tates Tank
MEASUREMENT SHEET
4Back wak
LauVer parton 0.3 2.8 64 m
Shate Poxtion 2-8
5 Plastenuq 2 98 22.4 nt
2 1l.2m
Fx Baton 8 m
paban
Fa Top 4
Deduchdn) o6 O36
plastemuq at top
MH 0.6X0.6
0.10
2.80
-0.15
SECTION
0.15
4.00
0.60
2.þ0
0.30
PLAN
UNDERGROUND WATER TANK
Maulana Mukhtar Ahmad Nadvi Technical campus
Department Of Civil Engineering
Micro Project:- EAC
Estimate of Water Tank of Size 4M X 3M
Measurement Sheet
Sr. Num Particular Num Length Breadth Depth Quantity Unit Note
1 Earthwork in Excavation 1 4.46 3.46 2.95 45.52322 Cu.M
2 PCC 1 4.46 3.46 0.15 2.31474 Cu.M
3 BBM 0
Long Wall 2 4.46 0.23 2.7 5.53932 Cu.M
Short Wall 2 3 0.23 2.7 3.726 Cu.M 9.26532
RCC Slab 1 4.46 3.46 0.1 1.54316 Cu.M 3.8579
5 Internal Plaster 1 14 2.7 37.8 M. Sq
Ceiling plaster 1 4 3 12 M. Sq 49.8
Rate Analysis for RCC Work
A-Concrete work
Dry volume is 52 %
more of wet volume
Wet volume of concrete =
Dry Volume of Concrete - 3.8579
5.864
B-Cement Calculation
Volume of Cement =
Dry Volume/ Sum of Proportion X Content of
Proportion = 12:4 as Cement Sand and cement in Proportion
Volume of Cement = Aggregate
Number of Cement Bags = 0.838 Cu. M
Number of Cement Bags = Volume of Cement / Volume of one Cement bag
23.93 Bags
C-Sand Calculation
Volume of Sand =
Dry Volume/ Sum of Proportion XContent of Sand in
Volume of Sand =
1.675 Cu. M Proportion
D-Aggregate Calculation
Volume of aggregate = Dry Volume/ Sum of Proportion XContent of
Volume of Aggregate = 3.351 Cu. M
Aggregate in Proportion
E- Steel Calculation
Assume Volume of steel 1% to the volume of Concrete
Volume of Steel = 0.039 Cu. M
Weight of Steel per Cu.M = 7850 Kg
Weight of Steel Required = 302.85 Kg
Rate Analysis for BBM Work
A-Brick Calculation
Total Quantity of Brick Work 9 26532 Cu M
Size of one brick= 19N9X9 CM
B-Mortar Calculation
C-Cement Calculation
Volume of Cement = Dry Volume/ Sum of Proportion X Content of cement in Proportion
Proportion = 1:6 as Cement Sand and Aggregate
Volume of Cement = 0.463 Cu. M
Number of Cement Bags= Volume of Cement / Volume of one Cement bag
Number of Cement Bags = 13.236 Bags
D-Sand Calculation
Volume of Sand= Dry Volume/ Sum of Proportion XContent of Sand in Proportion
2.780 Cu. M
Volume of Sand=
Rate Analysis for Plastering Work
A-Mortar Calculation
Thickness of Plaster = 12 mm
Area of Palstering = 49.8 SqM
Volume of Mortar= 0.60 Cu. M
Add 30% more to fill in joint = 0.78 Cu M
Dry volume is 25 % more of total wet volume = 0.97 Cu.M
B-Cement Calculation
VoBume of Cement = Dry Volume/ Sum of Proportion XContent of cement in Proportion
Proportion = 1:6 as Cement Sand and Aggregate
Volume of Cement = 0.139 Cu. M
Number of Cem ent Bags = Volume of Cement / Volume of one Cement bag
Number of Cem ent Bags = 3.964 Bags
C-Sand Calculation
Volume of Sand = Dry Volume/ Sum of Proportion X Content of Sand in
Volume of Sand = 0.832 Cu. M Proportion
Estimate of Water Tank of Size 4MX 3M
Abstract Sheet
A-Cost of Material:
Sr. Num Description of Material Per Amount
Quantity Unit Rate
1 Cement 41 Number 290 Number 11929.03
2 Sand 5.3 Cu.M 2000 Cu.M 10574.8
3 Aggregate 3.35 Cu.M 1500 Cu.M 5026.293
4 Steel 302.85 32 Kg 9691.045
Kg
Brick 4864.29 Number 5 Number 24321.47
Total Amount 61542.62
B-Cost of Labour:
Rate Per Amount
Description of Material Quantity Unit
Sr. Num
Number 500 Number 500
1 Head Mason
Number 350 Number 2800
Mason
12 Number 300 Number 3600
Mail Mazdoor
4 Number 250 Number 1000
Femail Mazdoor
10 Number 150 Number 1500
Bhisti 9400
Total Amount
Given
1 Outter Length of tank M
2 OutterWidth of tank 3