20 16-Jul-20 68.18% 0.00%
A-BDLG-55-1010 Painting for Internal wall 3 15-Jul-20 18-Jul-20 31.82% 0.00%
SASRF.5.3.25 FDP-1 Substation -8 Building (No.65) 13 19-Jul-20 2-Aug-20 0.19% 0.00% 0.00% 0.00%
A-BDLG-65-1000 Preparation for ceiling 3 19-Jul-20 21-Jul-20 29.27% 0.00%
A-BDLG-65-1010 Painting for ceiling 2 22-Jul-20 23-Jul-20 9.76% 0.00%
A-BDLG-65-1020 Preparation for Internal wall 2 25-Jul-20 26-Jul-20 14.63% 0.00%
A-BDLG-65-1030 Painting for Internal wall 2 27-Jul-20 28-Jul-20 4.88% 0.00%
A-BDLG-65-1040 Floor painting on cement screed 2 29-Jul-20 30-Jul-20 12.20% 0.00%
A-BDLG-65-1050 Repair of Doors 2 1-Aug-20 2-Aug-20 29.27% 0.00%
SASRF.5.3.26 FDP-1 Substation -9 Building (No.66) 13 1-Aug-20 15-Aug-20 0.19% 0.00% 0.00% 0.00%
A-BDLG-66-1000 Preparation for ceiling 3 1-Aug-20 3-Aug-20 29.27% 0.00%
A-BDLG-66-1010 Painting for ceiling 2 4-Aug-20 5-Aug-20 9.76% 0.00%
A-BDLG-66-1020 Preparation for Internal wall 2 6-Aug-20 8-Aug-20 14.63% 0.00%
A-BDLG-66-1030 Painting for Internal wall 2 9-Aug-20 10-Aug-20 4.88% 0.00%
A-BDLG-66-1040 Floor painting on cement screed 2 11-Aug-20 12-Aug-20 12.20% 0.00%
A-BDLG-66-1050 Repair of Doors 2 13-Aug-20 15-Aug-20 29.27% 0.00%
SASRF.5.3.27 FDP-1 Swithgear -50 Building (No.62) 26 13-Aug-20 12-Sep-20 1.24% 0.00% 0.00% 0.00%
A-BDLG-62-1000 Preparation for Internal wall 16 13-Aug-20 31-Aug-20 43.08% 0.00%
A-BDLG-62-1010 Painting for Internal wall 14 18-Aug-20 2-Sep-20 20.00% 0.00%
A-BDLG-62-1020 Floor preparation on cement screed 12 27-Aug-20 9-Sep-20 23.08% 0.00%
A-BDLG-62-1030 Floor painting on cement screed 10 1-Sep-20 12-Sep-20 13.85% 0.00%
SASRF.5.3.28 FDP-1 Workshop Building (No.64) 13 30-Aug-20 13-Sep-20 0.16% 0.00% 0.00% 0.00%
A-BDLG-64-1000 Demolish existing artficial stone 3 30-Aug-20 1-Sep-20 23.53% 0.00%
A-BDLG-64-1010 Installation of Artificial stone 3 2-Sep-20 5-Sep-20 23.53% 0.00%
A-BDLG-64-1020 Preparation for Internal wall 4 6-Sep-20 9-Sep-20 35.29% 0.00%
A-BDLG-64-1030 Painting for Internal wall 3 10-Sep-20 13-Sep-20 17.65% 0.00%
SASRF.5.3.29 Heliport Guard House Building (No.101) 19 6-Sep-20 27-Sep-20 0.38% 0.00% 0.00% 0.00%
A-BDLG-101-1000 Remove and Reinstallation of Acousctc ceiling tiles 3 6-Sep-20 8-Sep-20 12.50% 0.00%
A-BDLG-101-1010 Preparation for External wall 2 14-Sep-20 15-Sep-20 15.00% 0.00%
A-BDLG-101-1020 Painting for External wall 2 16-Sep-20 17-Sep-20 10.00% 0.00%
A-BDLG-101-1030 Preparation for Internal wall 3 19-Sep-20 21-Sep-20 15.00% 0.00%
