0% found this document useful (0 votes)
15 views

VIP Report of Foundation Design

Uploaded by

Salman Moghul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
15 views

VIP Report of Foundation Design

Uploaded by

Salman Moghul
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 17

VIP Submission Report of Foundation Design

YJK Building Software

2024.08
YJK Building Software

7.1.2 Foundation beam .......................................................................................................................... 9


7.1.3 Raft ......................................................................................................................................................9
Content 7.1.4 Masonry strip foundation .......................................................................................................10
7.2 Checking Calculation of Vertical Bearing Capacity of Pile Foundation ............................ 10
Chapter 1 Design Basis ..............................................................................................................................................3 7.2.1 Cap pile ........................................................................................................................................... 10
Chapter 2 Computing Software Information ................................................................................................... 3 7.2.2 Raft pile .......................................................................................................................................... 10
Chapter 3 Design Parameters .................................................................................................................................3 7.2.3 Pile under beams ........................................................................................................................10
3.1 General Parameters ...................................................................................................................................3 7.3 Checking Calculation of Uplift Bearing Capacity of Pile (Anchor) ......................................10
3.2 Calculation parameters of foundation bearing capacity ........................................................... 3 7.3.1 Pile .................................................................................................................................................... 10
3.3 Settlement calculation parameters .................................................................................................... 3 7.3.2 Anchor .............................................................................................................................................10
3.4 Calculation Parameters of Elastic Foundation Beam & Pile Raft ...........................................3 7.4 Checking Calculation of Horizontal Bearing Capacity of Pile Foundation ...................... 10
3.5 Water buoyancy, civil air defense load ..............................................................................................4 7.5 Checking calculation of pile section bearing capacity ............................................................. 10
3.6 Advanced Parameters ...............................................................................................................................4 Chapter 8 Foundation Design .............................................................................................................................. 10
Chapter 4 Load, Load Combination ..................................................................................................................... 5 8.1 Punching Checking Calculation......................................................................................................... 10
4.1 Load ..................................................................................................................................................................5 8.1.1 Single foundation ....................................................................................................................... 10
4.1.1 Upper load ....................................................................................................................................... 5 8.1.2 Pile cap ............................................................................................................................................10
4.1.2 Additional load ...............................................................................................................................6 8.1.3 Raft ................................................................................................................................................... 10
4.1.3 Plate load ..........................................................................................................................................6 8.1.4 Waterproof board ...................................................................................................................... 11
4.1.4 Overburden weight ...................................................................................................................... 6 8.2 Shear checking calculation .................................................................................................................. 11
4.1.5 Foundation self weight ............................................................................................................... 6 8.2.1 Single Foundation ...................................................................................................................... 11
4.1.6 Tie beam load ................................................................................................................................. 6 8.2.2 Pile cap ............................................................................................................................................11
4.1.7 Total Axial Load Statistics ......................................................................................................... 6 8.2.3 Flange plate of inverted T-shaped foundation beam ..................................................11
4.2 Load combination ...................................................................................................................................... 7 8.2.4 Masonry strip base flange plate ...........................................................................................11
4.2.1 Quasi-permanent combination ...............................................................................................7 8.2.5 Tie beam .........................................................................................................................................11
4.2.2 Nominal combination ................................................................................................................. 7 8.3 Checking calculation of local pressure ........................................................................................... 12
4.2.3 Fundamental combination ........................................................................................................7 8.3.1 Single Foundation ...................................................................................................................... 12
Chapter 5 Materials, Material Consumption ....................................................................................................8 8.3.2 Pile cap ............................................................................................................................................12
5.1 Material Sheet ..............................................................................................................................................8 8.3.3 Foundation beam ....................................................................................................................... 12
5.2 Design Value of Reinforcement Strength ......................................................................................... 8 8.3.4 Raft ................................................................................................................................................... 12
5.3 Number of Components and Concrete Amount ............................................................................8 8.4 Reinforcement design............................................................................................................................13
Chapter 6 Geological Data ........................................................................................................................................9 8.4.1 Single Foundation ...................................................................................................................... 13
6.1 Distribution map of geological exploration holes ........................................................................9 8.4.2 Pile cap ............................................................................................................................................13
6.2 Standard borehole information ........................................................................................................... 9 8.4.3 Foundation beam ....................................................................................................................... 13
6.3 Actual borehole information ................................................................................................................. 9 8.4.4 Raft ................................................................................................................................................... 13
Chapter 7 Checking Calculation of Bearing Capacity of Foundation and Pile Foundation .......... 9 8.4.5 Waterproof board ...................................................................................................................... 14
7.1 Checking calculation of foundation bearing capacity .................................................................9 8.4.6 Masonry strip foundation .......................................................................................................14
7.1.1 Single foundation .......................................................................................................................... 9 8.4.7 Tie beam .........................................................................................................................................15

i
YJK Building Software

8.4.8 Pile ....................................................................................................................................................15


