ENG - Ahmad Tayseer Taher Ahmad
ENG - Ahmad Tayseer Taher Ahmad
Qualifications
2002, Bachelor of Mechanical Engineering - Philadelphia University – Jordan
Basic qualifications
MEP Manager ,with more than 21 years of diversified experience in Projects Management,
Construction, Consultancy and T&C. Full Aware of all Project Management process with proven
successful projects records ,aware of MEP Standards on Practical Projects, International
Electromechanical Codes and Requirements, HVAC ,Fire Fighting, Plumbing, BMS and Smoke
Management , In-depth knowledge and Experience of Electromechanical Design, consulting,
Implementation and Testing & Commissioning for all Electromechanical systems as Per
International Codes.
Practical experiences
2023 until now: Shiph Aljazirah Contracting Company – (Riyadh – Saudi Arabia –
4.5 km Qidiyah Tunnel project – MEP Construction Manager
Responsibilities:
- Responsible for the management of the MEP site team including mentoring,
scheduling their activities, and leading coordination meetings, recruitment and
performance management of the team members.
- Directing the MEP site team through all construction phases of a project including
contractor coordination and all aspects of site management.
- Contact suppliers of electrical and specialty systems, plumbing and fire safety
materials/equipment, HVAC, etc.
- Monitoring MEP system installation progress, quality and safety, and initiating action
to rectify any non-conformance.
- Review, comments and recommends course of action for all MEP technical submittals,
material, shop drawings, methods statements, etc., for final approval of the consultant
and client’s as well.
- Supervise onsite MEP contractor(s) for their safety, quality, equipment and
maintenance of appropriate resourcing levels.
- Preparing MEP progress information for inclusion in the project report, providing all
relevant information to the project manager.
- Monitoring the preparation of MEP contractor’s final accounts obtaining relevant
certificates and submission to the client for payment.
- Ensuring the inclusion in the contract and subsequently requesting the design team,
consultants and contractors to supply the client with as-built drawings, including but
not limited to, installation drawings, operations and maintenance manuals.
6/2
Eng. Ahmad Tayseer Taher Ahmad
19. Pump rooms.
20. Wastewater treatment plant equipment.
21. Electric generators.
22. Scada room.
23. Implementation and installation of heating, ventilation and air conditioning
systems, fire systems, water supply, sewage, and desalination plant.
Responsibilities:
2019 to 2021: Saudi Bin ladin Group Company - Riyadh - Saudi Arabia – MEP
Manager
1. CMA Tower King Abdullah Financial Project Riyadh: The project includes
Piping, GRP tanks Pump Stations, Solar Systems, RO Plant, Well Pumps, Water
Purification systems, FM 200, AC, Ducting, Elevators, underground Utilities, shafts
piping.
2. King Faisal Air Force Academy: The project includes infrastructure, tanks &
other utilities like Potable water Lines Sewage Lines Transfer lines from Wells to all
services in the project along with R.O. Plant and sewage treatment plant.
6/3
Eng. Ahmad Tayseer Taher Ahmad
Responsibilities:
1. MOI Housing for Riyadh Project Design and Pricing quotation: Project Duty
to design the main pump rooms, underground utility for sewer and potable lines, R.O.
Plant 6000 M3/Day, HVAC and Fire Systems.
2. MOI Housing Sharorah. Project Design and Pricing quotation: Project Duty
Deep Well 1300 Meter, R.O. Plant 1400 M3/day along with cooling towers, Potable
water network along with Product tanks. Pumping station to all Buildings, Under
Ground Utility (Domestic, Potable and sewer network), Evaporation Bond, HVAC and
fire systems for the plant. Scada and BMS connections
3. Arana Sewage treatment Plant (Project Design and Project Manager):
Increase the capacity of the plant from 250,000 m3/day to 350,000 m3/day by
increasing the aeration rate and dewatering system with drying system.