A-BDLG-101-1040 Painting for Internal wall 2 22-Sep-20 23-Sep-20 7.50% 0.00%
A-BDLG-101-1050 Repair of Aluminium window 3 24-Sep-20 27-Sep-20 40.00% 0.00%
SASRF.5.3.30 Maintenence Contractor Building (No.29) 16 24-Sep-20 12-Oct-20 0.70% 0.00% 0.00% 0.00%
A-BDLG-29-1000 Preparation for External wall 3 24-Sep-20 27-Sep-20 8.11% 0.00%
A-BDLG-29-1010 Painting on External wall 2 28-Sep-20 29-Sep-20 4.05% 0.00%
A-BDLG-29-1020 Preparation for ceiling 2 30-Sep-20 1-Oct-20 5.41% 0.00%
A-BDLG-29-1030 Painting for ceiling 2 3-Oct-20 4-Oct-20 2.70% 0.00%
A-BDLG-29-1040 Preparation for Internal wall 3 5-Oct-20 7-Oct-20 12.16% 0.00%
A-BDLG-29-1050 Painting for Internal wall 2 8-Oct-20 10-Oct-20 5.41% 0.00%
A-BDLG-29-1060 Repair of Doors 5 30-Sep-20 5-Oct-20 24.32% 0.00%
A-BDLG-29-1070 Repair of windows 6 6-Oct-20 12-Oct-20 37.84% 0.00%
SASRF.5.3.31 MSS Guard House-1 Building (No.68) 10 11-Oct-20 21-Oct-20 0.40% 0.00% 0.00% 0.00%
A-BDLG-68-1000 Preparation for External wall 3 11-Oct-20 13-Oct-20 14.29% 0.00%
A-BDLG-68-1010 Painting on External wall 2 14-Oct-20 15-Oct-20 7.14% 0.00%
A-BDLG-68-1020 Preparation for Internal wall 3 14-Oct-20 17-Oct-20 14.29% 0.00%
A-BDLG-68-1030 Painting for Internal wall 2 18-Oct-20 19-Oct-20 7.14% 0.00%
A-BDLG-68-1040 Repair of Doors 3 14-Oct-20 17-Oct-20 28.57% 0.00%
A-BDLG-68-1050 Repair of windows 4 18-Oct-20 21-Oct-20 28.57% 0.00%
SASRF.5.3.32 MSS Guard House-2 Building (No.69) 10 20-Oct-20 31-Oct-20 0.40% 0.00% 0.00% 0.00%
A-BDLG-69-1000 Preparation for External wall 3 20-Oct-20 22-Oct-20 14.29% 0.00%
A-BDLG-69-1010 Painting on External wall 2 24-Oct-20 25-Oct-20 7.14% 0.00%
A-BDLG-69-1020 Preparation for Internal wall 3 24-Oct-20 26-Oct-20 14.29% 0.00%
A-BDLG-69-1030 Painting for Internal wall 2 27-Oct-20 28-Oct-20 7.14% 0.00%
A-BDLG-69-1040 Repair of Doors 3 24-Oct-20 26-Oct-20 28.57% 0.00%
A-BDLG-69-1050 Repair of windows 4 27-Oct-20 31-Oct-20 28.57% 0.00%
SASRF.5.3.33 MSS Overhaul store-224 Building (No.67) 11 29-Oct-20 10-Nov-20 0.27% 0.00% 0.00% 0.00%
A-BDLG-67-1010 Preparation for External wall 2 29-Oct-20 31-Oct-20 14.23% 0.00%
A-BDLG-67-1020 Painting on External wall 4 1-Nov-20 4-Nov-20 5.69% 0.00%
A-BDLG-67-1030 Preparation for Internal wall 3 5-Nov-20 8-Nov-20 28.47% 0.00%
A-BDLG-67-1040 Painting for Internal wall 2 9-Nov-20 10-Nov-20 14.23% 0.00%
A-BDLG-67-1050 Installation of Acoustic ceiling tiles 5 3-Nov-20 8-Nov-20 37.37% 0.00%
