Liugong Hui of Shougang Industrial Park, Beijing by CCTN

Uploaded by

davidschnieder15
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
485 views40 pages

Liugong Hui of Shougang Industrial Park, Beijing by CCTN

Uploaded by

davidschnieder15
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 40

CASE STUDY DATE

Group 4 10/24/2024

LIUGONG HUI MALL


Shijingshan District, West Beijing, China

GROUP 4
Abanes, Andal, Arapoc, Mamulang, Juson
CASE STUDY LIUGONG HUI MALL,
Group 4 China

INTRODUCTION
Liugong Hui is located in Shijingshan District, west Beijing,
in the middle of two Lakes (Qunming Lake and Xiu Lake)
area of Shougang Industrial Park,and the ground floor
area is 223753m².

It is renowned for serving the 2022 Winter Olympics where


that Gu Ailing and Su Yiming made history and achieved
great breakthrough in the Big Air program. Entering the
post-Olympic, the urban renewal of Shougang is still
continuing. Liugong Hui was born with such background
both of specific time and space. On June 18, 2o22,
Liugong Hui Shopping Mall had its grand opening.

Architects: BEIJING SHOUGANG INTERNATIONAL


ENGINEERING TECHNOLOGY, CCTN Design
SOUTH OF THE SKI JUMPING SHOUGANG EXHIBITION
WINTER OLYMPICS JINAN BRIDGE SAN GAOLU MUSEUM WINTER TRAINING LIUGONG HUI SHANGRI-LA HOTEL
OXYGEN PLANT PLATFORM AREA
PLAZA CENTER MALL
(2022 ORGANIZING (TRAFFIC HUB, HEART, AND (NATIONAL SPORTS GENERAL (NATIONAL SPORTS (TISHMAN SPEYER (SELF-SUPPLIED POWER PLANT AND ( TENCENT STUDIO HALL DIENCER ) ( WINTER OLYMPICS COMPETITION ( FIVE-YEAR CYCLE OF THE TRADE IN SERVICES
COMMITTEE OFFICE AREA ) HERITAGE PARK ) ADMINISTRATION WINTER TRAINING ADMINISTRATION WINTER COMMERCIAL AND OFFICE COOLING TOWER RENOVATION OF EVENTS : SKI JUMPING PLATFORM ) CONFERENCE: TEMPORARY EXHIBITION VENUE
CENTER) TRAINING CENTER COMPLEX ) XIANGSONG LILA HOTEL ) AND SUPPORTING FACILITIES )

PUBLIC SUPPORT SERVICES SOUTHERN DISTRICT


AREA AND URBAN PLANNING
FABRICATION HUB

SEWED WATERFRONT
SPACE: UNDERGROUND
PROJECT OF THE FENGSHA
FREIGHT RAILWAY LINE

PROXIMITY
1.6 KILOMETERS OF WATERFRONT SHORELINE 1.46 KILOMETERS OF WATERFRONT SHORELINE
IN THE NORTHERN AREA OF SHOUGANG IN THE SOUTHERN AREA OF SHOUGANG
LIUGONG HUI MALL,
CASE STUDY
China
Group 4

AERIAL VIEW
CASE STUDY DATE
Group 4 10/24/2024

HISTORY
Liugonghui Mall is an integral part of the
redevelopment project within Shougang Park,
located in the western region of Beijing. Shougang
Park, a historic site with roots in China's steel
industry, initially began operations in 1919,
symbolizing the industrial strength of the nation.

Over the decades, Shougang became a major steel


production hub, contributing significantly to China’s
industrial development. However, as Beijing’s urban
growth evolved, and in preparation for the 2022
Winter Olympics, the steel operations ceased,
leading to a new phase of urban renewal for the
entire area.
CASE STUDY DATE
Group 4 10/24/2024

THE SITE
The transformation of Liugonghui Mall
and the surrounding areas within
Shougang Park reflects a significant
effort in urban renewal and adaptive
reuse, balancing the preservation of
the site’s industrial heritage with the
needs of a modern, multifunctional
space.
CASE STUDY DATE
Group 4 10/24/2024

URBAN ANALYSIS
CASE STUDY DATE
Group 4 10/24/2024

URBAN ANALYSIS
CASE STUDY DATE
Group 4 10/24/2024

URBAN ANALYSIS
CASE STUDY DATE
Group 4 10/24/2024

1
2

SITE DEVELOPMENT 5

PLAN 3

6
LEGEND:
1. OFFICE BUILDINGS
2. BUSINESS AREA
3. GREEN SPACES
7
4. MALL 4
5. HOCKEY ARENA
6. WINTER TRAINING CENTER
7. POWER PLANT HOTEL
CASE STUDY DATE

BUILDING CLASSIFICATION
Group 4 10/24/2024

LEGEND:

NEW BUILDINGS

RENOVATED BUILDINGS

PRESERVED STRCUTURES

PRESERVED STRUCTURES
CASE STUDY DATE
Group 4 10/24/2024

SPATIAL
STRUCTURE
open
spac
Combined with the upper-level sight
axis axis
e

planning layout of the new


Shougang, the overall planning
layout is carried out around the idea
of ​"multiple axes and multiple nodes"
to achieve the harmony between the
busin
building landscape and the most ess axis

perfect presentation of the park's Hig


h Line
Wa
structural effect. Axis
terf
ront

Among them, the multiple axes


include the sight axis, open space
axis, commercial axis and high-line
waterfront axis, and the spatial
layout is guided by the axis.
CASE STUDY
Group 4 SPATIAL ANALYSIS 10/24/2024
DATE

O ly m p
ic C o
m m itt
O ffic e ee
P a rk

Three blast furnaces

Shijingshan

Four blast furnaces

Qunming Lake

Winter training center


ecological corridor
CASE STUDY DATE
Group 4 10/24/2024

CONCEPT & TRANSFORMATION


CASE STUDY DATE
Group 4 10/24/2024

CONCEPT &
TRANSFORMATION
Liugonghui Mall reflects a larger adaptive reuse initiative
to preserve the industrial legacy of Shougang Park while
introducing commercial, cultural, and office spaces. The
Site is consist of 11 industrial buildings, offering
customizable and distinctive workspaces tailored to the
needs of modern businesses and retail tenants.

With a focus on creating a high-end, mixed-use


commercial community, Liugonghui Mall successfully
bridges industrial heritage and urban commerce.
CASE STUDY DATE
Group 4 10/24/2024

TRANSFORMATION
The site was originally composed of four sedimentation
ponds, a sinking space with a diameter of about 30 meters.
The two concentrator ponds in the core were designed as
open squares, and the concentrator ponds at both ends
were used as concave green Spaces for rainwater runoff.

In the design, the sedimentation tanks at both ends were


transformed into sunken green space to collect rainwater
runoff, and the industrial remains of the mud scraper will be
retained to form the intention of “fixed clock”.

The sedimentation tank square is transformed from the two


sedimentation tanks in the middle core into a sunken open
square that can provide activities and rest. The steps
combined with colored pavement and green plants can be
used as an outdoor audience or for tourists to rest.
CASE STUDY DATE
Group 4 10/24/2024

TRANSFORMATION
CASE STUDY DATE
Group 4 10/24/2024

Key elements such as truss structures, overhead


cranes, steel columns, and red brick façades
were preserved to maintain the industrial
atmosphere and integrate historical elements
with modern design.

Public spaces were designed to support art


exhibitions, academic lectures, and small
performances, encouraging community
engagement and creative use of the space.

TRANSFORMATION
The redevelopment of the industrial zone
demonstrates a transformation from a steel
production hub to a vibrant commercial and
cultural destination.
CASE STUDY DATE
Group 4 10/24/2024

TRANSFORMATION
Open staircases and skywalks were introduced to improve
movement, offering a balance between public interaction
and traffic flow.
CASE STUDY DATE
Group 4 10/24/2024

TRANSFORMATION
CASE STUDY DATE
Group 4 10/24/2024

TRANSFORMATION
The design uses tracks to create rest Spaces and
rain gardens. At the same time, the continuation of
three blast furnace material, unified visual
connection.

At the same time, the railway track element is used


as a guide paving to guide people and the sight
to the Three Blast Furnace Museum and the
commercial mall.
CASE STUDY DATE
Group 4 10/24/2024

COMMUNITY
CONNECTION
Create a memorable and flexible space that
embodies the vision and mission of users
Engage the site’s unique existing structures,
Utilize best sustainable practices within a
constrained budget,
Provide a publicly accessible landscape to an
under-served community, and
Retain as well as a booster of the industrial
working-class history and culture of the site.
CASE STUDY DATE
Group 4 10/24/2024

FRONTAGE
A circular planting pond is designed on the east
side of Liugong Huibei Square, extending the
circular texture of the adjacent plots – cooling
tower and sedimentation tank, and combining
with trees to create an outdoor temporary
residence space.

The design achieves the function of guiding the


route through linear paving.
CASE STUDY DATE
Group 4 10/24/2024

RENOVATION
The central building and the north building of the three historic buildings have been completely preserved. The southern building
was demolished due to structural strength problems, and the historical memory has been framed in the way of landscape sites.
Between the wind room and the substation, the newly built shopping center organically stitched together three groups of historical
relics around it, creating an example of the integration of the old and the new.
CASE STUDY DATE
Group 4 10/24/2024

RENOVATION
The central building and the north building of the three historic buildings have been completely preserved. The southern building
was demolished due to structural strength problems, and the historical memory has been framed in the way of landscape sites.
Between the wind room and the substation, the newly built shopping center organically stitched together three groups of historical
relics around it, creating an example of the integration of the old and the new.
CASE STUDY DATE
Group 4 10/24/2024

RENOVATION
The No.2 Pump Station was first built in 1943 (Showa 18) during
the Japanese occupation. It is one of the oldest preserved
industrial relics in the Shougang Park, with its unique wooden roof
frame. This update tries to preserve and show the aesthetic
features of the structure of the second pumping station. From the
reinforcement technology, in view of the current situation of
internal decay and cavity of the existing wood parts, polymer
material grouting reinforcement is used to replace the severely
damaged wood parts as a whole, which basically presents the
original structural form of the wooden frame, plays a good role in
guiding the entrance of the base, and also makes it become the
most attractive space node during various festivals.