8.5 Raft center of gravity check .................................................................................................................15
8.6 Checking calculation of anti-floating stability .............................................................................15
Chapter 9 Settlement Calculation...................................................................................................................... 16
9.1 Settlement of natural foundation ..................................................................................................... 16
9.2 Settlement of pile foundation .............................................................................................................16
9.3 Settlement of solid deep foundation ............................................................................................... 16

ii
YJK Building Software

γ(kN/m3)

Chapter 1 Design Basis Weighted average weight of soil above the foundation γ
m(kN/m3)
20.0

Foundation embedding depth (m) 1.2


The project is designed in accordance with the following specifications and procedures:
1、ASCE/SEI 7-10-Minimum Design Loads for Buildings and Other Structures
2、ACI 318-14-Building Code Requirements for Structural Concrete and Commentary 3.3 Settlement calculation parameters
3、NAVFAC Design Manual 7.2
Whether to calculate iteratively No iteration

Chapter 2 Computing Software Information


Horizontal influence range considering adjacent loads(m) 20.0
Empirical coefficient of settlement calculation
(input 1.0 to take the empirical coefficient of specification, 1.00
The calculation software of this project is YJK-F foundation design software v6.1.0. otherwise take the input value directly)
Consider the horizontal influence range of adjacent
0.60
Chapter 3 Design Parameters foundation piles (times the pile length)
Empirical coefficient of settlement calculation by Mindrin
1.00
method

3.1 General Parameters Calculation method of pile cap settlement


Equivalent action layered summation
method
Whether to consider rebound recompression Not consider
Structural importance coefficient 1.00
Pile End Resistance Ratio α in Mindelin Stress Formula Each pile is calculated separately
Thickness of covering soil above foundation bottom(m) 0.8
Ratio β of uniformly distributed side resistance to total side
Soil cover weight(kN/m3) 20.0 1.00
resistance
Bending moment ratio of tie beam 0.00
Anti-floating Engineering Design Grade Class B
Safety factor of anti-floating stability 1.05
3.4 Calculation Parameters of Elastic Foundation Beam &
Whether adopt General Code Yes Pile Raft

3.2 Calculation parameters of foundation bearing capacity Method of calculation


Beam-slab method on elastic
foundation

Is the bearing capacity of foundation always calculated Considering the stiffness of superstructure Consider
according to the following parameters No Equivalent beam height of shear wall on raft(m) 5.0
“No”means that separately defined values take precedence Meshing Control Length(m) 1.0
Method of calculation NAVFAC Design Manual 7.2 Node Trimming Control Error(mm) 100
Design value of foundation bearing capacity Rd(kPa) 180.00 Natural Foundation/Conventional Pile
Foundation type
Weight (or floating weight) of soil below foundation bottom 20.0 Foundation

3
YJK Building Software

Automatic calculation according to Concrete unit weight(kN/m3) 25.0


Bed coefficient and pile stiffness
geological data Water unit weight(kN/m3) 9.800
Method for determining bending moment of plate element Take node average value Loading steps of nonlinear calculation 2
Boundary Moment Grinding Treatment of Plate Element in Maximum iteration times per step for nonlinear calculation 10
Yes
Variable Thickness Area
Nonlinear computational convergence error(mm) 1.000000e-003
Calculation of reinforcement by taking the average bending
No Convergence criterion for nonlinear computation Displacement control/Load control
moment in the range of 1m
The peak bending moment at the bottom of the column
considers the reduction factor of column width
0.5
3.6 Advanced Parameters
Consider the actual size of columns and
Method of Application of Column (Wall) Load
walls Raft Design
Stirrup spacing (mm) Take the lager value of 1.0 m and 0.33
200 Support reinforcement length
(applicable to foundation beam, tie beam and two pile caps) times the room span
Seismic grade of foundation beam Non-seismic Raft simulating waterproof board designed according to
No
Embedding coefficient of pile top 1.0 self-bearing

The cap pile in the waterproof board is set as a fixed support No Waterproof Board Design

Loading ratio of post-cast strip before construction 0.5 Water buoyancy (high water level) and civil air defense are
Yes
considered at the same time
Considering the combination of dead load and live load Yes
3.5 Water buoyancy, civil air defense load
Internal force integral method for calculating the influence of
No
waterproof board on single foundation
Nominal combination coefficient of water buoyancy 1.00
Whether to consider the influence of waterproof board
Fundamental combination coefficient of water buoyancy 1.35 Yes
stiffness on pile cap bending moment and shear force
Historical lowest water level/perennial stable water level(m) 0.00 Design of Foundation Beam and Masonry Strip
Historical highest water level/anti-floating design water Foundation
0.00
level(m) Overlapping area correction is considered in checking
Yes
Historical lowest water level participates in load calculation of foundation bearing capacity
No
combination Beam element method for calculating internal force
No
Checking calculation of anti-floating (the highest water level reinforcement of foundation beam of raft
No
in history participates in load combination) The bottom reinforcement area of inverted T-shaped
All combinations of waterproof board loads are transferred foundation beam is output according to web and flange Yes
to the foundation respectively
No
(only anti-floating combinations are transferred when <no> Minimum reinforcement ratio of longitudinal reinforcement
0.20%
is selected) at the bottom of flange of inverted T beam
Civil air defense level Non-civil air defense Tie Beam Design
Equivalent static load of plate(kPa) 0 Torque reduction factor 0.40

