Culvert - 14nos Scope of Work
Culvert - 14nos Scope of Work
BR-74(2 Span), BR-76(2 Span), BR-77(1 Span),BR-79(2 Span), BR-80(3 Span), BR-81(1 Span),BR-82(2 Span),
BR-82A(1Span), BR-83(3 Span),BR-84(3Span), BR-71(1 Span), BR-73(1 Span),BR-66(3Span), BR-69(2 Span),
For Box Culvert work (For Up Line )
Scope of work for Labour Contractor
1. Have to provided required number for Skillful Steel fixers,Skillful Carpenters,Skillful Masons & Workers
2. Welding machine & welding rod
3. Pressure pump(water jet)
4. Vibrator(at least 3nos;)
5. Water Pump
6. Generator & Fuel
7. Safety PPE ၀တ်စုံ
B. Included Scope of work by Labour Contractor As per Design Drawing and Specification
1. Cobble Laying work with Compacting as per instructions of Site Engineer & Tekken – RN JV & CMC
3. Rebar work Installation work & Unloading for culvert & wing wall work
7. Formwork(3 Times used), Scaffolding work,Formtie work & False work, Fabrication work & Installation
Work , P con & Chamfer Installation work for culvert & wing wall work
8. All necessary tools & equipments for (Rebar,Formwork,P con,Construction joint,Chamfer,Support &
Scaffolding ,Joint filler installation,curing and repairing work)
10. All necessary Scaffolding , Formwork removal work,Formtie ,P con & Chamfer removal work
14. Contractor မှ workmanship က ြောင်ဖြစ်က ေါ်လြောက ြော Defect မ ြောျားအြောျားလုံျား ုံ Repair & Rework လုံ ်ငန်ျား
15. Max Site Engineer,Tekken-RN JV & CMC Schedule အတုံင်ျားအခ န်မှှီပ ှီျားစှီျားကအြောင်က ြောင်ရွ ်က ျားရမည်။