4. King Khalid International Airport (Project Design): Deep Well 2405 meter deep,
RO plant 6000M3/Day, Cooling Towers, Underground Utility, Potable Water tanks
along with network.
6/4
Eng. Ahmad Tayseer Taher Ahmad
5. MOI Housing Jizan (Project Design): 2407 m3/day Sewage treatment plant, Lift
Stations, Sewer Network, TSE Lines to Irrigation Tank, Underground utilities.
Emergency Generators.
6. Renovation of al Khaimah 250,000 M3/Day Sewage Treatment plant.
(Project Manager): Renovation of Some Plant equipment.
Responsibilities:
2002 to 2016: Saudi Bin Laden Group Company - Riyadh - Saudi Arabia -
Project Manager - Mechanical Engineer
1. King Abdullah Financial District. (Project Manager): GRP Tanks, Solar System,
Pumping stations between layers, Sewage network, Domestic Networks, Elevators,
HVAC, Fire system.
2. Correctional Facilities (Project Manager): Deep Well 2200 meter Deep, Cooling
Towers, 2400 STP and R.O Plant, Pump Rooms, Under Ground Utilities, Fire Systems,
HVAC Systems, Boiler Plante All services in Hotel Building.
3. National Guard Hospital (Project Manager): Sewage Treatment Plant 2000
m3/day, Underground utilities, Evaporation Pond, HVAC Systems (Chiller Plant),
Cooling Towers, Boiler plant =1 megawatt, Underground Steam Pipes and Condensate
Return, Swimming Pools Pump Room. DI Systems for laboratory areas, Hospital
Oxygen Blowers along with piping, Kidney Chairs along with all connections needed
with treatment plant, Heat Exchangers, operation rooms piping Mortuary anatomy
rooms and Mortuary refrigerators.
4. Rawdat Khraim Palace. (Project Manager): RO Plant, Sewage Treatment Plant,
Hot water Boiler Plant, Under Ground Utilities, Swimming Pool Pump Room, Heat
Exchangers, Swimming Poole Treatment, Pumping Stations (Mechanical Room).
5. Central Security Buildings Extension. (Project Site Manager): R.O. Plant,
Sewage Treatment Plant, Pumps Room, HVAC, Fire System, Elevators, Underground
utilities.
6/5
Eng. Ahmad Tayseer Taher Ahmad
6. Prince Nayef Academy (project Site Manager): Deep Well 2200 meter Deep,
Cooling Towers, 12000 STP and 5000 R.O Plant, Pump Rooms, Under Ground Utilities,
Fire Systems, HVAC Systems, Main Pump Room.
7. Dammam Half Moon Pay Palace (Project Engineer): R.O. Plant, Sewage
Treatment Plant, Underground Utilities, HVAC, Fire System.
8. Central Security Buildings (Project Engineer): R.O. Plant, Sewage Treatment
Plant, Pumps Room, HVAC, Fire System, Elevators, Underground utilities.
9. King Salman Palace (Site Engineer): 6 wells, Collection Tank, Transfer Pumps
Pump Rooms, chiller plant along with chiller pipes, Swimming pools pump room.
Responsibilities:
- Project management to ensure all work is completed on time with high quality and
within specified costs.
- Manage the team in an effective manner and direction to ensure the completion of
work with high quality and without errors.
- Monitor batch progress and project budget.
- Preparing a monthly report that includes project progress, cost accounts and invoices.
- Coordinate and work with the project management team to resolve project issues to
ensure delivery/completion of project work.
- Implementation, installation and maintenance of heating, ventilation and air
conditioning systems, fire systems, water supply and sanitation.
- Limiting the quantities of materials needed for work and ordering them.
- Reviewing design and technical drawings.
- Directing the team to perform the work according to the requirements of the project
in terms of specifications and executive drawings.
- Supervising workers and technicians, setting work priorities, and distributing tasks.
Languages
Speaking Writing Reading
Arabic Native language
English Excellent Excellent Excellent
6/6