4
YJK Building Software

Pile Cap Design Deformation ratio control value 0.025


Designed as deep bending member Stress ratio control value 0.2
Design method of two pile caps with span-height ratio less Reinforcement according to Design of Pile and Anchor
than 5 'Longitudinal Reinforcement +
Check the bearing capacity of characteristic combination
Distributed Reinforcement' No
excluding wind and earthquake according to 1.0 times Ra
Isosceles and equilateral control dimensions of three pile
50 Ratio of pullout yield value to bearing capacity 4.00
caps(mm)
Importance coefficient of pile foundation γ0 1.00
Multi-column wall cap and single foundation with columns
and walls in the outline of members shall be calculated No Others
according to the code Stiffness reduction factor of solid element 0.80
Punching and Shearing Checking Calculation Additional bending moment caused by height difference is
No
Consider the unequal punching thickness in all directions No considered in finite element foundation

Shear wall punching raft considering unbalanced moment Yes Generate SAFE data files No

Critical ratio of span to thickness[λ] 0.25 When the decimal place is reserved, carry when it is greater
4
than
Limit value of width-thickness ratio of short limb wall[L/B] 8.0
Automatic combination of long limb walls for punching
No
checking calculation
Chapter 4 Load, Load Combination
Settlement Calculation
Adopt new settlement trial calculation method Yes
Maximum number of iterations 6 4.1 Load
Convergence control error(mm) 2.0
'Basic model' adopts pile-soil stiffness of 'settlement model' No 4.1.1 Upper load
Automatic calculating according to
Specified maximum soil thickness(m) 5.3.5 of foundation code and 5.5.14 of Table 4-1 Table of Total Upper Loads
pile foundation code X-direction Y-direction Moment Moment
Axial force
Automatic calculating according to Load case shear shear about X axis about Y axis
N(kN)
Specified minimum calculated depth(m) 5.3.7/5.3.8 of foundation code and Vx(kN) Vy(kN) Mx(kN.m) My(kN.m)
5.5.8/5.5.14 of pile foundation code
Dead 18236.6 -0.0 0.0 912.6 -25.3
Implement 5.3.7 of Foundation Code,
Implementation clauses of layerwise summation method Live 2391.1 -0.0 0.0 120.0 -15.1
and the deformation ratio is ≤ 0.025
WindX -0.0 505.7 0.0 14.3 887.0
Implement 5.5. 6 ~ 5.5. 13 of Pile
Implementation clauses of equivalent action method WindY 0.0 -0.0 212.0 -451.5 1.8
Foundation Code
Mindlin method adopts additional load on pile top to EX 20.4 1359.5 330.1 100.6 2344.1
No
calculate settlement EY -38.9 79.1 1615.6 -3672.2 -3.7
Mindlin method adopts accurate integration to calculate EV 0.0 0.0 0.0 0.0 0.0
Yes
settlement

5
YJK Building Software

X-direction Y-direction Moment Moment not be greater than 'Civil air defense load' in Table 4-1.
Axial force
Load case shear shear about X axis about Y axis
N(kN)
Vx(kN) Vy(kN) Mx(kN.m) My(kN.m) 4.1.4 Overburden weight
RF 0.0 0.0 0.0 0.0 0.0
Table 4-4 Table of Total Weight of Covered Soil
Note: 1. Downward axial force is positive, and the bending moment and shear force are counted in
the overall coordinate system. Axial force
Load case
2. 'Civil air defense load' refers to the civil air defense load acting on the roof and N(kN)
transmitted from vertical members to the foundation. Dead 6169.1
3. When the inverted floor method is used to calculate civil air defense, the roof civil air
defense load is considered as the fixed support.
4.1.5 Foundation self weight
4.1.2 Additional load
Table 4-5 Table of Total Foundation Self Weight

