Intake
Intake
1668.75 0 0 0 0
1669 11504 5752 1438 1438 30.00
1670 16485 13994.5 13994.5 15432.5 39.00
1671 27297 21891 21891 37323.5 48.00
1672 34898 31097.5 31097.5 68421 55.00
1673 42886 38892 38892 107313
1674 52471 47678.5 47678.5 154991.5
1675 62526 57498.5 57498.5 212490 99.00
1676 203949 133237.5 133237.5 345727.5
1677 239823 221886 221886 567613.5 131.00
1678 271900 255861.5 255861.5 823475
1679 628047 449973.5 449973.5 1273448.5
1680 722540 675293.5 675293.5 1948742 181.00
1681 792400 757470 757470 2706212
1682 873261 832830.5 832830.5 3539042.5
1683 953195 913228 913228 4452270.5
1684 1035248 994221.5 994221.5 5446492
1685 1135437 1085342.5 1085342.5 6531834.5 263.00
1686 1236940 1186188.5 1186188.5 7718023
1687 1330399 1283669.5 1283669.5 9001692.5
1688 1423515 1376957 1376957 10378649.5
1689 1528521 1476018 1476018 11854667.5
1690 1660299 1594410 1594410 13449077.5 360.00
1691 1780825 1720562 1720562 15169639.5 380.00
1692 1897205 1839015 1839015 17008654.5 400.00
Max Q 84.498028
Project Name Outlet structure Fixed Trash rack
parameter description Evacuation EVACUTION
Q Discharge, m3/s 5.200 14.08
height 2.9 5
width 2.5 2.3
Ag gross area 7.25 11.50
An net opening area
opening width, m 0.1 0.10
girder spacing, m 0.1 0.10
girder box thickness, m 0.006 0.006
opening height, m 0.094 0.094
area of 1 opening, m2 0.0094 0.00940
bar thickness, m 0.006 0.006
c/c spacing, m 0.106 0.11
# of horizontal members 29.00 50.00
# of openings in one member 23.58 21.70
total # of openings 683.96 1084.91
An 6.43 10.20
50 % clogging 50.00 50.00
% net opening 0.50 0.50
An An, after clogging 3.2146 5.10
R An/Ag 0.44 0.44
kt rack loss coefficient=1.45-0.45R-R 2 1.05 1.05
V v, computed on net area, after clogging 1.62 2.76
V v, computed on gross area, m2 0.72 1.22
hf Head loss, using net area, m 0.14 0.41
hf Head loss, using gross area, m 0.0276 0.08
velocity through net area of the trash rack is limited to 0.75 m/s
net area after 50% cloging= Qmax/0.75
net area
area of 1 opening
no of horizontal members
no of openings in one member
total no of openings
net area
50 % clogging
1680.00
1678.65 no of openinig for four sideded 4259.26
1.35 trash rack
1679.65
0.012
0.003
1681.5 0.084
-1.85 0.096
-0.184999999999991
Indian Standard IS 11388 : 2012
18.7769
28.1654
0.00706
55.5556
25.5556
1419.75
10.0178
5.00889
2.81154
x2 y2
1
D2 0.33D 2
Where, D is the vertical height of the conduit for defining the top and
D 1.4
X 0 0.25 0.5 0.75 1
x^2/D^2 0.000 0.03189 0.12755 0.28699 0.5102
1-(x^2/D^2) 1 0.96811 0.87245 0.71301 0.4898
Y^2=(1-(x^2/D^2))*(0.33D)^2 0.21344 0.20664 0.18622 0.15219 0.10454
Y 0.46 0.45457 0.43153 0.39011 0.32333
0.90
0.80
0.70
0.60
0.50
0.40
0.30
0 0.5 1 1.5
0.64667
1.4
2.04667
it for defining the top and bottom curves and the horizontal width of the conduit for defining the side curves.
