0% found this document useful (0 votes)
32 views3 pages

Risk Assessment For Top 5 High Risk Works

Uploaded by

neula
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views3 pages

Risk Assessment For Top 5 High Risk Works

Uploaded by

neula
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Doc No: 01/HSE/TWWHA

Patimban Port Development Project (II)


Package 5: Car Terminal Construction
TWWHA-P5-Safety Plan
RISK ASSESSMENT DATE ISSUED: 10/07/2024
Job Description: Critical Works M/E LAST REVIEWED DATE:
Area/Unit: Patimban Package 5: Car Terminal Construction REVIEWED BY:
Tag No/Equipment Description: SIGNATURE OF SUPERVISOR.
6 RESPONSIBLE PERSON:
PPE Required to do this Job: Minimum PPE standard, Ear Plug, Dust Mask, Life Jacket, Full Body Harness Page:

(Physical, Chemical, Risk Level before Mitigate (H,S,M,L) Control Statement Risk Level after Mitigate
JOB STEP Biological, Potential Event
Psychological, L S R E L S R E
Job Description: Critical Works M/E
1. Lifting or Laying Material - Ensure crane capacity is suitable for the lifting of the material
(Using Crane & TMC) - Ensure the length of the boom is suitable with working distance and radius of
Material and
Crane collapses 3 5 15 High Risk the material’s location. 1 4 4 Medium Risk
Equipment Damage
- Preparing Lifting Plan
- Ensure that Operator and rigger has a valid license (Kemnaker)

- Ensure wire slings, shackles and crane are in good condition before use
Workers are hit by objects - Ensure wire slings, shackles and crane meets lifting capacity.
Sling disconnected lifted/head 3 5 15 High Risk - Ensure no one gets close to the working radius of the crane during lifting. 1 5 5 Medium Risk
Injury/scratches/fracture - Barricade the working area
- use Tagline instead of hands for directing the load

- Make sure shackle is attached and locked properly.


- Ensure crane’s rotation is safe and slow when lifting.
- Make sure shackle SWL is above than material load.
Shackle hit workers/injury 3 5 15 High Risk 2 3 6 Medium Risk
- Make sure shackle is inspected by competent person.
- Barricade the working area
- Use Tagline instead of hands for directing the load

- Make sure crane capacity is suitable for the lifting of the test material.
- Make sure the length of the boom is suitable with the working distance and
radius of the material’s location.
- Ensure no one gets close to the working radius of the crane during lifting.
Workers pinched by
material failing 3 5 15 High Risk - Rigger must be in the safe working distance. 1 5 5 Medium Risk
material/injury/fracture
- Ensure workers keep safe working distance.
- material lashing should be fastened properly
- Barricade the working area
- Use Tagline instead of hands for directing the load

2. Installation Equipment
(Using electrical tools) - Ensure the tools used have been inspected, evidenced by sticker
- Ensure the tool is checked properly before use
- The power cable has been carefully checked, nothing is chipped
- Turn off the machine when the work is finished /after use
- Ensure cable must be elevated and secured on insulated S-hooks so cable are
Electrical power Electric shocked 3 5 15 High Risk 2 2 4 Medium Risk
caught in the water
- Ensure workers understand the correct way to use handtools
- Ensure distribution panel supplying power to the tools must be equipped with
an ELCB and must be grounded
- Use appropriate PPE
(Physical, Chemical, Risk Level before Mitigate (H,S,M,L) Control Statement Risk Level after Mitigate
JOB STEP Biological, Potential Event
Psychological, L S R E L S R E
- Ensure job rotation have been implementation
- Give a momentary pause while work is in progress.
4 2 8 Medium Risk - Provide sign / safety campaign 1 2 2 Low Risk
- Ensure worker are appropriate PPE (Earplug or earmuff)
Exposure of noise Hearing loss

- Inspect tools for any damage prior to each use. Check the handle & body
casing of the tools for cracks/another.
- Do not use drill or grinder above shoulder height or below knee level or in-
between legs. Never use an angle drill overhead.
- Drill Operator shall not wear loose clothing or jewelry. Ensure Long hair tied
back as appropriate for entanglement hazards control
-The RPM rating of the abrasive wheel/disc must not be lower than that of the
- Drill or Grinder can
machine
Motion (Drill, cutting disintegrate
3 5 15 High Risk - Ensure Portable Grinding and drill machine are fixed with guard, dead-man 2 3 6 Medium Risk
wheel, and grinder) - Injury
switch, cutting/grinding disc in good condition, handles as supplied by
- Activity stopped
manufacturer and never modify in any case
- Do not attempt to make an excessive depth of cut. Overstressing.The disc
increases the loading & susceptibility to twisting/binding of the disc in the cut &
the possibility of kickback or breakage.
- Make sure worker use correct PPE before work like gloves, safety goggles,
mask -, facshield, earplug.

