Zte Power Installation and Configuration
Zte Power Installation and Configuration
com
CONFIGURATION OF RECTIFIER
FEBRUARY - 2023
John J.
CONTENT
* ) Go to:
Configure IP
supplied by Claro
Configure port
server:162
* ) Go to:
Alarm Description Level Port of entry Input Relay Conf. Output Relay
High ambient temperature / Too high MAJOR/IMPORTANT X7 (Temp Send) UIB_X7_T4 UIB_X1_DO6
OFF
BATTERY 1
BATTERY 2
BATTERY 3
BATTERY 4
BATTERY 5
BATTERY 6
On/Off button
Dip switch
Battery communication
485
Bat 16
Bat 3
The RS485 port must be used
to interconnect the batteries.
Bat 2
Bat 1
Port Management
Configuration
Grounding terminal
BCUA HL.
· Connect the PE port to the busbar
land.
· Connect the batteries to the breakers
of the power core.
BCUA.
active.
3. Click Properties. double
click Internet Protocol version 4
(TCP/IPv4).
Local IP Mode:static
Upon completing the configuration of the IP provided by the provider, we verify if the IP has been
correctly changed. For this, as step 1, we change the IP of our computer following the steps
indicated at the beginning and we assign ourselves an IP within the segment that the operator
gives us. In this example the operator assigned us the IP 10.32.32.193 mask 255.255.255.216
As step 2 we open a command prompt manager and ping the address assigned to
us by our operator:
ping 10.32.32.193
We must obtain a response as shown in the image, otherwise the IP has not been
changed and the steps must be repeated again from the beginning.
Number of batteries
connected, in this case 6
lithium batteries connected State:In download(discharge).