1.5 2 2.5
Hydraulic Computation for Pipe Intake
Entrance loss
Transition loss
contraction loss coefficient, Kc
0.500
upsteam area a1 3.288
downstream diamter, D 1.400
downstream area, a2 1.539
average area 2.414
flow velocity 5.334
transition headloss 0.725
n 0.012
A (average) 2.414
P1 8.187
P2 4.398
Pav. 6.292
R 0.384
L 1.300
Kf 0.013
velocity of flow 5.334
friction headloss 0.019
n 0.012
A 1.539
P1 4.398
R 0.350
L 160.000
Kf 2.718
flow velocity through waterway 8.364
friction headloss in pipe line 9.692
Input Data
Diameter D3 1.4
Area A3 1.539
50% clogging
s.no Element
1 2
1 Entrance
m 2 Transition
3 Pipe Loss
m Qmax 12.88
Qmin 5.17
HT min 2.500
3 4 5 6 7 8
3.29 0.22 trash rack loss Kt 1.054 0.231
3.29 0.22 entrance loss Ke 0.180 0.039
2.41 0.41 contraction Kc 0.500 0.203
2.41 0.41 friction loss kf 0.013 0.005
1.54 1.00 friction Kf 2.718 2.718
KL 4.35
Max Flood
Level
m3/s
m3/s
Min Flood
Level
MWL= 1699.99 masl
NWL= 1697.00 masl
DSL= 1686.00 masl
RBL= 1679 masl
H= 18 m
D= 2.7 m
c= 0.9
g= 9.81 m/s2
k= 0.05
Average Change in
Elevation Elevation Area Average Area Par.Volume Tot.Volume Volume
1706 58,402,374.00 0
1705 1705.5 54,222,814.50 4,179,559.50
1704 1704.5 50,289,017.50 3,933,797.00
1703 1703.5 46,563,015.00 3,726,002.50
1702 1702.5 43,011,012.00 3,552,003.00
1701 1701.5 39,660,327.00 3,350,685.00
MWL 1700 1700.5 36,509,255.50 3,151,071.50
1699 1699.5 33,542,939.00 2,966,316.50
1698 1698.5 30,751,855.50 2,791,083.50
NWL 1697 1697.5 28,103,391.00 2,648,464.50
1696 1696.5 25,604,565.00 2,498,826.00
1695 1695.5 23,249,878.50 2,354,686.50
1694 1694.5 21,038,166.00 2,211,712.50
1693 1693.5 18,964,579.00 2,073,587.00
1692 1692.5 17,008,654.50 1,955,924.50
1691 1691.5 15,169,639.50 1,839,015.00
1690 1690.5 13,449,077.50 1,720,562.00
1689 1689.5 11,854,667.50 1,594,410.00
1688 1688.5 10,378,649.50 1,476,018.00
1687 1687.5 9,001,692.50 1,376,957.00
1686 1686.5 7,718,023.00 1,283,669.50
1685 1685.5 6,531,834.50 1,186,188.50
1684 1684.5 5,446,492.00 1,085,342.50
1683 1683.5 4,452,270.50 994,221.50
1682 1682.5 3,539,042.50 913,228.00
1681 1681.5 2,706,212.00 832,830.50
DSL 1680 1680.5 1,948,742.00 757,470.00
1679 1679.5 1,273,448.50 675,293.50
1678 1678.5 823,475.00 449,973.50
1677 1677.5 567,613.50 255,861.50
1676 1676.5 345,727.50 221,886.00
1675 1675.5 212,490.00 133,237.50
1674 1674.5 154,991.50 57,498.50
1673 1673.5 107,313.00 47,678.50
1672 1672.5 68,421.00 38,892.00
1671 1671.5 37,323.50 31,097.50
1670 1670.5 15,432.50 21,891.00
1669 1669.5 1,438.00 13,994.50
Evacuation Time in Day=
4.25718104
n= 0.012 0.000144
L= 160
r= 0.25
r^4/3 0.157490131
a= 1.53938040026
KL= 4.35
Repeated
Outflow
Capacity
Height Q(m^3/s)
Crest Water Velocity Q=CA√(2*g
length Depth V=Q/A *H) Time in Day
0 0.00 0.00 0.00
18.15 9.05 13.93 3.47
17.15 8.80 13.54 3.36
16.15 8.54 13.14 3.28
15.15 8.27 12.73 3.23
14.15 7.99 12.30 3.15
13.15 7.70 11.86 3.08
12.15 7.41 11.40 3.01
11.15 7.09 10.92 2.96
10.15 6.77 10.42 2.94 2,810.34
9.15 6.43 9.89 2.92
8.15 6.06 9.34 2.92
7.15 5.68 8.74 2.93
6.15 5.27 8.11 2.96
5.15 4.82 7.42 3.05
4.15 4.33 6.66 3.19
3.15 3.77 5.80 3.43
2.15 3.11 4.80 3.85
1.15 2.28 3.51 4.87
0.15 0.82 1.27 12.58 45.65