Table 4-2 Table of Total Additional Loads Axial force


Load case
N(kN)
X-direction Y-direction Moment Moment
Axial force
Load case shear shear about X axis about Y axis Dead 3904.3
N(kN)
Vx(kN) Vy(kN) Mx(kN.m) My(kN.m)
Dead 0.0 0.0 0.0 0.0 0.0 4.1.6 Tie beam load
Live 0.0 0.0 0.0 0.0 0.0
Note: Downward axial force is positive, and the bending moment and shear force are counted in Table 4-6 Table of Total Load of Tie Beam
the overall coordinate system. Axial force
Load case
N(kN)
4.1.3 Plate load Dead load (including self weight) 0.0
Live load 0.0
Table 4-3 Table of Total Plate Load
Axial force
Load case 4.1.7 Total Axial Load Statistics
N(kN)
Dead 1349.5 Table 4-7 Table of Total Axial Loads
Live 771.1 Load case Total Axial Load N(kN)
Buoyancy_low 4553.4 Dead 29659.6
Buoyancy_high 4553.4 Live 3162.2
RF 0.0 WindX -0.0
Note: 1. Downward dead load and live load are positive, while upward water buoyancy and civil WindY 0.0
air defense load are positive.
EX 20.4
2. 'Civil air defense load' refers to the static load acting on the bottom plate, which shall

6
YJK Building Software

Load case Total Axial Load N(kN) Combination


Combination
EY -38.9 number

EV 0.0 (10) StandComb 0.6Dead-0.6WindX

RF 0.0 (11) StandComb 0.6Dead-0.6WindY

Buoyancy_low 4553.4 (12) StandComb 1.0Dead+0.75Live+0.45WindX

Buoyancy_high 4553.4 (13) StandComb 1.0Dead+0.75Live+0.45WindY

Note: Downward dead load, live load, wind load, seismic load and civil air defence load are (14) StandComb 1.0Dead+0.75Live-0.45WindX
positive, while upward water buoyancy are positive. (15) StandComb 1.0Dead+0.75Live-0.45WindY
(16) StandComb 1.0Dead+0.7EX
4.2 Load combination (17) StandComb 1.0Dead+0.7EY
(18) StandComb 1.0Dead-0.7EX
4.2.1 Quasi-permanent combination (19) StandComb 1.0Dead-0.7EY
(20) StandComb 1.0Dead+0.75Live+0.52EX
Table 4-8 Quasi-permanent combination table (21) StandComb 1.0Dead+0.75Live+0.52EY
Combination (22) StandComb 1.0Dead+0.75Live-0.52EX
Combination
number
(23) StandComb 1.0Dead+0.75Live-0.52EY
(1) QuasiComb 1.0Dead+0.5Live (24) StandComb 0.6Dead+0.7EX
Note: Quasi-permanent combination is used for settlement calculation and raft center of gravity (25) StandComb 0.6Dead+0.7EY
check.
(26) StandComb 0.6Dead-0.7EX
(27) StandComb 0.6Dead-0.7EY
4.2.2 Nominal combination
Note: The nominal combination is used to check the bearing capacity of foundation and pile
foundation.
Table 4-9 Nominal Combination Table
Combination
number
Combination 4.2.3 Fundamental combination
(2) StandComb 1.0Dead
Table 4-10 Fundamental Combination Table
(3) StandComb 1.0Dead+1.0Live
Combination
(4) StandComb 1.0Dead+0.6WindX Combination
number
(5) StandComb 1.0Dead+0.6WindY (28) BasicComb 1.4Dead
(6) StandComb 1.0Dead-0.6WindX (29) BasicComb 1.2Dead+1.6Live
(7) StandComb 1.0Dead-0.6WindY (30) BasicComb 1.2Dead+1.0Live+1.0WindX
(8) StandComb 0.6Dead+0.6WindX (31) BasicComb 1.2Dead+1.0Live+1.0WindY
(9) StandComb 0.6Dead+0.6WindY (32) BasicComb 1.2Dead+1.0Live-1.0WindX

7
YJK Building Software

Combination Bottom
Combination Concret Top protective
number Stirru protective Minimum
Componen e Reinforcemen layer
(33) BasicComb 1.2Dead+1.0Live-1.0WindY p layer reinforcemen
t Strength t Grade thickness(mm
Grade thickness(mm t ratio
(34) BasicComb 0.9Dead+1.0WindX Grade )
)
(35) BasicComb 0.9Dead+1.0WindY Beam
(36) BasicComb 0.9Dead-1.0WindX Raft C30 G60 — 40 40 0.00%
(37) BasicComb 0.9Dead-1.0WindY Raft
(38) BasicComb 1.2Dead+1.0Live+1.0EX pile(pile
C30 G60 G60 40 — 0.00%
(39) BasicComb 1.2Dead+1.0Live+1.0EY under
beam)
(40) BasicComb 1.2Dead+1.0Live-1.0EX
Tie beam C20 G60 G60 40 — 0.00%
(41) BasicComb 1.2Dead+1.0Live-1.0EY
Strip
(42) BasicComb 0.9Dead+1.0EX C20 G60 G60 40 — 0.00%
Foundation
(43) BasicComb 0.9Dead+1.0EY
(44) BasicComb 0.9Dead-1.0EX
5.2 Design Value of Reinforcement Strength
(45) BasicComb 0.9Dead-1.0EY
Note: The fundamental combination is used for punching, shear, local compression checking Table 5-2 Reinforcement strength table
calculation and reinforcement design.
Reinforcement Design value of tensile Design value of compressive
grade strength(N/mm2) strength(N/mm2)

Chapter 5 Materials, Material Consumption HPB235 210 210


HPB300 270 270
HRB335 300 300
5.1 Material Sheet HRB400 360 360
HRB500 435 435
Table 5-1 Material Sheet
RRB400 360 360
Bottom
Concret Top protective HTRB600 520 520
Stirru protective Minimum
Componen e Reinforcemen layer
p layer reinforcemen T63/E/G 545 545
t Strength t Grade thickness(mm
Grade thickness(mm t ratio CRB600H 430 380
Grade )
)
HG6/C 550 550
Single
C25 G60 — 40 40 0.00%
Foundation
Pile Cap C30 G60 G60 40 40 0.00% 5.3 Number of Components and Concrete Amount
Cap Pile C30 G60 G60 40 — 0.00%
Table 5-3 Number of Components and Concrete Amount
Foundation C20 G60 G60 40 — 0.00%
Component Type Number of components Concrete consumption(m3)

8
YJK Building Software

Component Type Number of components Concrete consumption(m3)


6.3 Actual borehole information
Single foundation 0 0.0
Pile cap 0 0.0 Table 6-2 Actual borehole exploration information
Foundation beam 0 0.0 Boreho Soi Thickne Compressio Frictio
Layer Unit Status
Main raft 1 le l ss of soil n n Cohesion(k
numb weight(kN/ paramet
numbe typ layer modulus(M angle( Pa)
Thickened area 0 er m3) er
r e (m) Pa) °)
Raft Sump, elevator 154.2
shaft and 0 Note: The borehole elevation and waterhead elevation in the table are elevations relative to the
thinning area structure ± 0.000

Raft hole 0
Waterproof board 0 0.0 Chapter 7 Checking Calculation of Bearing
Cap pile 0 0.0
Pile Non-cap pile 0 0.0 Capacity of Foundation and Pile Foundation
Anchor 0 0.0
Tie beam 0 0.0
7.1 Checking calculation of foundation bearing capacity
Strip foundation 0 0.0
Total 154.2
7.1.1 Single foundation

Chapter 6 Geological Data There is no single foundation in this project!

7.1.2 Foundation beam


6.1 Distribution map of geological exploration holes
There is no foundation beam in this project!
See the auto CAD diagram of geological borehole distribution map for details.
7.1.3 Raft
6.2 Standard borehole information
Table 7-1 Checking results of bearing capacity of raft foundation
Table 6-1 Standard borehole exploration information (fa or (1.2*fa or
Pkavg Pkmax
Soi Ultimate Ultimate Compressi Fricti No. fa faE faE) 1.2*faE) Conclusion
Layer Unit Status (kPa) (kPa)
l pile side pile tip on on Cohesion( /Pkavg /Pkmax
numb weight(kN/ parame
typ resistance( resistance( modulus( angle( kPa)
er m3) ter FB1 180.00 239.40 80.78(3) 190.72(3) 2.23 1.13 Satisfied
e kPa) kPa) MPa) °)
Note: 1. Pkavg and Pkmax are the average base pressure and the maximum base pressure of the
control combination, and the numbers in brackets are the combination numbers.
2. When (fa or faE)/Pkavg > 50 or (1.2*fa or 1.2*faE)/Pkmax > 50, take 50 as the results.

9
YJK Building Software

7.1.4 Masonry strip foundation 7.4 Checking Calculation of Horizontal Bearing Capacity of
There is no strip foundation in this project! Pile Foundation

7.2 Checking Calculation of Vertical Bearing Capacity of Pile There is no pile in this project!

Foundation 7.5 Checking calculation of pile section bearing capacity


There is no cast-in-place pile in this project!
7.2.1 Cap pile

There is no pile cap in this project! Chapter 8 Foundation Design


7.2.2 Raft pile
8.1 Punching Checking Calculation
There is no raft pile in this project!
8.1.1 Single foundation
7.2.3 Pile under beams
There is no single foundation in this project!
There is no pile under the beam in this project!
8.1.2 Pile cap
7.3 Checking Calculation of Uplift Bearing Capacity of Pile
There is no pile cap in this project!
(Anchor)
8.1.3 Raft
7.3.1 Pile
Table 8-1Checking results of punching of raft 1
There is no pile in this project! Punching-shear Fl h0
R/S Conclusion
cone No. (kN) (mm)
7.3.2 Anchor W-1 1388(39) 350 0.91 Not satisfied
W-2 359(39) 350 3.01 Satisfied
There is no anchor in this project!
W-3 963(39) 350 1.15 Satisfied
W-4 546(38) 350 1.58 Satisfied
W-5 984(41) 350 1.32 Satisfied
W-6 351(41) 350 3.19 Satisfied

