Updated Option 2 Solution
Updated Option 2 Solution
This document provides the updated analysis for Option 2. All calculations and data are
based on the 'Processor File' and the '550 Group Project Report-5'. References are explicitly
cited for clarity and traceability.
- Emission factors:
- Formula: Boiler Input for Heating + Boiler Input for Ventilation + DHW
Electricity Consumption:
- Non-heating electricity: 290,069.72 kWh (Processor File).
3. Performance Metrics
Thermal Energy Demand Intensity (TEDI):
- Formula: (Boiler Input for Heating + Boiler Input for Ventilation) / Floor Area
4. Cost Analysis
Electricity Costs:
- TEDI ≤ 30 kWh/m²/year
- TEUI ≤ 120 kWh/m²/year
Performance of Option 2:
6. Recommendations
Option 2 improves system efficiency but does not meet Step Code targets.
Recommendations include: