GEO-TECHNICAL INVESTIGATION REPORT

Index
1. OBJECTIVE....................................................................................1

2. INTRODUCTION............................................................................1

3. SCOPE OF WORK...........................................................................1

4. EXPLORATION PROGRAMME...........................................................2

5. METHODOLOGY OF FIELD INVESTIGATION.......................................3

5.1. Boring.......................................................................................4

5.2. Sampling...................................................................................4

5.2.1. Disturbed Sampling (DS)..........................................................4

5.2.2. Undisturbed Sampling (UDS)......................................................4

5.2.3. Transportation and storage of samples.......................................5

5.3. Standard Penetration Test (SPT)...................................................5

5.4. Drilling in rock............................................................................6

5.5. Ground Water Level Measurement................................................8

6. STANDARDS AND GUIDELINES FOR FIELD INVESTIGATIONS..............8

7. GEOTECHNICAL LABORATORY TESTING...........................................8

8. GEOTECHNICAL ASSESSMENT AND FOUNDATION FEASIBILITY...........9

8.1. Depth of foundation..................................................................10

8.1.1. Foundation in Soil..................................................................10

8.1.2. Foundation in Rock.................................................................12

9. OPEN / SHALLOW FOUNDATIONS IN SOIL......................................12

9.1. Net safe bearing capacity from shear consideration.......................12

10.1.1. For Clay Soils (Φ = 0)...........................................................12

10.1.2. For C - Φ soils......................................................................13

10.1.3. Reduction Factors.................................................................13

9.2. Net Safe Bearing Capacity..........................................................14

10. OPEN / SHALLOW FOUNDATIONS IN ROCK...................................14


11. PILE FOUNDATIONS...................................................................15

11.1. Pile Capacity in soil..................................................................16

11.2. Lateral Capacity of Pile in Soils.................................................18

11.3. Capacity of piles in Intermediate Geomaterial and Rock................18

11.4. Moment Carrying Capacity of Socketed Piles................................21

12. SUMMARY OF FOUNDATION RECOMMENDATIONS..........................22

13. LIMITATIONS............................................................................26

ANNEXURES

➢ Borelogs with summary of test results

➢ Sample calcula%ons

➢ VUP at CH 100+290 km (SBC in Sand)


GEOTECHNICAL INVESTIGATION REPORT
1. OBJECTIVE

Consultancy services for prepara"on of DPR and Pre-Construc"on services from (i) Silchar ISBT
(Start point of Silchar Bypass) to junc"on of NH-37 & NH-6 at Dhaleshwari, (ii) End of proposed
Badarpur bypass to Churaibari (Assam-Tripura border), (iii) Spur from NH-8 near Karimganj to
Sutherkandi.

2. INTRODUCTION

This report presents the results of field explora"ons and Geotechnical engineering studies
performed for Minor bridges (MIB), Major bridges (MJB), Under passes (VUP, LVUP) and Culverts
in predetermined loca"ons. The purpose of the explora"on and studies is to iden"fy subsurface
condi"ons and formulate Geotechnical recommenda"ons for design and construc"on.

The main context of this report includes descrip"on of field explora"ons, laboratory tes"ng,
subsurface condi"ons, conclusions and recommenda"ons based upon review of exis"ng data,
engineering studies and analysis.

Field and Laboratory works are conducted based on Indian Standard specifica"ons and, as per the
requirement of project.

3. SCOPE OF WORK

The scope of subsoil Inves"ga"on is to ascertain Geotechnical and geological proper"es of


substrata for design and construc"on of various types of founda"ons. It is proposed to have
explora"on by drilling of boreholes at various loca"ons of given structures. Accordingly the
explora"on program of boreholes have been taken up in such a way that where shallow
founda"on is feasible, a depth equal to a maximum of 15m from ground level and where deep
founda"on is required, a depth equal to a maximum of 30m to 50m was considered. Soil and Rock

AA/HD/2598
Page 1
samples were collected appropriate to ground condi"ons and transported them to Geotechnical
laboratory. Laboratory tests are conducted to determine the Index and Engineering proper"es of
soil and rock. Engineering analysis has been carried out to assess Net Safe Bearing Capacity/Pile
capacity of founda"on for all the proposed structures.

4. EXPLORATION PROGRAMME

Structure list for Sub-Soil Inves%ga%on

S.No Chainage (Km) Structure Span (m)


1 87+779 MIB 1 x 25.0
2 89+535 Box MIB 1 x 10
3 89+560 MIB - Gas Pipe Line 1 x 20.0
4 90+535 Box MIB 2 x 6.0
5 92+706 MIB 1 x 20.0
6 95+587 MIB 1 x 20.0
7 97+000 VUP 1 x 20.0
8 97+092 Box MIB 1 x 6.0
9 97+448 Box MIB 1 x 6.0
10 97+664 Box MIB 1 x 6.0
11 97+774 Box MIB 1 x 6.0
12 98+260 Box MIB 1 x 6.0
13 98+501 Box MIB 1x6x3
14 98+587 LVUP 1 x 12.0
15 98+625 Box MIB 1 x 6.0
16 99+041 Box MIB 1x6x3
17 99+242 Box MIB 1 x 6.0
18 100+290 VUP 1 x 20.0
19 102+102 Box MIB 1 x 6 x 3.0
20 102+500 Box MIB 1 x 6 x 3.0

AA/HD/2598
Page 2
S.No Chainage (Km) Structure Span (m)
21 103+109 Box MIB 1 x 6.0
22 103+430 Box MIB 3 x 6.0
23 103+777 Box MIB 1 x 6 x 3.0
24 104+436 Box MIB 2 x 3.0
25 105+370 Box MIB 1 x 6.0
26 105+684 MIB 1 x 16.0
27 106+290 MIB - Gas Pipe Line 1 x 20.0
28 106+511 MIB 1 x 25.0

Field Tests

 Standard Penetra"on Test (SPT) was conducted at every 1.5m depth interval in boreholes
as per IS: 2131-1981.

 Disturbed Samples (DS) and undisturbed Samples (UDS) were collected as per IS: 1892-
1979.

 Core drilling in soD rock, weathered rock and in hard rock has been carried out by
diamond bit of Nx size using double tube core barrels and rock cores are collected.

 Ground Water table was observed in each bore hole as per IS: 6935 – 1973

5. METHODOLOGY OF FIELD INVESTIGATION

The field explora"on methods, sampling requirements, types and frequency of field tests are
performed based on project design requirements. Accordingly, we have developed the overall
inves"ga"on plan which enables us to obtain the data needed to define subsurface condi"ons and
perform Engineering analysis and design.

AA/HD/2598
Page 3
5.1. Boring

Drilling of boreholes was carried out at specified loca"ons to obtain informa"on about the subsoil
profile, its nature, strength and also to collect soil samples for strata iden"fica"on and conduc"ng
laboratory tests. The sequence of boring was planned aDer ascertaining preliminary nature of
subsoil profile. Boring is carried out as per the provisions given in IS: 1892-1979.

5.2. Sampling

All the accessories used for sampling and the method of sampling adopted confirms to IS: 2132. All
the disturbed and undisturbed samples collected in the field have been classified at the site as per
IS: 1498.

5.2.1. Disturbed Sampling (DS)

Disturbed soil samples were collected from bore holes at regular intervals to determine the soil
type, grain size distribu"on, AHerberg limits and soil classifica"on.

5.2.2. Undisturbed Sampling (UDS)

Undisturbed sampling was done in accordance with IS:2132-1986. Undisturbed samples will be
collected for every 1.5 m interval or change of strata which ever is less. Undisturbed samples are
collected with tubes of 100mm diameter & 450mm long MS tubes provided with sampler head
with ball check arrangement. Collec"on of undisturbed samples in very hard cohesive soils/dense
granular soils/gravels/cobbles/pebbles/boulders/refusal strata may not be prac"cally possible and
such collected samples will not truly represent the undisturbed condi"ons. The assembled
sampling tube should be lowered to the boHom of the hole and the sampling tube shall then be
pushed into the soil by a con"nuous and rapid mo"on. Undisturbed samples are used to
determine the shear parameters, natural moisture content and unit weight.

AA/HD/2598
Page 4
5.2.3. Transporta%on and storage of samples

The collected undisturbed samples sealed with wax at both ends, have to be taken out of the
liners or tubes for actual tes"ng. This should be done very carefully without causing any
disturbance to the samples themselves. ADer the sample is extruded, it should be kept either in
humidity chamber or in a desiccator and taken out only when actual tes"ng is carried out, to avoid
possible loss of moisture.

5.3. Standard Penetra%on Test (SPT)

Standard Penetra"on Test (SPT) has been conducted at different depths in all boreholes. For
shallow depths SPT was conducted at close intervals of 1.5m. SPT split spoon sampler of standard
dimensions is driven into the soil from borehole using 63.5kg hammer falling from 75cm height.
The SPT hammer is mechanically liDed to the specified height and allowed to fall freely. The
number of blows required to effect each 15 cm of penetra"on shall be recorded. The first 15 cm of
drive may be considered to be sea"ng drive. The total blows required for the second and third 15
cm of penetra"on shall be termed the penetra"on-resistance ‘N’. When the number of blows
exceeded 50, to penetrate the first or second 15cm length of the Sampler, the SPT ‘N’ is regarded
as more than 100 as described in IS: 2131–1981. N value is recorded as refusal when there is no
penetra"on of the sampler. Samples from the SPT split spoon sampler are preserved in polythene
covers and transported to the laboratory.

The degree of density of natural deposited cohesionless soils can be measured in terms of their
rela"ve density. SPT ‘N’ values are correlated with rela"ve density of non-cohesive stratum and
with consistency of cohesive strata.

AA/HD/2598
Page 5
Correla%on for Sand/ non-plas%c Silt Correla%on for Clay/ Plas%c soils

Penetra%on Value (N) Rela%ve Density Penetra%on Value (N) Consistency

0 – 4 Blows Very Loose 0 – 2 Blows Very SoD

4 – 10 Blows Loose 2 – 4 Blows SoD

10 – 30 Blows Medium Dense 4 – 8 Blows Medium

30 – 50 Blows Dense 8 – 15 Blows S"ff

>50 Blows Very Dense 15 – 30 Blows Very S"ff

>30 Blows Hard

5.4. Drilling in rock

For drilling in rock, drilling was advanced by rotary core drilling method using double tube core
barrels with TC bit or diamond bit as per the guidelines of IS:6926-1996. The maximum length of
drill run maintained is 1.0m. At the end of each run, the drill rod string with core barrel is
extracted from the Borehole and core is recovered from the core barrel. The percentage of core
recovery is recorded and the core pieces are transferred to the core box duly numbered and
labeled properly. The selected core samples are sent to the laboratory for conduc"ng tests. The
rock core samples are preserved and stored in wooden core boxes as specified in IS:4078 – 1980.

The following system of weathering classifica"on should be followed as per IS: 4464

Term Descrip%on Grade Interpreta%on


No visible sign of rock material weathering; perhaps
Fresh I CR > 90 %
slight discolora"on on major discon"nuity surfaces

SlightlyDiscolora"on indicates weathering of rock material and II CR between 70%


discon"nuity surfaces. All the rock material may be
Weathered discolored by weathering. to 90%

AA/HD/2598
Page 6
Term Descrip%on Grade Interpreta%on

Moderately Less than half of the rock material is decomposed or III CR between
disintegrated to a soil. Fresh or discolored rock is present
Weathered either as a con"nuous framework or as core stones. 51% to 70%

Highly More than half of the rock material is decomposed or IV CR between


disintegrated to a soil. Fresh or discolored rock is present
Weathered either as a discon"nuous framework or as core stones 11% to 50%

Completely All rock material is decomposed and / or disintegrated to V CR between


Weathered soil. The original mass structure is s"ll largely intact. zero to 10%

All rock material is converted to soil. The mass structure


Residual and material fabric are destroyed. There is a large CR = Zero
VI
Soil change in volume, but the soil has not been significantly But N > 50
transported.

RELATION BETWEEN RQD AND IN-SITU ROCK QUALITY

Rock quality is further measured by frequency of natural joints in rock mass. Rock Quality
Designa"on (RQD) is used to define state of fractures or massiveness of rock.

Following table defines the quality of rock mass.

RQD CLASSIFICATION RQD (%)

Excellent 91-100

Good 76-90

Fair 51-75

Poor 25-50

Very Poor <25

As per IS: 13365 Part -1: 1998

AA/HD/2598
Page 7
5.5. Ground Water Level Measurement

The depth of ground water level is supposed to be measured aDer the ground water level is
stabilized as per IS:6935 – 1973.

6. STANDARDS AND GUIDELINES FOR FIELD INVESTIGATIONS

Field explora"on by boring was as per below given standards:

S. No IS Code No Title

1 IS: 1892 – 1979 Code of Prac"ce for sub surface inves"ga"on for founda"ons

Classifica"on and Iden"fica"on of Soils for General


2 IS: 1498 – 1970
Engineering Purpose

3 IS: 2131 – 1981 Method for Standard Penetra"on Test (SPT) for Soils

4 IS: 2132 – 1986 Code of Prac"ce for Thin- Walled tube sampling of Soils

Code of prac"ce for presenta"on of drilling informa"on and


5 IS: 4464 – 1985
core descrip"on in founda"on inves"ga"on

6 IS: 5313 – 1980 Guide for core drilling observa"ons

7 IS: 4078 – 1980 Code of prac"ce for indexing and storage of drill cores

Diamond core drilling-Site inves"ga"on for river valley


8 IS: 6926 – 1996
projects-code of prac"ce

9 IS: 6935 – 1973 Method of determina"on of water level in a bore hole

Recommenda"ons for the prepara"on of Geological and Geo


10 IS: 6065 (part-1) - 1985
technical maps for river valley projects
7. GEOTECHNICAL LABORATORY TESTING

Laboratory tests comprises of the following tests conducted as per procedures given in relevant IS
codes.

AA/HD/2598
Page 8
Following tests were conducted on Undisturbed samples:

i) Sieve Analysis

ii) AHerberg Limits

iii) Free Swell Index (FSI)

iv) Triaxial test (UU)

v) NMC & Bulk density

vi) Specific Gravity

Following tests were conducted on disturbed samples:

i) Sieve Analysis & AHerberg Limits

Following tests were conducted on Rock Samples:

i) Water Absorp"on, Dry density, Porosity and Specific Gravity

ii) Uniaxial Compressive Strength (UCS)

iii) Point Load Index Test (as per requirement)

8. GEOTECHNICAL ASSESSMENT AND FOUNDATION FEASIBILITY

By observing the nature of subsurface strata, the type of founda"on for a given proposed
structure, expected heavy loads on piers and abutment founda"ons, the following types of
founda"ons can be recommended.

a) Shallow Founda"ons

b) Deep/ Pile Founda"ons

For sa"sfactory performance of a founda"on, the following criteria must be sa"sfied;

I. The founda"on must not fail in shear.

AA/HD/2598
Page 9
II. The founda"on should not seHle by an amount more than the permissible seHlement.

The smaller of the bearing pressure values obtained according to above (I) and (II), is adopted as
the allowable bearing capacity.

8.1. Depth of founda%on

Depth of Analysis:

For foo"ng res"ng on mul"layer deposits, weighted average or average of the ‘C’ and ‘Ø’ values
upto a depth of H = 0.5 B Tan (45 + Ø/2) is considered.

8.1.1. Founda%on in Soil

A founda"on must have an adequate depth from the considera"ons of adverse environmental
influences. It must also be economically feasible in terms of overall structure. Depth of founda"on
in soil shall be decided as per Clause 705.2 of IRC 78 for open founda"ons and confirmed with
clause 7 of IS : 1904 for special cases like; where volume change/ scour is expected/ or when
founda"on is to rest on sloping ground/ made or filled up ground/ frost ac"on is expected etc.

Scour depth calcula%on

Hydrology for the structures is calculated separately and presented whereas, maximum scour
depth based on erodible strata has been worked out and presented in summary of borelog
results itself. If the strata at which founding level arrived based on scour depth is soil, the
founding level has been arrived as explained below:

Founding level = H.F.L- 2*dsm (in case of piers) and

Founding level = H.F.L – 1.27*dsm (in case of abutments) as per IRC: 78 provisions.

AA/HD/2598
Page 10
Silt Factor

This is important factor for determining the scour depth of erodible strata. It is calculated using
following procedure as per IRC:78 (clause 703.2.2) & as suggested in IRC : 5 (clause 110.1.3)

Where Ksf = 1.76√(dm)

Ksf = Silt Factor

dm = Mean Diameter in mm

The mean scour depth below Highest Flood Level (HFL) for natural channels flowing over erodible
bed can be calculated as per IRC : 78 (clause 703.2)

dsm = 1.34 *(Db 2/ Ksf )1/3

Where Db = The design discharge for founda"on per metre width at effec"ve linear
water way

Ksf = Silt factor for a representa"ve sample of bed material obtained upto the
level of an"cipated scour

The minimum depth of Open founda"on shall be upto the stratum having safe bearing capacity
but not less than 2.0m below scour level or protected level as per IRC:78 (Clause 705.2.1)

Floor Protec%on

In case the founda"on has to rest on bed above the an"cipated scour level, scour protec"on/ floor
protec"on has to be done to ensure the bed below the founda"on remains non-erodible.

As per IRC: 78 – 2014, clause 703.3.2, for the design of floor protec"on works for open
founda"ons, the following values of maximum scour depth from Highest Flood level may be
adopted:

AA/HD/2598
Page 11
In a straight reach : 1.27 dsm

In a bend : 1.50 dsm or on the basis of concentra"on of flow

8.1.2. Founda%on in Rock

As per clause 705.2.2 (a) of IRC:78; for hard rock with an ul"mate crushing Strength of 12.5 MPa or
above, the depth of founda"on shall be 0.60m below rock surface and 1.50m for all other cases.
The embedment of the founda"ons shall be decided keeping in view the overall characteris"cs like
fissures, bedding plans, cavi"es, ul"mate crushing strength, proposed treatment of founda"on
strata etc.

