Discipline Weight Cumulative Cumulative
Cummulative Cummulative This week This week Variance
Discipline (%) on overall Planned to Actual to Date
Planned Actual Planned (%) Actual (%) to-date
progress Date (%) (%)
(%) (%)
Manning
HSE
Fire & Gas Cause & Effect Diagrams 208
Escape Route/ Fire Fighting Equipment Layout Drawing 156
Design Basis Report 40
Fire Fighting Equipment Data Sheet 40
Bill Of Quantity For Fire Fighting Equipment - Preliminary 40
Escape Route / Muster Point Drawing 40
Information / Emergency Signages Drawing 40
Madatory Signs / Prohibitive Signs Drawing 40
Warning Signs Drawings 60
Fire Water Demand Calculation / Report 100
Design Check List 10
Safety Design Philosophy 54
HSE Total 828
Weekly Planned Hrs
Manning
PROCESS
Technical Reports / Analysis
Process 200
Mechanical Equipment Design Calculations 200
Process Calculations 200
HAZOP / HAZAN Report 200
Equipment Sizing Calculation 200
Line Sizing Calculation 200
Relief and Blowdown Sizing and Calculation 200
Major Operating Equipment Philosophy 100
Fire Protection & Safety Equipment Philosophy 110
Utility Report 100
Drawings
Drawing Symbols / Legend Sheets - 3 nos. 100
Process Flow Diagram (PFD) 100
Process & Instrument Diagram (P&ID) 100
Utility Flow Scheme - Portable Water System 100
Utility Engineering Flow Scheme - Portable Water System 100
Utility Flow Scheme - Fire Water Storage and Purification 100
Piping & Instrument Diagram (P&ID) 100
Process Safety Flow Chart 100
Line and Valve Lists 100
Manning
Manning
Electrical
Technical Reports / Analysis
Electrical PowerSystem Design Philosophy 40
Power System Study Report 40
Lighting Calculations & Report 40
UPS Sizing Calculation & Report 40
Cable Sizing Calculation Note 40
Electrical Power System Design Philosophy 40
Power System Study Report 60
Drawings
General Earthing System Layout and Details 40
Lightening Protection System Layout 40
Cable Trench Layout 40
Living Quarters Power Layout 40
Living Quarters Room Lighting 40
Central Control Center Building Power Layout 40
Central Control Center Control Room Lighting 30
Generator Shed Illumination Layout 30
Guard House Illumination 30
Guard House Light - Power 30
Normal Lighting & Small DB Schedule 30
Living Quarters A/C DB Schedule 30
Central Control Center Building A/C DB Schedule 30
Perimeter Lighting Layout 30
UPS 230V AC Single Line Diagram 30
Electrical Equipment Layout 30
Hazarduos Area Classification 30
Lighting Mounting Detail 30
Lighting Protection Detail 30
Electrical Cable Trench Detail 30
Electrical Legend 30
Single Line Diagram 30
Perimeter Wiring Diagram for Street Light 30
Lighting Calculation 30
UPS Sizing Calculation 30
Detailed Installation Drawings for Power 30
Detailed Installation Drawings for Lighting 30
Detailed Installation Drawings for Grounding & lightning Protection 30
Electrical Load List 30
Electrical Cable Schedule 90
Electrical Equipment List 30
Datasheets
Data Sheet For Maintained Emergency Light 40
Data Sheet For Low Voltage Switch gear 40
Data Sheet For Normal Light 40
Data Sheet For Electrical Equipment 40
Data Sheet For Cable 40
Data Sheet for 100KVA Generator 40
Specification
Specification For Electrical Materials Installation and Construction 40
Electrical Lighting Fixtures Spec 40
Electrical Cable Spec 40
Electrical Cable Tray Spec 40
Electrical Packaged Equipment Spec 40
LV Swithchgear Spec 40
MTOs
Bill Of Engineering Measurement for Cables & other Electrical Items 50
Manning
Instrument
Technical Reports / Analysis
General calculations and design 50
