Physical Weekly Planned Progress for week ending 14th February 2020

Previous Previous
Discipline Weight Cumulative Cumulative
Cummulative Cummulative This week This week Variance
Discipline (%) on overall Planned to Actual to Date
Planned Actual Planned (%) Actual (%) to-date
progress Date (%) (%)
(%) (%)

Process 70.93% 0.00% 1.81% 0.00% 53.53% 0.00%


Mechanical 1.37% 0.00% 0.00% 0.00% 1.51% 0.00%
Piping 4.32% 0.00% 0.00% 0.00% 4.19% 0.00%
Civil/Structural 6.60% 0.00% 0.00% 0.00% 2.39% 0.00%
Electrical 0.55% 0.00% 0.00% 0.00% 2.30% 0.00%
Instrumentation & Control 3.12% 0.00% 0.00% 0.00% 1.74% 0.00%
Project Management 4.42% 0.00% 0.00% 0.00% 1.82% 0.00%
HSSE 1.60% 0.00% 0.00% 0.00% 2.00% 0.00%
QA?QC

Overall 100.00% 0.00% 1.81% 0.00% 70.72% 0.00%


Budgeted
EPC FOR ABA CITY GATE CLUSTER Hours

PROJECT MANAGEMENT & ADMINISTRATIVE


Set Up of Engineering & Project Management Office 190
Mobilization of Key Personnel 100
Topographical and Geotechincal Survey of the site 420
Project Management and Cordination 8752
Scheduling, Project Controls & Reporting 11517
Interface With Third Parties / Community Relations 4114
Preparation / Updating MDR 5900
Document Distribution Matrix 5900
Project Progress Report 5900
Project Close-out 20
PROJECT MANAGEMENT & ADMINISTRATIVE 42813
Weekly Planned Hrs

Cummulative Planned Hrs

Weekly %Planned Progress

Cummulative % Planned Progress

Manning

HSE
Fire & Gas Cause & Effect Diagrams 208
Escape Route/ Fire Fighting Equipment Layout Drawing 156
Design Basis Report 40
Fire Fighting Equipment Data Sheet 40
Bill Of Quantity For Fire Fighting Equipment - Preliminary 40
Escape Route / Muster Point Drawing 40
Information / Emergency Signages Drawing 40
Madatory Signs / Prohibitive Signs Drawing 40
Warning Signs Drawings 60
Fire Water Demand Calculation / Report 100
Design Check List 10
Safety Design Philosophy 54
HSE Total 828
Weekly Planned Hrs

Cummulative Planned Hrs

Weekly %Planned Progress

Cummulative % Planned Progress

Manning

PROCESS
Technical Reports / Analysis
Process 200
Mechanical Equipment Design Calculations 200
Process Calculations 200
HAZOP / HAZAN Report 200
Equipment Sizing Calculation 200
Line Sizing Calculation 200
Relief and Blowdown Sizing and Calculation 200
Major Operating Equipment Philosophy 100
Fire Protection & Safety Equipment Philosophy 110
Utility Report 100
Drawings
Drawing Symbols / Legend Sheets - 3 nos. 100
Process Flow Diagram (PFD) 100
Process & Instrument Diagram (P&ID) 100
Utility Flow Scheme - Portable Water System 100
Utility Engineering Flow Scheme - Portable Water System 100
Utility Flow Scheme - Fire Water Storage and Purification 100
Piping & Instrument Diagram (P&ID) 100
Process Safety Flow Chart 100
Line and Valve Lists 100

Total Process 2610


Weekly Planned Hrs

Cummulative Planned Hrs

Weekly %Planned Progress

Cummulative % Planned Progress

Manning

MECHANICAL & PIPING


Technical Reports / Analysis
Mechanical Design Philosophy 100
Mechanical Equipment Design Calculations 200
Mechanical Calculation for Metering System 200
Mechanical Calculation for Gas Heater 200
Mechanical Calculation for Pressure Regulating Systems 100
Mechanical Calculation for Separation / Filtration Systems 100
Mechanical Calculation for CNG Re-injection Syestem 100
Mechanical Equipment Design Calculations 100
Mechanical Calculation for Utilities 100
Mechanical Calculation for Power Generation System 100
Drawings
Equipment Layout Drawing 100
Datasheets
Data Sheet For Pressure Regulating System 100
Data Sheet For Metering Skid 100
Datasheet for Separators 100
Datsheets for CNG Tubes 100
Datasheet for Fuel Gas Driven generator (2 nos.) 100
Specifications
Specification for Separators 100
Specification for Gas Heater 100
Specification for Fuel Gas Driven generator 100
MTOs
Mechanical 300
General Piping Calculations Report 118
Pipe Spanning Analysis Report and Calculations 122
Pipe Stress Analysis and Flexibility Report and Calculations 122
Pipe Supports Philosophy 100
Plant Layout Philosophy 100
Piping 3D PDMS review reality Reports / Resolution 122
Piping Construction scope of Work 100
Piping Plot Plan 100
Piping Supports drawing 100
3D Plant Design Management System (PDMS) CAD 100
Piping manual Valve List 100
Tie-in Lis 15 100
Specification for Piping Materials 100
Piping MTO 100
Total Mechanical & Piping 3984
Weekly Planned Hrs
Cummulative Planned Hrs

Weekly %Planned Progress

Cummulative % Planned Progress

Manning

Electrical
Technical Reports / Analysis
Electrical PowerSystem Design Philosophy 40
Power System Study Report 40
Lighting Calculations & Report 40
UPS Sizing Calculation & Report 40
Cable Sizing Calculation Note 40
Electrical Power System Design Philosophy 40
Power System Study Report 60
Drawings
General Earthing System Layout and Details 40
Lightening Protection System Layout 40
Cable Trench Layout 40
Living Quarters Power Layout 40
Living Quarters Room Lighting 40
Central Control Center Building Power Layout 40
Central Control Center Control Room Lighting 30
Generator Shed Illumination Layout 30
Guard House Illumination 30
Guard House Light - Power 30
Normal Lighting & Small DB Schedule 30
Living Quarters A/C DB Schedule 30
Central Control Center Building A/C DB Schedule 30
Perimeter Lighting Layout 30
UPS 230V AC Single Line Diagram 30
Electrical Equipment Layout 30
Hazarduos Area Classification 30
Lighting Mounting Detail 30
Lighting Protection Detail 30
Electrical Cable Trench Detail 30
Electrical Legend 30
Single Line Diagram 30
Perimeter Wiring Diagram for Street Light 30
Lighting Calculation 30
UPS Sizing Calculation 30
Detailed Installation Drawings for Power 30
Detailed Installation Drawings for Lighting 30
Detailed Installation Drawings for Grounding & lightning Protection 30
Electrical Load List 30
Electrical Cable Schedule 90
Electrical Equipment List 30
Datasheets
Data Sheet For Maintained Emergency Light 40
Data Sheet For Low Voltage Switch gear 40
Data Sheet For Normal Light 40
Data Sheet For Electrical Equipment 40
Data Sheet For Cable 40
Data Sheet for 100KVA Generator 40
Specification
Specification For Electrical Materials Installation and Construction 40
Electrical Lighting Fixtures Spec 40
Electrical Cable Spec 40
Electrical Cable Tray Spec 40
Electrical Packaged Equipment Spec 40
LV Swithchgear Spec 40
MTOs
Bill Of Engineering Measurement for Cables & other Electrical Items 50