SASRF.5.3.34 Security operation Building (No.8) 10 11-Nov-20 22-Nov-20 0.13% 0.00% 0.00% 0.00%
A-BDLG-08-1000 Preparation for External wall 3 11-Nov-20 14-Nov-20 56.39% 0.00%
A-BDLG-08-1010 Painting on External wall 4 15-Nov-20 18-Nov-20 30.08% 0.00%
A-BDLG-08-1020 Preparation for Internal wall 1 19-Nov-20 19-Nov-20 7.52% 0.00%
A-BDLG-08-1030 Painting for Internal wall 2 21-Nov-20 22-Nov-20 6.02% 0.00%
SASRF.5.3.35 South Area Main Gatehouse Building (No.9) 9 23-Nov-20 2-Dec-20 0.16% 0.00% 0.00% 0.00%
A-BDLG-09-1000 Preparation for External wall 3 23-Nov-20 25-Nov-20 42.17% 0.00%
A-BDLG-09-1010 Painting on External wall 2 26-Nov-20 28-Nov-20 24.10% 0.00%
A-BDLG-09-1020 Preparation for Internal wall 2 29-Nov-20 30-Nov-20 24.10% 0.00%
A-BDLG-09-1030 Painting for Internal wall 2 1-Dec-20 2-Dec-20 9.64% 0.00%
SASRF.5.3.36 Swith Gear 10.A Building (No.87) 27 11-Nov-20 12-Dec-20 1.70% 0.00% 0.00% 0.00%
A-BDLG-87-1000 Demolish existing artficial stone 15 11-Nov-20 28-Nov-20 41.90% 0.00%
A-BDLG-87-1010 Installation of Artificial stone 19 18-Nov-20 9-Dec-20 42.46% 0.00%
Page 20 of 23
MANARAH AL JUBAIL CONST. CO. LTD
CIVIL, ELECTRO-MECHANICAL CONSTRUCTION
Project: South Area safety Related Facilities Cut off Date 06-Jan-2022
Original Previous
Activity ID Activity Name Duration Start Finish Weightage week This week To date
A-BDLG-87-1020 Preparation for Internal wall 6 3-Dec-20 9-Dec-20 10.06% 0.00%
A-BDLG-87-1030 Painting for Internal wall 4 8-Dec-20 12-Dec-20 5.59% 0.00%
SASRF.5.3.37 Swith Gear House-1 Building (No.75) 22 10-Dec-20 4-Jan-21 0.62% 0.00% 0.00% 0.00%
A-BDLG-75-1000 Demolish Epoxy paint on cement screed 5 10-Dec-20 15-Dec-20 22.90% 0.00%
A-BDLG-75-1010 Disassemble Existing aluminium doors 3 16-Dec-20 19-Dec-20 9.16% 0.00%
A-BDLG-75-1020 Floor preparation for cement screed 2 17-Dec-20 19-Dec-20 9.16% 0.00%
A-BDLG-75-1030 Screed concrete 1 20-Dec-20 20-Dec-20 3.82% 0.00%
A-BDLG-75-1040 Preparation for External wall 2 13-Dec-20 14-Dec-20 6.11% 0.00%
A-BDLG-75-1050 Painting on External wall 2 15-Dec-20 16-Dec-20 3.05% 0.00%
A-BDLG-75-1060 Preparation for Internal wall 2 23-Dec-20 24-Dec-20 6.11% 0.00%
A-BDLG-75-1070 Painting for Internal wall 2 26-Dec-20 27-Dec-20 3.05% 0.00%
A-BDLG-75-1080 Preparation for floor painting 3 28-Dec-20 30-Dec-20 9.16% 0.00%
A-BDLG-75-1090 Floor painting 2 31-Dec-20 2-Jan-21 6.11% 0.00%
A-BDLG-75-1100 Installation of Doors 2 3-Jan-21 4-Jan-21 21.37% 0.00%