9. OPEN / SHALLOW FOUNDATIONS IN SOIL

The safe bearing capacity of soil is the net intensity of loading which the founda"on will carry,
without undergoing shear failure and seHlement in excess of the permissible value for the
structure under considera"on.

9.1. Net safe bearing capacity from shear considera%on

10.1.1. For Clay Soils (Φ = 0)

The net ul"mate bearing capacity immediately aDer construc"on on fairly saturated
homogeneous cohesive soils shall be calculated using following equa"on.

qd = CNc Sc dc ic ; Where Nc = 5.14

The value of ‘C’ shall be obtained from unconfined compressive strength test or sta"c cone
penetra"on test or triaxial shear (UU) test.

Alterna"vely Net ul"mate bearing capacity can be determined by using the following equa"on;

AA/HD/2598
Page 12
qd = C Nc Sc dc ic ; Where qd = Net ul"mate bearing capacity

A factor of safety of 2.5 is used

Considering Φ = 0, Nc = 5.14

Thus the equa"on is simplified as

q (net safe) = 1/ 2.5 *C*5.14 Sc dc ic

= 2.056 C Sc dc

10.1.2. For C - Φ soils

For General shear:

Φ ≥ 360 and C ≥ 5 t/m2

qd = C Nc Sc dc ic + q ( Nq-1) Sq dq iq + 0.5 g B Ng Sg dg ig W '

For Local shear:

Φ ≤ 280 and C ≤ 3 t/m2

qd = (2/3) c Nc Sc dc ic + q ( Nq-1) Sq dq iq + 0.5 g B Ng Sg dg ig

For Intermediate Shear:

Average or interpolate between Local and General Shear.

10.1.3. Reduc%on Factors

Determined Bearing Capacity Factors Nc , Nq, Nγ from Table 1 of IS : 6403-1981

Shape factors Sc Sq Sγ from Table 2 of IS : 6403 - 1981


AA/HD/2598
Page 13
Depth factors dc dq dγ from clause 5.1.2.2 of IS : 6403 – 1981

Inclina"on factors ic iq iγ from clause 5.1.2.3 of IS : 6403 – 1981

9.2. Net Safe Bearing Capacity

Net safe bearing capacity is obtained by dividing the above Net Ul"mate bearing capacity by the
factor of safety of 2.5.

10. OPEN / SHALLOW FOUNDATIONS IN ROCK

As per IS: 12070-1987 & IS: 13365 (Part-1)-1998, analysis for allowable bearing capacity on rock
has been done by the following three methods.

a) Based on Presump"ve value (Classifica"on of Rock)

Assessment of net safe bearing pressure can be done based on rock classifica"on as listed in Table
2 of IS: 12070. The presump"ve value for various rock types listed here are mul"plied with the
correc"on factors according to the geological condi"ons as given in Clause 9.2, IS: 12070.

b) Based on rock mass ra"ng (RMR value)

Table 3 in IS: 12070 gives net allowable pressure. This ensures seHlement of founda"on up to 6m
thickness to be less than 12 mm for raD founda"ons.

Classifica%on No I II III IV V
RMR 100-81 80-61 60-41 40-21 20-0
Qns (t/m2) 600-448 440-288 280-141 135-48 45-30

AA/HD/2598
Page 14
c) Based on core strength of intact rock specimen

Rock mass with favourable characteris"cs that is, the safe bearing pressure is es"mated as

qs = qc x Nj

where

qs = safe bearing pressure (gross), qc = average uniaxial compressive strength of rock cores,

Nj = empirical coefficient depending on the spacing of discon"nui"es

Spacing of Discon%nui%es (cm) Nj

300 0.4
100-300 0.25
30-100 0.1
The safe bearing pressure obtained is mul"plied with the correc"on factor according to the
geological condi"ons to get the allowable bearing pressure as given in Clause 9.2 of IS: 12070.

Correc"on factor includes correc"ons for,

• Submerged Condi"on Under Water Table

• Cavi"es (Major cavi"es inside limestone)

• Slopes

11. PILE FOUNDATIONS

The total ver"cal load carrying capacity of pile founda"on is a combina"on of skin fric"on
resistance along the surface and end bearing resistance at pile "p, when Piles are installed
through layered soils. The pile design in soD soils has rela"vely high skin fric"on resistance and
granular soils have high end bearing resistance. Generally piles res"ng on sound rock can be

AA/HD/2598
Page 15
loaded to their safe structural capacity. But for the piles res"ng on weathered rock it is necessary
to provide Socke"ng depth. In the present situa"on socke"ng depth has been considered based
on IRC 78-2014. The General prac"ce of calcula"ng Ul"mate Bearing capacity of pile is of following
categories:

a) Ul"mate load capacity calculated from end bearing resistance only

b) Ul"mate load capacity calculated from skin fric"onal resistance only

c) Ul"mate load capacity calculated from combina"on of both skin fric"on & end bearing
resistance

d) Ul"mate load capacity calculated from end bearing resistance and ul"mate side socket
shear in case of piles res"ng on rock.

11.1. Pile Capacity in soil

The Ul"mate capacity of Pile in soil shall be calculated using following equa"on:

Q u =Q ep +Q sf

Qu =A p∗(C p∗N c +q∗N q +0 . 5∗D∗γ∗N γ )+(( ∑ K∗P Di *tan δ )∗Asi +α∗C∗As )

Where,

Qu = Total Ul"mate capacity of pile in Soil

Qep = Ul"mate End bearing resistance

Qsf = Ul"mate Skin fric"onal resistance

Cp = Average cohesion at pile "p

AA/HD/2598
Page 16
Nc = Bearing capacity factor as per IS 2911(Part 1)

q = Effec"ve over-burden pressure at pile "p

Nq, Nγ = Bearing Capacity factors depending on angle of internal fric"on 'Ø'

g = Effec"ve Unit weight of bearing soil layer

D = Diameter of the pile.

AP = Cross sec"onal area of base of pile.

K = Coefficient of earth pressure

PDi = Effec"ve overburden pressure at center of gravity of the pile

δ = Angle of wall fric"on between pile and soil (taken as 2/3 of Ø)

Asi = Surface area of the pile stem.

a = Reduc"on factor as per IS 2911(Part 1)

As = Surface area of the pile shaD.

C = Average cohesion through out the length of the Pile.

Total Safe capacity of the pile in soils is obtained by dividing the ul"mate capacity with a factor of
safety of 2.5 for both end bearing resistance and skin fric"on resistance.
Q ep Q sf
Q s= + W p
F .S F . S

Where,

Qs = Total Safe capacity of pile in Soil

Qep = Ul"mate End bearing resistance

Qsf = Ul"mate Skin fric"onal resistance

AA/HD/2598
Page 17
Wp = Weight of Pile

F.S. = Factor of Safety = 2.5

11.2. Lateral Capacity of Pile in Soils

It is important to determine, whether pile will behave as a short rigid element or as an infinity long
elas"c member. This can be done by calcula"ng s"ffness factor R\T, for par"cular combina"on of
pile and soil. The s"ffness factors T and R are given as,

T = (EI/ηh)1/5 for sands and normally loaded clays;

R = (EI/KB)1/4 for preloaded clays

where K1 and K2 are constants given in Table 3 and 4 of 2911-Part I - 2 (2010)

E is the Young's Modulus of the Pile material

I is the Moment of Iner"a of the Cross Sec"on

Criteria for short rigid and long flexible piles (Appendix-C)

Short (rigid) Pile: Le/T or Le/R ≤ 2

Long (Elas"c) Pile: Le/T ≥ 4 or Le/R ≥ 3.5

To calculate the safe lateral capacity of long pile, the method explained in IS 2911(Part 1) has been
used.

11.3. Capacity of piles in Intermediate Geomaterial and Rock

The ul"mate load carrying capacity may be calculated from one of the two approaches given
below:

AA/HD/2598
Page 18
IRC: 78– 2014 suggests the following methods for calcula on of pile capaci es

Method:1 This method is applicable if Cores of the rock are obtained and Unconfined Compressive
Strength derived using standard method of tes"ng.

Qu = Re + Raf =Ksp qc df Ab + AsCus


where,
Qu = Ul"mate Capacity of Pile socketed in rock

Re = Ul"mate End Bearing

Raf = Ul"mate Side Socket Shear

Ksp = An Empirical Co-efficient whose value ranges from 0.3 to 1.2 as per the table
given below for the rocks where core recovery is reported and cores tested for
Uniaxial Compressive Strength.

(CR+RQD)/ 2 Ksp

30% 0.3

100% 1.2

CR = Core Recovery in %

RQD = Rock Quality Designa"on in %

For Intermediate values, Ksp shall be linearly interpolated.

qc = Average Unconfined Compressive strength of Core below base of pile


for a depth twice the diameter /least lateral dimension of pile in Mpa.

Ab = Cross sec"onal area of base of Pile

AA/HD/2598
Page 19
df = Depth Factor = 1 + 0.4 Length of Socket/ Diameter of Socket. However,
value of df, should not be taken more 1.2.

As = Surface area of Socket

Cus = Ul"mate Shear strength along socket length = 0.225√qc

For calcula"on of Socket resistance the same should be restricted to 3 MPa.

Method: 2

This method is applicable when cores or core tes"ng results are not available or when geo-
material is highly fragmented. The shear strength of geo-material is obtained from its correla"on
with extrapolated SPT values for 300mm of penetra"on as given in table below. Also for weak rock
like Chalk, mudstone, claystone, shale and other intermediate rocks this method is preferred.

Shear Strength/ Consistency Moderately Weak Weak Very Weak

Approx 'N' Value 300 – 200 200 – 100 100 – 60

Shear Strength/ Cohesion in MPa 3.3 – 1.9


1.9 – 0.7 0.7 – 0.4

Qu = Re+R af = Cub Nc Ab+ AsCus

Where,

Cub = Average shear strength below base of pile for the depth twice the diameter /least
lateral dimension of the pile

Cus = Ul"mate Shear strength along socket length =0.225√qc

AA/HD/2598
Page 20
For calcula"on of Socket resistance the same should be restricted to 3 MPa.

Nc = 9

Total Safe capacity of the pile in rock is obtained from above ul"mate capacity divided by factor of
safety of 3 for end bearing resistance and 6 for side socket shear resistance.
Re R af
Q s= +
F .S F .S

Qu = Ul"mate Capacity of Pile socketed in rock

Re = Ul"mate End Bearing

Raf = Ul"mate Side Socket Shear

11.4. Moment Carrying Capacity of Socketed Piles

For the socketed pile, the socket length in the Rock may be calculated from following equa"on:

L s=2
H
σ1 D
H2

+ 4 2 2 +6
σ1 D σ
M
1D

where,

L = Socket length

H = Horizontal force at top of the socket

M = Moment at the top of the socket

D = Diameter of the pile.

σ 1 = Permissible compressive strength in Rock which is leaser of 30 kg/sq.cm or 0.33qc

ln case of socketed piles, for the sa"sfactory performance of the socket as fixed "p, the rota"on at
the top of the socket for the fixed condi"on(q) should be less than or equal to 5 percent of the
rota"on for the pinned condi"on at the top of the socket(q).
AA/HD/2598
Page 21
12. SUMMARY OF FOUNDATION RECOMMENDATIONS

Shallow Founda%ons (VUP,LVUP Structures)

Size of Depth of
Chainage Type of Ground RL Type of Fdn. Level
S.No Span (m) Loca%on Founda%on SBC (t/m2) Founda%on Remarks
(Km) Structure (m) founda%on (m)
BxL (m) from GL (m)
SBC w.r.t to 1.5m
1 98+587 LVUP 1 x 12.0 26.95 RaD 12x26 25.954 10.0 1.0
replacement
2 100+290 VUP 1 x 20.0 Abutment 35.7 Isolated 7x26 31.200 35 4.5

Shallow Founda%ons (Minor Bridge Structures)

Depth of
Size of
Chainage Span Ground Scour Type of Founda%on Founda%on SBC
S.No Structure LBL Loca%on Founda%on Remarks
(Km) (m) RL/IL (m) Level (m) founda%on Level (m) from GL/IL ( t/m2)
BxL (m)
(m)
SBC is w.r.t 1.5 m
1 89+535 Box MIB 1 x 10.0 21.661 22.1 - 16.244 RaD 10x41.5 20.961 0.7 10
Replacement

AA/HD/2598 Page 22
Depth of
Size of
Chainage Span Ground Scour Type of Founda%on Founda%on SBC
S.No Structure LBL Loca%on Founda%on Remarks
(Km) (m) RL/IL (m) Level (m) founda%on Level (m) from GL/IL ( t/m2)
BxL (m)
(m)
2 90+535 Box MIB 2 x 6.0 21.26 21.26 - 16.967 RaD 13.4x29.5 20.56 0.7 12
SBC of 15t/m2 is
3 97+092 Box MIB 1 x 6.0 22.378 22.378 RaD 6x30.5 1 15 achievable with
1.0m replacement
SBC is w.r.t 1.5 m
4 97+448 Box MIB 1 x 6.0 22.878 22.878 - - RaD 6x30.5 22.18 0.7 12
Replacement
SBC is w.r.t 1.5 m
5 97+664 Box MIB 1 x 6.0 22.884 22.884 - - RaD 6x14 22.28 0.6 10
Replacement
SBC is w.r.t 1.5 m
6 97+774 Box MIB 1 x 6.0 23.014 23.014 - - RaD 6x14 22.41 0.6 10
Replacement
7 98+260 Box MIB 1 x 6.0 22.044 22.044 - - RaD 6x14 21.34 0.7 12
SBC is w.r.t 1.5 m
8 98+501 Box MIB 1 x 6 x 3 27.534 27.534 - 25.001 RaD 6x35.43 26.93 0.6 10.5
Replacement
SBC is w.r.t 1.5 m
9 98+625 Box MIB 1 x 6.0 20.664 20.664 - - RaD 6x38 19.76 0.9 10.5
Replacement
10 99+041 Box MIB 1 x 6.0 22.024 22.024 - 26.774 RaD 6x14 21.32 0.7 10.5 SBC is w.r.t 1.5 m

AA/HD/2598 Page 23
Depth of
Size of
Chainage Span Ground Scour Type of Founda%on Founda%on SBC
S.No Structure LBL Loca%on Founda%on Remarks
(Km) (m) RL/IL (m) Level (m) founda%on Level (m) from GL/IL ( t/m2)
BxL (m)
(m)
Replacement
11 99+242 Box MIB 1 x 6.0 22.734 22.734 - - RaD 6x14 22.13 0.6 10.5
1x6x
12 102+102 Box MIB 29.994 29.994 - 32.680 RaD 6x26 29.29 0.7 12
3.0
1x6x
13 102+483 Box MIB 34.004 33.340 - - RaD 6x26 32.64 0.7 12
3.0
14 103+109 Box MIB 1 x 6.0 33.824 33.824 - - RaD 6x26 33.02 0.8 12
15 103+430 Box MIB 3 x 6.0 32 32 - - RaD 3x6x32.39 31.3 0.7 12
1x6x
16 103+777 Box MIB 30.764 30.764 - 33.901 RaD 6x26 30.06 0.7 12
3.0
17 104+436 Box MIB 2 x 3.0 27.534 27.534 - 24.134 RaD 6x34.47 26.93 0.6 12
18 105+370 Box MIB 1 x 6.0 26.249 26.249 - - RaD 6x26 25.55 0.7 12
19 105+684 MIB 1 x 16.0 21.610 21.610 Abutment 19.388 Isolated 8.0x11.5 4.222 4.3 35

AA/HD/2598 Page 24
Pile Founda%ons (VUP Structure)

Depth of
Chainage Type of Ground RL Type of Pile Pile %p Axial Lateral
S.No Span (m) Loca%on Founda%on Remarks
(Km) Structure (m) founda%on dia. (m) level (m) Capacity (T) capacity (T)
from GL (m)
1 97+000 VUP 1 x 20.0 Abutment 26.5 Pile -0.500 320 30 27

Pile Founda%ons (Minor Bridge Structures)

Depth of Axial Lateral


Chainage Ground Scour Type of Dia. Of Pile Tip
S.No Structure Span (m) Loca%on LBL Founda%on Capacity capacity Remarks
(Km) RL/IL (m) Level (m) founda%on Pile(m) level(m)
from GL (m) of Pile (T) of pile (T)
1 87+779 MIB 1 x 25.0 Abutment 20.700 20.37 17.936 Pile 1.2 -23.3 45 300 29
MIB - Gas
2 89+560 1 x 20.0 Abutment 22.677 22.677 - Pile 1.2 -2.32 25 350 24
Pipe Line
3 92+706 MIB 1 x 20.0 Abutment 20.440 20.4 19.532 Pile 1.2 -6.56 27 450 45
4 95+587 MIB 1 x 20.0 Abutment 21.190 21.190 20.582 Pile 1.2 -18.81 40 300 23

AA/HD/2598 Page 25
Note:
1. For Minor Bridges where raD founda"on is suggested, necessary scour protec"on works are recommended.
2. At all the loca"ons wherever SBC is recommended considering rock strata minimum embedment depth of 1.50 m shall be ensured for open founda"ons.
3. When replacement mar"al is to be placed over loose cohesive strata, In such case in situ strata shall be compacted prior to the placement of replacement
material to avoid immediate seHlement.
4. For pile "p res"ng in soil, minimum spacing between any two adjacent piles in pile group should be greater than or equal to 3 "mes the pile diameter. For
pile socketed inside rock, minimum spacing between any two adjacent piles in pile group should be greater than or equal to 2 "mes the pile diameter.
5. Pile length men"oned in the recommenda"on does not dimensions of pile cap.
6. For Culverts res"ng on SoD Soil/Black coHon soils, minimum Replacement of 0.50m shall be done with compacted layers of Coarse Sand/Stone
dust/Granular material un"l and unless specified otherwise.

