SURVEY OF EXISTING MILL MACHINERY INSTALLED AND OPERATING AMPS DATA FOR THE UPGRADI
To: Mr Tey-Mill Manager
Please provide the following information data: This surveys are crucial for the mill upgrade and ele
2 Press/Digester Station
1. Number of Press & Digester/Any additional units?
2. P15-Number of units
3. P25 Number of Units
4. Digester Feeding Conveyor Number of units?
4.1 Diameter of Conveyor & motor Kw
3 Depericarping Station
1. CBC Below Presses- Number of Units?
1.1 Diameter of CBC 1A / Kw of GM (Gearmotor)
1.2 Diameter of CBC 1B/Kw of GM
Line 1
2. CBC No.2 (Line 1)
2.1 Diameter & Kw of Gearmotor
3. Nut Polishing Drum
3.1 Diameter and Kw of GM
3.2 Fibre Cyclone Fan
Model and Motor Kw
3.3 Airlock Diameter and Kw of GM
4. Destoner System
Fan's Model & Motor Kw
Line 2
2. CBC No.2 (Line 2)
2.1 Diameter & Kw of Gearmotor
3. Nut Polishing Drum
3.1 Diameter and Kw of GM
3.2 Fibre Cyclone Fan
Model and Motor Kw
3.3 Airlock Diameter and Kw of GM
4. Destoner System
Fan's Model & Motor Kw
5 Fibre Conveyor system from Line 1 & Line 2 Below Fibre Cyclone
5.1 Diameter of Fibre Conveyor No.1 below Fibre Cyclone
Conveyor Gearmotor Kw/Running Amps?
5.1 Diameter of Fibre Conveyor No.2 below Fibre Cyclone
Conveyor Gearmotor Kw/Running Amps?
6 Clarification Station
6.1 Number of VCT
: Capacity No.1
: Capacity No.2
6.2 Number of Decanter
:Capacity Each
6.3 Number of Separator
: Capacity each
6.4 No. of Unit Vaccum Oil Dryer
: VD No.1: Capacity
: VD No.2: Capacity
7 Boiler Station
Number of Boiler ?
7.1 Boiler Number 1 : Capacity/Pressure
7.2 Boiler Number 2 : Capacity/Pressure
7.3 Boiler Number 3: Capacity/Pressure
8 Engine Room
Number of Steam Turbine
8.1 Turbine No. 1 Capacity:
8.2 Turbine No.2 Capacity:
8.3 Turbine No.3 Capacity:
Diameter Power
MCC Recording Amps