SASRF.5.3.38 Swith Gear House-4 Building (No.76) 21 21-Dec-20 13-Jan-21 0.53% 0.00% 0.00% 0.00%
A-BDLG-76-1000 Demolish Epoxy paint on cement screed 3 21-Dec-20 23-Dec-20 16.07% 0.00%
A-BDLG-76-1010 Disassemble existing aluminum doors 3 24-Dec-20 27-Dec-20 14.29% 0.00%
A-BDLG-76-1020 Pouring screed concrete 3 28-Dec-20 30-Dec-20 10.71% 0.00%
A-BDLG-76-1030 Laying of Granite tiles 1 31-Dec-20 31-Dec-20 1.79% 0.00%
A-BDLG-76-1040 Preparation for External wall 1 3-Jan-21 3-Jan-21 3.57% 0.00%
A-BDLG-76-1050 Painting on External wall 2 4-Jan-21 5-Jan-21 1.79% 0.00%
A-BDLG-76-1060 Preparation for Internal wall 1 6-Jan-21 6-Jan-21 3.57% 0.00%
A-BDLG-76-1070 Painting for Internal wall 2 7-Jan-21 9-Jan-21 1.79% 0.00%
A-BDLG-76-1080 Preparation for floor painting 2 10-Jan-21 11-Jan-21 7.14% 0.00%
A-BDLG-76-1090 Floor painting 2 12-Jan-21 13-Jan-21 3.57% 0.00%
A-BDLG-76-1100 Installation of Doors 3 6-Jan-21 9-Jan-21 35.71% 0.00%
SASRF.5.3.39 Swith Gear House No-40 (86) 19 19-Nov-20 10-Dec-20 0.70% 0.00% 0.00% 0.00%
A-BDLG-86-1000 Preparation for External wall 13 19-Nov-20 3-Dec-20 64.86% 0.00%
A-BDLG-86-1010 Painting on External wall 10 25-Nov-20 6-Dec-20 27.03% 0.00%
A-BDLG-86-1020 Preparation for Internal wall 2 7-Dec-20 8-Dec-20 5.41% 0.00%
A-BDLG-86-1030 Painting for Internal wall 2 9-Dec-20 10-Dec-20 2.70% 0.00%
SASRF.5.3.40 Swith Gear House Building (No-2A) 18 7-Dec-20 27-Dec-20 0.68% 0.00% 0.00% 0.00%
A-BDLG-2A-1000 Preparation for External wall 11 7-Dec-20 19-Dec-20 50.00% 0.00%
A-BDLG-2A-1010 Painting on External wall 8 12-Dec-20 20-Dec-20 25.00% 0.00%
A-BDLG-2A-1020 Preparation for Internal wall 5 20-Dec-20 24-Dec-20 16.67% 0.00%
A-BDLG-2A-1030 Painting for Internal wall 4 23-Dec-20 27-Dec-20 8.33% 0.00%
SASRF.5.3.41 Swith Gear 7A-Building (No-71) 12 26-Dec-20 7-Jan-21 0.34% 0.00% 0.00% 0.00%
A-BDLG-71-1000 Preparation for Internal wall 9 26-Dec-20 4-Jan-21 66.67% 0.00%
A-BDLG-71-1010 Painting for Internal wall 6 2-Jan-21 7-Jan-21 33.33% 0.00%
SASRF.5.3.42 Swith Gear 98-Building (No-70) 9 2-Jan-21 11-Jan-21 0.26% 0.00% 0.00% 0.00%
A-BDLG-70-1000 Preparation for Internal wall 7 2-Jan-21 9-Jan-21 66.67% 0.00%
A-BDLG-70-1010 Painting for Internal wall 5 6-Jan-21 11-Jan-21 33.33% 0.00%
SASRF.5.3.43 Emergency Control Center-2-Building (No-6) 7 12-Jan-21 19-Jan-21 0.36% 0.00% 0.00% 0.00%
A-BDLG-06-1000 Installation of Acoustic ceiling tiles 4 12-Jan-21 16-Jan-21 52.63% 0.00%
