0% found this document useful (0 votes)
31 views

Comparison of ICT System - DAIFUKU

Uploaded by

r
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views

Comparison of ICT System - DAIFUKU

Uploaded by

r
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

COMPARATIVE STATEMENT: ICT System

Job Name: DAIFUKU SHABAD


Job No : J2425/0017
List of Approved Makes: DLINK/DIGISOL/CISCO

Sr. SIP R0-Dlink R0-Progility(Dlink) R0-Gigisol R0-Profab


No. Item Description UOM Qty
Unit Rate Amount Unit Rate Amount Unit Rate Amount Unit Rate Amount Unit Rate Amount

Ahmed 7670890921 Deepika 9154120092 Deepika 9154120092 Karthik 7304997602

IV ICT SYSTEMS - WAP, BACKBONE CABLE


Note: The Access Point system shall be suitable for indoor application with seamless connectivity with 802.11n or above. The system architecture
1
shall have the ability to connect 25 minimum client per AP and Software based controller to control the Access points.

Supply installation, testing and commissioning of Access Points-CW9166D1 4:4 MU-MIMO 802.11ax, up to 7.8 Gbps-specified model is recommended
1.1 for all the locations
Switches-C9300X-24/48HX-M: 24x and 48x 10G mGig, 90 W PoE along with its software, controller and shall be complete with all fixing accessories.

Supply No's 14
Installation No's 14

Supply and installation testing and commissioning of 24 port Power on Ethernet (POE) Switch, with Minimum 2 SFP & 10/ 100/1000 gigabit Port
1.2 suitable for above WAP's ,with 2 No's of Fiber optic modules, Pigtails, along with all required connectors, Adequate weatherproof Enclosures and No's RO
fixing accessories.

Supply and installation testing and commissioning of 08 port Power on Ethernet (POE) Switch, with Minimum 2 SFP & 10/ 100/1000 gigabit Port
1.3 suitable for above WAP's ,with 2 No's of Fiber optic modules, Pigtails, along with all required connectors, Adequate weatherproof Enclosures and
fixing accessories.
Supply No's 6
Installation No's 6

Supply and installation testing and commissioning of Cisco Meraki C9300X-48-port Gigabit Switch, with Minimum 2 SFP & 10/ 100/1000 gigabit Port
1.4
suitable, with 2 No's of Fiber optic modules, Pigtails, along with all required connectors, Adequate weatherproof Enclosures and fixing accessories.

Supply No's 8
Installation No's 8

Supply & Installation of 12U wall mount Closed type weather proof industrial Rack including Power manager and cooling fans with all required
1.5
accessories in complete.
Supply No's 6
Installation No's 6

Supply installation, testing and commissioning of latest configuration Server PC, CPU with minimum 22" Display Monitor for Controlling and
1.6 monitoring purpose, The PC is expected to be with preloaded OS and suitable software’s for Above WAP's with licenses, Graphic Cards, 16GB RAM No RO
Minimum and with 1TB Hard Disk. Including all accessories as required.

1.7 Supply and Laying of Cat6 A unarmored Cable with required RJ45 connectors for interconnections of WAP's and POE switches.
Supply Mtrs 1500
Laying Mtrs 1,500

Supply and Laying of 6 Core Single mode armoured Fibre optic cable & 1 Inch HDPE Pipe with all required connectors, Splicing, Pigtails, FTB's and all
1.8
accessories in complete.
Supply Mtrs 1800
Laying Mtrs 1,800

Supply and fixing of 25mm dia heavy guage PVC conduit concealed in wall/ above false ceiling for taking copper wires including all accessories such as
1.9
Conduit junction boxes, bends etc as required.
Supply Mtrs 1200
Laying Mtrs 1,200

BASIC - - - - -

GST Extra Extra Extra Extra


P&F Extra Extra Extra Extra
Transportation & Insurance Extra Extra Extra Extra
Discount

GRAND TOTAL - - - - -

Deviation In terms Of Percentage ( %) - - #REF! -


Deviation In terms Of Value #DIV/0! #DIV/0! #REF! #DIV/0!
Technical Compliance

Payment Terms

Delivery

List of Make preferred by the branch with reasons (If Any) :


Warranty - Projects
DLP- Supplier
CAMC -Supplier
Technical Vetted by Planning ( Yes/No):
Negotiated price -R0
Negotiated price -R1
Negotiated price -R2
Negotiated price -R3

Prepared by: Checked by - Approved by - Approved by -