13. LIMITATIONS

Recommenda"ons contained in this report are based on our field observa"ons, subsurface explora"on, laboratory tests and some assump"ons. It is possible that
soil condi"ons could vary between or beyond the points explored. If soil condi"ons encountered during construc"on differs from those described herein,
concerned person at construc"on is requested to no"fy the same immediately to the Designer.

AA/HD/2598 Page 26
ANNEXURES
Borelogs with summary of test
results
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 87+779 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 20.700 Starting Date: 29/11/2023
Structure: MIB
Water Table, m: 1.20 Completed Date: 31/11/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 45.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1 1.20
1.50 1 2 2 4 SS 1.50 19.200 Light Brown, Very Loose, Fine Silty
SM

SAND
1.95
2

3.00 UDS Collected UDS 3.00 17.700 3.00


3

4
4.50 2 2 2 4 SS 4.50 16.200 Greyish Black, Soft, Silty CLAY with
CI
29/11/2023

trace of sand
4.95
5

6.00 2 4 5 9 SS 6.00 14.700 6.00


6
6.45

7
7.50 4 6 7 13 SS 7.50 13.200 Light Brown, Loose to Medium Dense,
SM

Fine Silty SAND


7.95
8

9.00 2 2 3 5 SS 9.00 11.700 9.00


9
9.45
CI

Greyish Black, Medium Stiff, Silty CLAY


10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 87+779 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 20.700 Starting Date: 29/11/2023
Structure: MIB
Water Depth, m: 1.20 Completed Date: 31/11/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 45.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 UDS Collected UDS 10.50 10.200

11
CI

Greyish Black, Medium Stiff, Silty CLAY


12.0 2 3 3 6 SS 12.00 8.700
12
12.45

13
13.5 3 5 7 12 SS 13.50 7.200 13.5

13.95
14
29/11/2023

15.0 1 2 2 4 SS 15.00 5.700


15
15.45

16

16.5 1 3 3 6 SS 16.50 4.200 Greyish Brown, Loose to Medium


SM

Dense, Fine Silty SAND


16.95
17

18.0 4 6 6 12 SS 18.00 2.700


18
18.45

19

19.5 8 12 15 27 SS 19.50 1.200 19.5


Greyish Black, Very Stiff to Hard, Silty
CH

19.95
20 CLAY
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 87+779 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 20.700 Starting Date: 29/11/2023
Structure: MIB
Water Depth, m: 1.20 Completed Date: 31/11/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 45.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

21.0 7 14 19 33 SS 21.00 -0.300


21
21.45

22

22.5 9 21 23 44 SS 22.50 -1.800

22.95
23

24.0 8 18 24 42 SS 24.00 -3.300


24
24.45
31/11/2023

Greyish Black, Very Stiff to Hard, Silty


CH

25
CLAY
25.5 7 9 12 21 SS 25.50 -4.800

25.95
26

27.0 16 23 29 52 SS 27.00 -6.300


27
27.45

28
28.5 19 26 33 59 SS 28.50 -7.800

28.95
29

30 30.0 18 28 36 64 SS 30.00 -9.300 30.0


Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 4 OF 6
150mm in
Bore Hole Number: 1 Chainage: 87+779 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 20.700 Starting Date: 29/11/2023
Structure: MIB
Water Depth, m: 1.20 Completed Date: 31/11/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 45.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

31
31.5 25 30 37 67 SS 31.50 -10.800

32

33.0 24 32 33 65 SS 33.00 -12.300


33

34
34.5 27 28 36 64 SS 34.50 -13.800
31/11/2023

Greyish Black, Very Stiff to Hard, Silty


CH

35
CLAY

36.0 24 33 34 67 SS 36.00 -15.300


36

37

37.5 27 30 39 69 SS 37.50 -16.800

38

39 39.0 30 34 36 70 SS 39.00 -18.300

40
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 5 OF 6
150mm in
Bore Hole Number: 1 Chainage: 87+779 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 20.700 Starting Date: 29/11/2023
Structure: MIB
Water Depth, m: 1.20 Completed Date: 31/11/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 45.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

40.5 32 35 38 73 SS 40.50 -19.800

41

42
31/11/2023

42.0 24 30 38 68 SS 42.00 -21.300


Greyish Black, Very Stiff to Hard, Silty
CH

CLAY

43

43.5 30 34 40 74 SS 43.50 -22.800

44

45.0 25 31 38 69 SS 45.00 -24.300 45.0


45

46

47

48

49

50
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)

Dry Density(g/cm3)
Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Silt Factor (Ksf)


Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€

C (kg/cm²)
Gravel (%)

Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 0.6 4 6 10.5 NP 0.0 0.0 74.0 26 - - - - - - - 2.49 SM

UDS 3.0 - 0 23.5 35.8 16.5 19.3 0.6 22.5 0.0 8.0 92 28 64 2.72 1.37 - - - 0.373 0.030 - CI

SS 4.5 4 4 27.7 38.4 15.5 22.9 0.5 25.4 - - - - - - - - - - - - 2.89 CI

SS 6.0 9 12 22.5 NP 0.0 0.0 73.0 27 - - - - - - - - - 1.76 SM

SS 7.5 13 15 21.5 NP 0.0 0.0 85.0 15 - - 2.65 - - - - - - 1.57 SM

SS 9.0 5 5 25.6 36.8 16.6 20.2 0.6 20.5 - - - - - - - - - - - - 3.00 CI

UDS 10.5 - 0 25.8 39.5 15.5 24.0 0.6 22.6 - - - - - - - 1.36 - 0.32 - - - CI

SS 12.0 6 6 26.5 40.5 16.8 23.7 0.6 22.5 - - - - - - - - - - - - 3.10 CI


87+779

SS 13.5 12 12 18.5 NP 0.0 0.0 77.0 23 - - - - - - - - - 1.52 SM


BH-1

SS 15.0 4 4 21.5 NP 0.0 0.0 81.0 19 - - - - - - - - - 1.42 SM

SS 16.5 6 6 25.5 NP 0.0 0.0 80.0 20 - - 2.66 - - - - - - 0.91 SM

SS 18.0 12 11 24.0 NP 0.0 0.0 75.0 25 - - - - - - - - - 0.91 SM

SS 19.5 27 27 22.5 54.6 22.5 32.1 1.0 46.5 - - - - - - - - - - - - 4.32 CH

SS 21.0 33 33 25.7 52.4 23.4 29.0 0.9 45.8 - - - - - - - - - - - - 4.57 CH

SS 22.5 44 44 27.6 67.5 22.9 44.6 0.9 41.6 - - - - - - - - - - - - 4.97 CH

SS 24.0 42 42 23.6 58.4 23.5 34.9 1.0 48.9 - - - - - - - - - - - - 4.90 CH

SS 25.5 21 21 28.6 54.5 25.4 29.1 0.9 55.8 - - - - - - - - - - - - 4.05 CH

SS 27.0 52 52 24.6 60.5 28.5 32.1 1.1 56.7 - - - - - - - - - - - - 5.22 CH


SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)

Dry Density(g/cm3)
Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Silt Factor (Ksf)


Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€

C (kg/cm²)
Gravel (%)

Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 28.5 59 59 26.8 51.8 24.8 27.0 0.9 52.1 - - - - - - - - - - - - 5.44 CH

SS 30.0 64 64 25.6 52.8 20.5 32.3 0.8 50.5 - - - - - - - - - - - - 5.58 CH

SS 31.5 67 67 24.5 51.2 20.8 30.4 0.9 50.8 - - - - - - - - - - - - - CH

SS 33.0 65 65 25.6 51.9 21.5 30.4 0.9 48.5 - - - - - - - - - - - - - CH

SS 34.5 64 64 27.4 53.2 22.4 30.8 0.8 47.9 - - - - - - - - - - - - - CH


87+779

SS 36.0 67 67 26.5 54.3 20.4 33.9 0.8 46.2 - - - - - - - - - - - - - CH


BH-1

SS 37.5 69 69 24.1 51.2 20.9 30.3 0.9 49.5 - - - - - - - - - - - - - CH

SS 39.0 70 70 25.2 51.9 24.5 27.4 1.0 48.7 - - - - - - - - - - - - - CH

SS 40.5 73 73 26.3 53.4 22.4 31.0 0.9 50.2 - - - - - - - - - - - - - CH

SS 42.0 68 68 24.3 53.7 23.5 30.2 1.0 50.7 - - - - - - - - - - - - - CH

SS 43.5 74 74 25.1 58.9 22.6 36.3 0.9 53.4 - - - - - - - - - - - - - CH

SS 45.0 69 69 24.3 55.8 24.8 31.0 1.0 54.2 - - - - - - - - - - - - - CH

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 89+535 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 21.661 Starting Date: 30/11/2023
Structure: Box MIB
Water Table, m: 0.60 Completed Date: 01/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 25.50
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

0.60

1
1.50 2 2 3 5 SS 1.50 20.161

1.95
2

3.00 UDS Collected UDS 3.00 18.661


3
Greyish Black, Soft to Medium Stiff, Silty
CH

CLAY with trace of sand

4
4.50 1 2 2 4 SS 4.50 17.161
30/11/2023

4.95
5

6.00 UDS Slipped UDS 6.00 15.661


6

6.50 2 2 3 5 SS 6.50 15.161 6.50

6.95
7
7.50 2 3 3 6 SS 7.50 14.161

7.95
8
Greyish Black, Medium Stiff, Silty CLAY
CI

with trace of sand

9.00 UDS Collected UDS 9.00 12.661


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 89+535 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 21.661 Starting Date: 30/11/2023
Structure: Box MIB
Water Depth, m: 0.60 Completed Date: 01/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 25.50
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 2 3 4 7 SS 10.50 11.161

10.95
CI

11 Greyish Black, Medium Stiff, Silty CLAY

12.0 6 12 13 25 SS 12.00 9.661 12.0


12
30/11/2023

12.45

13
13.5 9 16 19 35 SS 13.50 8.161

13.95
14

15.0 10 14 24 38 SS 15.00 6.661


15
15.45

Greyish Brown, Medium Dense to


Dense, Fine Silty SAND
SM

16

16.5 12 18 23 41 SS 16.50 5.161

16.95
17
01/12/2023

18.0 10 16 24 40 SS 18.00 3.661


18
18.45

19

19.5 14 22 32 54 SS 19.50 2.161


Greyish Brown, Very Dense, Fine Silty
19.95
20 SAND
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 89+535 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 21.661 Starting Date: 30/11/2023
Structure: Box MIB
Water Depth, m: 0.60 Completed Date: 01/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 25.50
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

Greyish Brown, Very Dense, Fine Silty


SM SAND
21.0 18 31 36 67 SS 21.00 0.661 21.0
21
21.45

22
01/12/2023

22.5 18 32 46 78 SS 22.50 -0.839

22.95
23
SP-SM

Greyish Brown, Very Dense, Poorly


graded SAND

24.0 28 49 51/10cm SS 24.00 -2.339


24

25
25.5 38 100/14cm SS 25.50 -3.839 25.5

26

27

28

29

30
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)

Dry Density(g/cm3)
Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€

C (kg/cm²)
Gravel (%)

Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 0.6 5 5 27.5 50.4 20.5 29.9 0.8 32.5 - - - - - - - - - - - - CH

UDS 3.0 - 0 25.5 55.0 19.8 35.2 0.8 40.5 0.0 8.0 92 40 52 2.72 1.41 - - - 0.37 0.02 CH

SS 4.5 4 4 23.9 52.8 17.5 35.3 0.8 41.0 - - - - - - - - - - - CH

SS 6.5 5 5 28.4 41.4 16.7 24.7 0.5 38.7 - - - - - - - - - - - - CI

SS 7.5 6 6 25.5 41.6 17.7 23.9 0.7 36.6 - - - - - - - - - - - - CI

UDS 9.0 - 0 28.4 38.5 15.6 22.9 0.4 36.4 0.0 6.0 94 38 56 2.72 - 1.3 - 0.30 - - CI

SS 10.5 7 7 25.5 35.5 14.4 21.1 0.5 29.7 - - - - - - - - - - - - CI

SS 12.0 25 20 14.8 NP 0.0 0.0 65.0 35 25 10 - - - - - - - SM


89+535

BH-1

SS 13.5 35 24 15.1 NP 0.0 0.0 68.0 32 20 12 2.67 - - - - - - SM

SS 15.0 38 25 14.6 NP 0.0 0.0 77.0 23 - - - - - - - - - SM

SS 16.5 41 25 18.5 NP 0.0 0.0 72.0 28 - - - - - - - - - SM

SS 18.0 40 24 20.5 NP 0.0 0.0 85.0 15 - - 2.65 - - - - - - SM

SS 19.5 54 29 19.5 NP 0.0 0.0 80.0 20 - - - - - - - - - SM

SS 21.0 67 33 11.3 NP 0.0 3.0 88.0 9 - - - - - - - - - SP-SM

SS 22.5 78 36 12.5 NP 0.0 2.0 90.0 8 - - - - - - - - - SP-SM

SS 24.0 100 43 10.5 NP 0.0 1.0 92.0 7 - - 2.65 - - - - - - SP-SM

SS 25.5 100 42 12.5 NP 0.0 2.0 88.0 10 - - - - - - - - - SP-SM

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 89+560 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.677 Starting Date: 30/11/2023
Structure: MIB- Gas Pipe Line
Water Table, m: 0.60 Completed Date: 01/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 25.50
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

0.60

1
1.50 2 2 3 5 SS 1.50 21.177

1.95
2

3.00 UDS Collected UDS 3.00 19.677


3
Greyish Black, Soft to Medium Stiff, Silty
CH

CLAY with trace of sand

4
4.50 1 2 2 4 SS 4.50 18.177
30/11/2023

4.95
5

6.00 UDS Slipped UDS 6.00 16.677


6

6.50 2 2 3 5 SS 6.50 16.177 6.50

6.95
7
7.50 2 3 3 6 SS 7.50 15.177

7.95
8
Greyish Black, Medium Stiff, Silty CLAY
CI

with trace of sand

9.00 UDS Collected UDS 9.00 13.677


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 89+560 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.677 Starting Date: 30/11/2023
Structure: MIB- Gas Pipe Line
Water Depth, m: 0.60 Completed Date: 01/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 25.50
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 2 3 4 7 SS 10.50 12.177

10.95
CI

11 Greyish Black, Medium Stiff, Silty CLAY

12.0 6 12 13 25 SS 12.00 10.677 12.0


12
30/11/2023

12.45

13
13.5 9 16 19 35 SS 13.50 9.177

13.95
14

15.0 10 14 24 38 SS 15.00 7.677


15
15.45

Greyish Brown, Medium Dense to


Dense, Fine Silty SAND
SM

16

16.5 12 18 23 41 SS 16.50 6.177

16.95
17
01/12/2023

18.0 10 16 24 40 SS 18.00 4.677


18
18.45

19

19.5 14 22 32 54 SS 19.50 3.177


Greyish Brown, Very Dense, Fine Silty
19.95
20 SAND
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 89+560 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.677 Starting Date: 30/11/2023
Structure: MIB- Gas Pipe Line
Water Depth, m: 0.60 Completed Date: 01/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 25.50
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

Greyish Brown, Very Dense, Fine Silty


SM SAND
21.0 18 31 36 67 SS 21.00 1.677 21.0
21
21.45

22
01/12/2023

22.5 18 32 46 78 SS 22.50 0.177

22.95
23
SP-SM

Greyish Brown, Very Dense, Poorly


graded SAND

24.0 28 49 51/10cm SS 24.00 -1.323


24

25
25.5 38 100/14cm SS 25.50 -2.823 25.5

26

27

28

29

30
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)

Dry Density(g/cm3)
Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€

C (kg/cm²)
Gravel (%)

Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 0.6 5 5 27.5 50.4 20.5 29.9 0.8 32.5 - - - - - - - - - - - - CH

UDS 3.0 - 0 25.5 55.0 19.8 35.2 0.8 40.5 0.0 8.0 92 40 52 2.72 1.41 - - - 0.37 0.02 CH

SS 4.5 4 4 23.9 52.8 17.5 35.3 0.8 41.0 - - - - - - - - - - - CH

SS 6.5 5 5 28.4 41.4 16.7 24.7 0.5 38.7 - - - - - - - - - - - - CI

SS 7.5 6 6 25.5 41.6 17.7 23.9 0.7 36.6 - - - - - - - - - - - - CI

UDS 9.0 - 0 28.4 38.5 15.6 22.9 0.4 36.4 0.0 6.0 94 38 56 2.72 - 1.3 - 0.30 - - CI

SS 10.5 7 7 25.5 35.5 14.4 21.1 0.5 29.7 - - - - - - - - - - - - CI

SS 12.0 25 20 14.8 NP 0.0 0.0 65.0 35 25 10 - - - - - - - SM


89+560

BH-1

SS 13.5 35 24 15.1 NP 0.0 0.0 68.0 32 20 12 2.67 - - - - - - SM

SS 15.0 38 25 14.6 NP 0.0 0.0 77.0 23 - - - - - - - - - SM

SS 16.5 41 25 18.5 NP 0.0 0.0 72.0 28 - - - - - - - - - SM

SS 18.0 40 24 20.5 NP 0.0 0.0 85.0 15 - - 2.65 - - - - - - SM

SS 19.5 54 29 19.5 NP 0.0 0.0 80.0 20 - - - - - - - - - SM

SS 21.0 67 33 11.3 NP 0.0 3.0 88.0 9 - - - - - - - - - SP-SM

SS 22.5 78 36 12.5 NP 0.0 2.0 90.0 8 - - - - - - - - - SP-SM

SS 24.0 100 43 10.5 NP 0.0 1.0 92.0 7 - - 2.65 - - - - - - SP-SM

SS 25.5 100 42 12.5 NP 0.0 2.0 88.0 10 - - - - - - - - - SP-SM

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 90+535 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 21.259 Starting Date: 30/11/2023
Structure: Box MIB
Water Table, m: 0.60 Completed Date: 01/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 25.50
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