Total Electrical 1880


Weekly Planned Hrs
Cummulative Planned Hrs

Weekly %Planned Progress

Cummulative % Planned Progress

Manning

Instrument
Technical Reports / Analysis
General calculations and design 50
Philosophy for Emergency Shut Down 20
Instrument And Control Philosophies 40
Supply and installation techniques 20
Control Valve Sizing Report 30
Drawings
Junction Box Typical Drawing 100
Instrument Pressure Gauge - Vessel Mounted 100
Instrument Pressure Gauge - Pipe Mounted 100
Instrument & Control Safety System (ICSS) Block 100
I/O List 100
Instrument Cable Schedule 100
Instrument tubing Schedule 100
Instrument Index 100
Datasheets
Data Sheet For Pressure Gauge 70
Data Sheet For Pressure Safety Valve 70
Data Sheet For Control Valves (CV) 70
Data Sheet For Control Valves (CV) 70
Data Sheet For Level Transmitter 70
Data Sheet For Pressure Indicator 70
Data Sheet For Pressure Transmitter 70
Data Sheet For Temperature Indicator 70
Data Sheet ForThermowell 70
Specifications
Specification For General Instrument 70
Specification For I & CS Functional Design 56
Specification For Installation of Instrument 50
Specification For Fire and Gas Detection System 50
MTOs
Instrument Materials Take-Off / BEME 70

Total Instrument 1886


Weekly Planned Hrs

Cummulative Planned Hrs

Weekly %Planned Progress

Cummulative % Planned Progress


Manning

Civil / Structural
Technical Reports / Analysis
Civil Structural Design Philosophy 100
Equipment Foundation Design Calculation Report 100
Generator Shed Vibration Calculation Report 100
Rigid Pavement Design Calculation Report 100
Civil Structural Design Philosophy 100
Pipe Support Calculation 100
Drawings
Civil General Note 100
Civil Overall Site Plan 100
Site Preparation Plans 100
Overall Site Preparation Plan Drawings 170
Generator Control room/ office/ Control room/ office Architectural Drawings 300
Guard House Architectural Drawing 200
Guard House Civil Structural Drawings & Details Drainage System Drawings and Details 300
Drainage System Drawings and Details 200
Typical Pipe Support Drawing and Details 100
Rigid Pavement Drawing & Details 100
Fencing Layout and Details 100
Structural Bar Bending Schedule 100
Drawing Index 100
Specifications
Specification For Civil Works (Materials & Construction) 200
MTOs
Civil/Structural preliminary MTO 200

Total Civil / Structural 2670


Weekly Planned Hrs

Cummulative Planned Hrs

Weekly %Planned Progress

Cummulative % Planned Progress

Manning

QA/QC
Project Quality Plan 82
Input data Acceptance Report 64
Quality Reviews 224
Technical Audit Report 63
QA Audit Report 88

Total QA/QC 3691


Weekly Planned Hrs

Cummulative Planned Hrs


Weekly %Planned Progress

Cummulative % Planned Progress

Manning

Total 60,362
Overal Weekly Planned Hrs

Cummulative Overal Weekly Planned Hrs

Overal Weekly %Planned Progress

Overal Cummulative % Planned Progress


10-Jan-20 17-Jan-20 24-Jan-20 31-Jan-20 07-Feb-20
Week 1 Week 2 Week 3 Week 4 Week 5

30 30 30 30 30
100

86
114

55
55
55

30 30 30 30 495
30 30 30 30 495

30 60 90 120 615

0.05% 0.05% 0.05% 0.05% 0.82%

0.05% 0.10% 0.15% 0.20% 1.02%

0.47 0.47 0.47 0.47 7.73

0 0 0 0 0
0 0 0 0 0

0 0 0 0 0

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00 0.00 0.00 0.00 0.00
0 0 0 0 0
0 0 0 0 0

0 0 0 0 0

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00 0.00 0.00 0.00 0.00


0 0 0 0 0
0 0 0 0 0

0 0 0 0 0

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00 0.00 0.00 0.00 0.00


0 0 0 0 0
0 0 0 0 0
0 0 0 0 0

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

0 0 0 0 0

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%


0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

0 0 0 0 0

0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

0 0 0 0 0
0.00% 0.00% 0.00% 0.00% 0.00%

0.00% 0.00% 0.00% 0.00% 0.00%

0.00 0.00 0.00 0.00 0.00

30 30 30 30 495
30 30 30 30 495

30 60 90 120 615

0.05% 0.05% 0.05% 0.05% 0.82%

0.05% 0.10% 0.15% 0.20% 1.02%


14-Feb-20 21-Feb-20 28-Feb-20 06-Mar-20 13-Mar-20
Week 6 Week 7 Week 8 Week 9 Week 10

30 5

145 160 115


250 250 250 250 250
332 332 332 332 332
64 109 113 113
160 160 160 160 160
160 160 160 160 160
160 160 160 160 160

1092 1276 1331 1290 1175


1092 1276 1331 1290 1175

1707 2983 4314 5604 6779

1.81% 2.11% 2.21% 2.14% 1.95%

2.83% 4.94% 7.15% 9.28% 11.23%

17.06 19.94 20.80 20.16 18.36

208
156
40
40
40
40
30 10
40
60
90 10
5 5
54
0 184 444 155 45
0 184 444 155 45

0 184 628 783 828

0.00% 0.30% 0.74% 0.26% 0.07%

0.00% 0.30% 1.04% 1.30% 1.37%


0.00 2.88 6.94 2.42 0.70

100 100
100 100
100 100
100 100
100 100
100 100
100 100
70 30
60 50
50 33 17

10 90
40 60
40 60
40 60
40 60
40 60
40 60
40 60
20 80

0 0 1190 1403 17
0 0 1190 1403 17

0 0 1190 2593 2610

0.00% 0.00% 1.97% 2.32% 0.03%

0.00% 0.00% 1.97% 4.30% 4.32%

0.00 0.00 18.59 21.92 0.27

40
30
60
60
30
30
30
30
30
30

60

65
65
65
65
65

20
13

118
122
95 5
75 25
55 45
37 85
100
67 33
37 63
47
47

0 118 384 364 978


0 118 384 364 978

0 118 502 866 1844

0.00% 0.20% 0.64% 0.60% 1.62%

0.00% 0.20% 0.83% 1.43% 3.05%

0.00 1.84 6.00 5.69 15.28

30
30
3
0 0 0 0 63
0 0 0 0 63
0 0 0 0 63

0.00% 0.00% 0.00% 0.00% 0.10%

0.00% 0.00% 0.00% 0.00% 0.10%

0.00 0.00 0.00 0.00 0.98

50
13

0 0 0 0 63
0 0 0 0 63

0 0 0 0 63

0.00% 0.00% 0.00% 0.00% 0.10%

0.00% 0.00% 0.00% 0.00% 0.10%


0.00 0.00 0.00 0.00 0.98

100
50 50
3 47 50
33 17 50
3 47 50
5 95

40 60
3
3
3
50 50 100
50
50 50 50 50
40 40

45 115 40

40 145 15

0 244 481 610 304


0 244 481 610 304

0 244 725 1335 1639

0.00% 0.40% 0.80% 1.01% 0.50%

0.00% 0.40% 1.20% 2.21% 2.72%

0.00 3.81 7.52 9.53 4.75

82
64
104
59
81

0 0 0 0 390
0 0 0 0 390

0 0 0 0 390
0.00% 0.00% 0.00% 0.00% 0.65%

0.00% 0.00% 0.00% 0.00% 0.65%

0.00 0.00 0.00 0.00 6.09

1092 1822 3830 3822 3035


1092 1822 3830 3822 3035

1707 3529 7359 11181 14216

1.81% 3.02% 6.35% 6.33% 5.03%

2.83% 5.85% 12.19% 18.52% 23.55%


20-Mar-20 27-Mar-20 03-Apr-20 10-Apr-20 17-Apr-20
Week #12 (Mar 16) Week #13 (Mar 23) Week #14 (Mar 30) Week #15 (Apr 06) Week #16 (Apr 13)

250 250 250 250 250


332 332 332 332 332
113 112 110 111 113
160 160 160 160 160
160 160 160 160 160
160 160 160 160 160

