Operations Management Case No. 2a
Operations Management Case No. 2a
CASE NO. 2a
Presented By:
Rolando C. Angustia III
John Andrew Maddela
Mark Andrie O. Narvaez
Jen rich L. Escala
Ivan Pablico
BSCMM 3-YA-2
Submitted to:
With the data provided by the Director of Operations, the team is tasked with
the following obligation:
Determine the different costs incurred by the company in terms of: Prevention cost, Appraisal Cost, Internal Failure Cost, and External Failure Cost.
•Prevention Costs:
• Team leader’s seminar for leadership: Php 155,000.00
• Quality Control Process Analysis for BPO Leaders: Php 55,600.00
• Increasing Agent Efficiency through AI: Php 78,500.00
• Internet connection upgrading from 200mbps to 500mbps: Php 35,000.00
•Improvement of fifty computer unit amounting to Php250,000.00 which replaced computer of older model amounting to Php115,000.00 (Improvement of 50 computer
units: Php 250,000.00)
• Meetings funds: Php 75,800.00
• IT technician bonuses: Php 278,000.00
•Appraisal Cost:
Data center system sweep from external contractors: Php 125,000.00
Inspection of the performance of agents by External Auditors: Php 105,000.00
Satellite Office Audit: Php 75,000.00
Main Office Audit: Php 125,000.00
•Internal Failure Costs:
Defective computers: Php 25,000.00
Computer repairs: Php 234,000.00
Overtime due to double shifts: Php 145,000.00
Internet service downtime: Php 433,000.00
SUMMARY:
Prevention Costs: 927,900
Appraisal Cost: 430,000
Internal Failure Costs: 837,000
External Failure Costs: 125,000
· Determine the cost of quality and explain.
· FORMULA COGQ= AC+PC COPQ=EFC+IFC COQ=COGQ+COPQ
· Solution:
· COGQ= 927,900+430,000= 1,357,900
· COPQ=125,000+837,000=962,000
· COQ=1,357,900+962,000=2,319,900
· Determine what are the cost of good quality and cost of poor quality and provide an explanation as to why one outweighs the other.
The COGQ is 1,357,900, which is higher than the COPQ of 962,000. This shows that the company is investing heavily in ensuring product
quality through prevention and appraisal, which is a good practice.
However, COPQ represents costs incurred when quality is compromised, which can significantly impact the company’s reputation and
profitability. In this case, while the company has high prevention costs, the COPQ is still a substantial portion, showing that poor quality is
affecting the business.
If the COGQ (prevention and appraisal) were increased, it would help reduce the COPQ, leading to a reduction in the losses from failures
and improving overall efficiency and customer satisfaction.
Thus, focusing more on improving prevention costs can reduce the COPQ, making it more cost-effective in the long term.
IT Support Engagement
Check for Internet Connectivity Issue
IT support staff is notified of the issue (based on shift assignments).
If an internet issue occurs, agents will need to Morning: IT Tech Assistant & IT Tech Support (17 minutes)
wait for resolution. Midday: IT Tech Supervisor & IT Tech Support (11 minutes)
Graveyard: IT Tech Senior & IT Tech Supervisor (7 minutes)
"If not resolved, escalate for further IT support" means that if the initial IT
Issue Resolved? support team (assigned during the current shift) is unable to resolve the
If resolved, return to call/issue resolution.
internet connectivity issue, the problem will be passed on to a higher level
of IT support or a different team that may have more expertise, resources,
or authority to fix the issue.
Call/Issue Completion
Once the issue is resolved, the call or task is
completed.
End of Shift
End of shift for banking agents,
transition to next shift if needed.
Process diagram.
· Compute the capacity of each account assignment using a single and multi-step process.
· The single-step process is quick, with all the information given in one calculation.
· The multi-step process involves breaking the problem into smaller parts and solving each part individually before
combining them for the final result.
·
NRU Eastern Bank (Credit Card) 32 agents + APEX Bank (Debit Card) 48 agents+ SEABANK (Credit Card) 32 agents=
112 agents
PT= 17 minutes+ 10 minutes + 14 minutes= 41
· Single step process
· CAPm=112/41=2.73170x1,320 minutes =3,606 call/day
· multi-step process
CAPm=32/17=1.88235x1,320 minutes=2,485 call/day
CAPm=48/10=4.8x1,320 minutes =6,336 call/day
· CAPm=32/14=2.28571x1,320 minutes =3,017 call/day
· FR={2,485call/day,6,336call/day,3,017 call/day}=2,485 call per day
· Compute the capacity of each of the IT support team using a single and multi-step process.
· Key Difference:
· The single-step process is quick, with all the information given in one calculation.
· The multi-step process involves breaking the problem into smaller parts and solving each part individually before combining them for the final
result.
· NRU=IT Tech Assistant + IT Tech Support +IT Tech Supervisor + IT Tech Support+IT Tech Senior + IT Tech Supervisor =6
· PT=17 minutes+11 minutes+7 minutes= 35 minutes
· multi-step process
·
· Morning Shift: 8:00 AM to 4:00 PM (8hrs or 480 minutes)
· CAPh=2/17=0.11764x480minutes=56 issue resolved per shift
· Calculate the utilization of each of the account assignments and determine which among them are in maximum capacity and
explain.
· Utilization=FR/CAP=
·2,485/2,485=100 This is capacity constraints The system or account assignment is its maximum capacity.
· 2,485/6,336=39 This is demand capacity the system is only using 39% of its available capacity.
· 2,485/3,017=82 This is demand capacity the demand capacity the system is only using 82% of its available capacity.
· Calculate for the utilization of the IT support team and determine which
among them are in maximum capacity and explain.
· Utilization=FR/CAP=
· 56/56=100 This means its maximum capacity. There is no extra capacity
available
· 56/76=74
· 56/120=47
· Provide an explanation as to how improvements to the bottleneck can be
made to, apply a new calculation for the said increase in capacity and
determine if the said scenario will now fall in a CC or DC situation.