3. Power Shutdown Lack of safety


awareness & - Socialization scope of work, hazard and mitigation in the briefing (TBM)
inadequate - Injury - Make sure workers understand scope of work
communication - Asset damage 3 5 15 High Risk -.Make sure all crew be present tool box meeting 1 4 4 Medium Risk
between work groups - Activity stop - Ensure workers are in a fit condition
- Trained and competent personnel only assigned for the work

- Ensure all permit to work was approved


- LOTOTO procedure must be followed, verify and confirm zero energy
- Provide hard baricade and restricted entry signage in a energize area
- All Procedure or flowchart shutdown and responsibility person must be posted
-Injury/LTI/Fatality
on workplace
Electrical power -Activity stop 4 5 20 High Risk
- Supervisor should be provide to ensure safe practices are followed
1 4 4 Medium Risk
-Asset damage
- Socialization Emergency number and posted on workplace
- Ensure access and egress free from obstruct object
- Strictly NO SMOKING
- Correct type of fire extinguisher to be provided as required

4. Working at Heigh
( Using boomlift, Ladder or - Ensure all permit to work was approved
Scaffolding) - Scaffolder must be certified. and hae been inspected (green tag). Ensure
stable ground for the installation of scaffoldings or ladder.
- Ensure load on ladder and scaffolding are secure & evenly distributed. Do not
Scaffolding or ladder - Injury / LTI exceed manufacturer’s rated capacity.
- Activity Stop 2 4 8 Medium Risk 1 3 3 Low Risk
collapse - Property Damage
- Top 2 rungs not allowed to be used
- Makesure 2 workers hold a ladder for buddy system
- Ladder shall be not travelled when in working positions with personnel in the
working platform
- Ensure 100% tie off always while working at height.
4. Working at Heigh
( Using boomlift, Ladder or
Scaffolding)

(Physical, Chemical, Risk Level before Mitigate (H,S,M,L) Control Statement Risk Level after Mitigate
JOB STEP Biological, Potential Event
Psychological, L S R E L S R E

- Boomlift have been inspected (colour coded & License Complete)


- Ensure operator competent and have a valid Licence
- Ensure load on Boomlift are secure & evenlydistributed. Do not exceed
Boomlift tipping or - Injury / LTI
manufacturer’s rated capacity.
Mechanical failure and - Activity Stop 3 4 12 Medium Risk 1 3 3 Low Risk
- Person shall enter and exit the working platform only when it is lowered to
oil leak - Property Damage
ground level or designated access point (Scaffolding, access egress, etc)
- Mandatory to check the Boomlift everyday before use
- Ensure 100% tie off always while working at height

5. Confined Space Entry


- Ensure all permit to work was approved
- Follow the Confined Space Entry safe work practice standard instructions
Lack of hazard - Review and implement controls of Gas detector
- Place barricades and signs to restrict access to work site
awareness of the
-Injury/LTI/Fatality 4 5 20 High Risk - Identify evacuation routes and access in out 2 2 4 Medium Risk
specific confined - Provide adequate ventilation (Using Blower)
space area - Ensure valid license for confined space certificate issued by Kemnaker
- Ensure AGT certificate is valid
- Emergency rescue plan

Likelihood (capability of frequency and avoidance): 1 = Rare; 2 = Remote; 3 = Occassional; 4 = Frequent; 5 = Almost Certain
Risk Assessment : Severity (severity of result, seriousness of accident): 1 = Negligible; 2 = Minor; 3 = Moderate; 4 = Major; 5 = Catastrophic
Risk Level = Likelihood × Severity = 1~25

Judgement of Risk Level:


1~3 = Low Risk, no additional risk control measures may be needed but conduct frequent review to ensure the accuracy of the risk level over time
4~12 = Medium Risk, carry out careful evaluation of the hazards to ensure the risk level is reduced as los as is practicable within a defined time period
15~25 = High Risk, not acceptable and must be reduced to at least medium risk before work commences; eliminate hazard before work commences if needed