1175 1174 1172 1173 1175


1175 1174 1172 1173 1175

7954 9128 10300 11473 12648

1.95% 1.94% 1.94% 1.94% 1.95%

13.18% 15.12% 17.06% 19.01% 20.95%

18.36 18.34 18.31 18.33 18.36

0 0 0 0 0
0 0 0 0 0

828 828 828 828 828

0.00% 0.00% 0.00% 0.00% 0.00%

1.37% 1.37% 1.37% 1.37% 1.37%


0.00 0.00 0.00 0.00 0.00
0 0 0 0 0
0 0 0 0 0

2610 2610 2610 2610 2610

0.00% 0.00% 0.00% 0.00% 0.00%

4.32% 4.32% 4.32% 4.32% 4.32%

0.00 0.00 0.00 0.00 0.00

35
35
35
35
35

8
20

158 143

0
0
0
0
0
0

53
53
75 25
100
100
203 168 0 0 0
203 168 0 0 0

2047 2215 2215 2215 2215

0.34% 0.28% 0.00% 0.00% 0.00%

3.39% 3.67% 3.67% 3.67% 3.67%

3.17 2.63 0.00 0.00 0.00

10
10
28 10
30 10
23 8 10
30 10
60

13 18 10
30 10
30 10
30 10
30 10
23 18
13 18
30
30
30
30
13
13
13
13
13
13

81 111 174 266 78


81 111 174 266 78
144 255 429 695 773

0.13% 0.18% 0.29% 0.44% 0.13%

0.24% 0.42% 0.71% 1.15% 1.28%

1.27 1.73 2.72 4.16 1.22

8
40
20
30

3 8 89
3 80 18
3 38 59
3 38 59
3 38 59
3 38 59
3 38 59
3 38 59

20 50
20 50
20 50
20 50
20 50
20 50
20 50
20 50
20 50

23 47
50 6
50
50

43 27

122 519 1151 33 0


122 519 1151 33 0

185 704 1855 1888 1888

0.20% 0.86% 1.91% 0.05% 0.00%

0.31% 1.17% 3.07% 3.13% 3.13%


1.91 8.11 17.98 0.52 0.00

47 50
67 30
47 50 70
32 8 60
50 40 60
60 32 8
40 40 40
50 40 10
20 40 23 17
60 40
60 40
20 80

413 330 411 177 0


413 330 411 177 0

2052 2382 2793 2970 0

0.68% 0.55% 0.68% 0.29% 0.00%

3.40% 3.95% 4.63% 4.92% 4.92%

6.45 5.16 6.42 2.77 0.00

120
5
7

132 0 0 0 0
132 0 0 0 0

522 522 522 522 522


0.22% 0.00% 0.00% 0.00% 0.00%

0.86% 0.86% 0.86% 0.86% 0.86%

2.06 0.00 0.00 0.00 0.00

2126 2302 2908 1649 1253


2126 2302 2908 1649 1253

16342 18644 21552 23201 24454

3.52% 3.81% 4.82% 2.73% 2.08%

27.07% 30.89% 35.70% 38.44% 40.51%


24-Apr-20 01-May-20 08-May-20 15-May-20 22-May-20
Week #17 (Apr 20) Week #18 (Apr 27) Week #19 (May 04) Week #20 (May 11) Week #21 (May 18)

250 250 250 250 250


332 332 332 332 332
113 113 112 109 113
160 160 160 160 160
160 160 160 160 160
160 160 160 160 160

1175 1175 1174 1171 1175


1175 1175 1174 1171 1175

13823 14998 16172 17343 18518

1.95% 1.95% 1.94% 1.94% 1.95%

22.90% 24.85% 26.79% 28.73% 30.68%

18.36 18.36 18.34 18.30 18.36

0 0 0 0 0
0 0 0 0 0

828 828 828 828 828

0.00% 0.00% 0.00% 0.00% 0.00%

1.37% 1.37% 1.37% 1.37% 1.37%


0.00 0.00 0.00 0.00 0.00
0 0 0 0 0
0 0 0 0 0

2610 2610 2610 2610 2610

0.00% 0.00% 0.00% 0.00% 0.00%

4.32% 4.32% 4.32% 4.32% 4.32%

0.00 0.00 0.00 0.00 0.00


0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0
0 0 0 0 0
0 0 0 0 0

2215 2215 2215 2215 2215

0.00% 0.00% 0.00% 0.00% 0.00%

3.67% 3.67% 3.67% 3.67% 3.67%

0.00 0.00 0.00 0.00 0.00


18
18
18
18
18
18
30
30
30
30
30
30
30
30
30
30
30
30
90
30

3 38
3 38
3 38
3 38
3 38
3 38

40
40
40
40
40
40

33 18

606 501 18 0 0
606 501 18 0 0
1379 1880 1898 1898 1898

1.00% 0.83% 0.03% 0.00% 0.00%

2.28% 3.11% 3.14% 3.14% 3.14%

9.47 7.83 0.28 0.00 0.00

0 0 0 0 0
0 0 0 0 0

1888 1888 1888 1888 1888

0.00% 0.00% 0.00% 0.00% 0.00%

3.13% 3.13% 3.13% 3.13% 3.13%


0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

0 0 0 0 0

0.00% 0.00% 0.00% 0.00% 0.00%

4.92% 4.92% 4.92% 4.92% 4.92%

0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

522 522 522 522 522


0.00% 0.00% 0.00% 0.00% 0.00%

0.86% 0.86% 0.86% 0.86% 0.86%

0.00 0.00 0.00 0.00 0.00

1781 1676 1192 1171 1175


1781 1676 1192 1171 1175

26235 27911 29103 30274 31449

2.95% 2.78% 1.97% 1.94% 1.95%

43.46% 46.24% 48.21% 50.15% 52.10%


29-May-20 05-Jun-20 12-Jun-20 19-Jun-20 26-Jun-20
Week #22 (May 25) Week #23 (Jun 01) Week #24 (Jun 08) Week #25 (Jun 15) Week #26 (Jun 22)

250 250 250 250 250


332 339 339 339 334
113 110 114 111 112
160 160 160 160 160
160 160 160 160 160
160 160 160 160 160

1175 1179 1183 1180 1176


1175 1179 1183 1180 1176

19693 20872 22055 23235 24411

1.95% 1.95% 1.96% 1.95% 1.95%

32.62% 34.58% 36.54% 38.49% 40.44%

18.36 18.42 18.48 18.44 18.38

0 0 0 0 0
0 0 0 0 0

828 828 828 828 828

0.00% 0.00% 0.00% 0.00% 0.00%

1.37% 1.37% 1.37% 1.37% 1.37%


0.00 0.00 0.00 0.00 0.00
0 0 0 0 0
0 0 0 0 0

2610.0 2610.0 2610.0 2610.0 2610.0

0.00% 0.00% 0.00% 0.00% 0.00%

4.32% 4.32% 4.32% 4.32% 4.32%

0.00 0.00 0.00 0.00 0.00


0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0
0 0 0 0 0

2215 2215 2215 2215 2215

0.00% 0.00% 0.00% 0.00% 0.00%

3.67% 3.67% 3.67% 3.67% 3.67%

0.00 0.00 0.00 0.00 0.00


0 0 0 0 0
0 0 0 0 0
1898 1898 1898 1898 1898

0.00% 0.00% 0.00% 0.00% 0.00%

3.14% 3.14% 3.14% 3.14% 3.14%

0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

1888 1888 1888 1888 1888

0.00% 0.00% 0.00% 0.00% 0.00%

3.13% 3.13% 3.13% 3.13% 3.13%


0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

0 0 0 0 0

0.00% 0.00% 0.00% 0.00% 0.00%

4.92% 4.92% 4.92% 4.92% 4.92%

0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

522 522 522 522 522


0.00% 0.00% 0.00% 0.00% 0.00%

0.86% 0.86% 0.86% 0.86% 0.86%

0.00 0.00 0.00 0.00 0.00

1175 1179 1183 1180 1176


1175 1179 1183 1180 1176

32624 33803 34986 36166 37342

1.95% 1.95% 1.96% 1.95% 1.95%

54.05% 56.00% 57.96% 59.92% 61.86%


03-Jul-20 10-Jul-20 17-Jul-20 24-Jul-20 31-Jul-20
Week #27 (Jun 29) Week #28 (Jul 06) Week #29 (Jul 13) Week #30 (Jul 20) Week #31 (Jul 27)

250 250 250 250 245


337 339 339 330 273
113 113 113 112 114
160 160 160 160 160
160 160 160 160 160
160 160 160 160 160