A-BDLG-06-1010 Preparation for Internal wall 5 13-Jan-21 18-Jan-21 31.58% 0.00%
A-BDLG-06-1020 Painting for Internal wall 4 16-Jan-21 19-Jan-21 15.79% 0.00%
SASRF.5.3.44 Plumbing works 85 23-Sep-20 30-Dec-20 3.80% 67.50% 1.25% 68.75%
PKG-3-PL-1000 Supply and install all plumbing accessories 75 23-Sep-20 19-Dec-20 75.00% 80.00% 0.00% 80.00%
PKG-3-PL-1010 Submission of all engineering documents 55 28-Oct-20 30-Dec-20 25.00% 30.00% 5.00% 35.00%
SASRF.5.4 General structures 150 5-Apr-20 26-Sep-20 4.25% 44.47% 2.01% 46.48%
SASRF.5.4.1 Bollards 116 5-Apr-20 17-Aug-20 92.49% 48.09% 2.17% 50.26%
A-BDS-1000 Formwork fixing 24 5-Apr-20 2-May-20 13.80% 65.00% 5.00% 70.00%
A-BDS-1010 Installation of pipe 27 8-Apr-20 9-May-20 12.86% 65.00% 5.00% 70.00%
A-BDS-1020 Concrete pouring 26 12-Apr-20 11-May-20 16.78% 65.00% 5.00% 70.00%
A-BDS-1030 Curing 32 13-Apr-20 19-May-20 0.41% 50.00% 0.00% 50.00%
A-BDS-1040 Surface preparation 40 21-Apr-20 6-Jun-20 27.06% 30.00% 0.00% 30.00%
A-BDS-1050 Coating 39 27-Apr-20 10-Jun-20 13.53% 30.00% 0.00% 30.00%
A-BDS-1060 Excavation 80 25-Apr-20 26-Jul-20 10.15% 48.00% 0.00% 48.00%
A-BDS-1070 Installation of bollards 95 29-Apr-20 17-Aug-20 5.41% 48.00% 0.00% 48.00%
SASRF.5.4.2 Signs 20 3-Sep-20 26-Sep-20 7.51% 0.00% 0.00% 0.00%
A-S-1000 Installation of Sign board 20 3-Sep-20 26-Sep-20 100.00% 0.00%
SASRF.6 Punch list clearance & Demobilization 38 12-Jan-21 24-Feb-21 2.52% 2.54% 3.20% 5.74%
A1000 Walkthrough for punch list 12 12-Jan-21 25-Jan-21 7.41% 3.00% 12.00% 15.00%
A1010 Punch list clearance 33 16-Jan-21 22-Feb-21 92.59% 2.50% 2.50% 5.00%
A1020 Demobilization of Manpower & Equipment 20 2-Feb-21 24-Feb-21 0.00% 0.00%
Page 21 of 23
MANARAH AL-JUBAIL CONT. CO. LTD.
4.00% 120.00%
3.50% 100.00%
Plan % Linear (Plan %) Actual % Cum Plan % Cum Actual % 100.00%
3.00%
72.91%
80.00%
2.50%
2.00% 60.00%
1.50%
40.00%
1.00%
20.00%
0.50%
0.00% 0.00%
13-Feb-20
20-Feb-20
27-Feb-20
5-Mar-20
12-Mar-20
19-Mar-20
26-Mar-20
2-Apr-20
9-Apr-20
16-Apr-20
23-Apr-20
30-Apr-20
7-May-20
14-May-20
21-May-20
28-May-20
4-Jun-20
11-Jun-20
18-Jun-20
25-Jun-20
2-Jul-20
9-Jul-20
16-Jul-20
23-Jul-20
30-Jul-20
6-Aug-20
13-Aug-20
20-Aug-20
27-Aug-20
3-Sep-20
10-Sep-20
17-Sep-20
24-Sep-20
1-Oct-20
8-Oct-20
15-Oct-20
22-Oct-20
29-Oct-20
5-Nov-20
12-Nov-20
19-Nov-20
26-Nov-20
3-Dec-20
10-Dec-20
17-Dec-20
24-Dec-20
31-Dec-20
7-Jan-21
14-Jan-21
21-Jan-21
28-Jan-21
4-Feb-21
