0024-00-Risk Assessment For Metal Guard Rail Works
0024-00-Risk Assessment For Metal Guard Rail Works
: 54300-OOSIT-ZZ-AJC-CIV-RA-0024-00
Document Title: RISK ASSESSMENT FOR METAL GUARD RAIL INSTALLATION WORKS Page: Page 1 of 5
RESIDUAL RISK
POTENTIAL RISK RATING Control Measure RATING
RISK
SN ACTIVITY HAZARDS
HARM/DAMAGE Probability Severity Rating (Refer to Hierarchy of Control) Probability Severity Rating
(P) (S) (PxS) (P) (S) (PxS) YES
Increase dust levels & air emission Speed limits to be followed specially when
Resulting of Air pollution and driving on unpaved roads (dirt road)
Use of access
roads
disturbing the surrounding
neighbours Habitat destruction.
2 3 6 Avoid dust generating activities during
excessively windy periods.
1 3 3 √
Provide an adequate water supply for dust
suppression.
TBT prior to start the activity.
Maintain good house keeping
Snake & scorpion
Check for snakes, scorpions and bees around
Site
clearance,
bites
Bee stings and other
Stings/Fatality 3 3 9 the area including equipment cabin.
Personal protective equipment must be
1 3 3 √
1 vermin
preparation & worn at all times.
survey works Close supervision by the foreman.
Proper training and monitoring minimize
manual handling.
Use mechanical aid (ALARP)
Manual Handling
Work related upper limb Only skilled / competent personnel to
Operations
Slips, trips and
disorders/cuts, abrasions/
foot/toe injuries/eye injuries
3 2 6 perform such activity.
Follow the installation procedure, avoid
1 2 2 √
caught in between.
shortcuts.
Personal protective equipment must be
worn at all times.
2 Mechanical Underground utility Electrocution , Explosion, 4 4 Secure NOC’s, as built drawings, Excavation 1 3
excavation services Flooding, Damage to property 16 Permit from Project Manager and or site 4 √
using Engineer.
Survey team must accurately identify and
excavator
marked the location and route of the existing
with Auger Utilities.
attachment Follow the certain depth to mount the sign
to mount the post.
metal Manual digging only and use none electrical
guardrail post conductive tools whilst digging near the
electrical line.
Don’t use pick axe for digging around the
cable.
Use cable detector to locate existing
electrical lines.
All existing underground utilities if any shall
be dealt with accordingly.
Close supervision by the Foreman.
AL JABER Transport & General Contracting Est. P.O. Box: 2175, Abu Dhabi, UAE. Tel.: +(971 2) 5554300 , Fax.: +(971 2) 5553370
Project Title: UPGRADING THE EXISTING ROAD FROM UMM AL ZOMOUL TO TAWI ARBAIN RA No.: 54300-OOSIT-ZZ-AJC-CIV-RA-0024-00
Document Title: RISK ASSESSMENT FOR METAL GUARD RAIL INSTALLATION WORKS Page: Page 2 of 5
AL JABER Transport & General Contracting Est. P.O. Box: 2175, Abu Dhabi, UAE. Tel.: +(971 2) 5554300 , Fax.: +(971 2) 5553370
Project Title: UPGRADING THE EXISTING ROAD FROM UMM AL ZOMOUL TO TAWI ARBAIN RA No.: 54300-OOSIT-ZZ-AJC-CIV-RA-0024-00
Document Title: RISK ASSESSMENT FOR METAL GUARD RAIL INSTALLATION WORKS Page: Page 3 of 5
AL JABER Transport & General Contracting Est. P.O. Box: 2175, Abu Dhabi, UAE. Tel.: +(971 2) 5554300 , Fax.: +(971 2) 5553370
Project Title: UPGRADING THE EXISTING ROAD FROM UMM AL ZOMOUL TO TAWI ARBAIN RA No.: 54300-OOSIT-ZZ-AJC-CIV-RA-0024-00
Document Title: RISK ASSESSMENT FOR METAL GUARD RAIL INSTALLATION WORKS Page: Page 4 of 5
Document Title: RISK ASSESSMENT FOR METAL GUARD RAIL INSTALLATION WORKS Page: Page 5 of 5
Close supervision
CEMP Induction and Trainings
Environmental Pollution Minimize and segregate waste and empty
Bad Odours regularly
8
Waste
Management
Inadequate waste
management
Health Effects
Epidemic outbreak Food and
2 3 6 Provision of Waste segregation
Regular waste disposal
1 3 3 √
Personal Protective Equipment Personal Equipment designed to protect the individual from the hazard.
AL JABER Transport & General Contracting Est. P.O. Box: 2175, Abu Dhabi, UAE. Tel.: +(971 2) 5554300 , Fax.: +(971 2) 5553370