1180 1182 1182 1172 1112


1180 1182 1182 1172 1112

25591 26773 27955 29127 30239

1.95% 1.96% 1.96% 1.94% 1.84%

42.40% 44.35% 46.31% 48.25% 50.10%

18.44 18.47 18.47 18.31 17.38

0 0 0 0 0
0 0 0 0 0

828 828 828 828 828

0.00% 0.00% 0.00% 0.00% 0.00%

1.37% 1.37% 1.37% 1.37% 1.37%


0.00 0.00 0.00 0.00 0.00
0 0 0 0 0
0 0 0 0 0

2610.0 2610.0 2610.0 2610.0 2610.0

0.00% 0.00% 0.00% 0.00% 0.00%

4.32% 4.32% 4.32% 4.32% 4.32%

0.00 0.00 0.00 0.00 0.00


0 0 0 0 0
0 0 0 0 0

2215 2215 2215 2215 2215

0.00% 0.00% 0.00% 0.00% 0.00%

3.67% 3.67% 3.67% 3.67% 3.67%

0.00 0.00 0.00 0.00 0.00


0 0 0 0 0
0 0 0 0 0
1898 1898 1898 1898 1898

0.00% 0.00% 0.00% 0.00% 0.00%

3.14% 3.14% 3.14% 3.14% 3.14%

0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

1888 1888 1888 1888 1888

0.00% 0.00% 0.00% 0.00% 0.00%

3.13% 3.13% 3.13% 3.13% 3.13%


0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

0 0 0 0 0

0.00% 0.00% 0.00% 0.00% 0.00%

4.92% 4.92% 4.92% 4.92% 4.92%

0.00 0.00 0.00 0.00 0.00

0
0 0 0 0 0

522 522 522 522 522


0.00% 0.00% 0.00% 0.00% 0.00%

0.86% 0.86% 0.86% 0.86% 0.86%

0.00 0.00 0.00 0.00 0.00

1180 1182 1182 1172 1112


1180 1182 1182 1172 1112

38522 39704 40886 42058 43170

1.95% 1.96% 1.96% 1.94% 1.84%

63.82% 65.78% 67.73% 69.68% 71.52%


07-Aug-20 14-Aug-20 21-Aug-20 28-Aug-20 04-Sep-20
Week #32 (Aug 03) Week #33 (Aug 10) Week #34 (Aug 17) Week #35 (Aug 24) Week #36 (Aug 31)

210 210 210 210 210


270 275 275 275 275
110 111 111 110 109
160 160 160 160 160
160 160 160 160 160
160 160 160 160 160

1070 1076 1076 1075 1074


1070 1076 1076 1075 1074

31309 32385 33461 34536 35610

1.77% 1.78% 1.78% 1.78% 1.78%

51.87% 53.65% 55.43% 57.21% 58.99%

16.72 16.81 16.81 16.80 16.78

0 0 0 0 0
0 0 0 0 0

828 828 828 828 828

0.00% 0.00% 0.00% 0.00% 0.00%

1.37% 1.37% 1.37% 1.37% 1.37%


0.00 0.00 0.00 0.00 0.00
0 0 0 0 0
0 0 0 0 0

2610.0 2610.0 2610.0 2610.0 2610.0

0.00% 0.00% 0.00% 0.00% 0.00%

4.32% 4.32% 4.32% 4.32% 4.32%

0.00 0.00 0.00 0.00 0.00


0 0 0 0 0
0 0 0 0 0

2215 2215 2215 2215 2215

0.00% 0.00% 0.00% 0.00% 0.00%

3.67% 3.67% 3.67% 3.67% 3.67%

0.00 0.00 0.00 0.00 0.00


0 0 0 0 0
0 0 0 0 0
1898 1898 1898 1898 1898

0.00% 0.00% 0.00% 0.00% 0.00%

3.14% 3.14% 3.14% 3.14% 3.14%

0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

1888 1888 1888 1888 1888

0.00% 0.00% 0.00% 0.00% 0.00%

3.13% 3.13% 3.13% 3.13% 3.13%


0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

0 0 0 0 0

0.00% 0.00% 0.00% 0.00% 0.00%

4.92% 4.92% 4.92% 4.92% 4.92%

0.00 0.00 0.00 0.00 0.00

0 0 0 0 0

522 522 522 522 522


0.00% 0.00% 0.00% 0.00% 0.00%

0.86% 0.86% 0.86% 0.86% 0.86%

0.00 0.00 0.00 0.00 0.00

1070 1076 1076 1075 1074


1070 1076 1076 1075 1074

44240 45316 46392 47467 48541

1.77% 1.78% 1.78% 1.78% 1.78%

73.29% 75.07% 76.86% 78.64% 80.42%


11-Sep-20 18-Sep-20 25-Sep-20 02-Oct-20 09-Oct-20
Week #37 (Sep 07) Week #38 (Sep 14) Week #39 (Sep 21) Week #40 (Sep 28) Week #41 (Oct 05)

210 210 210 210 210


268 268 268 268 268
109 111 111 113 110
160 160 160 160 160
160 160 160 160 160
160 160 160 160 160

1067 1069 1069 1071 1068


1067 1069 1069 1071 1068

36677 37746 38815 39886 40954

1.77% 1.77% 1.77% 1.77% 1.77%

60.76% 62.53% 64.30% 66.08% 67.85%

16.67 16.70 16.70 16.73 16.69

0 0 0 0 0
0 0 0 0 0

828 828 828 828 828

0.00% 0.00% 0.00% 0.00% 0.00%

1.37% 1.37% 1.37% 1.37% 1.37%


0.00 0.00 0.00 0.00 0.00
0 0 0 0 0
0 0 0 0 0

2610.0 2610.0 2610.0 2610.0 2610.0

0.00% 0.00% 0.00% 0.00% 0.00%

4.32% 4.32% 4.32% 4.32% 4.32%

0.00 0.00 0.00 0.00 0.00


0 0 0 0 0
0 0 0 0 0

2215 2215 2215 2215 2215

0.00% 0.00% 0.00% 0.00% 0.00%

3.67% 3.67% 3.67% 3.67% 3.67%

0.00 0.00 0.00 0.00 0.00


0 0 0 0 0
0 0 0 0 0
1898 1898 1898 1898 1898

0.00% 0.00% 0.00% 0.00% 0.00%

3.14% 3.14% 3.14% 3.14% 3.14%

0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

1888 1888 1888 1888 1888

0.00% 0.00% 0.00% 0.00% 0.00%

3.13% 3.13% 3.13% 3.13% 3.13%


0.00 0.00 0.00 0.00 0.00

0 0 0 0 0
0 0 0 0 0

0 0 0 0 0

0.00% 0.00% 0.00% 0.00% 0.00%

4.92% 4.92% 4.92% 4.92% 4.92%

0.00 0.00 0.00 0.00 0.00

0 0 0 0 0

522 522 522 522 522


0.00% 0.00% 0.00% 0.00% 0.00%

0.86% 0.86% 0.86% 0.86% 0.86%

0.00 0.00 0.00 0.00 0.00

1067 1069 1069 1071 1068


1067 1069 1069 1071 1068

49608 50677 51746 52817 53885

1.77% 1.77% 1.77% 1.77% 1.77%

82.18% 83.96% 85.73% 87.50% 89.27%


16-Oct-20 23-Oct-20
Week #42 (Oct 12) Week #43 (Oct 19)