11-Feb-21
18-Feb-21
25-Feb-21
4-Mar-21
11-Mar-21
18-Mar-21
25-Mar-21
1-Apr-21
8-Apr-21
15-Apr-21
22-Apr-21
29-Apr-21
6-May-21
13-May-21
20-May-21
27-May-21
3-Jun-21
10-Jun-21
17-Jun-21
24-Jun-21
1-Jul-21
8-Jul-21
15-Jul-21
22-Jul-21
29-Jul-21
5-Aug-21
12-Aug-21
19-Aug-21
26-Aug-21
2-Sep-21
9-Sep-21
16-Sep-21
23-Sep-21
30-Sep-21
7-Oct-21
14-Oct-21
21-Oct-21
28-Oct-21
4-Nov-21
11-Nov-21
18-Nov-21
25-Nov-21
2-Dec-21
9-Dec-21
16-Dec-21
23-Dec-21
30-Dec-21
6-Jan-22
13-Jan-22
14-May-20
21-May-20
28-May-20
13-May-21
20-May-21
27-May-21
12-Mar-20
19-Mar-20
26-Mar-20
12-Nov-20
19-Nov-20
26-Nov-20
11-Mar-21
18-Mar-21
25-Mar-21
11-Nov-21
13-Aug-20
20-Aug-20
27-Aug-20
12-Aug-21
19-Aug-21
26-Aug-21
10-Sep-20
17-Sep-20
24-Sep-20
10-Dec-20
17-Dec-20
24-Dec-20
31-Dec-20
16-Sep-21
23-Sep-21
30-Sep-21
13-Feb-20
20-Feb-20
27-Feb-20
16-Apr-20
23-Apr-20
30-Apr-20
11-Jun-20
18-Jun-20
25-Jun-20
11-Feb-21
18-Feb-21
25-Feb-21
15-Apr-21
22-Apr-21
29-Apr-21
10-Jun-21
17-Jun-21
24-Jun-21
15-Oct-20
22-Oct-20
29-Oct-20
14-Jan-21
21-Jan-21
28-Jan-21
14-Oct-21
21-Oct-21
28-Oct-21
7-May-20
6-May-21
5-Mar-20
5-Nov-20
4-Mar-21
4-Nov-21
16-Jul-20
23-Jul-20
30-Jul-20
6-Aug-20
15-Jul-21
22-Jul-21
29-Jul-21
5-Aug-21
3-Sep-20
3-Dec-20
2-Sep-21
9-Sep-21
2-Apr-20
9-Apr-20
4-Jun-20
4-Feb-21
1-Apr-21
8-Apr-21
3-Jun-21
1-Oct-20
8-Oct-20
7-Jan-21
7-Oct-21
2-Jul-20
9-Jul-20
1-Jul-21
8-Jul-21
Week
Plan % 0.09% 0.38% 0.75% 1.31% 2.14% 1.87% 2.20% 1.90% 1.84% 1.84% 2.10% 2.68% 3.05% 3.45% 3.05% 3.42% 2.60% 2.33% 2.16% 2.56% 2.53% 2.64% 2.71% 2.55% 2.63% 3.11% 2.61% 2.87% 2.77% 2.58% 2.13% 2.61% 3.01% 2.80% 2.40% 1.68% 1.48% 1.12% 1.27% 1.31% 0.80% 0.76% 0.72% 0.90% 1.08% 1.03% 0.85% 1.34% 1.06% 0.93% 0.63% 0.42% 0.42% 0.42% 0.14%
Actual % 0.20% 0.44% 0.51% 0.67% 0.85% 0.73% 1.40% 1.02% 0.00% 0.66% 0.90% 0.96% 0.78% 1.35% 1.08% 0.39% 0.88% 0.47% 0.96% 1.03% 1.22% 0.77% 1.13% 1.49% 0.92% 1.03% 2.65% 1.36% 1.22% 1.35% 1.69% 1.37% 1.24% 1.85% 0.82% 1.23% 1.23% 1.20% 1.23% 0.77% 1.08% 1.51% 0.59% 0.86% 0.48% 0.66% 0.57% 0.46% 0.60% 0.31% 0.70% 1.12% 0.73% 1.48% 0.84% 0.77% 0.54% 0.39% 0.91% 0.82% 0.44% 0.12% 0.63% 0.18% 0.52% 0.19% 0.47% 0.26% 0.31% 1.27% 0.16% 0.32% 0.20% 0.27% 0.55% 0.22% 0.35% 0.96% 0.75% 0.70% 0.48% 0.46% 0.26% 0.42% 0.24% 0.31% 0.59% 0.42% 0.19% 0.56% 0.18% 1.01%