10
YJK Building Software

Punching-shear Fl h0 Punching-shear Fl h0
R/S Conclusion R/S Conclusion
cone No. (kN) (mm) cone No. (kN) (mm)
W-7 592(39) 350 2.16 Satisfied ZD-10 1035(40) 350 1.32 Satisfied
W-8 536(41) 350 2.47 Satisfied ZD-10 1035(40) 350 1.45 Satisfied
Z-1 976(40) 350 1.14 Satisfied Note: 1. Fl is the pressure design value of the control combination, and the numbers in brackets
Z-2 1549(29) 550 1.32 Satisfied are the combination number;
Z-3 931(29) 550 2.32 Satisfied 2. Z-*Column,W-*Wall,ZH-*Pile,ZD-*Pier,DJ-*Single foundation,CT-*Cap,
JHQ-*Thickened area.
Z-4 1029(40) 350 1.09 Satisfied
Z-5 1218(39) 550 1.99 Satisfied
8.1.4 Waterproof board
Z-6 1003(40) 550 2.33 Satisfied
Z-7 802(38) 517 2.01 Satisfied There is no waterproof board in this project!
Z-8 1221(38) 350 1.05 Satisfied
Z-9 1129(40) 350 1.00 Satisfied 8.2 Shear checking calculation
Z-10 1108(40) 367 1.02 Satisfied
Z-11 844(38) 350 1.29 Satisfied 8.2.1 Single Foundation
Z-12 696(41) 350 1.85 Satisfied
Z-13 1278(39) 350 1.02 Satisfied There is no single foundation in this project!
Z-14 982(40) 350 1.10 Satisfied
Z-15 445(38) 350 2.82 Satisfied 8.2.2 Pile cap
Z-16 595(40) 350 2.18 Satisfied
There is no pile cap in this project!
Z-22 760(38) 350 1.37 Satisfied
Z-23 1048(40) 350 1.28 Satisfied
8.2.3 Flange plate of inverted T-shaped foundation beam
ZD-2 1414(29) 350 1.08 Satisfied
ZD-2 1414(29) 350 1.14 Satisfied There is no foundation beam that needs to be checked in this project!
ZD-3 753(29) 350 2.22 Satisfied
ZD-3 753(29) 350 2.45 Satisfied 8.2.4 Masonry strip base flange plate
ZD-5 1114(39) 350 2.01 Satisfied
ZD-5 1114(39) 350 3.12 Satisfied There is no strip foundation in this project!

ZD-6 884(40) 350 2.43 Satisfied


ZD-6 884(40) 350 2.81 Satisfied
8.2.5 Tie beam
ZD-7 686(38) 350 2.08 Satisfied
There is no tie beam in this project!
ZD-7 686(38) 350 2.51 Satisfied

11
YJK Building Software

8.3 Checking calculation of local pressure Raft No.


Column/Wall/Pile Fl
R/S Conclusion
No. (kN)
Satisfied without
8.3.1 Single Foundation 1 Z-3 1306(38) 7.61
reinforcement
Satisfied without
There is no single foundation in this project! 1 Z-4 1172(28) 5.66
reinforcement
Satisfied without
8.3.2 Pile cap 1 Z-5 1313(29) 5.05
reinforcement
Satisfied without
There is no pile cap in this project! 1 Z-6 1082(40) 6.13
reinforcement
Satisfied without
8.3.3 Foundation beam 1 Z-7 1070(38) 7.74
reinforcement
Satisfied without
There is no foundation beam under local compression in this project! 1 Z-8 1277(38) 5.19
reinforcement
Satisfied without
1 Z-9 1232(40) 9.75
8.3.4 Raft reinforcement
Satisfied without
1 Z-10 1346(40) 8.93
Table 8-2Checking results of local compression on raft 1 reinforcement
Column/Wall/Pile Fl Satisfied without
Raft No. R/S Conclusion 1 Z-11 967(39) 5.14
No. (kN) reinforcement
Satisfied without Satisfied without
1 W-1 1533(39) 11.08 1 Z-12 785(41) 10.13
reinforcement reinforcement
Satisfied without Satisfied without
1 W-3 1048(39) 10.43 1 Z-13 1334(39) 3.73
reinforcement reinforcement
Satisfied without Satisfied without
1 W-4 967(41) 17.75 1 Z-14 1063(40) 4.68
reinforcement reinforcement
Satisfied without Satisfied without
1 W-5 1039(41) 5.98 1 Z-15 486(38) 10.22
reinforcement reinforcement
Satisfied without Satisfied without
1 W-7 673(39) 6.16 1 Z-16 717(40) 6.93
reinforcement reinforcement
Satisfied without Satisfied without
1 W-8 605(41) 6.85 1 Z-22 985(39) 8.42
reinforcement reinforcement
Satisfied without Satisfied without
1 Z-1 1166(40) 5.69 1 Z-23 1206(28) 6.60
reinforcement reinforcement
Satisfied without Note: 1. Fl is the compression design value of the control combination, and the number in brackets
1 Z-2 1728(29) 3.84 is the combination number.
reinforcement