Philosophy for Emergency Shut Down 20
Instrument And Control Philosophies 40
Supply and installation techniques 20
Control Valve Sizing Report 30
Drawings
Junction Box Typical Drawing 100
Instrument Pressure Gauge - Vessel Mounted 100
Instrument Pressure Gauge - Pipe Mounted 100
Instrument & Control Safety System (ICSS) Block 100
I/O List 100
Instrument Cable Schedule 100
Instrument tubing Schedule 100
Instrument Index 100
Datasheets
Data Sheet For Pressure Gauge 70
Data Sheet For Pressure Safety Valve 70
Data Sheet For Control Valves (CV) 70
Data Sheet For Control Valves (CV) 70
Data Sheet For Level Transmitter 70
Data Sheet For Pressure Indicator 70
Data Sheet For Pressure Transmitter 70
Data Sheet For Temperature Indicator 70
Data Sheet ForThermowell 70
Specifications
Specification For General Instrument 70
Specification For I & CS Functional Design 56
Specification For Installation of Instrument 50
Specification For Fire and Gas Detection System 50
MTOs
Instrument Materials Take-Off / BEME 70
Civil / Structural
Technical Reports / Analysis
Civil Structural Design Philosophy 100
Equipment Foundation Design Calculation Report 100
Generator Shed Vibration Calculation Report 100
Rigid Pavement Design Calculation Report 100
Civil Structural Design Philosophy 100
Pipe Support Calculation 100
Drawings
Civil General Note 100
Civil Overall Site Plan 100
Site Preparation Plans 100
Overall Site Preparation Plan Drawings 170
Generator Control room/ office/ Control room/ office Architectural Drawings 300
Guard House Architectural Drawing 200
Guard House Civil Structural Drawings & Details Drainage System Drawings and Details 300
Drainage System Drawings and Details 200
Typical Pipe Support Drawing and Details 100
Rigid Pavement Drawing & Details 100
Fencing Layout and Details 100
Structural Bar Bending Schedule 100
Drawing Index 100
Specifications
Specification For Civil Works (Materials & Construction) 200
MTOs
Civil/Structural preliminary MTO 200
Manning
QA/QC
Project Quality Plan 82
Input data Acceptance Report 64
Quality Reviews 224
Technical Audit Report 63
QA Audit Report 88
Manning
Total 60,362
Overal Weekly Planned Hrs
30 30 30 30 30
100
86
114
55
55
55
30 30 30 30 495
30 30 30 30 495
30 60 90 120 615
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0.00% 0.00% 0.00% 0.00% 0.00%
30 30 30 30 495
30 30 30 30 495
30 60 90 120 615
30 5
208
156
40
40
40
40
30 10
40
60
90 10
5 5
54
0 184 444 155 45
0 184 444 155 45
100 100
100 100
100 100
100 100
100 100
100 100
100 100
70 30
60 50
50 33 17
10 90
40 60
40 60
40 60
40 60
40 60
40 60
40 60
20 80
0 0 1190 1403 17
0 0 1190 1403 17
40
30
60
60
30
30
30
30
30
30
60
65
65
65
65
65
20
13
118
122
95 5
75 25
55 45
37 85
100
67 33
37 63
47
47
30
30
3
0 0 0 0 63
0 0 0 0 63
0 0 0 0 63
50
13
0 0 0 0 63
0 0 0 0 63
0 0 0 0 63
100
50 50
3 47 50
33 17 50
3 47 50
5 95
40 60
3
3
3
50 50 100
50
50 50 50 50
40 40
45 115 40
40 145 15
82
64
104
59
81
0 0 0 0 390
0 0 0 0 390
0 0 0 0 390
0.00% 0.00% 0.00% 0.00% 0.65%
0 0 0 0 0
0 0 0 0 0
35
35
35
35
35
8
20
158 143
0
0
0
0
0
0
53
53
75 25
100
100
203 168 0 0 0
203 168 0 0 0
10
10
28 10
30 10
23 8 10
30 10
60
13 18 10
30 10
30 10
30 10
30 10
23 18
13 18
30
30
30
30
13
13
13
13
13
13
8
40
20
30
3 8 89
3 80 18
3 38 59
3 38 59
3 38 59
3 38 59
3 38 59
3 38 59
20 50
20 50
20 50
20 50
20 50
20 50
20 50
20 50
20 50
23 47
50 6
50
50
43 27
47 50
67 30
47 50 70
32 8 60
50 40 60
60 32 8
40 40 40
50 40 10
20 40 23 17
60 40
60 40
20 80
120
5
7
132 0 0 0 0
132 0 0 0 0
0 0 0 0 0
0 0 0 0 0
3 38
3 38
3 38
3 38
3 38
3 38
40
40
40
40
40
40
