CA Certificate
CA Certificate
Information as on____________________
Certification work Assigned vide letter No.--------------------------- Dated :-
Subject: Certificate of amount incurred on [Project Name ] for Construction of __________Tower/Block/Building(s) _____ situ
No.__________, demarcated by its boundaries (latitude and longitude of the end-points) to the North, to the South, to the Ea
______, Tehsil Competent Authority/Development Authority, District _______ , PIN _____________, admeasuring sq. mete
____[Promoter] having RERA Registration No.-------------- , Designated A/C No.---------------Bank Name-------
S.No. Particulars
1 2
1 Land Cost
(a) Acquisition cost of land (purchase or through agreement with land owner) and legal costs on land
transaction;
(b) Amount payable to obtain development rights, additional FAR and any other incentive under Local
Authority or State Government or any Statutory Authority, if any;
(c) Acquisition cost of TDR (Transfer of Development Rights), if any;
(d) Amounts payable to State Government or competent authority or any other statutory authority of
the State or Central Government towards stamp duty, transfer charges, registration fees etc. (if not
included in para (a) above);
(e) Interest (Other than Penal Interest , Penalties etc) paid to FI , Scheduled Banks , NBFC and
"Unsecured Loan at State Bank of India - Marginal cost of Fund based lending Rate (SBI -MCLR)" on
money borrowed for purchase of land and also to ,Competent Authority.
S.No. Particulars
1 2
2 Project Clearance Fees
(a) Fees paid to RERA
(b) Fees paid to Local Authority
(c) Consultant/Architect Fees (directly attributable to project)
(d) Any other (specify)
Sub Total of Construction Cost (in Rs.) (sum of (a) to (d) of Row 3a )
5 Percentage completion of Construction Work completed (as per Project Engineer, Architect’s
Certificate)
6 Percentage completion of Total project (Proportionate cost incurred on the project to the total
estimated cost) ( Col.4 of row 4 / Col.3 of row 4 )%
7 Total amount received from allottees till date since Inception of the Project (in Rs.)
9 Cummulative Amount that can be withdrawn from Designated a/c, i.e. (Total
Estimated Cost * Proportionate Cost Incurred on the Project)
(Column 3 of Row 4 * row 6 )
10 Amount actually withdrawn till date since inception of the project ( This shall include 70% of the
amounts already realised till date but not deposited in the designated Account )
This certificate is being issued on specific request of M/s ………………… (Name of the Promoter) for UP RERA compliance. The c
information and records produced before us/me and is true to the best of our/my knowledge and belief.
0 0
Amount incurred
Total Cost Estimated (actual out-flow) till
now
3 4
0 0
0 0
0 0
0
0