12
YJK Building Software

2. Z-*Column, W-*Wanll, ZH-*Pile. Note: 1. The reinforcement area in the table is the reinforcement area per linear meter
(mm*mm/m), which is the larger of the calculated and constructional reinforcement areas;
8.4 Reinforcement design 2. Figures in brackets refer to reinforcement ratio (%).
Table 8-4 Reinforcement Design of Slab Strip under Column
Lower reinforcement
8.4.1 Single Foundation No. Over-reinforced
X direction Y direction

There is no single foundation in this project! 1 1167(0.33) 1167(0.33) NO


2 1900(0.35) 1833(0.33) NO
8.4.2 Pile cap 3 1833(0.33) 1833(0.33) NO
4 1167(0.33) 1167(0.33) NO
There is no two-pile cap in this project! 5 1833(0.33) 1833(0.33) NO
There is no three-pile cap in this project!
6 1833(0.33) 1167(0.33) NO
There are no other caps in this project!
7 1167(0.33) 1833(0.33) NO
8 1167(0.33) 1167(0.33) NO
8.4.3 Foundation beam
9 1167(0.33) 1167(0.33) NO
There is no foundation beam in this project (excluding inverted T-shaped foundation beam)! 10 1833(0.33) 1833(0.33) NO
There is no inverted T-shaped foundation beam in this project! 11 1167(0.33) 1317(0.38) NO
12 1167(0.33) 1167(0.33) NO
8.4.4 Raft 13 1167(0.33) 1167(0.33) NO
14 1167(0.33) 1167(0.33) NO
Table 8-3 Reiforcement design of room strip(Mid-span Area Only)
15 1167(0.33) 1167(0.33) NO
Room strip Lower reinforcement Upper reinforcement 16 1167(0.33) 1167(0.33) NO
Over-reinforced
No. X direction Y direction X direction Y direction 22 1167(0.33) 1167(0.33) NO
1 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO 23 1167(0.33) 1167(0.33) NO
2 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO Note: 1. The reinforcement area in the table is the reinforcement area per linear meter
3 1167(0.33) 1167(0.33) 1172(0.33) 1167(0.33) NO (mm*mm/m), which is the larger of the calculated and constructional reinforcement areas;
4 1167(0.33) 1167(0.33) 1300(0.37) 1332(0.38) NO 2. Figures in brackets refer to reinforcement ratio (%).
5 1167(0.33) 1317(0.38) 1167(0.33) 1167(0.33) NO Table 8-5 Reinforcement design of slab strip under wall

6 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO Normal direction of


No. reinforcement at lower part of Over-reinforced
7 1167(0.33) 1338(0.38) 1167(0.33) 1167(0.33) NO
section
8 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
1 1167(0.33) NO
9 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
2 0(0.00) NO
10 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
3 1167(0.33) NO

13
YJK Building Software

Normal direction of Grid No. Lower reinforcement Upper reinforcement Over-reinforced


No. reinforcement at lower part of Over-reinforced 20 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
section
21 1338(0.38) 1167(0.33) 1167(0.33) 1167(0.33) NO
4 0(0.00) NO
22 1167(0.33) 1688(0.48) 1167(0.33) 1167(0.33) NO
5 0(0.00) NO
25 0(0.00) 0(0.00) 0(0.00) 0(0.00) NO
6 1167(0.33) NO
27 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
7 0(0.00) NO
28 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
8 0(0.00) NO
29 1338(0.38) 1167(0.33) 1167(0.33) 1167(0.33) NO
Note: 1. The reinforcement area in the table is the reinforcement area per linear meter
30 0(0.00) 0(0.00) 0(0.00) 0(0.00) NO
(mm*mm/m), which is the larger of the calculated and constructional reinforcement areas;
2. Figures in brackets refer to reinforcement ratio (%). 31 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
Table 8-6 Reinforcement design of slab strip between columns 32 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
Lower reinforcement Upper reinforcement 33 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
Grid No. Over-reinforced 34 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
X direction Y direction X direction Y direction
1 0(0.00) 0(0.00) 0(0.00) 0(0.00) NO 35 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO

2 1167(0.33) 1167(0.33) 1346(0.38) 1167(0.33) NO 36 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO

3 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO 39 0(0.00) 0(0.00) 0(0.00) 0(0.00) NO

4 1167(0.33) 1167(0.33) 1442(0.41) 1167(0.33) NO 42 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO

5 1167(0.33) 1167(0.33) 1527(0.44) 1248(0.36) NO 43 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO

6 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO 52 1167(0.33) 1167(0.33) 1325(0.38) 1167(0.33) NO

7 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO 53 1167(0.33) 1167(0.33) 1167(0.33) 1213(0.35) NO

8 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO 54 0(0.00) 0(0.00) 0(0.00) 0(0.00) NO