33 18
606 501 18 0 0
606 501 18 0 0
1379 1880 1898 1898 1898
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
210
268
109
160
160
160
20
1067 20
1067 20
42021 42041
1.77% 0.03%
69.61% 69.65%
16.67 0.31
0 0
0 0
828 828
0.00% 0.00%
1.37% 1.37%
0.00 0.00
0 0
0 0
2610.0 2610.0
0.00% 0.00%
4.32% 4.32%
0.00 0.00
0 0
0 0
2215 2215
0.00% 0.00%
3.67% 3.67%
0.00 0.00
0 0
0 0
1898 1898
0.00% 0.00%
3.14% 3.14%
0.00 0.00
0 0
0 0
1888 1888
0.00% 0.00%
3.13% 3.13%
0.00 0.00
0 0
0 0
0 0
0.00% 0.00%
4.92% 4.92%
0.00 0.00
0 0
522 522
0.00% 0.00%
0.86% 0.86%
0.00 0.00
1067 20
1067 20
54952 54972
1.77% 0.03%
91.04% 91.07%
P
Indirect activities
Kick off Project Meeting
Site Visit
Site Checklist/Report
Project Progress Review Meeting
Inputs to Weekly Progress report / Schedule / MDR
Design Review Meeting
Review of Client Supplied documents
HAZOP Study
HAZID Study
Input to Final Design Dossiers & Close-out Report
60362
8 0.00307
20 0.00766
34 0.01303
32 0.01226
16 0.00613
44 0.01686
80 0.03065
48 0.01839
48 0.01839
48 0.01839
150 0.05747
30 0.01149
30 0.01149
30 0.01149
30 0.01149
50 0.01916
50 0.01916
30 0.01149
32 0.01226
36 0.01379
30 0.01149
50 0.01916
50 0.01916
90 0.03448
60 0.02299
60 0.02299
60 0.02299
60 0.02299
60 0.02299
60 0.02299
60 0.02299
120 0.04598
32 0.01226
80 0.03065
40 0.01533
48 0.01839
20 0.00766
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
2610 1.00
Start Study/Preparation
Study/
Start Preparati
on
10% 20%
Code 2 – Approved Code 1 – Approved
Code 3 – Rejected, with Comments, without Comments, & IFC (Issue for
Issue to Client Revise & Re-Submit Revise & Re-Submit & Proceed with Construction)
Proceed with Construction
Construction
Done 15% QTY NUM Done 15% Done 15% Done 15%
Issue
for Issue to Approval
Internal Client by Client
Review
20% 15% 20%
Quantity Physical
AFC(Approved for Discipline
Progress % Weight % Start Finish
Construction) Complete Progress Weight (%) on
overall
progress
Done 20% 50% 50%
Indirect activities
Kick off Project Meeting
Site Visit
Site Visit Checklist/Report
Project Progress Review Meeting
Design Review Meeting
Review of Client Supplied documents
HAZOP Study
HAZID Study
3D Model Review
Procurement Support
Direct activities
Overall Layout Plan Report/Analysis
Equipment Layout Plan Report/Analysis
Tie-in Details Report/Analysis
Piping Layout Report/Analysis
Piping Details Report/Analysis
Detail of Pipe Support Report/Analysis
Type of Instalation Detail for Vent, Drain, PI & TI Report/Analysis
Plot Plan-Pipeline Report/Analysis
Bill of Materials - Pipeline Report/Analysis
Weld Map - Piping Report/Analysis
Piping Calculation Report Report/Analysis
Bill of Materials - Piping Report/Analysis
Plot Plan-Piping Report/Analysis
Material Requisition for Valves Report/Analysis
Material Requisition for Piping Materials Report/Analysis
Material Requisition for Process Equipment Report/Analysis
Material Requisition for Fire Fighting Equipment & Materials Report/Analysis
Material Requisition for Fire Fighting Equipment & Materials Report/Analysis
BOQ for Piping Works Report/Analysis
Piping Plot Plan Report/Analysis
Piping General arrangement Report/Analysis
Piping Support Details (Typ.) Report/Analysis
Tie-in List Report/Analysis
Tie-in Schedule
Specification for Piping Materials Report/Analysis
Piping MTO Report/Analysis
Installation Details for for Vent, Drain, PI, TI (Typical) Report/Analysis
System 3D Model Report/Analysis
Pipe Stress Analysis Report Report/Analysis
Design Philosophy Report/Analysis
Mechanical Equipment Design Calculations