210
268
109
160
160
160
20
1067 20
1067 20

42021 42041

1.77% 0.03%

69.61% 69.65%

16.67 0.31

0 0
0 0

828 828

0.00% 0.00%

1.37% 1.37%
0.00 0.00
0 0
0 0

2610.0 2610.0

0.00% 0.00%

4.32% 4.32%

0.00 0.00
0 0
0 0

2215 2215

0.00% 0.00%

3.67% 3.67%

0.00 0.00
0 0
0 0
1898 1898

0.00% 0.00%

3.14% 3.14%

0.00 0.00

0 0
0 0

1888 1888

0.00% 0.00%

3.13% 3.13%
0.00 0.00

0 0
0 0

0 0

0.00% 0.00%

4.92% 4.92%

0.00 0.00

0 0

522 522
0.00% 0.00%

0.86% 0.86%

0.00 0.00

1067 20
1067 20

54952 54972

1.77% 0.03%

91.04% 91.07%
P

DOCUMENT TITLE CATEGORY

Indirect activities
Kick off Project Meeting
Site Visit
Site Checklist/Report
Project Progress Review Meeting
Inputs to Weekly Progress report / Schedule / MDR
Design Review Meeting
Review of Client Supplied documents
HAZOP Study
HAZID Study
Input to Final Design Dossiers & Close-out Report

Mobilize Procurement Personnel Required to Engineering


Direct activities
Basis of Design - Proces Report/Analysis
HYSYS Simulations Report Report/Analysis
Process Calculations Report/Analysis
HAZOP / HAZAN Report Report/Analysis
Equipment Sizing Calculation Report/Analysis
Line Sizing Calculation Report/Analysis
Relief and Blowdown Sizing and Calculation Report/Analysis
Relief Valve Sizing Calculation Report/Analysis
Heat and Material Balance Report/Analysis
Major Operating Equipment Philosophy Report/Analysis
Fire Protection & Safety Equipment Philosophy Report/Analysis
Utility Report Report/Analysis

Drawing Symbols / Legend Sheets - 3 nos. Drawing


Process Flow Diagram (PFD) Drawing
Process & Instrument Diagram (P&ID) Drawing
Utility Flow Scheme - Portable Water System Drawing
Utility Engineering Flow Scheme - Portable Water System Drawing
Utility Flow Scheme - Fire Water Storage and Pumping Drawing
Piping & Instrument Diagram (P&ID) Drawing
Process Safety Flow Chart Drawing
Cause and Effect Matrix
Hazard Report
Line and Valve Lists Drawing
Line Sizing report
HAZOP Node sheets
Control and Safeguarding Philosophy
Datasheet for Seperator Datasheet
Datasheet for Gas Metering Skid Datasheet
Datasheet for Pressure Reduction Skid Datasheet
Datasheet for Filter Seperation Datasheet
Datasheet for Instrument Air/Gas Package Datasheet
Datasheet for Shutdown Valve Datasheet
Datasheet for Vent Stack Datasheet
Datasheet for Vent Scrubber Datasheet
Datasheet for Gas Heater Skid Datasheet
Datasheet for Level Transmitter Indicator Datasheet
Datasheet for Corrosion Monitors near Tie-in point Datasheet
Datasheet for Corrosion Monitors at PRMF Inlet Datasheet
Datasheet for Emergency Shut-off valve Datasheet
Datasheet for Pressure Gauses Datasheet
Datasheet for Level Switches Datasheet
Datasheet for Gas Flowmeters Datasheet
Datasheet for Pressure Relieve Valve Datasheet
Datasheet for Temperature Gauges Datasheet
Datasheet for Pressure Switches Datasheet
Datasheet for Flow Transmitter Datasheet
Datasheet for Pneumatic Control Valve Datasheet
Datasheet for UV IR Flame Detectors Datasheet
Datasheet for Gas Detector Datasheet
Datasheet for Jockery Pump Datasheet
Datasheet for Fire Water Pump Datasheet
Datasheet for Portable Water Pump Datasheet
Datasheet for Glycol Injection Pumps Datasheet
Datasheet for Odorizer Package Datasheet
Grand Total
ABA CITY GATE

60362

Manhour Weight BL DATE FORECAST DATE


DOCUMENT NUMBER
per Discpl.
Factor Start Finish Start

8 0.00307
20 0.00766
34 0.01303
32 0.01226
16 0.00613
44 0.01686
80 0.03065
48 0.01839
48 0.01839
48 0.01839
150 0.05747

30 0.01149
30 0.01149
30 0.01149
30 0.01149
50 0.01916
50 0.01916
30 0.01149
32 0.01226
36 0.01379
30 0.01149
50 0.01916
50 0.01916

90 0.03448
60 0.02299
60 0.02299
60 0.02299
60 0.02299
60 0.02299
60 0.02299
60 0.02299
120 0.04598
32 0.01226
80 0.03065
40 0.01533
48 0.01839
20 0.00766
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
28 0.01073
2610 1.00
Start Study/Preparation

FORECAST DATE ACTUAL DATE Done 5% Done 15%


Finish Start Finish

Study/
Start Preparati
on
10% 20%
Code 2 – Approved Code 1 – Approved
Code 3 – Rejected, with Comments, without Comments, & IFC (Issue for
Issue to Client Revise & Re-Submit Revise & Re-Submit & Proceed with Construction)
Proceed with Construction
Construction
Done 15% QTY NUM Done 15% Done 15% Done 15%

Issue
for Issue to Approval
Internal Client by Client
Review
20% 15% 20%
Quantity Physical
AFC(Approved for Discipline
Progress % Weight % Start Finish
Construction) Complete Progress Weight (%) on
overall
progress
Done 20% 50% 50%

0.000% 0.000 0% 0% 0.013%


0.000% 0.000 0% 0% 0.033%
0.000% 0.000 0.056%
0.000% 0.000 0% 0% 0.053%
0.000% 0.000 0.027%
0.000% 0.000 0.073%
0.000% 0.000 0.133%
0.000% 0.000 0.080%
0.000% 0.000 0.080%
0.000% 0.000 0.080%
0.000% 0.000 0% 0% 0.249%

0.000% 0.000% 0.050%


0.000% 0.000% 0.050%
0.000% 0.000% 0.050%
0.000% 0.000% 0.050%
0.000% 0.000% 0.083%
0.000% 0.000% 0.083%
0.000% 0.000% 0.050%
0.000% 0.000% 0.053%
0.000% 0.000% 0.060%
0.000% 0.000% 0.050%
0.000% 0.000% 0.083%
0.000% 0.000% 0.083%
Issue for
Quantity Physical
Constructio
Progress % Weight %
n/Purchasin
Complete Progress
g
15%

0.000% 0.000% 0.149%


0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.199%
0.000% 0.000% 0.053%
0.000% 0.000% 0.133%
0.000% 0.000% 0.066%
0.000% 0.000% 0.080%
0.000% 0.000% 0.033%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.000% 0.000% 0.046%
0.00000 0.00000 4.324%
P

DOCUMENT TITLE CATEGORY

Indirect activities
Kick off Project Meeting
Site Visit
Site Visit Checklist/Report
Project Progress Review Meeting
Design Review Meeting
Review of Client Supplied documents
HAZOP Study
HAZID Study
3D Model Review

Procurement Support
Direct activities
Overall Layout Plan Report/Analysis
Equipment Layout Plan Report/Analysis
Tie-in Details Report/Analysis
Piping Layout Report/Analysis
Piping Details Report/Analysis
Detail of Pipe Support Report/Analysis
Type of Instalation Detail for Vent, Drain, PI & TI Report/Analysis
Plot Plan-Pipeline Report/Analysis
Bill of Materials - Pipeline Report/Analysis
Weld Map - Piping Report/Analysis
Piping Calculation Report Report/Analysis
Bill of Materials - Piping Report/Analysis
Plot Plan-Piping Report/Analysis
Material Requisition for Valves Report/Analysis
Material Requisition for Piping Materials Report/Analysis
Material Requisition for Process Equipment Report/Analysis
Material Requisition for Fire Fighting Equipment & Materials Report/Analysis
Material Requisition for Fire Fighting Equipment & Materials Report/Analysis
BOQ for Piping Works Report/Analysis
Piping Plot Plan Report/Analysis
Piping General arrangement Report/Analysis
Piping Support Details (Typ.) Report/Analysis
Tie-in List Report/Analysis
Tie-in Schedule
Specification for Piping Materials Report/Analysis
Piping MTO Report/Analysis
Installation Details for for Vent, Drain, PI, TI (Typical) Report/Analysis
System 3D Model Report/Analysis
Pipe Stress Analysis Report Report/Analysis
Design Philosophy Report/Analysis
Mechanical Equipment Design Calculations
Mechanical Calculation for Metering System
Mechanical Calculation for Gas Heater
Mechanical Calculation for PRS
Mechanical Calculation for Seperation/Filtration System
Mechanical Calculation for Utility System
Mechanical Calculation for Power Generation System
Mechanical BOQ
BOQ for Mechanical Works
Overall Layout Plan
Equipment Layout Plan Report/Analysis

