Elemental Costing
Elemental Costing
2 SUPER STRUCTURE
2.1 Concrete 2,158.00 sm 9,300.00
2.2 Rebars 2,158.00 sm 5,000.00
2.3 Formworks 2,158.00 sm 3,700.00
2.4 Masonry Works 2,158.00 sm 3,200.00
2.5 Architectural Finishes
2.51 Floor Finish 2,158.00 sm 6,500.00
2.52 Wall Finishes 2,158.00 sm 3,200.00
2.53 Ceiling Finishes 2,158.00 sm 5,500.00
2.54 Painting Works 2,158.00 sm 2,000.00
2.55 Doors and Jambs 2,158.00 sm 3,500.00
2.56 Windows 2,158.00 sm 9,000.00
2.57 Cabinets / Counters 2,158.00 sm 3,200.00
2.58 Metal Works 2,158.00 sm 2,200.00
3 SPECIALTY WORKS
3.1 Electrical 2,158.00 sm 7,500.00
3.2 Electronics System 2,158.00 sm 6,000.00
3.3 Fire Protection 2,158.00 sm 2,500.00
3.4 FDAS 2,158.00 sm 3,000.00
3.5 Mechanical Works 2,158.00 sm 9,300.00
3.6 Plumbing & Sanitary 2,158.00 sm 4,800.00
3.7 Swimming Pool 2,158.00 sm 6,300.00
3.8 Golf Course including Plantscape 2,158.00 sm 5,200.00
3.9 Site Development 2,158.00 sm 3,700.00
DIRECT COST
539,500.00
3,237,000.00
4,747,600.00
4,100,200.00
2,589,600.00
-
20,069,400.00
10,790,000.00
7,984,600.00
6,905,600.00
-
14,027,000.00
6,905,600.00
11,869,000.00
4,316,000.00
7,553,000.00
19,422,000.00
6,905,600.00
4,747,600.00
16,185,000.00
12,948,000.00
5,395,000.00
6,474,000.00
20,069,400.00
10,358,400.00
13,595,400.00
11,221,600.00
7,984,600.00
240,940,700.00 ###
###
###
24,094,070.00 ###
19,275,256.00
5,686,200.52
34,117,203.12
83,172,729.64 150,191.58
324,113,429.64