Mechanical Calculation for Metering System
Mechanical Calculation for Gas Heater
Mechanical Calculation for PRS
Mechanical Calculation for Seperation/Filtration System
Mechanical Calculation for Utility System
Mechanical Calculation for Power Generation System
Mechanical BOQ
BOQ for Mechanical Works
Overall Layout Plan
Equipment Layout Plan Report/Analysis
60362
Study/ Issue to Approval
Start
Preparation Client by Client
10 0.00251
60 0.01506
30 0.00753
40 0.01004
40 0.01004
90 0.02259
20 0.00502
20 0.00502
90 0.02259
100 0.02510
70 0.01757 0% 0%
70 0.01757 0%
70 0.01757 0%
70 0.01757 0%
70 0.01757 0% 0%
70 0.01757 0%
70 0.01757 0%
241 0.06049 0%
70 0.01757
70 0.01757
83 0.02083
70 0.01757
70 0.01757
70 0.01757
70 0.01757
50 0.01255
50 0.01255
50 0.01255
30 0.00753
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
Issue
Study/
for Issue to
Start Preparati
Internal Client
on
Review
10% 20% 20% 15%
400 0.10040
70 0.01757
60 0.01506
3984 1.00000
Issue for
Quantity Physical
Constructi
on/Purchas
Progress % Weight % Start Finish Discipline
Complete Progress Weight (%) on
ing
overall progress
30% 50% 50%
Indirect activities
Kick off Project Meeting
Site Visit
Site Visit Checklist/Report
Project Progress Review Meeting
Design Review Meeting
Review of Client Supplied documents
HAZOP Study
HAZID Study
3D Model Review
Procurement Support
Direct activities
Overall Layout Plan Report/Analysis
Equipment Layout Plan Report/Analysis
Tie-in Details Report/Analysis
Piping Layout Report/Analysis
Piping Details Report/Analysis
Detail of Pipe Support Report/Analysis
Type of Instalation Detail for Vent, Drain, PI & TI Report/Analysis
Plot Plan-Pipeline Report/Analysis
Bill of Materials - Pipeline Report/Analysis
Weld Map - Piping Report/Analysis
Piping Calculation Report Report/Analysis
Bill of Materials - Piping Report/Analysis
Plot Plan-Piping Report/Analysis
Material Requisition for Valves Report/Analysis
Material Requisition for Piping Materials Report/Analysis
Material Requisition for Process Equipment Report/Analysis
Material Requisition for Fire Fighting Equipment & Materials Report/Analysis
Material Requisition for Fire Fighting Equipment & Materials Report/Analysis
BOQ for Piping Works Report/Analysis
Piping Plot Plan Report/Analysis
Piping General arrangement Report/Analysis
Piping Support Details (Typ.) Report/Analysis
Tie-in List Report/Analysis
Tie-in Schedule
Specification for Piping Materials Report/Analysis
Piping MTO Report/Analysis
Installation Details for for Vent, Drain, PI, TI (Typical) Report/Analysis
System 3D Model Report/Analysis
Pipe Stress Analysis Report Report/Analysis
Design Philosophy Report/Analysis
Mechanical Equipment Design Calculations
Mechanical Calculation for Metering System
Mechanical Calculation for Gas Heater
Mechanical Calculation for PRS
Mechanical Calculation for Seperation/Filtration System
Mechanical Calculation for Utility System
Mechanical Calculation for Power Generation System
Mechanical BOQ
BOQ for Mechanical Works
Overall Layout Plan
Equipment Layout Plan Report/Analysis
60362
Study/ Issue to Approval
Start
Preparation Client by Client
10 0.00251
60 0.01506
30 0.00753
40 0.01004
40 0.01004
90 0.02259
20 0.00502
20 0.00502
90 0.02259
100 0.02510
70 0.01757 0% 0%
70 0.01757 0%
70 0.01757 0%
70 0.01757 0%
70 0.01757 0% 0%
70 0.01757 0%
70 0.01757 0%
241 0.06049 0%
70 0.01757
70 0.01757
83 0.02083
70 0.01757
70 0.01757
70 0.01757
70 0.01757
50 0.01255
50 0.01255
50 0.01255
30 0.00753
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
Issue
Study/