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00 270.62
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
0 0.00 0.00
42.71 days
Sediment load after twenty Sediment load after fifty
S. No. Items five years years
1 Sediment load (MCM) after T 3.773 7.547
2 Dead Storage level 1680.4 1684.100
3 New Zero elevation 1676 1682.000
C 0.62
L 2.7
W 2.3
Q 54.333266105451
Woyebo Dam project
Q = CAÖ2gh
Assume gate opening of D, m diameter and “C” value 0.9
A=(pd2)/4 L W K= 0.85
D 2.7 2.2 1.997663
578.50 2.4963
578.00 2.2122 0.2840 578.25 4.55 4.43 0.50 0.046416 5.904
577.50 1.9330 0.2792 577.75 4.05 4.43 0.50 0.046416 5.904
577.00 1.6763 0.2567 577.25 3.55 4.43 0.50 0.046416 5.904
576.50 1.4545 0.2218 576.75 3.05 4.43 0.50 0.046416 5.904
576.00 1.2637 0.1908 576.25 2.55 4.43 0.50 0.046416 5.904
575.50 1.0956 0.1681 575.75 2.05 4.43 0.50 0.046416 5.904
575.00 0.9427 0.1529 575.25 1.55 4.43 0.50 0.046416 5.904
574.50 0.8014 0.1413 574.75 1.05 4.43 0.50 0.046416 5.904
574.00 0.6713 0.1301 574.25 0.55 4.43 0.50 0.046416 5.904
573.50 0.5559 0.1155 573.75 0.05
((DS/Q)/
3600*24))
calculated (days)
Discharge (m3/s)
28,103,391.00 28.103
14.08 2.05 25,604,565.00 25.605
13.29 2.05 23,249,878.50 23.250
12.45 2.06 21,038,166.00 21.038
11.55 2.08 18,964,579.00 18.965
10.57 2.14 17,008,654.50 17.009
9.48 2.24 15,169,639.50 15.170
8.26 2.41 13,449,077.50 13.449
6.83 2.70 11,854,667.50 11.855
4.99 3.42 10,378,649.50 10.379
1.80 8.84 9,001,692.50 9.002
0.00 7,718,023.00 7.718
30.00
m
small dam pp426
degree formula in feet from small dam
small dam pp 426
((DS/Q)/
Discharge
3600*24))
Q (days)
0.463 7.10
0.44 7.37 Formula in meter
0.412 7.20 FRL
0.38 6.67
0.35 6.22
0.32 6.04
0.29 6.19
0.24 6.70
0.19 7.77
DS
46.79
Basin Design
since the discharge is less than 11 m3/s and the velocity is less than 15m/s the selected type of stilling basin is the
Impact type stilling basin. Design of small dams p.463
To determine the basin width
parameter
flow area
through
the pipe 1.53938 m2 54.36 ft2
d Sqrt(A) 1.240718 m 7.3731068541079 ft
F V/sqrt(g*d) 1.841945 3.71357761129268
For the above value of froude number the w/d ratio from figure 6-10 is 4 ft
other basin dimensions are standardized in relation to the basin width
w/d 4
ft mm 20% added from
the value basin
width read from
the figure for
w 14.85431 4527.593824 better efficiency design of small canals p.309
H 3W/4 11.14073 3395.695368
L 4w/3 19.80575 6036.791765
a W/2 7.427155 2263.796912
b 3W/8 5.570366 1697.847684
c W/2 7.427155 2263.796912
d W/6 2.475718 754.5989706
e W/12 1.237859 377.2994853
t W/12 1.237859 377.2994853
sugested
minimum
riprap stone
size diameter W/20 0.742716 226.3796912
121.92
basin is the
Project: WEYBO
Hydraulic calulation of conduit for Diversion
1)Design Data Unit
Requried Discharge, Qr m3/s 30.50
Reservior waterlevel m 1683.40
D/S waterlevel m 1679.40
Mannig's roughness, n 0.014
length of conduit, L m 160.00
sprinkler
TOTAL AREA(ha) 2057.4 demand(l/s)
row crops(60%) 1234.44 1264.4
vegetables(30%) 617.22 632.2
fruit crops(10%) 205.74 210
2106.6 2.1m^3/s
surface
TOTAL AREA (ha) 1248
Duty (main canal)l/s/ha 1.79
Demand(l/s) 2233.92
supply 5.208
evacuation 9.9
diversion 30