0% found this document useful (0 votes)
9 views

Assignment

Civil eng poytecnic assignment

Uploaded by

pagareharsh226
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

Assignment

Civil eng poytecnic assignment

Uploaded by

pagareharsh226
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Tdksgund

tates Tank
MEASUREMENT SHEET

of project: Sheet No.: Þ


ITEM Length Breadth Depth
No. Quantity Remark
(m) (m) (m)

IEzcaNatan 4.6 26 245 3S8ri L: (4t03t0.3-46 )


B-(2t4g403]=26m
2Pcc (:4:8 4.4 0.16 2.IZmL= (4+ 2103+ 2x415)- 4.4m
B= (2+216%+2xo1s)24m

3RcL. Slab 4.6 2.4 d.l 1-9mL= (4+.3 +0.3)=4-6n


|B=(00.3 to.3) =26m

Deductian For MH 0036 m


Ne! Quantly c 1-164n

4Back wak
LauVer parton 0.3 2.8 64 m
Shate Poxtion 2-8

5 Plastenuq 2 98 22.4 nt
2 1l.2m
Fx Baton 8 m
paban
Fa Top 4
Deduchdn) o6 O36
plastemuq at top
MH 0.6X0.6

0.10
2.80

-0.15

SECTION
0.15

4.00
0.60
2.þ0

0.30

PLAN
UNDERGROUND WATER TANK
Maulana Mukhtar Ahmad Nadvi Technical campus
Department Of Civil Engineering
Micro Project:- EAC
Estimate of Water Tank of Size 4M X 3M
Measurement Sheet
Sr. Num Particular Num Length Breadth Depth Quantity Unit Note
1 Earthwork in Excavation 1 4.46 3.46 2.95 45.52322 Cu.M
2 PCC 1 4.46 3.46 0.15 2.31474 Cu.M
3 BBM 0
Long Wall 2 4.46 0.23 2.7 5.53932 Cu.M
Short Wall 2 3 0.23 2.7 3.726 Cu.M 9.26532
RCC Slab 1 4.46 3.46 0.1 1.54316 Cu.M 3.8579
5 Internal Plaster 1 14 2.7 37.8 M. Sq
Ceiling plaster 1 4 3 12 M. Sq 49.8
Rate Analysis for RCC Work
A-Concrete work
Dry volume is 52 %
more of wet volume
Wet volume of concrete =
Dry Volume of Concrete - 3.8579
5.864

B-Cement Calculation
Volume of Cement =
Dry Volume/ Sum of Proportion X Content of
Proportion = 12:4 as Cement Sand and cement in Proportion
Volume of Cement = Aggregate
Number of Cement Bags = 0.838 Cu. M
Number of Cement Bags = Volume of Cement / Volume of one Cement bag
23.93 Bags

C-Sand Calculation
Volume of Sand =
Dry Volume/ Sum of Proportion XContent of Sand in
Volume of Sand =
1.675 Cu. M Proportion

D-Aggregate Calculation
Volume of aggregate = Dry Volume/ Sum of Proportion XContent of
Volume of Aggregate = 3.351 Cu. M
Aggregate in Proportion

E- Steel Calculation
Assume Volume of steel 1% to the volume of Concrete
Volume of Steel = 0.039 Cu. M
Weight of Steel per Cu.M = 7850 Kg
Weight of Steel Required = 302.85 Kg
Rate Analysis for BBM Work
A-Brick Calculation
Total Quantity of Brick Work 9 26532 Cu M
Size of one brick= 19N9X9 CM

Size of One Brick with Mortar thickness = 20x10x10 CM


Number of Brick = Volume of Masonary/ volume of one brick with mortar
Numbe rof Brick= 4632 66 Numbers
Assume 5 % Wastage = 231.633 Numbers
Total Quantity of Brick = 4864.293 Numbers