Variance % 0.11% 0.06% -0.23% -0.64% -1.29% -1.14% -0.79% -0.88% -1.84% -1.19% -1.20% -1.72% -2.26% -2.09% -1.96% -3.03% -1.72% -1.86% -1.20% -1.53% -1.31% -1.87% -1.58% -1.06% -1.72% -2.08% 0.04% -1.51% -1.55% -1.23% -0.43% -1.23% -1.76% -0.96% -1.59% -0.44% -0.24% 0.08% -0.04% -0.55% 0.28% 0.75% -0.13% -0.04% -0.60% -0.37% -0.28% -0.88% -0.46% -0.62% 0.07% 0.70% 0.31% 1.06% 0.69% 0.77% 0.54% 0.39% 0.91% 0.82% 0.44% 0.12% 0.63% 0.18% 0.52% 0.19% 0.47% 0.26% 0.31% 1.27% 0.16% 0.32% 0.20% 0.27% 0.55% 0.22% 0.35% 0.96% 0.75% 0.70% 0.48% 0.46% 0.26% 0.42% 0.24% 0.31% 0.59% 0.42% 0.19% 0.56% 0.18% 1.01%
Cum Plan % 0.09% 0.47% 1.22% 2.53% 4.66% 6.53% 8.73% 10.62% 12.46% 14.30% 16.40% 19.08% 22.13% 25.57% 28.62% 32.04% 34.65% 36.97% 39.13% 41.69% 44.23% 46.87% 49.58% 52.13% 54.76% 57.87% 60.48% 63.35% 66.12% 68.71% 70.83% 73.44% 76.44% 79.24% 81.65% 83.32% 84.80% 85.92% 87.19% 88.50% 89.30% 90.06% 90.78% 91.68% 92.75% 93.78% 94.63% 95.97% 97.03% 97.96% 98.59% 99.01% 99.43% 99.86% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
Cum Actual % 0.20% 0.65% 1.16% 1.83% 2.68% 3.41% 4.81% 5.83% 5.83% 6.49% 7.39% 8.35% 9.13% 10.48% 11.57% 11.96% 12.84% 13.31% 14.27% 15.30% 16.52% 17.29% 18.42% 19.91% 20.82% 21.86% 24.51% 25.87% 27.09% 28.44% 30.14% 31.51% 32.75% 34.60% 35.41% 36.65% 37.88% 39.09% 40.31% 41.08% 42.15% 43.67% 44.26% 45.12% 45.60% 46.26% 46.82% 47.28% 47.88% 48.19% 48.89% 50.01% 50.74% 52.23% 53.06% 53.83% 54.38% 54.77% 55.68% 56.50% 56.94% 57.06% 57.69% 57.87% 58.39% 58.57% 59.04% 59.31% 59.62% 60.89% 61.04% 61.36% 61.56% 61.83% 62.39% 62.61% 62.96% 63.91% 64.66% 65.36% 65.84% 66.30% 66.56% 66.98% 67.22% 67.53% 68.12% 68.54% 68.73% 69.29% 69.47% 70.48%
Cum Variance % 0.11% 0.17% -0.06% -0.70% -1.98% -3.12% -3.91% -4.79% -6.63% -7.81% -9.02% -10.73% -13.00% -15.09% -17.06% -20.08% -21.80% -23.66% -24.86% -26.39% -27.71% -29.58% -31.16% -32.22% -33.94% -36.02% -35.97% -37.48% -39.03% -40.26% -40.69% -41.93% -43.69% -44.65% -46.23% -46.67% -46.92% -46.84% -46.88% -47.42% -47.14% -46.39% -46.51% -46.55% -47.15% -47.53% -47.81% -48.69% -49.15% -49.77% -49.70% -49.00% -48.69% -47.63% -46.94% -46.17% -45.62% -45.23% -44.32% -43.50% -43.06% -42.94% -42.31% -42.13% -41.61% -41.43% -40.96% -40.69% -40.38% -39.11% -38.96% -38.64% -38.44% -38.17% -37.61% -37.39% -37.04% -36.09% -35.34% -34.64% -34.16% -33.70% -33.44% -33.02% -32.78% -32.47% -31.88% -31.46% -31.27% -30.71% -30.53% -29.52%
0.00%
0.50%
1.00%
1.50%
2.00%
2.50%
3.00%
3.50%
4.00%
13-Feb-20
20-Feb-20
27-Feb-20
5-Mar-20
12-Mar-20
19-Mar-20
MANARAH AL-JUBAIL CONT. CO. LTD.