0.60

1
1.50 2 2 3 5 SS 1.50 19.759

1.95
2

3.00 UDS Collected UDS 3.00 18.259


3
Greyish Black, Soft to Medium Stiff, Silty
CH

CLAY with trace of sand

4
4.50 1 2 2 4 SS 4.50 16.759
30/11/2023

4.95
5

6.00 UDS Slipped UDS 6.00 15.259


6

6.50 2 2 3 5 SS 6.50 14.759 6.50

6.95
7
7.50 2 3 3 6 SS 7.50 13.759

7.95
8
Greyish Black, Medium Stiff, Silty CLAY
CI

with trace of sand

9.00 UDS Collected UDS 9.00 12.259


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 90+535 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 21.259 Starting Date: 30/11/2023
Structure: Box MIB
Water Depth, m: 0.60 Completed Date: 01/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 25.50
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 2 3 4 7 SS 10.50 10.759

10.95
CI

11 Greyish Black, Medium Stiff, Silty CLAY

12.0 6 12 13 25 SS 12.00 9.259 12.0


12
30/11/2023

12.45

13
13.5 9 16 19 35 SS 13.50 7.759

13.95
14

15.0 10 14 24 38 SS 15.00 6.259


15
15.45

Greyish Brown, Medium Dense to


Dense, Fine Silty SAND
SM

16

16.5 12 18 23 41 SS 16.50 4.759

16.95
17
01/12/2023

18.0 10 16 24 40 SS 18.00 3.259


18
18.45

19

19.5 14 22 32 54 SS 19.50 1.759


Greyish Brown, Very Dense, Fine Silty
19.95
20 SAND
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 90+535 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 21.259 Starting Date: 30/11/2023
Structure: Box MIB
Water Depth, m: 0.60 Completed Date: 01/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 25.50
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

Greyish Brown, Very Dense, Fine Silty


SM SAND
21.0 18 31 36 67 SS 21.00 0.259 21.0
21
21.45

22
01/12/2023

22.5 18 32 46 78 SS 22.50 -1.241

22.95
23
SP-SM

Greyish Brown, Very Dense, Poorly


graded SAND

24.0 28 49 51/10cm SS 24.00 -2.741


24

25
25.5 38 100/14cm SS 25.50 -4.241 25.5

26

27

28

29

30
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)

Dry Density(g/cm3)
Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€

C (kg/cm²)
Gravel (%)

Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 0.6 5 5 27.5 50.4 20.5 29.9 0.8 32.5 - - - - - - - - - - - - CH

UDS 3.0 - 0 25.5 55.0 19.8 35.2 0.8 40.5 0.0 8.0 92 40 52 2.72 1.41 - - - 0.37 0.02 CH

SS 4.5 4 4 23.9 52.8 17.5 35.3 0.8 41.0 - - - - - - - - - - - CH

SS 6.5 5 5 28.4 41.4 16.7 24.7 0.5 38.7 - - - - - - - - - - - - CI

SS 7.5 6 6 25.5 41.6 17.7 23.9 0.7 36.6 - - - - - - - - - - - - CI

UDS 9.0 - 0 28.4 38.5 15.6 22.9 0.4 36.4 0.0 6.0 94 38 56 2.72 - 1.3 - 0.30 - - CI

SS 10.5 7 7 25.5 35.5 14.4 21.1 0.5 29.7 - - - - - - - - - - - - CI

SS 12.0 25 20 14.8 NP 0.0 0.0 65.0 35 25 10 - - - - - - - SM


90+535

BH-1

SS 13.5 35 24 15.1 NP 0.0 0.0 68.0 32 20 12 2.67 - - - - - - SM

SS 15.0 38 25 14.6 NP 0.0 0.0 77.0 23 - - - - - - - - - SM

SS 16.5 41 25 18.5 NP 0.0 0.0 72.0 28 - - - - - - - - - SM

SS 18.0 40 24 20.5 NP 0.0 0.0 85.0 15 - - 2.65 - - - - - - SM

SS 19.5 54 29 19.5 NP 0.0 0.0 80.0 20 - - - - - - - - - SM

SS 21.0 67 33 11.3 NP 0.0 3.0 88.0 9 - - - - - - - - - SP-SM

SS 22.5 78 36 12.5 NP 0.0 2.0 90.0 8 - - - - - - - - - SP-SM

SS 24.0 100 43 10.5 NP 0.0 1.0 92.0 7 - - 2.65 - - - - - - SP-SM

SS 25.5 100 42 12.5 NP 0.0 2.0 88.0 10 - - - - - - - - - SP-SM

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 92+706 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 20.440 Starting Date: 01/12/2023
Structure: MIB
Water Table, m: 2.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 4 4 6 10 SS 1.50 18.940

1.95
2

2.80
3.00 2 2 4 6 SS 3.00 17.440
3
3.45
Greyish Brown, Medium Stiff to Stiff,
Silty CLAY with trace of sand
4
4.50 3 4 5 9 SS 4.50 15.940
01/12/2023

4.95
5
CI

6.00 UDS Collected UDS 6.00 14.440


6

7
7.50 7 8 13 21 SS 7.50 12.940

7.95
8

Greyish Brown, Very Stiff, Silty CLAY


9.00 9 10 13 23 SS 9.00 11.440
9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 92+706 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 20.440 Starting Date: 01/12/2023
Structure: MIB
Water Depth, m: 2.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

CL Greyish Brown, Very Stiff, Silty CLAY


10.5 21 32 41 73 SS 10.50 9.940 10.5

10.95
11

12.0 29 42 56 98 SS 12.00 8.440


12
12.45

13
13.5 46 73 27/9 cm SS 13.50 6.940

14
02/12/2023

15.0 52 78 22/8 cm SS 15.00 5.440


15
Browinsh Grey, Very Dense, Fine Silty
SM

SAND

16

16.5 58 79 21/6 cm SS 16.50 -16.500

17

18.0 60 80 20/7 cm SS 18.00 -18.000


18

19 19.5 56 78 22/7 cm SS 19.50 -19.500

20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 92+706 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 20.440 Starting Date: 01/12/2023
Structure: MIB
Water Depth, m: 2.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

21 21.0 61 78 22/5 cm SS 21.00 -0.560

22

22.5 63 79 21/4 cm SS 22.50 -2.060

23
02/12/2023

Browinsh Grey, Very Dense, Fine Silty


SM
SAND

24 24.0 67 77 23/5 cm SS 24.00 -3.560

25
25.5 61 80 20/5 cm SS 25.50 -5.060

26

27 27.0 68 82 12/5 cm SS 27.00 -6.560 27

28

29

30
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Shear
Hydrometer
Consistency Properties Gradation Properties Strength Consolidation

Natural Moisture Content


Analysis

Ground Water Table (m)


Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)

Silt Factor (Ksf)


Specific Gravity
Type of Sample

SPT "N" Value

Silt&Clay (%)

Cv (mm²/Sec)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 0.6 10 10 23.9 40.7 20.5 20.2 0.8 22.5 - - - - - - - - - - - - 3.41 CI

SS 3.0 6 6 27.5 41.5 19.7 21.8 0.6 35.5 - - - - - - - - - - - - 3.10 CI

SS 4.5 9 9 25.6 35.9 15.5 20.4 0.5 31.5 - - - - - - - - - - - - 3.34 CI

UDS 6.0 - 0 25.9 37.8 16.5 21.3 0.6 35.5 0.0 11.0 89 36 53.0 2.71 1.36 - - - 0.36 0.03 - CI

SS 7.5 21 21 26.5 45.6 20.5 25.1 0.8 36.5 - - - - - - - - - - - - 4.05 CI

SS 9.0 23 23 25.6 46.5 21.5 25.0 0.8 34.5 - - - - - - - - - - - - 4.14 CI

SS 10.5 71 44 18.6 NP 0.0 0.0 77.0 23 - - - - - - - - - 1.30 SM

SS 12.0 98 55 17.8 NP 0.0 0.0 72.0 28 - - - - - - - - - 1.50 SM


92+706

SS 13.5 100 53 11.5 NP 0.0 0.0 82.0 18 - - - - - - - - - 1.53 SM


BH-1

SS 15.0 100 51 10.8 NP 0.0 0.0 88.0 12 - - - - - - - - - 0.93 SM

SS 16.5 100 52 11.2 NP - - - - - - - - - - - - - - SM

SS 18.0 100 53 10.7 NP - - - - - - - - - - - - - - SM

SS 19.5 100 54 10.6 NP - - - - - - - - - - - - - - SM

SS 21.0 100 52 11.7 NP - - - - - - - - - - - - - - SM

SS 22.5 100 53 10.2 NP - - - - - - - - - - - - - - SM

SS 24.0 100 54 11.4 NP - - - - - - - - - - - - - - SM

SS 25.5 100 51 10.8 NP - - - - - - - - - - - - - - SM

SS 27.0 100 52 10.9 NP - - - - - - - - - - - - - - SM


DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 95+587 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 21.190 Starting Date: 01/12/2023
Structure: MIB
Water Table, m: 3.80 Completed Date: 04/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 40.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 1 2 2 4 SS 1.50 19.690

1.95
2

3.00 UDS Collected UDS 3.00 18.190


3

3.80
4
4.50 2 2 3 5 SS 4.50 16.690
01/12/2023

4.95
5 Greyish Black, Soft to Medium Stiff, Silty
CI

CLAY with trace of sand

6.00 UDS Collected UDS 6.00 15.190


6

7
7.50 2 3 3 6 SS 7.50 13.690

7.95
8

9.00 UDS Collected UDS 9.00 12.190


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 95+587 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 21.190 Starting Date: 01/12/2023
Structure: MIB
Water Depth, m: 3.80 Completed Date: 04/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 40.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 4 5 6 11 SS 10.50 10.690

10.95
CI

11 Greyish Black, Stiff, Silty CLAY

12.0 41 68 32/5cm S 12.00 9.190 12.0


12
02/12/2023

13
13.5 57 100/12cm SS 13.50 7.690

14

15.0 73 100/6cm UDS 15.00 6.190 Greyish Brown, Very Dense, Clayey
15
SC

SAND

16

16.5 63 100/10cm SS 16.50 4.690

17
03/12/2023

18.0 18 25 24 49 SS 18.00 3.190 18.0


18
18.45
CH

19 19.5 21 26 29 55 SS 19.50 40.690 Greyish Black, Hard, Silty CLAY

19.95

20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 95+587 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 21.190 Starting Date: 01/12/2023
Structure: MIB
Water Depth, m: 3.80 Completed Date: 04/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 40.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

21.0 23 27 30 57 SS 21.00 0.190


21
21.45
03/12/2023

22

22.5 31 39 43 82 SS 22.50 -1.310

22.95
23

24.0 34 44 52 96 SS 24.00 -2.810


24
24.45
CH

25 Greyish Black, Hard, Silty CLAY


25.5 41 59 41/5cm SS 25.50 -4.310

26
04/12/2023

27.0 31 42 48 90 SS 27.00 -5.810


27
27.45

28
28.5 29 44 51 95 SS 28.50 -28.50

28.95
29

30 30.0 33 49 51/8cm SS 30.0 -8.810 30.0


Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 4 OF 6
150mm in
Bore Hole Number: 1 Chainage: 95+587 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 21.190 Starting Date: 01/12/2023
Structure: MIB
Water Depth, m: 3.80 Completed Date: 04/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 40.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

31
31.5 32 48 52/7cm SS 31.5 -10.310

31.95
32

33 33.0 35 45 55/8cm SS 33.0 -11.810

33.45

34

34.5 38 46 54/7cm SS 34.5 -13.310


04/12/2023

34.95
CH

35 Greyish Black, Hard, Silty CLAY

36 36.0 32 50 50/8cm SS 36.0 -14.810

36.45

37

37.5 35 55 45/8cm SS 37.5 -16.310


37.95
38

39 39.0 36 54 46/9cm SS 39.0 -17.810

39.45

40 40.0 34 52 48/8cm SS 40.0 -18.810 30.0


Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)

Dry Density(g/cm3)
Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Silt Factor (Ksf)


Specific Gravity
Type of Sample

SPT "N" Value

Silt&Clay (%)

Cv (mm²/Sec)
Borehole No.

IS - Notation
Void Ratio€

C (kg/cm²)
Gravel (%)

Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 4 4 23.5 40.5 17.7 22.8 0.7 22.5 - - - - - - - - - - - - 2.89 CI

UDS 3.0 3.8 - 0 27.5 42.6 18.5 24.1 0.6 21.6 0.0 15.0 85 21 64 2.71 1.47 - - - 0.42 0.03 - CI

SS 4.5 5 5 25.0 41.5 17.5 24.0 0.7 23.5 - - - - - - - - - - - - 3.00 CI

UDS 6.0 - - 28.6 38.5 15.5 23.0 0.4 26.4 0.0 8.0 92 28 64 2.72 - 1.32 - 0.42 - - - CI

SS 7.5 6 6 25.5 38.4 16.5 21.9 0.6 25.4 - - - - - - - - - - - 3.10 CI

UDS 9.0 - - 28.4 47.5 17.5 30.0 0.6 26.5 0.0 12.0 88 24 64 2.71 - 1.38 - 0.28 - - - CI

SS 10.5 11 11 29.5 46.2 18.5 27.7 0.6 23.5 - - - - - - - - - - - - 3.48 CI

SS 12.0 100 75 12.8 25.5 NP 10.1 0.0 53.0 47 - - - - - - - - - 1.52 SC

SS 13.5 100 75 17.9 23.5 NP 11.5 0.0 55.0 45 30 15 2.67 - - - - - - 1.53 SC

SS 15.0 100 75 14.6 12.8 NP 10.5 0.0 58.0 42 - - - - - - - - - 0.82 SC


95+587

BH-1

SS 16.5 100 75 15.5 15.6 NP 10.0 0.0 51.0 49 37 12 2.67 - - - - - - 1.33 SC

SS 18.0 49 49 22.5 54.6 20.1 34.5 0.9 41.0 - - - - - - - - - - - - 5.13 CH

SS 19.5 55 55 23.6 50.7 21.0 29.7 0.9 45.7 - - - - - - - - - - - - 5.32 CH

SS 21.0 57 57 27.5 52.6 23.5 29.1 0.9 42.5 - - - - - - - - - - - - 5.38 CH

SS 22.5 82 82 25.9 67.5 28.9 38.6 1.1 50.5 - - - - - - - - - - - - 6.05 CH

SS 24.0 96 96 23.8 58.4 23.5 34.9 1.0 52.5 - - - - - - - - - - - - 6.38 CH

SS 25.5 100 100 27.6 54.8 22.0 32.8 0.8 48.7 - - - - - - - - - - - - 6.47 CH

SS 27.0 90 90 29.9 56.5 26.6 29.9 0.9 42.5 - - - - - - - - - - - - 6.24 CH

SS 28.5 95 95 28.5 61.0 29.9 31.1 1.0 50.4 - - - - - - - - - - - - 6.36 CH

SS 30.0 100 100 25.9 53.5 25.5 28.0 1.0 48.5 - - - - - - - - - - - - 6.47 CH

SS 31.5 100 100 25.8 55.2 24.5 30.7 1.0 50.2 - - - - - - - - - - - - - CH


SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)

Dry Density(g/cm3)
Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Silt Factor (Ksf)


Specific Gravity
Type of Sample

SPT "N" Value

Silt&Clay (%)

Cv (mm²/Sec)
Borehole No.