for Issue to
Start Preparati
Internal Client
on
Review
10% 20% 20% 15%
400 0.10040
70 0.01757
60 0.01506
3984 1.00000
Issue for
Quantity Physical
Constructi
on/Purchas
Progress % Weight % Start Finish Discipline
Complete Progress Weight (%) on
ing
overall progress
30% 50% 50%
Indirect activities
Kick off Project Meeting
Site Visit
Site Visit Checklist/Report
Project Progress Review Meeting
Inputs to Weekly Progress report / Schedule / MDR
3D Model Review
Review of Received Company's Design Dossier
Soil Geotechnical Investigation
Topographical Survey
Underground Site Probing Report
Procurement Support
Direct activities
Design Philosophy Report/Analysis
Soil Investigation Report Report/Analysis
Constructibility Review Report Report/Analysis
Foundation Design Calculation Report Report/Analysis
Specification for Civil Works Report/Analysis
Concrete Mix Design Report/Analysis
Pipe Sleepers (Details) Report/Analysis
Bill of Quantities - Civil/Structural Report/Analysis
BOQ for Civil Works Report/Analysis
Slope Tank Installation Details Report/Analysis
60362
Study/ Issue to Approval
Start
Preparation Client by Client
10 0.00375
60 0.02247
30 0.01124
50 0.01873
30 0.01124
40 0.01498
100 0.03745
30 0.01124
20 0.00749
20 0.00749
50 0.01873
60 0.02247 0% 0%
70 0.02622 0%
70 0.02622 0%
60 0.02247 0%
60 0.02247 0% 0%
60 0.02247 0%
60 0.02247 0%
60 0.02247 0%
60 0.02247
60 0.02247
Issue
Study/
for Issue to
Start Preparati
Internal Client
on
Review
10% 20% 20% 15%
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
110 0.04120
2670 1.00000
Issue for
Quantity Physical
Constructi
Progress % Weight % Start Finish
Discipline
on/Purchas Weight (%) on
Complete Progress
ing
overall
30% 50% 50% progress
Indirect activities
Kick off Project Meeting
Site Visit
Site Visit Checklist/Report
Project Progress Review Meeting
Inputs to Weekly Progress report / Schedule / MDR
Design Review Meeting
3D Model Review
Direct activities
BOQ for Electrical Works Requisition
Electrical Power System Design Philosophy Requisition
Lighting Calculation Report Requisition
Cable Sizing Calculation Report Requisition
Installation Details for Power Requisition
Installation Details for Lighting Requisition
Electrical Load List Requisition
Datasheet for Maintained Emergency Light Datasheet
Datasheet for Low Voltage Switchgear Datasheet
Datasheet for Normal Light Datasheet
Datasheet For Electrical Equipment Datasheet
Datasheet for Cable Datasheet
Specification for Lighting Fixture Specification
Specification for Electrical Cable Specification
Specification for Electrical Cable Tray Specification
Specification for Packaged Equipment Specification
Specification forLV Switchgear Specification
MTOs Specification
Installation Manual Specification
Hazardous Area Classification Specification
60362
Study/ Issue to Approval
Start
Preparation Client by Client
10 0.00532
60 0.03191
30 0.01596
140 0.07447
20 0.01064
60 0.03191
30 0.01596
60 0.03191 0% 0%
60 0.03191 0%
60 0.03191 0%
60 0.03191 0%
60 0.03191 0% 0%
60 0.03191 0%
60 0.03191 0%
60 0.03191 0%
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
Issue
Study/
for Issue to
Start Preparati
Internal Client
on
Review
10% 20% 20% 15%
90 0.04787
60 0.03191
60 0.03191
60 0.03191
60 0.03191
1880 1.00000
Issue for
Quantity Physical
Constructi
Progress % Weight % Start Finish
Discipline
on/Purchas Weight (%) on
Complete Progress
ing
overall
30% 50% 50% progress
Indirect activities
Kick off Project Meeting
Site Visit
Site Checklist/Report
Project Progress Review Meeting
