FOR TRANSFORMER / REACTOR
TANK PROTECTION
1282
FOR HIGHER RATING TRANSFORMER /
REACTOR TANK PROTECTION WITH PLC,
MIMIC AND SCADA COMPATIBILITY
2
TYPICAL INSTALLATION
3
AUTO EXPLOSION PREVENTION MODE
DIFFERENTIAL
RELAY
MASTER TRIP /
HV+LV CB TRIP
NITROGEN
INJECTION
RAPID
PRESSURE
RISE RELAY N2 RELEASE
(RPRR) TRANSFORMER, CUBICLE
DEVICE
REACTOR
N2 QUICK DEPRESSURISATION
VALVE ASSEMBLY
NITROGEN
INJECTION CIVIL
WORK
COVERED
OIL PIT/TANK
EXHIBIT 1A
Internal heavy faults result in short circuit and consequent imbalance of input and output current
leads to operation of differential relay. Faults lead to consequent oil surge / turbulance in the
transformer tank leading to operation of buchholz relay and/or Rapid pressure rise relay.
Immediate reduction of pressure is achieved by partially draining oil from the top of the
transformer tank. Conservator oil is isolated simultaneously due to operation of TCIV. The
drained oil is collected in the covered oil pit / tank. Refer to exhibit 1A.
4
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
RAPID
PRESSURE
RISE RELAY
N2 RELEASE
(RPRR) TRANSFORMER,
DEVICE
REACTOR CUBICLE
N2 QUICK DEPRESSURISATION
VALVE ASSEMBLY
NITROGEN
INJECTION CIVIL
WORK
COVERED
OIL PIT/TANK
EXHIBIT 1B
Simultaneous with oil drain, nitrogen gas is injected at a predetermined flow rate and pressure
from the bottom side valves of the transformer tank. Stirring action by the nitrogen gas of the
transformer oil reduces the temperature of the top layer of the oil eliminating the possibility of fire
on the top surface of the oil. Continuous nitrogen injection for upto 45 minutes cools the oil to
ambient temperature. Refer to exhibit 1B.
FIRE DETECTOR
MASTER TRIP /
HV+LV CB TRIP
OIL DRAIN
NITROGEN
INJECTION
5
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
RAPID
PRESSURE
RISE RELAY
(RPRR)
TRANSFORMER, N2 RELEASE
REACTOR DEVICE CUBICLE
N2
QUICK DEPRESSURISATION
VALVE ASSEMBLY
NITROGEN
INJECTION CIVIL
WORK
COVERED
OIL PIT/TANK
EXHIBIT 2A
System will also operate in case of bushing failure or transformer tank rupture. Since oil from
conservator will flow at an abnormal rate resulting in operation of TCIV, which isolates the
conservator oil preventing aggravation and spread of fire. Consequently buchholz relay operates
due to non availability of oil in the relay. Refer to exhibit 2A.
TYPICAL LOGIC 1
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
TRANSFORMER, N2 RELEASE
REACTOR DEVICE
CUBICLE
N2
QUICK DEPRESSURISATION
VALVE ASSEMBLY
NITROGEN
INJECTION CIVIL
WORK
COVERED
OIL PIT/TANK
EXHIBIT 2B
Upon receipt of system activation signals, immediate draining of top layer of oil in the transformer
tank commences, reducing any pressure in the transformer tank. The t op layer of oil gets
drained and collected in a covered oil pit / tank . Refer to exhibit 2B.
6
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV)
N2 RELEASE
TRANSFORMER, DEVICE
REACTOR CUBICLE
N2
QUICK DEPRESSURISATION
VALVE ASSEMBLY
NITROGEN
INJECTION CIVIL
WORK
COVERED
OIL PIT/TANK
EXHIBIT 2C
Simultaneous with oil drain, nitrogen gas is injected at a predetermined flow rate and pressure
from the bottom side valves of the transformer tank. Stirring action by the nitrogen gas of the
transformer oil reduces the temperature of the top layer of the oil extinguishing any fire on the top
surface of the oil. Continuous nitrogen injection for upto 45 minutes cools the oil to ambient
temperature. Refer to exhibit 2C.
MASTER TRIP /
HV+LV CB TRIP
EXTINGUISHING
RELEASE SWITCH ‘ON’
OIL DRAIN
NITROGEN
INJECTION
7
LOCAL MANUAL MODE
In case of an unlikely event of failure of power source, the system can be still be operated
manually from the cubicle.
OPERATING
TRANSFORMER CONSERVATOR ISOLATION VALVE (TCIV) SIGNALS
FROM
CONTROL CONTROL
FIRE DETECTOR BOX
BUCHHOLZ RELAY ROOM /
RELAY
PANEL
NITROGEN INJECTION (OLTC)
OLTC
RAPID
PRESSURE
RISE RELAY
(RPRR) N2 RELEASE CUBICLE
TRANSFORMER
DEVICE
N2
QUICK DEPRESSURISATION
NITROGEN
VALVE ASSEMBLY
INJECTION
(TANK) CIVIL
WORK
COVERED
OIL PIT / TANK
8
TYPICAL LAYOUT FOR OPTIONAL
CABLE BOX PROTECTION
FIRE DETECTOR
RPRR OIL DRAIN
NITROGEN INJECTION
BUCHHOLZ RELAY
OIL DRAIN
RAPID CUBICLE
CUBICLE FOR CABLE
PRESSURE FOR TANK
RISE RELAY BOX /
(RPRR) TRANSFORMER N2 RELEASE BUSHING
DEVICE N2 RELEASE
DEVICE
Q QUICK
N2 N2 DEPRESSURISATION
NITROGEN VALVE ASSEMBLY (Q)
INJECTION CIVIL CIVIL
WORK WORK
COVERED
OIL PIT/TANK
authorised in writing. Worldwide representatives are available for spares and service.
Marketing enquiry questionnaire form PTFS 1005 should be entered completely for
prompt response and offering of most appropriate model. Operation and maintenance
number of copies required both in digital and hard format and to whom these should be
delivered.
9
TESTIMONIALS
10
SOME INTERNATIONAL PATENTS
11
TECHNICAL HIGHLIGHTS
0
Fire detector heat : 141 C
sensing temperature
Cubicle :
Dimensions in mm
Transformer rating Weight in Kgs
L B H
250 MVA and above 1600 600 1900 600
10 MVA to 249 MVA 1200 500 1900 500
2 MVA to 10 MVA 1200 500 1700 450
Below 2 MVA 1200 500 1200 350
Dimensions in mm
Types Weight in Kgs
L B H
12
Protection Main Tank Main Tank+OLTC Main Tank+OLTC
Required Only (with/without filter) +Cable box
Tank Tank
Cable Cable
Box Box
Tank
Cable
Box
13
for SCADA/SAS
Unmanned
Substation
14
SCOPE OF SUPPLY / WORK
15
# Rights reserved to amend design data without prior notification.
WORLDWIDE MARKETING NETWORK
ROMANIA
SOUTH KOREA
UAE
OMAN
INDIA
HONDURAS MALI
ECUADOR
CTR Pune
SOUTH AFRICA
INSTALLATIONS
CTR Pune
1282
FIRE PROTECTION DIVISION
CTR
CTR MANUFACTURING INDUSTRIES LTD
NAGAR ROAD, PUNE 411014, INDIA.
PHONE : 91 20 26633402/3/4/5. FAX : 91 20 26633425
PM FS.1005
APRIL 2013 [email protected] / [email protected]