IS - Notation
Void Ratio€

C (kg/cm²)
Gravel (%)

Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 33.0 100 100 27.5 55.6 22.8 32.8 0.9 50.9 - - - - - - - - - - - - - CH

SS 34.5 100 100 27.6 58.2 25.9 32.3 0.9 51.0 - - - - - - - - - - - - - CH


95+587

SS 36.0 100 100 28.1 55.2 24.7 30.5 0.9 52.7 - - - - - - - - - - - - - CH


BH-1

SS 37.5 100 100 26.8 55.9 25.9 30.0 1.0 50.9 - - - - - - - - - - - - - CH

SS 39.0 100 100 27.5 58.8 26.8 32.0 1.0 49.8 - - - - - - - - - - - - - CH

SS 40.0 100 100 29.2 57.9 24.4 33.5 0.9 48.5 - - - - - - - - - - - - - CH

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 97+000 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 26.500 Starting Date: 02/12/2023
Structure: VUP
Water Table, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

0.80
1
1.50 1 2 2 4 SS 1.50 25.000

1.95
2
Greyish Black, Soft, Silty CLAY with
CL

trace of sand

3.00 UDS Collected UDS 3.00 23.500


3

4
4.50 4 6 7 13 SS 4.50 22.000 4.50
02/12/2023

4.95
5

6.00 4 7 10 17 SS 6.00 20.500 Greyish Brown, Medium Dense, Fine


6
Silty SAND
6.45

7
SM

7.50 12 23 28 51 SS 7.50 19.000

7.95
8

Greyish Brown, Very Dense, Fine Silty


9.00 15 26 33 59 SS 9.00 17.500 SAND
9
9.45

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 97+000 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 26.500 Starting Date: 02/12/2023
Structure: VUP
Water Depth, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

Greyish Brown, Very Dense, Fine Silty

SM
10.5 18 31 41 72 SS 10.50 16.000 10.5 SAND

11

12 12.0 24 28 36 64 SS 12.00 14.500

12.45

13

13.5 27 29 36 65 SS 13.50 13.000

13.95
14
02/12/2023

15 15.0 25 31 37 68 SS 15.00 11.500


CH

Greyish Black, Soft, Silty CLAY


15.45

16

16.5 28 34 35 69 SS 16.50 10.000

17 16.95

18.0 27 28 34 62 SS 18.00 8.500


18
18.45

19

19.5 20 29 34 63 SS 19.50 7.000

20 19.95
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 97+000 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 26.500 Starting Date: 02/12/2023
Structure: VUP
Water Depth, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

21 21.0 20 31 40 71 SS 21.00 5.500


21.45

22

22.5 25 28 37 65 SS 22.50 4.000


22.95
23
CH

Greyish Black, Soft, Silty CLAY

24 24.0 24 28 32 60 SS 24.00 2.500


24.45
02/12/2023

25

25.5 26 30 37 67 SS 25.50 1.000

26 25.95

27 27.0 29 34 37 71 SS 27.00 -0.500


27.45

28

29

30
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

Cv (mm²/Sec)
SPT "N" Value

Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 4 4 25.5 35.4 18.0 17.4 0.6 21.5 - - - - - - - - - - - - CL
0.8
UDS 3.0 - 0 26.5 37.5 17.0 20.5 0.5 20.8 0.0 7.0 93 31 62 2.72 1.25 - - - 0.230 0.027 CL

SS 4.5 13 16 12.8 NP 0.0 0.0 66.0 34 22 12 - - - - - - - SM

SS 6.0 17 18 11.6 NP 0.0 0.0 55.0 45 30 15 2.67 - - - - - - SM

SS 7.5 51 38 10.5 NP 0.0 0.0 73.0 27 - - - - - - - - - SM

SS 9.0 59 40 12.5 NP 0.0 0.0 82.0 18 - - 2.65 - - - - - - SM

SS 10.5 72 44 10.4 NP 0.0 0.0 80.0 20 - - - - - - - - - SM

SS 12.0 64 64 25.6 52.8 20.5 32.3 0.8 50.5 - - - - - - - - - - - - CH


97+000

SS 13.5 65 65 24.5 51.2 20.8 30.4 0.9 50.8 - - - - - - - - - - - - CH


BH-1

SS 15.0 68 68 25.6 51.9 21.5 30.4 0.9 48.5 - - - - - - - - - - - - CH

SS 16.5 69 69 27.4 53.2 22.4 30.8 0.8 47.9 - - - - - - - - - - - - CH

SS 18.0 62 62 26.5 54.3 20.4 33.9 0.8 46.2 - - - - - - - - - - - - CH

SS 19.5 63 63 24.1 51.2 20.9 30.3 0.9 49.5 - - - - - - - - - - - - CH

SS 21.0 71 71 25.2 51.9 24.5 27.4 1.0 48.7 - - - - - - - - - - - - CH

SS 22.5 65 65 26.3 53.4 22.4 31.0 0.9 50.2 - - - - - - - - - - - - CH

SS 24.0 60 60 24.3 53.7 23.5 30.2 1.0 50.7 - - - - - - - - - - - - CH

SS 25.5 72 72 25.1 58.9 22.6 36.3 0.9 53.4 - - - - - - - - - - - - CH

SS 27.0 76 76 24.3 55.8 24.8 31.0 1.0 54.2 - - - - - - - - - - - - CH

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 97+092 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.378 Starting Date: 02/12/2023
Structure: Box MIB
Water Table, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

0.80
1
1.50 1 2 2 4 SS 1.50 20.878

1.95
2
Greyish Black, Soft, Silty CLAY with
CL

trace of sand

3.00 UDS Collected UDS 3.00 19.378


3

4
4.50 4 6 7 13 SS 4.50 17.878 4.50
02/12/2023

4.95
5

6.00 4 7 10 17 SS 6.00 16.378 Greyish Brown, Medium Dense, Fine


6
Silty SAND
6.45

7
SM

7.50 12 23 28 51 SS 7.50 14.878

7.95
8

Greyish Brown, Very Dense, Fine Silty


9.00 15 26 33 59 SS 9.00 13.378 SAND
9
9.45

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 97+092 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.378 Starting Date: 02/12/2023
Structure: Box MIB
Water Depth, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

Greyish Brown, Very Dense, Fine Silty

SM
10.5 18 31 41 72 SS 10.50 11.878 10.5 SAND

11

12 12.0 24 28 36 64 SS 12.00 10.378

12.45

13

13.5 27 29 36 65 SS 13.50 8.878

13.95
14
02/12/2023

15 15.0 25 31 37 68 SS 15.00 7.378


CH

Greyish Black, Soft, Silty CLAY


15.45

16

16.5 28 34 35 69 SS 16.50 5.878

17 16.95

18.0 27 28 34 62 SS 18.00 4.378


18
18.45

19

19.5 20 29 34 63 SS 19.50 2.878

20 19.95
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 97+092 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.378 Starting Date: 02/12/2023
Structure: Box MIB
Water Depth, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

21 21.0 20 31 40 71 SS 21.00 1.378


21.45

22

22.5 25 28 37 65 SS 22.50 -0.122


22.95
23
CH

Greyish Black, Soft, Silty CLAY

24 24.0 24 28 32 60 SS 24.00 -1.622


24.45
02/12/2023

25

25.5 26 30 37 67 SS 25.50 -3.122

26 25.95

27 27.0 29 34 37 71 SS 27.00 -4.622


27.45

28

29

30
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

Cv (mm²/Sec)
SPT "N" Value

Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 4 4 25.5 35.4 18.0 17.4 0.6 21.5 - - - - - - - - - - - - CL
0.8
UDS 3.0 - 0 26.5 37.5 17.0 20.5 0.5 20.8 0.0 7.0 93 31 62 2.72 1.25 - - - 0.230 0.027 CL

SS 4.5 13 16 12.8 NP 0.0 0.0 66.0 34 22 12 - - - - - - - SM

SS 6.0 17 18 11.6 NP 0.0 0.0 55.0 45 30 15 2.67 - - - - - - SM

SS 7.5 51 38 10.5 NP 0.0 0.0 73.0 27 - - - - - - - - - SM

SS 9.0 59 40 12.5 NP 0.0 0.0 82.0 18 - - 2.65 - - - - - - SM

SS 10.5 72 44 10.4 NP 0.0 0.0 80.0 20 - - - - - - - - - SM

SS 12.0 64 64 25.6 52.8 20.5 32.3 0.8 50.5 - - - - - - - - - - - - CH


97+092

SS 13.5 65 65 24.5 51.2 20.8 30.4 0.9 50.8 - - - - - - - - - - - - CH


BH-1

SS 15.0 68 68 25.6 51.9 21.5 30.4 0.9 48.5 - - - - - - - - - - - - CH

SS 16.5 69 69 27.4 53.2 22.4 30.8 0.8 47.9 - - - - - - - - - - - - CH

SS 18.0 62 62 26.5 54.3 20.4 33.9 0.8 46.2 - - - - - - - - - - - - CH

SS 19.5 63 63 24.1 51.2 20.9 30.3 0.9 49.5 - - - - - - - - - - - - CH

SS 21.0 71 71 25.2 51.9 24.5 27.4 1.0 48.7 - - - - - - - - - - - - CH

SS 22.5 65 65 26.3 53.4 22.4 31.0 0.9 50.2 - - - - - - - - - - - - CH

SS 24.0 60 60 24.3 53.7 23.5 30.2 1.0 50.7 - - - - - - - - - - - - CH

SS 25.5 72 72 25.1 58.9 22.6 36.3 0.9 53.4 - - - - - - - - - - - - CH

SS 27.0 76 76 24.3 55.8 24.8 31.0 1.0 54.2 - - - - - - - - - - - - CH

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 97+448 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.878 Starting Date: 02/12/2023
Structure: Box MIB
Water Table, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

0.80
1
1.50 1 2 2 4 SS 1.50 21.378

1.95
2
Greyish Black, Soft, Silty CLAY with
CL

trace of sand

3.00 UDS Collected UDS 3.00 19.878


3

4
4.50 4 6 7 13 SS 4.50 18.378 4.50
02/12/2023

4.95
5

6.00 4 7 10 17 SS 6.00 16.878 Greyish Brown, Medium Dense, Fine


6
Silty SAND
6.45

7
SM

7.50 12 23 28 51 SS 7.50 15.378

7.95
8

Greyish Brown, Very Dense, Fine Silty


9.00 15 26 33 59 SS 9.00 13.878 SAND
9
9.45

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 97+448 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.878 Starting Date: 02/12/2023
Structure: Box MIB
Water Depth, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

Greyish Brown, Very Dense, Fine Silty

SM
10.5 18 31 41 72 SS 10.50 12.378 10.5 SAND

11

12 12.0 24 28 36 64 SS 12.00 10.878

12.45

13

13.5 27 29 36 65 SS 13.50 9.378

13.95
14
02/12/2023

15 15.0 25 31 37 68 SS 15.00 7.878


CH

Greyish Black, Soft, Silty CLAY


15.45

16

16.5 28 34 35 69 SS 16.50 6.378

17 16.95

18.0 27 28 34 62 SS 18.00 4.878


18
18.45

19

19.5 20 29 34 63 SS 19.50 3.378

20 19.95
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 97+448 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.878 Starting Date: 02/12/2023
Structure: Box MIB
Water Depth, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

21 21.0 20 31 40 71 SS 21.00 1.878


21.45

22

22.5 25 28 37 65 SS 22.50 0.378


22.95
23
CH

Greyish Black, Soft, Silty CLAY

24 24.0 24 28 32 60 SS 24.00 -1.122


24.45
02/12/2023

25

25.5 26 30 37 67 SS 25.50 -2.622

26 25.95

27 27.0 29 34 37 71 SS 27.00 -4.122


27.45

28

29

30
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

Cv (mm²/Sec)
SPT "N" Value

Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 4 4 25.5 35.4 18.0 17.4 0.6 21.5 - - - - - - - - - - - - CL
0.8
UDS 3.0 - 0 26.5 37.5 17.0 20.5 0.5 20.8 0.0 7.0 93 31 62 2.72 1.25 - - - 0.230 0.027 CL

SS 4.5 13 16 12.8 NP 0.0 0.0 66.0 34 22 12 - - - - - - - SM

SS 6.0 17 18 11.6 NP 0.0 0.0 55.0 45 30 15 2.67 - - - - - - SM

SS 7.5 51 38 10.5 NP 0.0 0.0 73.0 27 - - - - - - - - - SM

SS 9.0 59 40 12.5 NP 0.0 0.0 82.0 18 - - 2.65 - - - - - - SM

SS 10.5 72 44 10.4 NP 0.0 0.0 80.0 20 - - - - - - - - - SM

SS 12.0 64 64 25.6 52.8 20.5 32.3 0.8 50.5 - - - - - - - - - - - - CH


97+448

SS 13.5 65 65 24.5 51.2 20.8 30.4 0.9 50.8 - - - - - - - - - - - - CH


BH-1

SS 15.0 68 68 25.6 51.9 21.5 30.4 0.9 48.5 - - - - - - - - - - - - CH

SS 16.5 69 69 27.4 53.2 22.4 30.8 0.8 47.9 - - - - - - - - - - - - CH

SS 18.0 62 62 26.5 54.3 20.4 33.9 0.8 46.2 - - - - - - - - - - - - CH

SS 19.5 63 63 24.1 51.2 20.9 30.3 0.9 49.5 - - - - - - - - - - - - CH

SS 21.0 71 71 25.2 51.9 24.5 27.4 1.0 48.7 - - - - - - - - - - - - CH

SS 22.5 65 65 26.3 53.4 22.4 31.0 0.9 50.2 - - - - - - - - - - - - CH

SS 24.0 60 60 24.3 53.7 23.5 30.2 1.0 50.7 - - - - - - - - - - - - CH

SS 25.5 72 72 25.1 58.9 22.6 36.3 0.9 53.4 - - - - - - - - - - - - CH

SS 27.0 76 76 24.3 55.8 24.8 31.0 1.0 54.2 - - - - - - - - - - - - CH

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 97+664 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.884 Starting Date: 02/12/2023
Structure: Box MIB
Water Table, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

0.80
1
1.50 1 2 2 4 SS 1.50 21.384

1.95
2
Greyish Black, Soft, Silty CLAY with
CL

trace of sand

3.00 UDS Collected UDS 3.00 19.884


3

4
4.50 4 6 7 13 SS 4.50 18.384 4.50
02/12/2023

4.95
5

6.00 4 7 10 17 SS 6.00 16.884 Greyish Brown, Medium Dense, Fine


6
Silty SAND
6.45

7
SM

7.50 12 23 28 51 SS 7.50 15.384

7.95
8

Greyish Brown, Very Dense, Fine Silty


9.00 15 26 33 59 SS 9.00 13.884 SAND
9
9.45

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 97+664 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.884 Starting Date: 02/12/2023
Structure: Box MIB
Water Depth, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

Greyish Brown, Very Dense, Fine Silty

SM
10.5 18 31 41 72 SS 10.50 12.384 10.5 SAND

11

12 12.0 24 28 36 64 SS 12.00 10.884

12.45

13

13.5 27 29 36 65 SS 13.50 9.384

13.95
14
02/12/2023

15 15.0 25 31 37 68 SS 15.00 7.884


CH

Greyish Black, Soft, Silty CLAY


15.45

16

16.5 28 34 35 69 SS 16.50 6.384

17 16.95

18.0 27 28 34 62 SS 18.00 4.884


18
18.45

19

19.5 20 29 34 63 SS 19.50 3.384

20 19.95
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 97+664 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.884 Starting Date: 02/12/2023
Structure: Box MIB
Water Depth, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

21 21.0 20 31 40 71 SS 21.00 1.884


21.45

22

22.5 25 28 37 65 SS 22.50 0.384


22.95
23
CH

Greyish Black, Soft, Silty CLAY

24 24.0 24 28 32 60 SS 24.00 -1.116


24.45
02/12/2023

25

25.5 26 30 37 67 SS 25.50 -2.616

26 25.95

27 27.0 29 34 37 71 SS 27.00 -4.116


27.45

28

29

30
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

Cv (mm²/Sec)
SPT "N" Value

Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 4 4 25.5 35.4 18.0 17.4 0.6 21.5 - - - - - - - - - - - - CL
0.8
UDS 3.0 - 0 26.5 37.5 17.0 20.5 0.5 20.8 0.0 7.0 93 31 62 2.72 1.25 - - - 0.230 0.027 CL

SS 4.5 13 16 12.8 NP 0.0 0.0 66.0 34 22 12 - - - - - - - SM

SS 6.0 17 18 11.6 NP 0.0 0.0 55.0 45 30 15 2.67 - - - - - - SM

SS 7.5 51 38 10.5 NP 0.0 0.0 73.0 27 - - - - - - - - - SM

SS 9.0 59 40 12.5 NP 0.0 0.0 82.0 18 - - 2.65 - - - - - - SM

SS 10.5 72 44 10.4 NP 0.0 0.0 80.0 20 - - - - - - - - - SM

SS 12.0 64 64 25.6 52.8 20.5 32.3 0.8 50.5 - - - - - - - - - - - - CH


97+664

SS 13.5 65 65 24.5 51.2 20.8 30.4 0.9 50.8 - - - - - - - - - - - - CH


BH-1

SS 15.0 68 68 25.6 51.9 21.5 30.4 0.9 48.5 - - - - - - - - - - - - CH

SS 16.5 69 69 27.4 53.2 22.4 30.8 0.8 47.9 - - - - - - - - - - - - CH

SS 18.0 62 62 26.5 54.3 20.4 33.9 0.8 46.2 - - - - - - - - - - - - CH

SS 19.5 63 63 24.1 51.2 20.9 30.3 0.9 49.5 - - - - - - - - - - - - CH

SS 21.0 71 71 25.2 51.9 24.5 27.4 1.0 48.7 - - - - - - - - - - - - CH

SS 22.5 65 65 26.3 53.4 22.4 31.0 0.9 50.2 - - - - - - - - - - - - CH

SS 24.0 60 60 24.3 53.7 23.5 30.2 1.0 50.7 - - - - - - - - - - - - CH

SS 25.5 72 72 25.1 58.9 22.6 36.3 0.9 53.4 - - - - - - - - - - - - CH

SS 27.0 76 76 24.3 55.8 24.8 31.0 1.0 54.2 - - - - - - - - - - - - CH

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 98+260 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.044 Starting Date: 02/12/2023
Structure: Sinking ground
Water Table, m: 1.90 Completed Date: 03/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 10.50
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 5 7 8 15 SS 1.50 20.544

1.90 1.95
2

3.00 6 8 9 17 SS 3.00 19.044


3
3.45
02/12/2023

4
4.50 10 11 14 25 SS 4.50 17.544 Browinsh Grey, Medium Dense to
SM

Dense, Fine Silty SAND


4.95
5

6.00 12 14 17 31 SS 6.00 16.044


6
6.45

7
7.50 16 19 23 42 SS 7.50 14.544

7.95
8
03/12/2023

9.00 15 26 33 59 SS 9.00 13.044 9.00


9
9.45
CH

Greyish Black, Hard, Silty CLAY


10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 98+260 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.044 Starting Date: 02/12/2023
Structure: Sinking ground
Water Depth, m: 1.90 Completed Date: 03/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 10.50
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

CH
Greyish Black, Hard, Silty CLAY
10.5 23 28 34 62 SS 10.50 11.544 10.5

11

12

13

14

15

16

17

18

19

20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 15 18 16.7 NP 0.0 0.0 55.0 45 30 15 2.67 - - - - - - SM
1.9
SS 3.0 17 19 18.4 NP 0.0 0.0 77.0 23 - - - - - - - - - SM