Pipeline Alignment Drawing Drawing


Piping Isometric Drawing Drawing
Piping Isometric Drawing Drawing
Grand Total
ABA CITY GATE

60362
Study/ Issue to Approval
Start
Preparation Client by Client

Manhour Weight 10% 20% 20% 20%


DOCUMENT NUMBER
per Discpl.
Factor

10 0.00251
60 0.01506
30 0.00753
40 0.01004
40 0.01004
90 0.02259
20 0.00502
20 0.00502
90 0.02259
100 0.02510

70 0.01757 0% 0%
70 0.01757 0%
70 0.01757 0%
70 0.01757 0%
70 0.01757 0% 0%
70 0.01757 0%
70 0.01757 0%
241 0.06049 0%
70 0.01757
70 0.01757
83 0.02083
70 0.01757
70 0.01757
70 0.01757
70 0.01757
50 0.01255
50 0.01255
50 0.01255
30 0.00753
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
Issue
Study/
for Issue to
Start Preparati
Internal Client
on
Review
10% 20% 20% 15%
400 0.10040
70 0.01757
60 0.01506
3984 1.00000
Issue for
Quantity Physical
Constructi
on/Purchas
Progress % Weight % Start Finish Discipline
Complete Progress Weight (%) on
ing
overall progress
30% 50% 50%

0.000% 0.000 0% 0% 0.02%


0.000% 0.000 0% 0% 0.10%
0.000% 0.000 0.05%
0.000% 0.000 0% 0% 0.07%
0.000% 0.000 0.07%
0.000% 0.000 0.15%
0.000% 0.000 0.03%
0.000% 0.000 0.03%
0.000% 0.000 0.15%
0.000% 0.000 0% 0% 0.17%

0.000% 0.000% 0.12%


0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.40%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.14%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.08%
0.000% 0.000% 0.08%
0.000% 0.000% 0.08%
0.000% 0.000% 0.05%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
Issue for
Quantity Physical
Approval Constructio
Progress % Weight %
by Client n/Purchasin
Complete Progress
g
20% 15%

0.000% 0.000% 0.66%


0.000% 0.000% 0.12%
0.000% 0.000% 0.10%
0.00000 0.00000 6.600%
P

DOCUMENT TITLE CATEGORY

Indirect activities
Kick off Project Meeting
Site Visit
Site Visit Checklist/Report
Project Progress Review Meeting
Design Review Meeting
Review of Client Supplied documents
HAZOP Study
HAZID Study
3D Model Review

Procurement Support
Direct activities
Overall Layout Plan Report/Analysis
Equipment Layout Plan Report/Analysis
Tie-in Details Report/Analysis
Piping Layout Report/Analysis
Piping Details Report/Analysis
Detail of Pipe Support Report/Analysis
Type of Instalation Detail for Vent, Drain, PI & TI Report/Analysis
Plot Plan-Pipeline Report/Analysis
Bill of Materials - Pipeline Report/Analysis
Weld Map - Piping Report/Analysis
Piping Calculation Report Report/Analysis
Bill of Materials - Piping Report/Analysis
Plot Plan-Piping Report/Analysis
Material Requisition for Valves Report/Analysis
Material Requisition for Piping Materials Report/Analysis
Material Requisition for Process Equipment Report/Analysis
Material Requisition for Fire Fighting Equipment & Materials Report/Analysis
Material Requisition for Fire Fighting Equipment & Materials Report/Analysis
BOQ for Piping Works Report/Analysis
Piping Plot Plan Report/Analysis
Piping General arrangement Report/Analysis
Piping Support Details (Typ.) Report/Analysis
Tie-in List Report/Analysis
Tie-in Schedule
Specification for Piping Materials Report/Analysis
Piping MTO Report/Analysis
Installation Details for for Vent, Drain, PI, TI (Typical) Report/Analysis
System 3D Model Report/Analysis
Pipe Stress Analysis Report Report/Analysis
Design Philosophy Report/Analysis
Mechanical Equipment Design Calculations
Mechanical Calculation for Metering System
Mechanical Calculation for Gas Heater
Mechanical Calculation for PRS
Mechanical Calculation for Seperation/Filtration System
Mechanical Calculation for Utility System
Mechanical Calculation for Power Generation System
Mechanical BOQ
BOQ for Mechanical Works
Overall Layout Plan
Equipment Layout Plan Report/Analysis

Pipeline Alignment Drawing Drawing


Piping Isometric Drawing Drawing
Piping Isometric Drawing Drawing
Grand Total
ABA CITY GATE

60362
Study/ Issue to Approval
Start
Preparation Client by Client

Manhour Weight 10% 20% 20% 20%


DOCUMENT NUMBER
per Discpl.
Factor

10 0.00251
60 0.01506
30 0.00753
40 0.01004
40 0.01004
90 0.02259
20 0.00502
20 0.00502
90 0.02259
100 0.02510

70 0.01757 0% 0%
70 0.01757 0%
70 0.01757 0%
70 0.01757 0%
70 0.01757 0% 0%
70 0.01757 0%
70 0.01757 0%
241 0.06049 0%
70 0.01757
70 0.01757
83 0.02083
70 0.01757
70 0.01757
70 0.01757
70 0.01757
50 0.01255
50 0.01255
50 0.01255
30 0.00753
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
70 0.01757
Issue
Study/
for Issue to
Start Preparati
Internal Client
on
Review
10% 20% 20% 15%
400 0.10040
70 0.01757
60 0.01506
3984 1.00000
Issue for
Quantity Physical
Constructi
on/Purchas
Progress % Weight % Start Finish Discipline
Complete Progress Weight (%) on
ing
overall progress
30% 50% 50%

0.000% 0.000 0% 0% 0.02%


0.000% 0.000 0% 0% 0.10%
0.000% 0.000 0.05%
0.000% 0.000 0% 0% 0.07%
0.000% 0.000 0.07%
0.000% 0.000 0.15%
0.000% 0.000 0.03%
0.000% 0.000 0.03%
0.000% 0.000 0.15%
0.000% 0.000 0% 0% 0.17%

0.000% 0.000% 0.12%


0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.40%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.14%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.08%
0.000% 0.000% 0.08%
0.000% 0.000% 0.08%
0.000% 0.000% 0.05%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
0.000% 0.000% 0.12%
Issue for
Quantity Physical
Approval Constructio
Progress % Weight %
by Client n/Purchasin
Complete Progress
g
20% 15%

0.000% 0.000% 0.66%


0.000% 0.000% 0.12%
0.000% 0.000% 0.10%
0.00000 0.00000 6.600%
P

DOCUMENT TITLE CATEGORY

Indirect activities
Kick off Project Meeting
Site Visit
Site Visit Checklist/Report
Project Progress Review Meeting
Inputs to Weekly Progress report / Schedule / MDR
3D Model Review
Review of Received Company's Design Dossier
Soil Geotechnical Investigation
Topographical Survey
Underground Site Probing Report

Procurement Support
Direct activities
Design Philosophy Report/Analysis
Soil Investigation Report Report/Analysis
Constructibility Review Report Report/Analysis
Foundation Design Calculation Report Report/Analysis
Specification for Civil Works Report/Analysis
Concrete Mix Design Report/Analysis
Pipe Sleepers (Details) Report/Analysis
Bill of Quantities - Civil/Structural Report/Analysis
BOQ for Civil Works Report/Analysis
Slope Tank Installation Details Report/Analysis

