0% found this document useful (0 votes)
12 views

P183-Boq-Security System Spine Precast Factory

Uploaded by

khatrisayyam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views

P183-Boq-Security System Spine Precast Factory

Uploaded by

khatrisayyam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

SPINE CONCRETE PRECAST FACILITIES

Total Amount
Sl. No. Description Unit Qty Unit Rate (SAR) (SAR)

Bill of Quantities :SECURITY SYSTEM

Supply,Delivery and Installation ,T&C/Configuration and Shop drawings of


Security System to make the System functional in accordance with relevant
Authority and NEOM Specifications, Approved Drawings, all required under
the Main Contract Conditions, accordance and compliance with the
Contract, & to the entire satisfaction and approval of the Contractor, the
Employer and the Engineer.
Warranty Period: 2 years
As per attached NEOM Specification,

1 WALL MOUNT BRACKET FOR EXTERNAL CAMERAS No 15


2 POLE MOUNT BRACKET FOR EXTERNAL CAMERAS No 106
3 AUTOMATIC NUMBER PLATE READING OUTDOOR CAMERA No 4
4 PTZ OUTDOOR CAMERA - POLE MOUNTED No 3
5 2MP FIXED BOX TYPE CAMERA - WALL MOUNTED (WEATHER PROOF) No 23
6 2MP FIXED BOX TYPE CAMERA - WALL MOUNTED No 72
7 2MP CEILING MOUNTED DOME CAMERA No 57
2MP FIXED DOME CAMERA - CEILING MOUNTED
8
120% IDENTIFICATION
No 22
55" LED SCREENS
9 No 10
(FINAL QUANTITY AS PER SPECIALIST BASED ON THE TOTAL CAMERAS)
CCTV WORKSTATION INCLUDING PC, MONITORS AND PTZ JOYSTICK ETC. REFER
10 SECURITY SCHEMATIC RI-NC-PFC-EL-DD-AA-0021) No 3
(FINAL QUANTITY AS PER SPECIALIST BASED ON THE TOTAL CAMERAS)
WORKSTATION FOR ANPR CAMERAS
11 No 1
(FINAL QUANTITY AS PER SPECIALIST BASED ON THE TOTAL CAMERAS)
12 INDUSTRIAL SWITCH WITH WEATHER PROOF ENCLOSURE No 62
13 MEDIA CONVERTOR No 16
14 CAT-6A PATCH CORDS FOR MEDIA CONVERTOR No
VIDEO SECURITY EQUIPMENT CABINET (OUTDOOR TYPE WITH REQUIRED
COOLING/VENTILATION)
15 (FOR RACK SIZE, ACTIVE AND PASSIVE COMPONENTS AND UPS DETAILS REFER No 4
EXTERNAL CAMERAS SCHEMATIC )
TO BE FINALIZED AS PER SPECIALIST
9U SEC. RACK (FOR ACTIVE AND PASSIVE COMPONENTS AND UPS DETAILS
16 No 13
REFER SCHEMATIC)
12U SEC. RACK (FOR ACTIVE AND PASSIVE COMPONENTS AND UPS DETAILS
17 1
REFER SCHEMATIC)
24U SEC. RACK (with 2kVA Rack Mounted UPS 60 min. backup)
18 No 1
(FOR ACTIVE AND PASSIVE COMPONENTS REFER SCHEMATIC )
42U SECURITY SERVER/STORAGE RACKS COMPLETE IN ALL RESPECT UPS
19 DETAILS REFER SCHEMATIC) No 2
(REFER SECURITY SCHEMATIC RI-NC-PFC-EL-DD-AA-0021)
20 HDMI CABLES FOR SCREENS (TO BE ESTIMATED BY SPECIALIST)
21 CAT-6A UTP CABLE (TO BE ESTIMATED BY SPECIALIST) mtr
4 CORE SINGLE MODE MODE FIBER OPTIC-CABLE (FOR CCTV POINTS EXCEEDING
22 mtr
90M)
6 CORE SINGLE MODE BACKBONE FIBER OPTIC-CABLE (FOR MAIN AND
23 mtr
REDUNDANT BACKBONE CABLE)
24 4 CORE SINGLE MODE FIBER OPTIC- LOOP CABLE FOR EXTERNAL CAMERAS mtr
16 CORE SINGLE MODE BACKBONE FIBER OPTIC-CABLE (FROM MICROWAVE
25 mtr
ANTENNA TO COMMUNICATION SERVER IN OFFICE)
THESE QTY ARE INDICATIVE AND SYSTEM SPECIALIST NEED TO CALCULATE ALL REQUIRED DEVICES/ACCESSORIES TO MAKE THE SYSTEM FULLY
Note:
FUNCTIONAL.

Total Amount (SAR)


Note: 1
Environmental Product Declaration (EPD) shall be included in material submittal. (Sustainability requirement)
All materials to be delivered after final approvals Client/Consultant
No delivery or production until Materials approved and site reconfirmation.
Warranty shall be provided in approved NEOM format and shall commence on the TOC date of the Project.
Provide spare parts
Provide training & demonstration for the Employer's Representative
Preparation of Shop Drawing and As Built Drawings shall be included in Specialist scope.