SS 4.5 25 25 15.2 NP 0.0 0.0 82.0 18 - - - - - - - - - SM


98+260

BH-1

SS 6.0 31 27 11.6 NP 0.0 0.0 76.0 24 - - 2.66 - - - - - - SM

SS 7.5 42 32 10.5 NP 0.0 0.0 88.0 12 - - - - - - - - - SM

SS 9.0 56 56 22.5 55.5 22.5 33.0 1.2 40.5 0.0 8.0 92 32 60 2.72 - - - - - - CH
SS 10.5 62 62 26.5 51.0 20.5 30.5 1.1 42.6 0.0 12.0 88 - - 2.72 - - - - - - CH
DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 0.8 5 5 26.5 50.6 20.5 30.1 0.8 45.9 - - - - - - CH

UDS 3.0 - 0 26.5 51.5 22.8 28.7 0.9 48.5 0.0 11.0 89 25 64 2.72 1.34 - - - 0.32 0.03 CH
98+501

SS 4.5 4 4 24.8 56.8 23.8 33.0 1.0 49.5 - - - - - - CH


BH-1

SS 6.0 29 25 12.5 NP 0.0 0.0 85.0 15 2.65 - - - - - - SM

SS 7.5 34 27 11.5 NP 0.0 1.0 82.0 17 - - - - - - SM

SS 9.0 36 27 10.5 NP 0.0 0.0 78.0 22 2.66 - - - - - - SM

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 98+501 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 27.534 Starting Date: 04/12/2023
Structure: Box MIB
Water Table, m: 0.80 Completed Date: 04/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 9.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

0.80
1
1.50 2 2 3 5 SS 1.50 26.034

1.95
2

3.00 UDS Collected UDS 3.00 24.534 Greyish Brown, Soft to Medium Stiff,
CH

3
Silty CLAY with trace of sand
3.45

4
4.50 2 2 2 4 SS 4.50 23.034
04/12/2023

4.95
5

6.00 8 13 16 29 SS 6.00 21.534 6.00


6
6.45

7
7.50 11 15 19 34 SS 7.50 20.034
SM

Greyish Brown, Dense, Fine Silty SAND


7.95
8

9.00 10 14 22 36 SS 9.00 18.534 9.00


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 0.8 5 5 26.5 50.6 20.5 30.1 0.8 45.9 - - - - - - CH

UDS 3.0 - 0 26.5 51.5 22.8 28.7 0.9 48.5 0.0 11.0 89 25 64 2.72 1.34 - - - 0.32 0.03 CH
98+587

SS 4.5 4 4 24.8 56.8 23.8 33.0 1.0 49.5 - - - - - - CH


BH-1

SS 6.0 29 25 12.5 NP 0.0 0.0 85.0 15 2.65 - - - - - - SM

SS 7.5 34 27 11.5 NP 0.0 1.0 82.0 17 - - - - - - SM

SS 9.0 36 27 10.5 NP 0.0 0.0 78.0 22 2.66 - - - - - - SM

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 98+587 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 26.954 Starting Date: 04/12/2023
Structure: LVUP
Water Table, m: 0.80 Completed Date: 04/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 9.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

0.80
1
1.50 2 2 3 5 SS 1.50 25.454

1.95
2

3.00 UDS Collected UDS 3.00 23.954 Greyish Brown, Soft to Medium Stiff,
CH

3
Silty CLAY with trace of sand
3.45

4
4.50 2 2 2 4 SS 4.50 22.454
04/12/2023

4.95
5

6.00 8 13 16 29 SS 6.00 20.954 6.00


6
6.45

7
7.50 11 15 19 34 SS 7.50 19.454
SM

Greyish Brown, Dense, Fine Silty SAND


7.95
8

9.00 10 14 22 36 SS 9.00 17.954 9.00


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 98+625 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 20.664 Starting Date: 04/12/2023
Structure: Box MIB
Water Table, m: 0.80 Completed Date: 04/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 9.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

0.80
1
1.50 2 2 3 5 SS 1.50 19.164

1.95
2

3.00 UDS Collected UDS 3.00 17.664 Greyish Brown, Soft to Medium Stiff,
CH

3
Silty CLAY with trace of sand
3.45

4
4.50 2 2 2 4 SS 4.50 16.164
04/12/2023

4.95
5

6.00 8 13 16 29 SS 6.00 14.664 6.00


6
6.45

7
7.50 11 15 19 34 SS 7.50 13.164
SM

Greyish Brown, Dense, Fine Silty SAND


7.95
8

9.00 10 14 22 36 SS 9.00 11.664 9.00


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 0.8 5 5 26.5 50.6 20.5 30.1 0.8 45.9 - - - - - - CH

UDS 3.0 - 0 26.5 51.5 22.8 28.7 0.9 48.5 0.0 11.0 89 25 64 2.72 1.34 - - - 0.32 0.03 CH
98+625

SS 4.5 4 4 24.8 56.8 23.8 33.0 1.0 49.5 - - - - - - CH


BH-1

SS 6.0 29 25 12.5 NP 0.0 0.0 85.0 15 2.65 - - - - - - SM

SS 7.5 34 27 11.5 NP 0.0 1.0 82.0 17 - - - - - - SM

SS 9.0 36 27 10.5 NP 0.0 0.0 78.0 22 2.66 - - - - - - SM

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 98+774 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 23.014 Starting Date: 02/12/2023
Structure: Box MIB
Water Table, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

0.80
1
1.50 1 2 2 4 SS 1.50 21.514

1.95
2
Greyish Black, Soft, Silty CLAY with
CL

trace of sand

3.00 UDS Collected UDS 3.00 20.014


3

4
4.50 4 6 7 13 SS 4.50 18.514 4.50
02/12/2023

4.95
5

6.00 4 7 10 17 SS 6.00 17.014 Greyish Brown, Medium Dense, Fine


6
Silty SAND
6.45

7
SM

7.50 12 23 28 51 SS 7.50 15.514

7.95
8

Greyish Brown, Very Dense, Fine Silty


9.00 15 26 33 59 SS 9.00 14.014 SAND
9
9.45

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 98+774 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 23.014 Starting Date: 02/12/2023
Structure: Box MIB
Water Depth, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

Greyish Brown, Very Dense, Fine Silty

SM
10.5 18 31 41 72 SS 10.50 12.514 10.5 SAND

11

12 12.0 24 28 36 64 SS 12.00 11.014

12.45

13

13.5 27 29 36 65 SS 13.50 9.514

13.95
14
02/12/2023

15 15.0 25 31 37 68 SS 15.00 8.014


CH

Greyish Black, Soft, Silty CLAY


15.45

16

16.5 28 34 35 69 SS 16.50 6.514

17 16.95

18.0 27 28 34 62 SS 18.00 5.014


18
18.45

19

19.5 20 29 34 63 SS 19.50 3.514

20 19.95
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 98+774 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 23.014 Starting Date: 02/12/2023
Structure: Box MIB
Water Depth, m: 0.80 Completed Date: 02/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 27.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

21 21.0 20 31 40 71 SS 21.00 2.014


21.45

22

22.5 25 28 37 65 SS 22.50 0.514


22.95
23
CH

Greyish Black, Soft, Silty CLAY

24 24.0 24 28 32 60 SS 24.00 -0.986


24.45
02/12/2023

25

25.5 26 30 37 67 SS 25.50 -2.486

26 25.95

27 27.0 29 34 37 71 SS 27.00 -3.986


27.45

28

29

30
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

Cv (mm²/Sec)
SPT "N" Value

Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 4 4 25.5 35.4 18.0 17.4 0.6 21.5 - - - - - - - - - - - - CL
0.8
UDS 3.0 - 0 26.5 37.5 17.0 20.5 0.5 20.8 0.0 7.0 93 31 62 2.72 1.25 - - - 0.230 0.027 CL

SS 4.5 13 16 12.8 NP 0.0 0.0 66.0 34 22 12 - - - - - - - SM

SS 6.0 17 18 11.6 NP 0.0 0.0 55.0 45 30 15 2.67 - - - - - - SM

SS 7.5 51 38 10.5 NP 0.0 0.0 73.0 27 - - - - - - - - - SM

SS 9.0 59 40 12.5 NP 0.0 0.0 82.0 18 - - 2.65 - - - - - - SM

SS 10.5 72 44 10.4 NP 0.0 0.0 80.0 20 - - - - - - - - - SM

SS 12.0 64 64 25.6 52.8 20.5 32.3 0.8 50.5 - - - - - - - - - - - - CH


98+774

SS 13.5 65 65 24.5 51.2 20.8 30.4 0.9 50.8 - - - - - - - - - - - - CH


BH-1

SS 15.0 68 68 25.6 51.9 21.5 30.4 0.9 48.5 - - - - - - - - - - - - CH

SS 16.5 69 69 27.4 53.2 22.4 30.8 0.8 47.9 - - - - - - - - - - - - CH

SS 18.0 62 62 26.5 54.3 20.4 33.9 0.8 46.2 - - - - - - - - - - - - CH

SS 19.5 63 63 24.1 51.2 20.9 30.3 0.9 49.5 - - - - - - - - - - - - CH

SS 21.0 71 71 25.2 51.9 24.5 27.4 1.0 48.7 - - - - - - - - - - - - CH

SS 22.5 65 65 26.3 53.4 22.4 31.0 0.9 50.2 - - - - - - - - - - - - CH

SS 24.0 60 60 24.3 53.7 23.5 30.2 1.0 50.7 - - - - - - - - - - - - CH

SS 25.5 72 72 25.1 58.9 22.6 36.3 0.9 53.4 - - - - - - - - - - - - CH

SS 27.0 76 76 24.3 55.8 24.8 31.0 1.0 54.2 - - - - - - - - - - - - CH

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 99+041 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.024 Starting Date: 04/12/2023
Structure: Box MIB
Water Table, m: 0.80 Completed Date: 04/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 9.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

0.80
1
1.50 2 2 3 5 SS 1.50 20.524

1.95
2

3.00 UDS Collected UDS 3.00 19.024 Greyish Brown, Soft to Medium Stiff,
CH

3
Silty CLAY with trace of sand
3.45

4
4.50 2 2 2 4 SS 4.50 17.524
04/12/2023

4.95
5

6.00 8 13 16 29 SS 6.00 16.024 6.00


6
6.45

7
7.50 11 15 19 34 SS 7.50 14.524
SM

Greyish Brown, Dense, Fine Silty SAND


7.95
8

9.00 10 14 22 36 SS 9.00 13.024 9.00


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 0.8 5 5 26.5 50.6 20.5 30.1 0.8 45.9 - - - - - - CH

UDS 3.0 - 0 26.5 51.5 22.8 28.7 0.9 48.5 0.0 11.0 89 25 64 2.72 1.34 - - - 0.32 0.03 CH
99+041

SS 4.5 4 4 24.8 56.8 23.8 33.0 1.0 49.5 - - - - - - CH


BH-1

SS 6.0 29 25 12.5 NP 0.0 0.0 85.0 15 2.65 - - - - - - SM

SS 7.5 34 27 11.5 NP 0.0 1.0 82.0 17 - - - - - - SM

SS 9.0 36 27 10.5 NP 0.0 0.0 78.0 22 2.66 - - - - - - SM

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 99+242 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.734 Starting Date: 04/12/2023
Structure: Box MIB
Water Table, m: 0.90 Completed Date: 04/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 10.50
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

0.90
1
1.50 10 16 21 37 SS 1.50 21.234

1.95
2

3.00 13 18 26 44 SS 3.00 19.734


3
3.45

4
4.50 16 21 34 55 SS 4.50 18.234
04/12/2023

4.95
5
CI

Greyish Brown, Hard Silty CLAY

6.00 23 34 41 75 SS 6.00 16.734


6
6.45

7
7.50 20 40 49 89 SS 7.50 15.234

7.95
8

9.00 28 45 55/9cm SS 9.00 13.734


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 99+242 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.734 Starting Date: 04/12/2023
Structure: Box MIB
Water Depth, m: 0.90 Completed Date: 04/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 10.50
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

CI
Greyish Brown, Hard Silty CLAY
10.5 34 69 31/5cm SS 10.50 12.234 10.5

11

12

13

14

15

16

17

18

19

20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 37 37 23.5 40.7 18.8 21.9 0.8 28.6 - - - - - - - - - - - - CI
0.9
SS 3.0 44 44 24.5 42.8 18.8 24.0 0.8 32.5 - - - - - - - - - - - - CI

SS 4.5 55 55 27.7 41.4 19.8 21.6 0.6 28.4 0.0 11.0 89 31 58 2.72 - - - - - - CI
99+242

BH-1

SS 6.0 75 75 28.5 35.4 18.8 16.6 0.4 26.7 - - - - - - - - - - - - CI

SS 7.5 89 89 26.8 48.5 17.7 30.8 0.7 28.5 0.0 6.0 94 38 56 2.72 - - - - - - CI

SS 9.0 100 100 28.9 36.6 18.8 17.8 0.4 29.4 - - - - - - - - - - - - CI

SS 10.5 100 100 27.0 36.5 17.7 18.8 0.5 26.8 - - - - - - - - - - - - CI

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 100+290 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 35.700 Starting Date: 04/12/2023
Structure: VUP
Water Table, m: 2.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 3 6 9 15 SS 1.50 34.200

1.95
2
2.30 Greyish Brown, Medium Dense, Fine
Silty SAND

3.00 5 8 11 19 SS 3.00 32.700


3
3.45

4
4.50 14 23 31 54 SS 4.50 31.200
SM
04/12/2023

4.95
5

6.00 19 26 37 63 SS 6.00 29.700


6
6.45

Greyish Brown, Very Dense, Fine Silty


SAND
7
7.50 25 32 39 71 SS 7.50 28.200

7.95
8

9.00 31 38 44 82 SS 9.00 26.700 9.00


9
9.45
Greyish Brown, Very Dense, Poorly
SC

graded SAND
10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 100+290 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 35.700 Starting Date: 04/12/2023
Structure: VUP
Water Depth, m: 2.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 38 41 51 92 SS 10.50 25.200

10.95
11

12.0 41 45 53 98 SS 12.00 23.700


12
05/12/2023

12.45
Greyish Brown, Very Dense, Poorly
SC

graded SAND

13
13.5 28 46 54/9cm SS 13.50 22.200

14

15.0 33 52 48/10cm SS 15.00 20.700 15.0


15

16

17

18

19

20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 15 18 15.5 NP 0.0 0.0 77.0 23 - - - - - - - - - SM
2.3
SS 3.0 19 21 13.5 NP 0.0 0.0 71.0 29 - - - - - - - - - SM

SS 4.5 54 45 16.2 NP 0.0 0.0 82.0 18 - - - - - - - - - SM

SS 6.0 53 40 14.4 NP 0.0 0.0 76.0 24 - - - - - - - - - SM


100+290

SS 7.5 71 48 13.5 NP 0.0 0.0 81.0 19 - - - - - - - - - SM


BH-1

SS 9.0 82 51 13.8 35.6 17.7 17.9 1.2 25.9 0.0 55.0 45 - - - - - - - - - SC

SS 10.5 94 54 15.5 36.5 18.5 18.0 1.2 28.4 0.0 56.0 44 9 35 2.72 - - - - - - SC

SS 12.0 98 53 16.8 35.8 16.5 19.3 1.0 26.5 0.0 62.0 38 - - - - - - - - - SC

SS 13.5 100 52 20.5 41.5 21.5 20.0 1.1 26.5 0.0 55.0 45 13 32 2.72 - - - - - - SC

SS 15.0 100 50 18.5 38.9 19.5 19.4 1.1 20.5 0.0 53.0 47 - - - - - - - - - SC

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 102+102 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 29.994 Starting Date: 04/12/2023
Structure: Box MIB
Water Table, m: 4.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 6 6 8 14 SS 1.50 28.494

1.95
2
Greyish Black, Stiff to Very Stiff, Silty
CLAY

3.00 9 11 13 24 SS 3.00 26.994


3
3.45

4
4.30
4.50 15 19 27 46 SS 4.50 25.494
04/12/2023

4.95
5
CI

6.00 17 21 30 51 SS 6.00 23.994


6
6.45

7
7.50 39 47 53/11cm SS 7.50 22.494 Greyish Black, Hard, Silty CLAY

9.00 46 61 39/5cm SS 9.00 20.994


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 102+102 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 29.994 Starting Date: 04/12/2023
Structure: Box MIB
Water Depth, m: 4.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 61 83 17/2cm SS 10.50 19.494

11

12.0 72 80 20/2cm SS 12.00 17.994


12
05/12/2023

CI

Greyish Black, Hard, Silty CLAY

13
13.5 81 100/13cm SS 13.50 16.494

14

15.0 92 100/10cm SS 15.00 14.994 15.0


15

16

17

18

19

20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 14 14 23.6 40.7 20.5 20.2 0.8 32.5 - - - - - - - - - - - CI

SS 3.0 4.3 24 24 27.5 42.5 18.8 23.7 0.6 33.4 - - - - - 2.72 - - - - - - CI

SS 4.5 46 46 32.9 41.4 21.5 19.9 0.4 32.7 0.0 7.0 93 35 58 2.72 - - - - - - CI

SS 6.0 51 51 27.6 35.4 19.9 15.5 0.5 28.9 - - - - - - - - - - - CI


102+102

SS 7.5 100 100 23.5 41.5 20.7 20.8 0.9 30.4 - - - - - - - - - - - CI


BH-1

SS 9.0 100 100 28.4 37.5 21.5 16.0 0.6 31.9 - - - - - 2.72 - - - - - - CI

SS 10.5 100 100 26.5 46.5 19.7 26.8 0.7 35.4 - - - - - - - - - - - CI

SS 12.0 100 100 25.5 38.4 18.5 19.9 0.6 35.1 0.0 10.0 90 40 50 2.72 - - - - - - CI

SS 13.5 100 100 24.8 47.5 22.6 24.9 0.9 29.7 - - - - - - - - - - - CI

SS 15.0 100 100 23.2 36.6 18.8 17.8 0.8 28.5 - - - - - 2.72 - - - - - - CI

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 102+483 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 34.004 Starting Date: 04/12/2023
Structure: Box MIB
Water Table, m: 4.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 6 6 8 14 SS 1.50 32.504