The 7000 wind room on the north side of the No.2 pump station
adopts the reinforcement strategy of superimposed new
structural columns inside the facade. While increasing the
strength, it well maintains the original facade style and the
construction of internal wind columns and crane beams, creating
an impressive core industrial wind space.
CASE STUDY DATE
Group 4 10/24/2024

INTERIOR
The old site’s Fan Room was built in 1992 to provide cold air for the blast furnace, but after the renovations, it now functions as the
project’s main entrance and east atrium.The project’s authentic industrial atmosphere proved to be the core modeling concept for
the design; the ceiling uses the sloping roof of the original factory structure to introduce light into the space, while the original truss
structure, overhead crane and structural columns have been preserved in their original form, together with the red brick texture of
the old factory façade.
CASE STUDY DATE
Group 4 10/24/2024

RENOVATION
CASE STUDY DATE
Group 4 10/24/2024

RENOVATION
CASE STUDY DATE
Group 4 10/24/2024

RENOVATION
CASE STUDY DATE
Group 4 10/24/2024

RENOVATION
51 Theater was built in 1975. The theater is
located in the east and west, with
Shijingshan as the background. It is not only
the cultural activity place of Shougang
staff, but also the communication platform
of all circles inside and outside the factory.

Historically, 51 Theater has received many


performances from Japan, the United
States, the former Soviet Union and other
countries. It can be said that this is the
spiritual fortress of Shougang staff.
CASE STUDY DATE
Group 4 10/24/2024

RENOVATION
Re-set the stage shear walls and frames,
The unique historical and cultural value of 51 Theater
and re-lay the roof led the designers to choose the renovation strategy of
preserving the original architectural style of the main
facade on the east side, only updating the most
indifferent components, and preserving the integrity
and sense of ceremony of the square on the same side
Re-roofing the as much as possible.
auditorium
The inner side of the theater wall is reinforced by local
shear walls and additional shotcrete walls, which
maximizes the overall rigidity of the remains without
damaging the original style of the large space. The
cramped backstage part on the west side of the
theater was demolished and expanded to add a
rehearsal space and supporting office.

Retain the inner side of the Demolish and


wall and set up shear wall rebuild front office
CASE STUDY DATE
Group 4 10/24/2024

SHOPPING
The skylights featured in the new atrium space on the west side are arranged in a diamond-shaped array, allowing natural light to
diffuse throughout the room while reducing the distance between people and nature.The skylight’s detailed design carefully
regulates the amount of available light and effectively conserve energy.The space itself is composed of semipermeable boxes of
various dimensions, which can be dynamically used for retail, dining, and leisure. The design uses different textures and materials
to differentiate the boxes, while the presence of small-scale commercial spaces facilitates greater freedom in utilizing the
numerous shared areas.
CASE STUDY DATE
Group 4 10/24/2024

INTERIOR
.As a new commercial landmark, Chang’An Mills inherits
Shougang’s industrial legacy while forging a brighter future. In
doing so, it explored not only the synthesis of past and present,
but the ability to create a shared space that meets the needs of
the current consumer experience, while retaining dynamic and
interactive elements.

Once the Liugonghui project was put into operation, it


immediately became one of the most popular public spaces in
Xicheng District. The COVID-19 epidemic has not reduced the
enthusiasm of the public to come here celebrating holidays.
What’s more, various industry players have been showing strong
interest in here, and the commercial programs are upgrading
and iterating spontaneously.
CASE STUDY DATE
Group 4 10/24/2024

CONNECTION TO
THE CITY/LOCALITY
The industrial factories once measured with wheels and rails are now transformed into
urban blocks measured with human footsteps. Therefore, it is necessary to create
neighborly space friendly to slow walking. Various industrial relics of different types and
scales are retained in the neighborhoods that return to the urban neighborhood scale and
become an integral part of the vitality of the neighborhoods.

Industrial relic buildings are pulled back from the “once” context to the “present” meaning
in users’ value cognition. They become the place itself, not just visual labels. At this point,
the industrial relics really participate in the great cycle of urban space metabolism and
realize the value reconstruction of urban space.
CASE STUDY DATE
Group 4 10/24/2024

1st floor 2nd floor 3rd floor

COMMERCIAL
BUILDING
SECTION
CASE STUDY DATE
Group 4 10/24/2024

1st floor 2nd floor

SECTION

FACTORY BUILDING
CASE STUDY DATE
1st floor 2nd floor
Group 4 10/24/2024

SECTION

OFFICE BUILDING
CASE STUDY DATE
Group 4 10/24/2024

1st floor 2nd floor

SECTION
THEATER BUILDING
CASE STUDY DATE
Group 4 10/24/2024

THANK YOU

GROUP 4
Abanes, Andal, Arapoc, Mamulang, Juson