B-Mortar Calculation

Dry volume is 35 % volume of Masonary


Volume of Masonary = 9.2653
Dry Volume of Mortar = 3.243

C-Cement Calculation
Volume of Cement = Dry Volume/ Sum of Proportion X Content of cement in Proportion
Proportion = 1:6 as Cement Sand and Aggregate
Volume of Cement = 0.463 Cu. M
Number of Cement Bags= Volume of Cement / Volume of one Cement bag
Number of Cement Bags = 13.236 Bags

D-Sand Calculation
Volume of Sand= Dry Volume/ Sum of Proportion XContent of Sand in Proportion
2.780 Cu. M
Volume of Sand=
Rate Analysis for Plastering Work
A-Mortar Calculation
Thickness of Plaster = 12 mm
Area of Palstering = 49.8 SqM
Volume of Mortar= 0.60 Cu. M
Add 30% more to fill in joint = 0.78 Cu M
Dry volume is 25 % more of total wet volume = 0.97 Cu.M

B-Cement Calculation
VoBume of Cement = Dry Volume/ Sum of Proportion XContent of cement in Proportion
Proportion = 1:6 as Cement Sand and Aggregate
Volume of Cement = 0.139 Cu. M
Number of Cem ent Bags = Volume of Cement / Volume of one Cement bag
Number of Cem ent Bags = 3.964 Bags

C-Sand Calculation
Volume of Sand = Dry Volume/ Sum of Proportion X Content of Sand in
Volume of Sand = 0.832 Cu. M Proportion
Estimate of Water Tank of Size 4MX 3M
Abstract Sheet
A-Cost of Material:
Sr. Num Description of Material Per Amount
Quantity Unit Rate
1 Cement 41 Number 290 Number 11929.03
2 Sand 5.3 Cu.M 2000 Cu.M 10574.8
3 Aggregate 3.35 Cu.M 1500 Cu.M 5026.293
4 Steel 302.85 32 Kg 9691.045
Kg
Brick 4864.29 Number 5 Number 24321.47
Total Amount 61542.62

B-Cost of Labour:
Rate Per Amount
Description of Material Quantity Unit
Sr. Num
Number 500 Number 500
1 Head Mason
Number 350 Number 2800
Mason
12 Number 300 Number 3600
Mail Mazdoor
4 Number 250 Number 1000
Femail Mazdoor
10 Number 150 Number 1500
Bhisti 9400
Total Amount

Total of Material &Labour 70942.62

Add Water Charges @1.5 %= 1064.139


AddContractor Profit @ 10 %= 7094.262
79101.03
Grand Total =
Rate per Cu.M = 2441.39
Detailed estimate of septic tank

Given
1 Outter Length of tank M

2 OutterWidth of tank 3

Over all depth of tank from


3
tank slab top to pcc bottom 2.8
4 PCC depth 0.1

5 Depth of brick work 2.6


RCC slab depth 0.1 M
6
7 Tank above Ground Level 0.3
Width of Wall 0.23 M
8
4 M
Length of Long Wall
2.54 M
10 Length of Short Wall
Over all internal length of
11 12.16 M
wall
Measurement Sheet
Width Depth Quantity Unit Remark
Particular Number Length
Item Num. 3 2.5 30 M3
1 4
1 Earth work in Excavation 3 0.1 1.2 M3
1 4
2 PCC
BBM 0.23 2.6 4.784 M3
4
|Long Wall 0.23 2.6 3.038 M3
2 2.54
Short Wall Total BBM 7.822 M3
3 0.1 1.200 M3
4
1
RCC Slab 12.16 0 2.6 31.616 M2
1
|Internal Plaster
Abstract Sheet
|Item Num. Particular Quantity Rates Per Amount in Rs.
1 Earth work in Excavation 30 500 M3 15000
2 PCC 1.2 1200 M3 1440
BBM 7.822 6000 M3 46931.04
RCC Slab 1.200 1800 M3 2160
Internal Plaster 31.616 250 M2 7904
5
Total Cost in Rs. 73435.04