1.95
2
Greyish Black, Stiff to Very Stiff, Silty
CLAY

3.00 9 11 13 24 SS 3.00 31.004


3
3.45

4
4.30
4.50 15 19 27 46 SS 4.50 29.504
04/12/2023

4.95
5
CI

6.00 17 21 30 51 SS 6.00 28.004


6
6.45

7
7.50 39 47 53/11cm SS 7.50 26.504 Greyish Black, Hard, Silty CLAY

9.00 46 61 39/5cm SS 9.00 25.004


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 102+483 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 34.004 Starting Date: 04/12/2023
Structure: Box MIB
Water Depth, m: 4.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 61 83 17/2cm SS 10.50 23.504

11

12.0 72 80 20/2cm SS 12.00 22.004


12
05/12/2023

CI

Greyish Black, Hard, Silty CLAY

13
13.5 81 100/13cm SS 13.50 20.504

14

15.0 92 100/10cm SS 15.00 19.004 15.0


15

16

17

18

19

20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 14 14 23.6 40.7 20.5 20.2 0.8 32.5 - - - - - - - - - - - CI

SS 3.0 4.3 24 24 27.5 42.5 18.8 23.7 0.6 33.4 - - - - - 2.72 - - - - - - CI

SS 4.5 46 46 32.9 41.4 21.5 19.9 0.4 32.7 0.0 7.0 93 35 58 2.72 - - - - - - CI

SS 6.0 51 51 27.6 35.4 19.9 15.5 0.5 28.9 - - - - - - - - - - - CI


102+483

SS 7.5 100 100 23.5 41.5 20.7 20.8 0.9 30.4 - - - - - - - - - - - CI


BH-1

SS 9.0 100 100 28.4 37.5 21.5 16.0 0.6 31.9 - - - - - 2.72 - - - - - - CI

SS 10.5 100 100 26.5 46.5 19.7 26.8 0.7 35.4 - - - - - - - - - - - CI

SS 12.0 100 100 25.5 38.4 18.5 19.9 0.6 35.1 0.0 10.0 90 40 50 2.72 - - - - - - CI

SS 13.5 100 100 24.8 47.5 22.6 24.9 0.9 29.7 - - - - - - - - - - - CI

SS 15.0 100 100 23.2 36.6 18.8 17.8 0.8 28.5 - - - - - 2.72 - - - - - - CI

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 103+109 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 33.824 Starting Date: 04/12/2023
Structure: Box MIB
Water Table, m: 4.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 6 6 8 14 SS 1.50 32.324

1.95
2
Greyish Black, Stiff to Very Stiff, Silty
CLAY

3.00 9 11 13 24 SS 3.00 30.824


3
3.45

4
4.30
4.50 15 19 27 46 SS 4.50 29.324
04/12/2023

4.95
5
CI

6.00 17 21 30 51 SS 6.00 27.824


6
6.45

7
7.50 39 47 53/11cm SS 7.50 26.324 Greyish Black, Hard, Silty CLAY

9.00 46 61 39/5cm SS 9.00 24.824


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 103+109 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 33.824 Starting Date: 04/12/2023
Structure: Box MIB
Water Depth, m: 4.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 61 83 17/2cm SS 10.50 23.324

11

12.0 72 80 20/2cm SS 12.00 21.824


12
05/12/2023

CI

Greyish Black, Hard, Silty CLAY

13
13.5 81 100/13cm SS 13.50 20.324

14

15.0 92 100/10cm SS 15.00 18.824 15.0


15

16

17

18

19

20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 14 14 23.6 40.7 20.5 20.2 0.8 32.5 - - - - - - - - - - - CI

SS 3.0 4.3 24 24 27.5 42.5 18.8 23.7 0.6 33.4 - - - - - 2.72 - - - - - - CI

SS 4.5 46 46 32.9 41.4 21.5 19.9 0.4 32.7 0.0 7.0 93 35 58 2.72 - - - - - - CI

SS 6.0 51 51 27.6 35.4 19.9 15.5 0.5 28.9 - - - - - - - - - - - CI


103+109

SS 7.5 100 100 23.5 41.5 20.7 20.8 0.9 30.4 - - - - - - - - - - - CI


BH-1

SS 9.0 100 100 28.4 37.5 21.5 16.0 0.6 31.9 - - - - - 2.72 - - - - - - CI

SS 10.5 100 100 26.5 46.5 19.7 26.8 0.7 35.4 - - - - - - - - - - - CI

SS 12.0 100 100 25.5 38.4 18.5 19.9 0.6 35.1 0.0 10.0 90 40 50 2.72 - - - - - - CI

SS 13.5 100 100 24.8 47.5 22.6 24.9 0.9 29.7 - - - - - - - - - - - CI

SS 15.0 100 100 23.2 36.6 18.8 17.8 0.8 28.5 - - - - - 2.72 - - - - - - CI

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 103+430 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 32.004 Starting Date: 04/12/2023
Structure: Box MIB
Water Table, m: 4.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 6 6 8 14 SS 1.50 30.504

1.95
2
Greyish Black, Stiff to Very Stiff, Silty
CLAY

3.00 9 11 13 24 SS 3.00 29.004


3
3.45

4
4.30
4.50 15 19 27 46 SS 4.50 27.504
04/12/2023

4.95
5
CI

6.00 17 21 30 51 SS 6.00 26.004


6
6.45

7
7.50 39 47 53/11cm SS 7.50 24.504 Greyish Black, Hard, Silty CLAY

9.00 46 61 39/5cm SS 9.00 23.004


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 103+430 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 32.004 Starting Date: 04/12/2023
Structure: Box MIB
Water Depth, m: 4.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 61 83 17/2cm SS 10.50 21.504

11

12.0 72 80 20/2cm SS 12.00 20.004


12
05/12/2023

CI

Greyish Black, Hard, Silty CLAY

13
13.5 81 100/13cm SS 13.50 18.504

14

15.0 92 100/10cm SS 15.00 17.004 15.0


15

16

17

18

19

20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 14 14 23.6 40.7 20.5 20.2 0.8 32.5 - - - - - - - - - - - CI

SS 3.0 4.3 24 24 27.5 42.5 18.8 23.7 0.6 33.4 - - - - - 2.72 - - - - - - CI

SS 4.5 46 46 32.9 41.4 21.5 19.9 0.4 32.7 0.0 7.0 93 35 58 2.72 - - - - - - CI

SS 6.0 51 51 27.6 35.4 19.9 15.5 0.5 28.9 - - - - - - - - - - - CI


103+430

SS 7.5 100 100 23.5 41.5 20.7 20.8 0.9 30.4 - - - - - - - - - - - CI


BH-1

SS 9.0 100 100 28.4 37.5 21.5 16.0 0.6 31.9 - - - - - 2.72 - - - - - - CI

SS 10.5 100 100 26.5 46.5 19.7 26.8 0.7 35.4 - - - - - - - - - - - CI

SS 12.0 100 100 25.5 38.4 18.5 19.9 0.6 35.1 0.0 10.0 90 40 50 2.72 - - - - - - CI

SS 13.5 100 100 24.8 47.5 22.6 24.9 0.9 29.7 - - - - - - - - - - - CI

SS 15.0 100 100 23.2 36.6 18.8 17.8 0.8 28.5 - - - - - 2.72 - - - - - - CI

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 103+777 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 30.764 Starting Date: 04/12/2023
Structure: Box MIB
Water Table, m: 4.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 6 6 8 14 SS 1.50 29.264

1.95
2
Greyish Black, Stiff to Very Stiff, Silty
CLAY

3.00 9 11 13 24 SS 3.00 27.764


3
3.45

4
4.30
4.50 15 19 27 46 SS 4.50 26.264
04/12/2023

4.95
5
CI

6.00 17 21 30 51 SS 6.00 24.764


6
6.45

7
7.50 39 47 53/11cm SS 7.50 23.264 Greyish Black, Hard, Silty CLAY

9.00 46 61 39/5cm SS 9.00 21.764


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 103+777 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 30.764 Starting Date: 04/12/2023
Structure: Box MIB
Water Depth, m: 4.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 61 83 17/2cm SS 10.50 20.264

11

12.0 72 80 20/2cm SS 12.00 18.764


12
05/12/2023

CI

Greyish Black, Hard, Silty CLAY

13
13.5 81 100/13cm SS 13.50 17.264

14

15.0 92 100/10cm SS 15.00 15.764 15.0


15

16

17

18

19

20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 14 14 23.6 40.7 20.5 20.2 0.8 32.5 - - - - - - - - - - - CI

SS 3.0 4.3 24 24 27.5 42.5 18.8 23.7 0.6 33.4 - - - - - 2.72 - - - - - - CI

SS 4.5 46 46 32.9 41.4 21.5 19.9 0.4 32.7 0.0 7.0 93 35 58 2.72 - - - - - - CI

SS 6.0 51 51 27.6 35.4 19.9 15.5 0.5 28.9 - - - - - - - - - - - CI


103+777

SS 7.5 100 100 23.5 41.5 20.7 20.8 0.9 30.4 - - - - - - - - - - - CI


BH-1

SS 9.0 100 100 28.4 37.5 21.5 16.0 0.6 31.9 - - - - - 2.72 - - - - - - CI

SS 10.5 100 100 26.5 46.5 19.7 26.8 0.7 35.4 - - - - - - - - - - - CI

SS 12.0 100 100 25.5 38.4 18.5 19.9 0.6 35.1 0.0 10.0 90 40 50 2.72 - - - - - - CI

SS 13.5 100 100 24.8 47.5 22.6 24.9 0.9 29.7 - - - - - - - - - - - CI

SS 15.0 100 100 23.2 36.6 18.8 17.8 0.8 28.5 - - - - - 2.72 - - - - - - CI

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 104+436 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 27.534 Starting Date: 04/12/2023
Structure: Box MIB
Water Table, m: 4.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 6 6 8 14 SS 1.50 26.034

1.95
2
Greyish Black, Stiff to Very Stiff, Silty
CLAY

3.00 9 11 13 24 SS 3.00 24.534


3
3.45

4
4.30
4.50 15 19 27 46 SS 4.50 23.034
04/12/2023

4.95
5
CI

6.00 17 21 30 51 SS 6.00 21.534


6
6.45

7
7.50 39 47 53/11cm SS 7.50 20.034 Greyish Black, Hard, Silty CLAY

9.00 46 61 39/5cm SS 9.00 18.534


9

10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 104+436 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 27.534 Starting Date: 04/12/2023
Structure: Box MIB
Water Depth, m: 4.30 Completed Date: 05/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 15.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 61 83 17/2cm SS 10.50 17.034

11

12.0 72 80 20/2cm SS 12.00 15.534


12
05/12/2023

CI

Greyish Black, Hard, Silty CLAY

13
13.5 81 100/13cm SS 13.50 14.034

14

15.0 92 100/10cm SS 15.00 12.534 15.0


15

16

17

18

19

20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Gradation Properties Hydrometer Shear
Consistency Properties Analysis Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Perameters

Depth of Sample (m)

Freeswell Index (%)


Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Density(g/cm3)
Specific Gravity
Type of Sample

SPT "N" Value

Cv (mm²/Sec)
Silt&Clay (%)
Borehole No.

IS - Notation
Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)

Cc
Ip

Ic
SS 1.5 14 14 23.6 40.7 20.5 20.2 0.8 32.5 - - - - - - - - - - - CI

SS 3.0 4.3 24 24 27.5 42.5 18.8 23.7 0.6 33.4 - - - - - 2.72 - - - - - - CI

SS 4.5 46 46 32.9 41.4 21.5 19.9 0.4 32.7 0.0 7.0 93 35 58 2.72 - - - - - - CI

SS 6.0 51 51 27.6 35.4 19.9 15.5 0.5 28.9 - - - - - - - - - - - CI


104+436

SS 7.5 100 100 23.5 41.5 20.7 20.8 0.9 30.4 - - - - - - - - - - - CI


BH-1

SS 9.0 100 100 28.4 37.5 21.5 16.0 0.6 31.9 - - - - - 2.72 - - - - - - CI

SS 10.5 100 100 26.5 46.5 19.7 26.8 0.7 35.4 - - - - - - - - - - - CI

SS 12.0 100 100 25.5 38.4 18.5 19.9 0.6 35.1 0.0 10.0 90 40 50 2.72 - - - - - - CI

SS 13.5 100 100 24.8 47.5 22.6 24.9 0.9 29.7 - - - - - - - - - - - CI

SS 15.0 100 100 23.2 36.6 18.8 17.8 0.8 28.5 - - - - - 2.72 - - - - - - CI

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
SUMMARY OF LABORATORY TEST RESULTS
Shear
Hydrometer
Consistency Properties Gradation Properties Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Analysis
Perameters

Depth of Sample (m)

Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Freeswell Index

Density(g/cm3)
Specific Gravity
Type of Sample

Cv (mm²/Sec)
SPT "N" Value

Silt&Clay (%)

IS - Notation
Borehole No.

Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)
(%)

Cc
Ip

Ic
SS 1.5 23 23 26.5 54.6 22.5 32.1 0.9 28.5 - - - - - - - - - - - - CH
2.8
SS 3.0 25 25 24.5 52.4 23.5 28.9 1.0 27.6 - - - - - - - - - - - - CH

SS 4.5 7 7 25.5 51.0 20.8 30.2 0.8 28.9 - - - - - - - - - - - - CH

UDS 6.0 - - 27.5 42.8 19.8 23.0 0.7 27.8 0.0 9.0 91 27 64 2.72 1.34 - - 0.39 0.03 - CI

SS 7.5 6 6 26.5 40.7 19.5 21.2 0.7 29.9 - - - - - - - - - - - - CI

SS 9.0 38 28 16.5 NP 0.0 0.0 77.0 23 - - - - - - - - - SM

SS 10.5 54 35 15.6 NP 0.0 0.0 82.0 18 - - 2.65 - - - - - - SM


105+370

SS 12.0 100 56 13.5 NP 0.0 1.0 86.0 13 - - - - - - - - - SM


BH-1

SS 13.5 100 53 15.6 NP 0.0 2.0 88.0 10 - - 2.65 - - - - - - SM

SS 15.0 100 57 12.5 NP 0.0 1.0 79.0 20 - - - - - - - - - SM

SS 16.5 100 54 12.5 NP 0.0 1.0 89.0 10 - - - - - - - - - SM

SS 18.0 100 56 12.5 NP 0.0 2.0 86.0 12 - - - - - - - - - SM

SS 19.5 100 53 12.5 NP 0.0 1.0 89.0 10 - - - - - - - - - SM

SS 21.0 100 57 12.5 NP 0.0 2.0 85.0 13 - - - - - - - - - SM

SS 22.5 100 56 12.5 NP 0.0 1.0 81.0 18 - - - - - - - - - SM

SS 24.0 100 55 12.5 NP 0.0 1.0 76.0 23 - - - - - - - - - SM

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 105+370 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 26.249 Starting Date: 05/12/2023
Structure: Box MIB
Water Table, m: 2.80 Completed Date: 06/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 24.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 7 12 11 23 SS 1.50 24.749

1.95
2
Greyish Black, Very Stiff, Silty CLAY

2.80
3.00 6 10 15 25 SS 3.00 23.249
CH

3
3.45

4
4.50 3 3 4 7 SS 4.50 21.749
05/12/2023

4.95
5
Greyish Black, Medium Stiff, Silty CLAY

6.00 UDS Collected UDS 6.00 20.249 6.00


6

7
7.50 2 3 3 6 SS 7.50 18.749
CI

Greyish Black, Medium Stiff, Silty CLAY


7.95
8

9.00 12 17 21 38 SS 9.00 17.249 9.00


9
9.45
SM

Greyish Brown, Dense, Fine Silty SAND


10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 105+370 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 26.249 Starting Date: 05/12/2023
Structure: Box MIB
Water Depth, m: 2.80 Completed Date: 06/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 24.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 15 24 30 54 SS 10.50 15.749

10.95
11

12.0 32 53 47/11cm SS 12.00 14.249


12

13
13.5 39 60 40/6cm SS 13.50 12.749

14
06/12/2023

15.0 52 100/10cm SS 15.00 11.249


15 Greyish Brown, Dense, Fine Silty SAND
SM

16

16.5 56 100/10cm SS 16.50 -16.500

17

18.0 54 100/10cm SS 18.00 -18.000


18

19

19.5 52 100/10cm SS 19.50 -19.500


20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 105+370 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 26.249 Starting Date: 05/12/2023
Structure: Box MIB
Water Depth, m: 2.80 Completed Date: 06/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 24.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

21 21.0 54 100/10cm SS 21.00 5.249

22 Greyish Brown, Dense, Fine Silty SAND


06/12/2023

SM

22.5 56 100/10cm SS 22.50 3.749

23

24.0 58 100/10cm SS 24.00 2.249 24.0


24

25

26

27

28

29

30
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 105+684 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 21.610 Starting Date: 05/12/2023
Structure: MIB
Water Table, m: 2.80 Completed Date: 06/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 24.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 7 12 11 23 SS 1.50 20.110

1.95
2
Greyish Black, Very Stiff, Silty CLAY

2.80
3.00 6 10 15 25 SS 3.00 18.610
CH

3
3.45

4
4.50 3 3 4 7 SS 4.50 17.110
05/12/2023

4.95
5
Greyish Black, Medium Stiff, Silty CLAY

6.00 UDS Collected UDS 6.00 15.610 6.00


6

7
7.50 2 3 3 6 SS 7.50 14.110
CI

Greyish Black, Medium Stiff, Silty CLAY


7.95
8

9.00 12 17 21 38 SS 9.00 12.610 9.00


9
9.45
SM

Greyish Brown, Dense, Fine Silty SAND


10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 105+684 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 21.610 Starting Date: 05/12/2023
Structure: MIB
Water Depth, m: 2.80 Completed Date: 06/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 24.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 15 24 30 54 SS 10.50 11.110

10.95
11

12.0 32 53 47/11cm SS 12.00 9.610


12

13
13.5 39 60 40/6cm SS 13.50 8.110

14
06/12/2023

15.0 52 100/10cm SS 15.00 6.610


15 Greyish Brown, Dense, Fine Silty SAND
SM

16

16.5 56 100/10cm SS 16.50 -16.500

17

18.0 54 100/10cm SS 18.00 -18.000


18

19

19.5 52 100/10cm SS 19.50 -19.500


20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 105+684 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 21.610 Starting Date: 05/12/2023
Structure: MIB
Water Depth, m: 2.80 Completed Date: 06/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 24.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

21 21.0 54 100/10cm SS 21.00 0.610

22 Greyish Brown, Dense, Fine Silty SAND


06/12/2023

SM

22.5 56 100/10cm SS 22.50 -0.890

23

24.0 58 100/10cm SS 24.00 -2.390 24.0


24

25

26

27

28

29

30
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Shear
Hydrometer
Consistency Properties Gradation Properties Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Analysis
Perameters

Depth of Sample (m)

Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Freeswell Index

Density(g/cm3)
Specific Gravity
Type of Sample

Cv (mm²/Sec)
SPT "N" Value

Silt&Clay (%)

IS - Notation
Borehole No.

Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)
(%)

Cc
Ip

Ic
SS 1.5 23 23 26.5 54.6 22.5 32.1 0.9 28.5 - - - - - - - - - - - - CH
2.8
SS 3.0 25 25 24.5 52.4 23.5 28.9 1.0 27.6 - - - - - - - - - - - - CH

SS 4.5 7 7 25.5 51.0 20.8 30.2 0.8 28.9 - - - - - - - - - - - - CH

UDS 6.0 - - 27.5 42.8 19.8 23.0 0.7 27.8 0.0 9.0 91 27 64 2.72 1.34 - - 0.39 0.03 - CI

SS 7.5 6 6 26.5 40.7 19.5 21.2 0.7 29.9 - - - - - - - - - - - - CI

SS 9.0 38 28 16.5 NP 0.0 0.0 77.0 23 - - - - - - - - - SM

SS 10.5 54 35 15.6 NP 0.0 0.0 82.0 18 - - 2.65 - - - - - - SM


105+684

SS 12.0 100 56 13.5 NP 0.0 1.0 86.0 13 - - - - - - - - - SM


BH-1

SS 13.5 100 53 15.6 NP 0.0 2.0 88.0 10 - - 2.65 - - - - - - SM

SS 15.0 100 57 12.5 NP 0.0 1.0 79.0 20 - - - - - - - - - SM

SS 16.5 100 54 12.5 NP 0.0 1.0 89.0 10 - - - - - - - - - SM

SS 18.0 100 56 12.5 NP 0.0 2.0 86.0 12 - - - - - - - - - SM

SS 19.5 100 53 12.5 NP 0.0 1.0 89.0 10 - - - - - - - - - SM

SS 21.0 100 57 12.5 NP 0.0 2.0 85.0 13 - - - - - - - - - SM

SS 22.5 100 56 12.5 NP 0.0 1.0 81.0 18 - - - - - - - - - SM

SS 24.0 100 55 12.5 NP 0.0 1.0 76.0 23 - - - - - - - - - SM

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 106+290 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 23.002 Starting Date: 05/12/2023
Structure: MIB- Gas Pipe Line
Water Table, m: 2.80 Completed Date: 06/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 24.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 7 12 11 23 SS 1.50 21.502

1.95
2
Greyish Black, Very Stiff, Silty CLAY

2.80
3.00 6 10 15 25 SS 3.00 20.002
CH

3
3.45

4
4.50 3 3 4 7 SS 4.50 18.502
05/12/2023

4.95
5
Greyish Black, Medium Stiff, Silty CLAY

6.00 UDS Collected UDS 6.00 17.002 6.00


6

7
7.50 2 3 3 6 SS 7.50 15.502
CI

Greyish Black, Medium Stiff, Silty CLAY


7.95
8

9.00 12 17 21 38 SS 9.00 14.002 9.00


9
9.45
SM

Greyish Brown, Dense, Fine Silty SAND


10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 106+290 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 23.002 Starting Date: 05/12/2023
Structure: MIB- Gas Pipe Line
Water Depth, m: 2.80 Completed Date: 06/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 24.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 15 24 30 54 SS 10.50 12.502

10.95
11

12.0 32 53 47/11cm SS 12.00 11.002


12

13
13.5 39 60 40/6cm SS 13.50 9.502

14
06/12/2023

15.0 52 100/10cm SS 15.00 8.002


15 Greyish Brown, Dense, Fine Silty SAND
SM

16

16.5 56 100/10cm SS 16.50 -16.500

17

18.0 54 100/10cm SS 18.00 -18.000


18

19

19.5 52 100/10cm SS 19.50 -19.500


20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 106+290 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 23.002 Starting Date: 05/12/2023
Structure: MIB- Gas Pipe Line
Water Depth, m: 2.80 Completed Date: 06/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 24.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

21 21.0 54 100/10cm SS 21.00 2.002

22 Greyish Brown, Dense, Fine Silty SAND


06/12/2023

SM

22.5 56 100/10cm SS 22.50 0.502

23

24.0 58 100/10cm SS 24.00 -0.998 24.0


24

25

26

27

28

29

30
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Shear
Hydrometer
Consistency Properties Gradation Properties Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Analysis
Perameters

Depth of Sample (m)

Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Freeswell Index

Density(g/cm3)
Specific Gravity
Type of Sample

Cv (mm²/Sec)
SPT "N" Value

Silt&Clay (%)

IS - Notation
Borehole No.

Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)
(%)

Cc
Ip

Ic
SS 1.5 23 23 26.5 54.6 22.5 32.1 0.9 28.5 - - - - - - - - - - - - CH
2.8
SS 3.0 25 25 24.5 52.4 23.5 28.9 1.0 27.6 - - - - - - - - - - - - CH

SS 4.5 7 7 25.5 51.0 20.8 30.2 0.8 28.9 - - - - - - - - - - - - CH

UDS 6.0 - - 27.5 42.8 19.8 23.0 0.7 27.8 0.0 9.0 91 27 64 2.72 1.34 - - 0.39 0.03 - CI

SS 7.5 6 6 26.5 40.7 19.5 21.2 0.7 29.9 - - - - - - - - - - - - CI

SS 9.0 38 28 16.5 NP 0.0 0.0 77.0 23 - - - - - - - - - SM

SS 10.5 54 35 15.6 NP 0.0 0.0 82.0 18 - - 2.65 - - - - - - SM


106+290

SS 12.0 100 56 13.5 NP 0.0 1.0 86.0 13 - - - - - - - - - SM


BH-1

SS 13.5 100 53 15.6 NP 0.0 2.0 88.0 10 - - 2.65 - - - - - - SM

SS 15.0 100 57 12.5 NP 0.0 1.0 79.0 20 - - - - - - - - - SM

SS 16.5 100 54 12.5 NP 0.0 1.0 89.0 10 - - - - - - - - - SM

SS 18.0 100 56 12.5 NP 0.0 2.0 86.0 12 - - - - - - - - - SM

SS 19.5 100 53 12.5 NP 0.0 1.0 89.0 10 - - - - - - - - - SM

SS 21.0 100 57 12.5 NP 0.0 2.0 85.0 13 - - - - - - - - - SM

SS 22.5 100 56 12.5 NP 0.0 1.0 81.0 18 - - - - - - - - - SM

SS 24.0 100 55 12.5 NP 0.0 1.0 76.0 23 - - - - - - - - - SM

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 1 OF 6
150mm in
Bore Hole Number: 1 Chainage: 106+511 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.112 Starting Date: 05/12/2023
Structure: MIB
Water Table, m: 2.80 Completed Date: 06/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 24.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

1
1.50 7 12 11 23 SS 1.50 20.612

1.95
2
Greyish Black, Very Stiff, Silty CLAY

2.80
3.00 6 10 15 25 SS 3.00 19.112
CH

3
3.45

4
4.50 3 3 4 7 SS 4.50 17.612
05/12/2023

4.95
5
Greyish Black, Medium Stiff, Silty CLAY

6.00 UDS Collected UDS 6.00 16.112 6.00


6

7
7.50 2 3 3 6 SS 7.50 14.612
CI

Greyish Black, Medium Stiff, Silty CLAY


7.95
8

9.00 12 17 21 38 SS 9.00 13.112 9.00


9
9.45
SM

Greyish Brown, Dense, Fine Silty SAND


10
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 2 OF 6
150mm in
Bore Hole Number: 1 Chainage: 106+511 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.112 Starting Date: 05/12/2023
Structure: MIB
Water Depth, m: 2.80 Completed Date: 06/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 24.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

10.5 15 24 30 54 SS 10.50 11.612

10.95
11

12.0 32 53 47/11cm SS 12.00 10.112


12

13
13.5 39 60 40/6cm SS 13.50 8.612

14
06/12/2023

15.0 52 100/10cm SS 15.00 7.112


15 Greyish Brown, Dense, Fine Silty SAND
SM

16

16.5 56 100/10cm SS 16.50 -16.500

17

18.0 54 100/10cm SS 18.00 -18.000


18

19

19.5 52 100/10cm SS 19.50 -19.500


20
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
GEOTECHNICAL INVESTIGATION - BORE LOG SHEET

GT-
PROJECT CLIENT:
CONSULTANT:

GeoTechnical Investigation for Consultancy Services for preparation of Detailed Project


Report and providing preconstruction services from End of proposed Badarpur Bypass to
Churaibari (Assam-Tripura Border), State of Assam
Bore Hole Location: Section-II SHEET 3 OF 6
150mm in
Bore Hole Number: 1 Chainage: 106+511 Dia of the Bore Hole: Soil & NX In
Rock
Ground Level, m: 22.112 Starting Date: 05/12/2023
Structure: MIB
Water Depth, m: 2.80 Completed Date: 06/12/2023
E: -
Type of Boring: Rotary Co-Ordinates: Terminated Depth, m: 24.00
N: -
Rock
Depth below E.G.L. (m)

Drilling Progress Date

SPT-Data Sampling Details Strata Description


Core %
Water Depth (m)

Layer Depth(m)

IS Classification
No.of Blows

Legend
SPT 'N' Value
Depth (m)

Depth(m)
R.Q.D %

R.L. (m)
C.R %

Type Geotechnical Description


15cm

30cm

45cm

21 21.0 54 100/10cm SS 21.00 1.112

22 Greyish Brown, Dense, Fine Silty SAND


06/12/2023

SM

22.5 56 100/10cm SS 22.50 -0.388

23

24.0 58 100/10cm SS 24.00 -1.888 24.0


24

25

26

27

28

29

30
Note: CS - Core Sample SS - Split Spoon Sam UDS - Undisturbed Sample DS - Disturbed Sample
SUMMARY OF LABORATORY TEST RESULTS
Shear
Hydrometer
Consistency Properties Gradation Properties Strength Consolidation

Natural Moisture Content


Ground Water Table (m)
Analysis
Perameters

Depth of Sample (m)

Corrected "N" Value

Plastic Limit (%)


Liquid Limit (%)

Freeswell Index

Density(g/cm3)
Specific Gravity
Type of Sample

Cv (mm²/Sec)
SPT "N" Value

Silt&Clay (%)

IS - Notation
Borehole No.

Void Ratio€
Gravel (%)

C (kN/m²)
Sand (%)
Chainage

Clay (%)
Silt (%)

φ (°)
(%)

Cc
Ip

Ic
SS 1.5 23 23 26.5 54.6 22.5 32.1 0.9 28.5 - - - - - - - - - - - - CH
2.8
SS 3.0 25 25 24.5 52.4 23.5 28.9 1.0 27.6 - - - - - - - - - - - - CH

SS 4.5 7 7 25.5 51.0 20.8 30.2 0.8 28.9 - - - - - - - - - - - - CH

UDS 6.0 - - 27.5 42.8 19.8 23.0 0.7 27.8 0.0 9.0 91 27 64 2.72 1.34 - - 0.39 0.03 - CI

SS 7.5 6 6 26.5 40.7 19.5 21.2 0.7 29.9 - - - - - - - - - - - - CI

SS 9.0 38 28 16.5 NP 0.0 0.0 77.0 23 - - - - - - - - - SM

SS 10.5 54 35 15.6 NP 0.0 0.0 82.0 18 - - 2.65 - - - - - - SM


106+511

SS 12.0 100 56 13.5 NP 0.0 1.0 86.0 13 - - - - - - - - - SM


BH-1

SS 13.5 100 53 15.6 NP 0.0 2.0 88.0 10 - - 2.65 - - - - - - SM

SS 15.0 100 57 12.5 NP 0.0 1.0 79.0 20 - - - - - - - - - SM

SS 16.5 100 54 12.5 NP 0.0 1.0 89.0 10 - - - - - - - - - SM

SS 18.0 100 56 12.5 NP 0.0 2.0 86.0 12 - - - - - - - - - SM

SS 19.5 100 53 12.5 NP 0.0 1.0 89.0 10 - - - - - - - - - SM

SS 21.0 100 57 12.5 NP 0.0 2.0 85.0 13 - - - - - - - - - SM

SS 22.5 100 56 12.5 NP 0.0 1.0 81.0 18 - - - - - - - - - SM

SS 24.0 100 55 12.5 NP 0.0 1.0 76.0 23 - - - - - - - - - SM

DS = Disturbed Sample; NMC = Nature Moisture Content; Ip = Plasticity Index; SS = Split Spoon Sample; LL= Liquid Limit;Ic = (LL-NMC)/Ip; UDS = Undisturbed Sample; PL= Plastic Limit
Sample Calculations
Geotechnical Investigation Report Annexure

Safe Bearing capacity calculation for shallow foundation


(IS: 6403, IS: 8009 part I, IS: 1904)
Structure : VUP
Location : 100+290

1.5 x B D = 4.5 m
GL = 35.700 m

FL = 29.700 m B = 7.0 m

Dense Sand

Description Unit Value


General Data:
R.L of the Borehole m 35.700
Low bed level m 35.700
R.L of scour m 35.700
Founding Level m 29.700
R.L of Strata where SBC is required m 29.700
Field data:
Description of Strata where SBC is required Dense Sand
Observed average SPT N value at founding level - 54
Corrected average SPT N value (from borelog) - 44
Angle of internal friction of soil (Ø) (as per IS 6403 fig 1) Deg 36.00
Lab data:
Cohesion value of soil (C) t/m2 -
Angle of internal friction of soil (φ) Deg -
Foundation details:
Type of foundation Isolated
Shape of foundation Rectangle
Width of foundation (B) m 7.00*
Length of foundation (L) m 26.00*
Depth of base of open foundation from LBL (Df ) m 4.5
Angle of inclination of open foundation (α) Deg 0.0
Depth of Ground Water Table below Ground level m 0.0
Bulk unit weight of bearing soil layer (γ) t/m3 1.75*
Bulk unit weight of overburden soil (γ) t/m3 1.75*
Effective unit weight of overburden soil (γsub) t/m3 0.75
Effective overburden pressure at base of foundation with respect
t/m2 3.38
to Ground Water Table (q)
Factor of Safety (FOS) - 2.5
*Assumed values

AA/HD/2145
Geotechnical Investigation Report Annexure

Bearing Capacity based on Shear Criteria as per IS: 6403


Considered cohesion (C) t/m2 0.0
Considered Angle of internal friction (Ø) Deg 36
As Ø ≥ 36° it is General Shear failure.
Net allowable bearing
capacity (qd) = C Nc Sc dc ic + γDf (Nq – 1) Sq dq iq + 0.5 γ B Nγ Sγ dγ iγ W'

Effective width (B) m 7.0


Effective Length (L) m 26.0
Depth of shear zone below foundation base m 6.9
Reduced Angle of internal friction of bearing soil considered (Ø') Deg -

Nc = 51.958 N'c = -
Bearing Capacity Factors (IS 6403 table Nq = 39.480 N'q = -
1)
N = 60.306 N' = -
γ γ

Shape Factors (IS 6403 table 2)


Inclination Factors (IS 6403 Depth Factors (IS 6403 cl:
cl: 5.1.2.3) 5.1.2.2)
Sc = 1.054 dc = 1.252 ic = 1.000
Sq = 1.054 dq = 1.126 iq = 1.000
S = 0.892 d = 1.126 i = 1.000
γ γ γ
Water Table Correction Factor W' (As per IS 6403
= 0.5
clause 5.1.2.4)

C Nc Sc dc ic + γDf (Nq – 1) Sq dq
=
Net Ultimate bearing capacity (qd) iq + 0.5 γ B Nγ Sγ dγ iγ W'

= 339.67 t/m2
= 339.67/2.5 t/m2
Net Safe bearing capacity (qns) qd / FOS
= 135 t/m2

Bearing Capacity based on Settlement Criteria as per IS: 8009 (Part-I)


m 0.0065
Settlement per unit pressure (10t/m2) (IS 8009 part 1 fig: 9)
mm 6.52
D/√(LB) - 0.33
L/B - 3.71
Depth correction factor (IS 8009 part 1 fig: 12) - 0.89
Rigidity factor (IS 8009 part 1 cl: 9.5.2) - 0.8
Water Table correction factor (IS 8009 part 1 fig: 9) - 0.5
Corrected settlement mm 9.32
Bearing pressure for 50mm settlement t/m2 54.0

Hence, allowable bearing capacity at Founding


Level (qall) t/m2 35

AA/HD/2145