0% found this document useful (0 votes)
14 views

Culvert - 14nos Scope of Work

Uploaded by

hein gyi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views

Culvert - 14nos Scope of Work

Uploaded by

hein gyi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Yangon-Mandalay Railway Improvement Phase I Project CP 102

BR-74(2 Span), BR-76(2 Span), BR-77(1 Span),BR-79(2 Span), BR-80(3 Span), BR-81(1 Span),BR-82(2 Span),
BR-82A(1Span), BR-83(3 Span),BR-84(3Span), BR-71(1 Span), BR-73(1 Span),BR-66(3Span), BR-69(2 Span),
For Box Culvert work (For Up Line )
Scope of work for Labour Contractor

A. Included Manpower & Materials Supply by Labour Contractor

1. Have to provided required number for Skillful Steel fixers,Skillful Carpenters,Skillful Masons & Workers
2. Welding machine & welding rod
3. Pressure pump(water jet)
4. Vibrator(at least 3nos;)
5. Water Pump
6. Generator & Fuel
7. Safety PPE ၀တ်စုံ

B. Included Scope of work by Labour Contractor As per Design Drawing and Specification

1. Cobble Laying work with Compacting as per instructions of Site Engineer & Tekken – RN JV & CMC

2. Lean Concrete work with levelling & Vibrating

3. Rebar work Installation work & Unloading for culvert & wing wall work

4. Rebar cleaning work & rust removal of rebar work if necessary

5. Assembly bar & Chair bar fabrication & installation work

6. Concrete work with levelling & Vibrating

7. Formwork(3 Times used), Scaffolding work,Formtie work & False work, Fabrication work & Installation

Work , P con & Chamfer Installation work for culvert & wing wall work

8. All necessary tools & equipments for (Rebar,Formwork,P con,Construction joint,Chamfer,Support &
Scaffolding ,Joint filler installation,curing and repairing work)

9. All material unloading work

10. All necessary Scaffolding , Formwork removal work,Formtie ,P con & Chamfer removal work

11. Water Pumping work

12. Curing work

13. P con filling work (labour only)

14. Contractor မှ workmanship က ြောင်ဖြစ်က ေါ်လြောက ြော Defect မ ြောျားအြောျားလုံျား ုံ Repair & Rework လုံ ်ငန်ျား

က ြောင်ရွ ်ရြောတွင် Approved repair material မ ြောျား ုံ ြော ုံျားက ျားရမည်။

15. Max Site Engineer,Tekken-RN JV & CMC Schedule အတုံင်ျားအခ န်မှှီပ ှီျားစှီျားကအြောင်က ြောင်ရွ ်က ျားရမည်။

16. Necessary Night Shift work


17. Max Site Engineer,Tekken-RN JV & CMC Inspection စစ်က ျားပ ှီျား Passed ဖြစ် ည်အထက ြောင်ရွ ်

ရမည်ဖြစ် ည်။

C. Excluded Materials and scope of work for Labour Contractor(Supply by Max)


1. Rebar(M.s)rod(Fabrication by machine to cut & bent)
2. Ready Mix Concrete(AG)(Station Pump)
3. Water Supply
4. Nail & Binding wire
5. Safety Barriers materials & installation work
6. Cover Block material
7. P con filling work (material only)
8. Loading for all materials
9. Earthwork Excavation work
10. All Survey Construction work
11. Backfilling material and workdone work
12. Formwork material,False work material,Formtie material,P con,Chamfer & Scaffolding material
13. Watercourse Management,Sand & Cobble material
14. Foundation excavated soil disposal work
15. Train watchman
16. Night lighting work
17. Cash Iron,Ø 50 PVC Drain Pipe & Ø 100 PVC Drain Pipe