CS Foundation Layout, Sections and Details Drawing


CS Shelter Layout, Sections and Details Drawing
Valve Pit Layout, Sections and Details Drawing
Fire Break Wall Layout and Details Drawing
Building Architectural Drawings Drawing
Rigid Pavement Drawings and Details Drawing
Drainage System Drawings and Details Drawing
Fencing Layout and Details Drawing
Architectural and Structural Details for Control Room
Architectural and Structural Details Workshop
Architectural and Structural Details Mess Drawing
Foundation Details for Gas Metering Skid
Foundation Details for Pressure Reduction Skid
Foundation Details for Pressure Filter Seperator
Foundation Details for Instrument Air/Gas Package Datasheet
Foundation Details for Vent Stack Datasheet
Foundation Details for Vent Scrubber Datasheet
Foundation Details for Gas Heater Skid Datasheet
Foundation Details for Jockey Pump Datasheet
Foundation Details for Fire Water Pump Datasheet
Foundation Details for Glycol Injection Pumps Datasheet
Foundation Details for Portable Water Pump Datasheet
Foundation Details for Odorizer Package Datasheet
Overall Site Plan Datasheet
Drawing Index Datasheet
MTO Datasheet
Grand Total
ABA CITY GATE

60362
Study/ Issue to Approval
Start
Preparation Client by Client

Manhour Weight 10% 20% 20% 20%


DOCUMENT NUMBER
per Discpl.
Factor

10 0.00375
60 0.02247
30 0.01124
50 0.01873
30 0.01124
40 0.01498
100 0.03745
30 0.01124
20 0.00749
20 0.00749
50 0.01873

60 0.02247 0% 0%
70 0.02622 0%
70 0.02622 0%
60 0.02247 0%
60 0.02247 0% 0%
60 0.02247 0%
60 0.02247 0%
60 0.02247 0%
60 0.02247
60 0.02247
Issue
Study/
for Issue to
Start Preparati
Internal Client
on
Review
10% 20% 20% 15%
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
60 0.02247
110 0.04120
2670 1.00000
Issue for
Quantity Physical
Constructi
Progress % Weight % Start Finish
Discipline
on/Purchas Weight (%) on
Complete Progress
ing
overall
30% 50% 50% progress

0.000% 0.000 0% 0% 0.017%


0.000% 0.000 0% 0% 0.099%
0.000% 0.000 0.050%
0.000% 0.000 0% 0% 0.083%
0.000% 0.000 0.050%
0.000% 0.000 0.066%
0.000% 0.000 0.166%
0.000% 0.000 0.050%
0.000% 0.000 0.033%
0.000% 0.000 0.033%
0.000% 0.000 0% 0% 0.083%

0.000% 0.000% 0.099%


0.000% 0.000% 0.116%
0.000% 0.000% 0.116%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
Issue for
Quantity Physical
Approval Constructio
Progress % Weight %
by Client n/Purchasin
Complete Progress
g
20% 15%

0.000% 0.000% 0.099%


0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.182%
0.00000 0.00000 4.423%
DOCUMENT TITLE CATEGORY

Indirect activities
Kick off Project Meeting
Site Visit
Site Visit Checklist/Report
Project Progress Review Meeting
Inputs to Weekly Progress report / Schedule / MDR
Design Review Meeting
3D Model Review
Direct activities
BOQ for Electrical Works Requisition
Electrical Power System Design Philosophy Requisition
Lighting Calculation Report Requisition
Cable Sizing Calculation Report Requisition
Installation Details for Power Requisition
Installation Details for Lighting Requisition
Electrical Load List Requisition
Datasheet for Maintained Emergency Light Datasheet
Datasheet for Low Voltage Switchgear Datasheet
Datasheet for Normal Light Datasheet
Datasheet For Electrical Equipment Datasheet
Datasheet for Cable Datasheet
Specification for Lighting Fixture Specification
Specification for Electrical Cable Specification
Specification for Electrical Cable Tray Specification
Specification for Packaged Equipment Specification
Specification forLV Switchgear Specification
MTOs Specification
Installation Manual Specification
Hazardous Area Classification Specification

Earthing System Layout and Details Drawing


Electrical Single Line Diagram Main Distribution Board (MDB) Drawing
Electrical Single Line Diagram Distribution Board (DBs) Drawing
General Lighting and Cable Layout Drawing
Perimeter Lighting Layout Drawing
Grand Total
ABA CITY GATE

60362
Study/ Issue to Approval
Start
Preparation Client by Client

Manhour Weight 10% 20% 20% 20%


DOCUMENT NUMBER
per Discpl.
Factor

10 0.00532
60 0.03191
30 0.01596
140 0.07447
20 0.01064
60 0.03191
30 0.01596

60 0.03191 0% 0%
60 0.03191 0%
60 0.03191 0%
60 0.03191 0%
60 0.03191 0% 0%
60 0.03191 0%
60 0.03191 0%
60 0.03191 0%
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
60 0.03191
Issue
Study/
for Issue to
Start Preparati
Internal Client
on
Review
10% 20% 20% 15%
90 0.04787
60 0.03191
60 0.03191
60 0.03191
60 0.03191
1880 1.00000
Issue for
Quantity Physical
Constructi
Progress % Weight % Start Finish
Discipline
on/Purchas Weight (%) on
Complete Progress
ing
overall
30% 50% 50% progress

0.000% 0.000 0% 0% 0.017%


0.000% 0.000 0% 0% 0.099%
0.000% 0.000 0.050%
0.000% 0.000 0% 0% 0.232%
0.000% 0.000 0.033%
0.000% 0.000 0.099%
0.000% 0.000 0.050%

0.000% 0.000% 0.099%


0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
Issue for
Quantity Physical
Approval Constructio
Progress % Weight %
by Client n/Purchasin
Complete Progress
g
20% 15%

0.000% 0.000% 0.149%


0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.00000 0.00000 0.547%
DOCUMENT TITLE CATEGORY

Indirect activities
Kick off Project Meeting
Site Visit
Site Checklist/Report
Project Progress Review Meeting
Inputs to Weekly Progress report / Schedule / MDR
Design Review
Review of Client Supplied documents
HAZOP Study
HAZID Study
SIL Workshop
Input to Final Design Dossiers & Close-out Report

Mobilize Procurement Personnel Required to Engineering


Direct activities
BOQ for Instrumentation Works Report/Analysis
Emergency Shutdown Philosophy Report/Analysis
Instrument and Control Philosophy Report/Analysis
Control Valve Sizing Report Report/Analysis
I/O List Report/Analysis
Cable Schedule Report/Analysis
Tubing Schedule Report/Analysis
Instrument Index Report/Analysis
Instrument List Report/Analysis
Instrument Datasheet Report/Analysis
Hook-up Details Report/Analysis
Cable Specifications Report/Analysis
Control Cabinet Specifications Report/Analysis
PLC System Specification Report/Analysis
F & G System Specifications Report/Analysis
PAGA System Specifications Report/Analysis
Process/General Ethernet Specifications Report/Analysis
General Instrument Specification Report/Analysis
Instrument Installation Detail (TYPICAL) Report/Analysis
Calculation & Design Report Report/Analysis
MTO/BEME Report/Analysis
Junction Box Drawing (TYPICAL) Drawing
Instrument/Cable Layout Drawing Drawing
Control Schematic Drawing Drawing
Junction Box Drawing Drawing
ICSS Block Diagram Drawing
F & G Layout Drawings Drawing
PAGA System Layout Drawing Drawing
Grand Total
ABA CITY GATE

60362
Start Study/Preparation Issue to Client

Manhour Weight 10% 20% 20%


DOCUMENT NUMBER
per Discpl.
Factor

10 0.00530
60 0.03181
30 0.01591
32 0.01697
20 0.01060
44 0.02333
60 0.03181
30 0.01591
20 0.01060
10 0.00530
60 0.03181
100 0.05302