9 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO 57 1167(0.33) 1167(0.33) 1167(0.33) 1307(0.37) NO

10 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO Note: 1. The reinforcement area in the table is the reinforcement area per linear meter
(mm*mm/m), which is the larger of the calculated and constructional reinforcement areas;
11 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
2. Figures in brackets refer to reinforcement ratio (%).
12 1688(0.48) 1167(0.33) 1167(0.33) 1167(0.33) NO
There is no slab strip perpendicular to the foundation beam in this project!
13 0(0.00) 0(0.00) 0(0.00) 0(0.00) NO
14 1167(0.33) 1167(0.33) 1167(0.33) 1313(0.38) NO 8.4.5 Waterproof board
15 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
16 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO There is no waterproof board in this project!
17 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
18 1317(0.38) 1167(0.33) 1167(0.33) 1167(0.33) NO 8.4.6 Masonry strip foundation
19 1167(0.33) 1167(0.33) 1167(0.33) 1167(0.33) NO
There is no strip foundation in this project!

14
YJK Building Software

capacity] shall prevail


8.4.7 Tie beam
4. The safety factor of anti-floating stability is 1.05;
5. RaftZone-*denotes raft area, FsbZone-*denotes waterproof board area, Raft-*denotes
There is no tie beam in this project!
raft number contained in area, and Fsb-*denotes waterproof board number contained in area;
6. Gk is the sum of dead weight and compressive weight, PFk is the sum of uplift bearing
8.4.8 Pile capacity of pile, and Nw,k is buoyancy value.
Table 8-9Overall anti-floating checking calculation (new anti-floating specification)
There are no piles that need reinforcement in this project! G ∑Rt Nw,k
Area Total Checking
Comb Kw [Kw]
No. area(m*m) (kN) (kN) (kN) results
8.5 Raft center of gravity check Table 8-10 Anti-floating combination coefficient table
Load type Anti-floating combination coefficient
Table 8-7 Raft center of gravity check
柱(墙)荷载 1.00
Ra Mx My e W A Checki
Fz e/(0.1*W/ (Xc,Yc) (XL,YL) 基础附加荷载 0.95
ft (kN* (kN* (m (m*m* (m* ng
(kN) A) (mm) (mm)
No. m) m) ) m) m) results 基础自重 1.00
Not 基础覆土重 0.90
296 0.3 385.5 (26374,214 (26066,216
1 -6263 -9108 1105.27 1.30 satisfie 基础板面荷载 0.95
43 7 7 01) 13)
d
锚杆(桩)抗拔力 1.00
Note: 1. When checking the center of gravity of raft, the program treats all rafts as pileless rafts
Table 8-11 Anti-floating table
for checking calculation;
2. Fz: total vertical load, Mx, My: total bending moment, e: eccentricity, W: foundation Sum of self
Foundation
bottom edge resistance moment consistent with eccentricity direction, A: foundation bottom area, (Xc, Column(wall) Additional Soil Plate weight and
Area self
Yc): raft centroid coordinates, (XL, YL): load center coordinates. load(kN) load(kN) weight(kN) load(kN) dead
load(kN)
weight(kN)

8.6 Checking calculation of anti-floating stability Note: 1. The overall anti-floating checking calculation is based on Articles 3.0. 3 and 6.4. 1 ~ 6.4.
3 of the Technical Standard for Anti-floating of Construction Engineering (JGJ476-2019);
2. Zone-* denotes the area number, Raft-* denotes the raft number, and Fsb-* denotes the
Table 8-8 Checking calculation of anti-floating stability
waterproof board number;
Included 3. G is the sum of dead weight, ΣRt is the sum of uplift bearing capacity of pile, and Nw,k
Total Gk Nw,k Checking
Area No. plate Gk/Nw,k is the value of buoyancy.
area(m*m) (kN) (kN) results
number 4. comb: control combination number, kw: anti-floating stability factor, [kw] anti-floating
RaftZone-1 Raft-1 386 28139 4553 6.18 Satisfied stability safety factor.
Note: 1. The overall anti-floating checking calculation is based on the Code for Design of 5. The positive and negative signs of each load: downward direction is positive and the
Building Foundation Article 5.4. 3 of GB50007-2011; upward direction is negative.
2. The sum of pile uplift bearing capacity only includes the characteristic value of pile
uplift bearing capacity with uplift stiffness greater than 100;
3. Since the pile can not give full play to its uplift bearing capacity, the overall anti floating
checking results considering the pile uplift bearing capacity are only for reference, and the local anti
floating checking results of [foundation soil / pile bearing capacity checking] and [uplift bearing

15
YJK Building Software

Chapter 9 Settlement Calculation

9.1 Settlement of natural foundation


No geological data is entered, and settlement is not recorded!

9.2 Settlement of pile foundation


No geological data is entered, and settlement is not recorded!

9.3 Settlement of solid deep foundation


There is no pile cap in this project!
There is no piled raft in this project!

16

You might also like