0% found this document useful (0 votes)
236 views36 pages

Yotta Chandivali Deck

Upcoming DC CHANDIVALI POWAI

Uploaded by

ppaande
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
236 views36 pages

Yotta Chandivali Deck

Upcoming DC CHANDIVALI POWAI

Uploaded by

ppaande
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 36

YOTTA CHANDIVALI

DATA CENTER PARK


(MDC PARK)
About Yotta

About Chandivali DC Park

About M1 & M2

Proposed Solution
AGENDA
Implementation Plan and Methodology

Why Yotta

Certifications & Recognitions at other DC


Locations
Our Customers
YOTTA: AN INTEGRATED DATA CENTER, CLOUD &
MANAGED IT SERVICES PROVIDER

WHO ARE WE? DATA CENTER DOMAIN


EXPERTISE & OWNERSHIP
▪ Designs, Builds and Operates large-scale Hyper Density Data Center
Parks and Edge Data Centres offering wholesale and retail colocation
HYPERSCALE AND
▪ Designs, Builds and Operates ICT and Cloud Infrastructure offering ENTERPRISE COLO
complete range of Enterprise IT Solutions including Public Cloud,
Private Cloud, Federated Cloud, IT Management, IT Security, Bulk
INNOVATIVE CLOUD
Internet Connectivity and Inter-DC metro fiber network SERVICES
▪ Extensive in-house expertise in Land Acquisition, Construction, Power
Generation & Distribution, DC Design and Engineering, Project
IT MANAGEMENT & CYBER
Management, Hyperscale deployments SECURITY SERVICES
▪ Extensive In-house expertise and eco-system Partnerships to deliver
innovative, customised and industry-specific Cloud and ICT Solutions
INTERNET & INTER CLOUD
CONNECTIVITY SERVICES
DATA CENTER FOOTPRINT

MUMBAI POWAI DC PARK


2 Buildings, 12000 Racks, 67MW
Going Live in 2025
DELHI GREATER NOIDA DC PARK
6 Buildings, 30000 Racks, 160MW
Live
MUMBAI CHANDIVALI DC PARK
2 Building, 12000 Racks, 67MW
Going Live in 2025
GUJARAT- GIFT CITY DC
1 Floor, 250+ Racks, 1.5 MW
Going Live in 2023
NAVI MUMBAI – PANVEL DC PARK
5 Buildings, 30000 Racks, 160MW
Live BANGLADESH – DHAKA DC PARK
2 Buildings, 5500 Racks, 30 MW
Going Live 2024

PUNE – DARUMBARE DC PARK CHENNAI – ORRAGADAM DC PARK


3 Buildings, 18000 Racks, 90MW 6 Buildings, 11000 Racks, 60 MW
Going Live 2025 Going Live 2024

Edge Data Centers across 56 cities (2022 – 2027) Bhubaneshwar, Chandigarh, Coimbatore, Guwahati, Indore, Jaipur,
13 Edge Data Centers in Phase I (2022 – 2024) Kochi, Lucknow, Mangalore, Nagpur, Surat, Varanasi, Vishakhapatnam
ABOUT CHANDIVALI
DC PARK
YOTTA CHANDIVALI DATA CENTRE - LOCATION

Yotta DC Park Lat/Long -19.1136, 72.8908


2 Buildings, 12000 Racks, 67 MW IT LOAD - Going Live in 2025
Google co-ordinates: https://goo.gl/maps/ThZz7cXfFX4nWxnbA
YOTTA CHANDIVALI DC PARK - PROPOSED LAYOUT
KEY HIGHLIGHTS OF THE CAMPUS

LAND
OWNERSHIP Self-owned DESIGN PUE < 1.5 LAND AREA 4 Acres
STATUS

100 MW IT POWER 67 MW BUILT UP AREA 0.6 Mn sq.


TOTAL POWER
ft.

POWER NO. OF 2
FIBER FEASIBILITY Feasible Secured
PERMITTING / BUILDINGS
STATUS
FEASIBILITY STATUS

RACKS 12,000
NO. OF FIBER ESTIMATED End
4
PATHS GO-LIVE DATE 2025
TVRA Moderate
CONTRACTING Rating
FIBER OPERATORS COLO+
8+ OPTIONS IN 8
IN CAMPUS BTS
THE CAMPUS
DEDICATED ADMIN BLDG
SERVICES TYPES COLO+BTS
IN THE CAMPUS +Cloud
DEDICATED DG BLDG
YOTTA CHANDIVALI DC PARK – BUILDINGS M1 & M2

Parameters Details for Each bldg

1. Built up Area 3 lac sq. ft.

2. No. of floors G+8

3. Racks 6,000

4. IT Power 33.5 MW

5. Total Power 50 MW

6. Design PUE <1.5

7. Load Bearing 1500 Kg/sqm; I.F 1.5

Conceptual View of the DC building


FLOOR PLANS
YOTTA CHANDIVALI DC PARK – BUILDING GROUND FLOOR LAYOUT
YOTTA CHANDIVALI DC PARK – HYPERSCALE FLOOR LAYOUT
YOTTA CHANDIVALI DC PARK – ENTERPRISE FLOOR LAYOUT
POWER SUPPLY
UTILITY POWER SUPPLY – POWER FEASIBILITY LETTER
UTILITY POWER SUPPLY – from 2 upstream sub-stations