26-Mar-20
2-Apr-20 Plan %
9-Apr-20
16-Apr-20
23-Apr-20
Linear (Plan %)
30-Apr-20
7-May-20
14-May-20
Actual %
21-May-20
28-May-20
4-Jun-20
Cum Plan %
11-Jun-20
18-Jun-20
25-Jun-20
Cum Actual %
2-Jul-20
9-Jul-20
16-Jul-20
23-Jul-20
30-Jul-20
6-Aug-20
13-Aug-20
20-Aug-20
27-Aug-20
3-Sep-20
10-Sep-20
17-Sep-20
24-Sep-20
1-Oct-20
8-Oct-20
15-Oct-20
22-Oct-20
29-Oct-20
5-Nov-20
12-Nov-20
19-Nov-20
26-Nov-20
3-Dec-20
10-Dec-20
17-Dec-20
24-Dec-20
31-Dec-20
7-Jan-21
14-Jan-21
21-Jan-21
28-Jan-21
4-Feb-21
11-Feb-21
18-Feb-21
25-Feb-21
4-Mar-21
11-Mar-21
18-Mar-21
25-Mar-21
1-Apr-21
8-Apr-21
15-Apr-21
22-Apr-21
29-Apr-21
6-May-21
13-May-21
20-May-21
27-May-21
3-Jun-21
10-Jun-21
17-Jun-21
24-Jun-21
1-Jul-21
8-Jul-21
15-Jul-21
22-Jul-21
29-Jul-21
5-Aug-21
12-Aug-21
19-Aug-21
26-Aug-21
2-Sep-21
9-Sep-21
16-Sep-21
23-Sep-21
30-Sep-21
7-Oct-21
14-Oct-21
21-Oct-21
28-Oct-21
4-Nov-21
11-Nov-21
18-Nov-21
18-Nov-21
25-Nov-21
-28.66%
71.34%
0.86%
0.86%
25-Nov-21
2-Dec-21
-28.43%
71.57%
0.23%
0.23%
2-Dec-21
9-Dec-21
-28.17%
71.83%
0.26%
0.26%
9-Dec-21
16-Dec-21
-27.97%
72.03%
0.20%
0.20%
16-Dec-21 23-Dec-21
-27.69%
72.31%
0.28%
0.28%
End Date
30-Dec-21
Start Date:
23-Dec-21
Cut Off Date
Contract No:
-27.52%
72.48%
100.00% 100.00% 100.00% 100.00% 100.00% 100.00%
0.17%
0.17%
6-Jan-22
72.91%
30-Dec-21
3940-200
30-Dec-2021
30-Apr-22
8-Dec-19
-27.09%
72.91%
0.43%
0.43%
13-Jan-22
100.00%
6-Jan-22
0.00%
-26.55%
73.45%
100.00% 100.00%
0.54%
0.54%
20.00%
40.00%
60.00%
80.00%
100.00%
120.00%
13-Jan-22