20 0.01060 0% 0%
60 0.03181 0%
20 0.01060 0%
40 0.02121 0%
100 0.05302 0% 0%
100 0.05302 0%
120 0.06363 0%
10 0.00530 0%
40 0.02121
20 0.01060
100 0.05302
80 0.04242
20 0.01060
20 0.01060
20 0.01060
40 0.02121
20 0.01060
60 0.03181
10 0.00530
30 0.01591
30 0.01591
Issue for
Start Study/Preparation Internal
Review
Issue for
Start Study/Preparation Internal
Review
10% 20% 20%
90 0.04772
60 0.03181
60 0.03181
60 0.03181
60 0.03181
60 0.03181
60 0.03181
1886 1.00000
Issue for Physical
Approval by Quantity Progress %
Construction/Purchasin Weight % Start
Client Complete
g Progress

20% 30% 50%

0.000% 0.000 0%
0.000% 0.000 0%
0.000% 0.000
0.000% 0.000 0%
0.000% 0.000
0.000% 0.000
0.000% 0.000
0.000% 0.000
0.000% 0.000
0.000% 0.000
0.000% 0.000
0.000% 0.000 0%

0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
Issue for Physical
Issue to Quantity Progress
Approval by Client Construction/Pur Weight %
Client % Complete
chasing Progress
Issue for Physical
Issue to Quantity Progress
Approval by Client Construction/Pur Weight %
Client % Complete
chasing Progress
15% 20% 15%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.000% 0.000%
0.00000 0.00000
Finish Discipline Weight
(%) on overall
progress
50%

0% 0.017%
0% 0.099%
0.050%
0% 0.053%
0.033%
0.073%
0.099%
0.050%
0.033%
0.017%
0.099%
0% 0.166%

0.033%
0.099%
0.033%
0.066%
0.166%
0.166%
0.199%
0.017%
0.066%
0.033%
0.166%
0.133%
0.033%
0.033%
0.033%
0.066%
0.033%
0.099%
0.017%
0.050%
0.050%
0.149%
0.099%
0.099%
0.099%
0.099%
0.099%
0.099%
3.124%
DOCUMENT TITLE CATEGORY

Indirect activities

Kick off Project Meeting


Mobilization/Project Office Set up
Project Progress Meeting/Design Review Meeting
Project Coordination
Direct activities

Project Schedule - Preliminary


Project Schedule - DED
Project Control Plan
Project Progress Report
Project Execution Plan
Project Close-out
Site Visit Report
Document Control plan
Document Distribution Matrix
Interface With Third Parties / Community Relations

Deliverable Register (MDR)


Grand Total
ABA CITY GATE

60362
Study/ Issue to Approval
Start
Preparation Client by Client

Manhour Weight 10% 20% 20% 20%


DOCUMENT NUMBER
per Discpl.
Factor

10 0.00023
290 0.00677
1048 0.02448
1409 0.03291

1883 0.04398 0% 0% 0%
3800 0.08876 0% 0%
4800 0.11212 0% 0%
4800 0.11212 0% 0%
2900 0.06774 0% 0% 0%
20 0.00047 0% 0%
53 0.00123 0% 0% 0%
5900 0.13781 0% 0%
5900 0.13781 0%
4100 0.09577 0%
5900 0.13781 0%
42813 1.00000
Issue for
Quantity Physical
Constructi
Progress % Weight % Start Finish
Discipline
on/Purchas Weight (%)
Complete Progress
ing
on overall
progress

30% 50% 50%

100.000% 0.000 100% 100% 0.02%


0.000% 0.000 0% 0% 0.48%
0.000% 0.000 1.74%
0.000% 0.000 0% 0% 2.33%

0.000% 0.000 3.12%


0.000% 0.000 6.30%
0.000% 0.000 7.95%
0.000% 0.000 7.95%
0.000% 0.000 4.80%
0.000% 0.000 0.03%
0.000% 0.000 0.09%
0.000% 0.000 9.77%
0.000% 0.000 9.77%
0.000% 0.000 6.79%
0.000% 0.000 9.77%
1.00000 0.00023 70.93%
DOCUMENT TITLE CATEGORY

Indirect activities

Kick off Project Meeting


Site Visit/Survey
Project Progress Meeting/Design Review Meeting
Direct activities

Fire & Gas Cause & Effect Diagrams Report/Analysis


Escape Route/ Fire Fighting Equipment Layout Drawing Report/Analysis
HSE1006 Design Basis Report Report/Analysis
Fire Fighting Equipment Data Sheet Report/Analysis
Bill Of Quantity For Fire Fighting Equipment - Preliminary Report/Analysis
Escape Route / Muster Point Drawing Report/Analysis
Information / Emergency Signages Drawing Report/Analysis
Madatory Signs / Prohibitive Signs Drawing Report/Analysis
Warning Signs Drawings Report/Analysis
Fire Water Demand Calculation / Report Report/Analysis
Design Check List Report/Analysis
Safety Design Philosophy Report/Analysis
Grand Total
ABA CITY GATE

60362
Study/ Issue to Approval by
Start
Preparation Client Client

Manhour Weight 10% 20% 20% 20%


DOCUMENT NUMBER
per Discpl.
Factor

10 0.01208
20 0.02415

10 0.01208

208 0.25121 0% 0%
156 0.18841 0%
40 0.04831 0%
40 0.04831 0%
40 0.04831 0% 0%
40 0.04831 0%
40 0.04831 0%
40 0.04831 0%
60 0.07246

60 0.07246

10 0.01208

54 0.06522
828 1.00000
Issue for
Quantity Physical
Constructi
Progress % Weight % Start Finish
Discipline
on/Purchas Weight (%) on
Complete Progress
ing
overall
30% 50% 50% progress

0.000% 0.000 0% 0% 0.017%


0.000% 0.000 0% 0% 0.033%
0.000% 0.000 0.017%

0.000% 0.000% 0.345%


0.000% 0.000% 0.258%
0.000% 0.000% 0.066%
0.000% 0.000% 0.066%
0.000% 0.000% 0.066%
0.000% 0.000% 0.066%
0.000% 0.000% 0.066%
0.000% 0.000% 0.066%
0.000% 0.000% 0.099%
0.000% 0.000% 0.099%
0.000% 0.000% 0.017%
0.000% 0.000% 0.089%
0.00000 0.00000 1.372%
P

DOCUMENT TITLE CATEGORY

Indirect activities
Kick off Project Meeting
Site Visit
Site Checklist/Report
Project Progress Review Meeting
Inputs to Weekly Progress report / Schedule / MDR
Design Review Meeting
Review of Client Supplied documents
HAZOP Study
HAZID Study
Input to Final Design Dossiers & Close-out Report

Mobilize Procurement Personnel Required to Engineering


Direct activities

Project Quality Plan Report/Analysis


Input data Acceptance Report Report/Analysis
Quality Reviews Report/Analysis
Technical Audit Report Report/Analysis
QA Audit Report Report/Analysis
Grand Total
ABA CITY GATE

60362
Study/ Issue to Approval
Start
Preparation Client by Client

Manhour Weight 10% 20% 20% 20%


DOCUMENT NUMBER
per Discpl.
Factor

8 0.00826
20 0.02066
34 0.03512
32 0.03306
16 0.01653
44 0.04545
80 0.08264
48 0.04959
48 0.04959
48 0.04959
350 0.36157

20 0.02066 0% 0%
60 0.06198 0%
20 0.02066 0%
40 0.04132 0%
100 0.10331 0% 0%
968 1.00000
Issue for
Quantity Physical
Constructi
on/Purchas
Progress % Weight % Start Finish Discipline Weight
Complete Progress (%) on overall
ing
progress
30% 50% 50%

0.000% 0.000 0% 0% 0.013%


0.000% 0.000 0% 0% 0.033%
0.000% 0.000 0.056%
0.000% 0.000 0% 0% 0.053%
0.000% 0.000 0.027%
0.000% 0.000 0.073%
0.000% 0.000 0.133%
0.000% 0.000 0.080%
0.000% 0.000 0.080%
0.000% 0.000 0.080%
0.000% 0.000 0% 0% 0.580%

0.000% 0.000% 0.033%


0.000% 0.000% 0.099%
0.000% 0.000% 0.033%
0.000% 0.000% 0.066%
0.000% 0.000% 0.166%
0.00000 0.00000 1.604%