• 1 km from
Saki RSS

• 2.9 km from
Sahar RSS
PROPOSED HT POWER DISTRIBUTION
POWER BACK UP

• DG Fuel Tank Tank - 48 Hours Back


Up at full load capacity

• Re-Fueling Contract with HSD


providers with agreed SLAs

• N+N UPS redundancy with Li-ion


battery backup of 10 minutes at full
load capacity
NETWORK &
CONNECTIVITY
PROPOSED 4 PATH FIBRE CONNECTIVITY AT CHANDIVALI
MMRs AND FIBER DUCTS – N+N Redundancy

MMR

FIBER DUCT

FIBER DUCT

MMR
21
PROPOSED REDUNDANT FIBRE CONNECTIVITY AT CHANDIVALI

Carrier Neutral DC TELECOM OPERATORS

4 paths from DC to
Main Highways

All Major Telcos

Redundant Fiber
Riser Conduits

Redundant
MM Rooms

Yotta Fiber to
other DCs & LSs* INTERNET EXCHANGES

10G / 100G options

ISP & NLD Services

Connectivity to
Hyperscalers
STANDOUT
FEATURES
OPERATIONAL FEATURES

Water leak detection Rodent repellent Fire Alarm System

Remote Hand & Smart Rack level Power


Fire Fighting
Hand Support Consumption report

2 Hour Fire Rating Carrier Neutral


PROPOSED 15-LAYER PHYSICAL SECURITY

6. All incoming vehicles scanned. Driver


1. Campus Main Entrance 11. Frisking at Server Hall Floors
along with the Vehicle Registration details
are photographed

2. Yotta Data Center Park Entrance 7. Explosive & Narcotics Detection 12. Server Key Access Management

13. Automated Mantrap to enter the


3. Yotta Data Center Gate 8. Baggage Scanning & Manual Frisking server hall floor

4. Barbed fenced walls with more than 14. Biometric authentication to enter the
9. Access controlled visitor pass is issued from
500 Surveillance Cameras which are reception server hall
manually and AI Monitored

5. Dedicated vehicle holding with 10. Turnstile barriers to exit the lobby
boom barrier restricts access 15. Cage and Rack Authentication as
required
PROPOSED 15-LAYER PHYSICAL SECURITY
PROPOSED MATERIAL HANDLING AT YOTTA CHANDIVALI DC PARK

Dedicated & environment friendly cargo handling RFID Tagging


area for customer material movement

Scissor Lifts & Cargo Lifts No tilt in customers’ material movement


PROPOSED NOC & BMS

➢ Monitored and Managed 24x7 ➢ State of the art & feature rich BMS
Monitors round the clock
➢ Helpdesk for monitoring of auto alerts and
ticket management ➢ Monitors all parameters such
as Temperature, Relative Humidity,
➢ NOC - SOC Integration Power Consumption. Transformers,
➢ Automated intrusion detection Diesel Generator Sets, Fuel Storage,
High Tension Panels, Cooling
➢ Technical domain expertise and experience systems monitoring available.
PROPOSED ADMIN BUILDING FACILITIES

SEATING AREA CAFETARIA


IMPLEMENTATION
PLAN &
METHODOLOGY
PROJECT MANAGEMENT METHODOLOGY

Our Project Management methodology is a comprehensive Project delivery approach which is consistently followed to manage the
projects in an effective and efficient manner.

Each Project is handled by a dedicated Project Manager who acts as the Single Point of Contact (SPOC) for customer during the
implementation phase for any issues as well as for availing new services.

Our typical Project Management methodology involves following steps:

PROCUREMENT
PROJECT
PROJECT PROJECT & PROJECT
DESIGN PHASE COMPLETION &
INITIATION PLANNING MOBILIZATION DELIVERY
HANDOVER
PHASE

31
WHY YOTTA

Own Land
Power Distribution to cater to DC park Capacity Design
IV Tier 3 with 99.982% Uptime
Dedicated Building, Floor, SHs, Cage
4 Redundant Fiber Path
15 Layers of Security
Secure Key Management System
Explosives and Narcotics Detection
RFID based Asset Tracking and Configuration Management Database (CMDB) access to the customer
Real Time 24x7 access of the Facility BMS system and the CCTV monitoring system to the customer

33
YOTTA CERTIFICATIONS & RECOGNITIONS – Global and Site Specific

Best DC Operations
*In progress Team By

ISO 22301 : 2019


ISO CERTIFICATIONS

ISO/IEC 27017:2015
ISO/IEC 27018: 2019
PII 732157

ISO 9001:2015
FS 731404 Excellence In Datacenter
Asia Pacific Awards 2021 By
ITMS 732160
ISO/IEC 20000-1:2018
PCI DSS
AIS 732033

ISO/IEC 27001:2013
IS 730449

EMS RBI – RBI – Data


Data Center Architecture
ISO 14001:2015
Innovation In Scalable Banking
Cybersecurity Localisation Award 2020 By Infrastructure Award 2020 By

OHS Framework Framework


ISO 45001: 2018

ISO 23001: 2019


YOTTA’s TECHNOLOGY PARTNERS
FEW OF YOTTA’s KEY CUSTOMERS

ONE OF THE LARGEST ONE OF THE LARGEST


HYPERSCALER CUSTOMERS SOCIAL MEDIA COMPANY
HYPERSCALERS IN THE WORLD
36
THANK YOU

022-68689000 [email protected] www.yotta.com