Inputs to Weekly Progress report / Schedule / MDR
Design Review
Review of Client Supplied documents
HAZOP Study
HAZID Study
SIL Workshop
Input to Final Design Dossiers & Close-out Report
60362
Start Study/Preparation Issue to Client
10 0.00530
60 0.03181
30 0.01591
32 0.01697
20 0.01060
44 0.02333
60 0.03181
30 0.01591
20 0.01060
10 0.00530
60 0.03181
100 0.05302
20 0.01060 0% 0%
60 0.03181 0%
20 0.01060 0%
40 0.02121 0%
100 0.05302 0% 0%
100 0.05302 0%
120 0.06363 0%
10 0.00530 0%
40 0.02121
20 0.01060
100 0.05302
80 0.04242
20 0.01060
20 0.01060
20 0.01060
40 0.02121
20 0.01060
60 0.03181
10 0.00530
30 0.01591
30 0.01591
Issue for
Start Study/Preparation Internal
Review
Issue for
Start Study/Preparation Internal
Review
10% 20% 20%
90 0.04772
60 0.03181
60 0.03181
60 0.03181
60 0.03181
60 0.03181
60 0.03181
1886 1.00000
Issue for Physical
Approval by Quantity Progress %
Construction/Purchasin Weight % Start
Client Complete
g Progress
0.000% 0.000 0%
0.000% 0.000 0%
0.000% 0.000
0.000% 0.000 0%
0.000% 0.000
0.000% 0.000
0.000% 0.000
0.000% 0.000
0.000% 0.000
0.000% 0.000
0.000% 0.000
0.000% 0.000 0%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
Issue for Physical
Issue to Quantity Progress
Approval by Client Construction/Pur Weight %
Client % Complete
chasing Progress
Issue for Physical
Issue to Quantity Progress
Approval by Client Construction/Pur Weight %
Client % Complete
chasing Progress
15% 20% 15%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.00000 0.00000
Finish Discipline Weight
(%) on overall
progress
50%
0% 0.017%
0% 0.099%
0.050%
0% 0.053%
0.033%
0.073%
0.099%
0.050%
0.033%
0.017%
0.099%
0% 0.166%
0.033%
0.099%
0.033%
0.066%
0.166%
0.166%
0.199%
0.017%
0.066%
0.033%
0.166%
0.133%
0.033%
0.033%
0.033%
0.066%
0.033%
0.099%
0.017%
0.050%
0.050%
0.149%
0.099%
0.099%
0.099%
0.099%
0.099%
0.099%
3.124%
DOCUMENT TITLE CATEGORY
Indirect activities
60362
Study/ Issue to Approval
Start
Preparation Client by Client
10 0.00023
290 0.00677
1048 0.02448
1409 0.03291
1883 0.04398 0% 0% 0%
3800 0.08876 0% 0%
4800 0.11212 0% 0%
4800 0.11212 0% 0%
2900 0.06774 0% 0% 0%
20 0.00047 0% 0%
53 0.00123 0% 0% 0%
5900 0.13781 0% 0%
5900 0.13781 0%
4100 0.09577 0%
5900 0.13781 0%
42813 1.00000
Issue for
Quantity Physical
Constructi
Progress % Weight % Start Finish
Discipline
on/Purchas Weight (%)
Complete Progress
ing
on overall
progress
Indirect activities
60362
Study/ Issue to Approval by
Start
Preparation Client Client
10 0.01208
20 0.02415
10 0.01208
208 0.25121 0% 0%
156 0.18841 0%
40 0.04831 0%
40 0.04831 0%
40 0.04831 0% 0%
40 0.04831 0%
40 0.04831 0%
40 0.04831 0%
60 0.07246
60 0.07246
10 0.01208
54 0.06522
828 1.00000
Issue for
Quantity Physical
Constructi
Progress % Weight % Start Finish
Discipline
on/Purchas Weight (%) on
Complete Progress
ing
overall
30% 50% 50% progress
Indirect activities
Kick off Project Meeting
Site Visit
Site Checklist/Report
Project Progress Review Meeting
Inputs to Weekly Progress report / Schedule / MDR
Design Review Meeting
Review of Client Supplied documents
HAZOP Study
HAZID Study
Input to Final Design Dossiers & Close-out Report
60362
Study/ Issue to Approval
Start
Preparation Client by Client
8 0.00826
20 0.02066
34 0.03512
32 0.03306
16 0.01653
44 0.04545
80 0.08264
48 0.04959
48 0.04959
48 0.04959
350 0.36157
20 0.02066 0% 0%
60 0.06198 0%
20 0.02066 0%
40 0.04132 0%
100 0.10331 0% 0%
968 1.00000
Issue for
Quantity Physical
Constructi
on/Purchas
Progress % Weight % Start Finish Discipline Weight
Complete Progress (%) on overall
ing
progress
30% 50% 50%