COMMENTS
COMMENTS
Reinforcement.
G.L.
SECTION B-B
SECTION A-A 1) WHAT IS C/C DISTANCE OF SUPPORT ? NOT SHOWN IN DRG KINDLY INCORPORATE
2) PROVIDE SBC REPORT
3) HOW TO FIND SCOUR DEPTH IN DRG IF AS PER SITE IS INCRESED THEN HEIGHT OF PEDESTAL
ALSO INCERESED AND DESIGN ALSO CHANGE SO KIDNLY INCORPORATE DEPTH OF FOUNDATION
BELOW GL
B
4) IF THEIR ARE REIVER THEN ALSO CONSIDERED VELOCITY OF WATER ACT ON PEDESTAL
5) SEISMIC ANALYSIS REQUIRED TO INCORPORATE
6) PEDESTAL DESIGN AS COLUMN SO CHECK MINIMUM STEEL AS PER IS 456
7) ADD PROPER NOTES FOR SBC , VELOCOTY OF WATER , SEISMIC ZONE ETC
12# @300 c/c Surface 8) IN PEDESTAL PLAN DETAIL - STEEL NOT SHOWN PROPERLY
Reinforcement. 9) SHOWN CONNECTION DETAIL OF PIPE AND PEDESTAL IF ANY
NOTES-
A A 1) ALL DIMENSIONS ARE IN MM AND LEVELS & CO-ORDINATES ARE IN METER.
2) THIS IS A TYPICAL DRAWING MAY CHANGE MINOR AS PER SITE CONDITIONS WITH THE APPROVAL OF L-SECTION.
3) GRADE OF CONCRETE FOR RCC SHALL BE M25.
4) ALL REINFORCEMENT SHALL BE HIGH STRENGTH DEFORMED TMT BARS OF GRADE FE 500 CONFORMING TO IS:1786. CLIENT: EXECUTIVE ENGINEER
GOVERNMENT OF RAJASTHAN
PUBLIC HEALTH ENGINEERING DEPARTMENT, AJMER
5) SCOUR DEPTH IS ASSUMED 1.5 METER. HOWEVER DEPTH OF FOUNDATION BELOW GL. MAY VARY AS PER SCOUR DEPTH AS
PROJECT:
PER SIT CONDITION. "
B
"
TITLE: TYPICAL DRAWING OF PEDESTAL FOR 700MM PIPEL
PLAN CONTRACTOR: DEALT BY :-
CHECKED BY:-
S.K.
S.K.
ZUBERI ENGINERING SCALE REVISION DATE
SHEET-2/2 SIZE - A1