PV Simulation Report
PV Simulation Report
___________________
Project: 1357 KW-Shahen Solar
Variant: By Engr. Muhammad Rashid
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Project summary
Geographical Site Situation Project settings
Al Bayān Latitude 24.86 °N Albedo 0.20
Saudi Arabia Longitude 46.85 °E
Altitude 584 m
Time zone UTC+3
Weather data
Al Bayān
Meteonorm 8.0 (1998-2002), Sat=34% - Synthetic
System summary
Grid-Connected System On Grid System-Ground Mounted
System information
PV Array Inverters
Nb. of modules 2340 units Nb. of units 6 units
Pnom total 1357 kWp Pnom total 1050 kWac
Pnom ratio 1.293
Results summary
Produced Energy 2586583 kWh/year Specific production 1906 kWh/kWp/year Perf. Ratio PR 77.56 %
Apparent energy 2586583 kVAh/year
Table of contents
Project and results summary 2
Variant notes 3
General parameters, PV Array Characteristics, System losses 4
Horizon definition 7
Near shading definition - Iso-shadings diagram 8
Main results 9
Loss diagram 10
Predef. graphs 11
Module layout 17
P50 - P90 evaluation 20
Single-line diagram 21
Cost of the system 22
CO₂ Emission Balance 23
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Variant notes
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
General parameters
Grid-Connected System On Grid System-Ground Mounted
PV Field Orientation
Orientation Sheds configuration Models used
Fixed plane Nb. of sheds 90 units Transposition Perez
Tilt/Azimuth 24 / 0 ° Sizes Diffuse Perez, Meteonorm
Sheds spacing 9.00 m Circumsolar separate
Collector width 4.95 m
Ground Cov. Ratio (GCR) 55.0 %
Top inactive band 0.02 m
Bottom inactive band 0.02 m
Shading limit angle
Limit profile angle 24.4 °
PV Array Characteristics
PV module Inverter
Manufacturer JA solar Manufacturer Huawei Technologies
Model JAM78-S30-580-MR Model SUN2000-185KTL-H1
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 580 Wp Unit Nom. Power 175 kWac
Number of PV modules 2340 units Number of inverters 6 units
Nominal (STC) 1357 kWp Total power 1050 kWac
Array #1 - INV-1
Number of PV modules 390 units Number of inverters 1 unit
Nominal (STC) 226 kWp Total power 175 kWac
Modules 15 string x 26 In series
At operating cond. (50°C) Operating voltage 550-1500 V
Pmpp 206 kWp Max. power (=>30°C) 185 kWac
U mpp 1042 V Pnom ratio (DC:AC) 1.29
I mpp 198 A Power sharing within this inverter
Array #2 - INV-2
Number of PV modules 390 units Number of inverters 1 unit
Nominal (STC) 226 kWp Total power 175 kWac
Modules 15 string x 26 In series
At operating cond. (50°C) Operating voltage 550-1500 V
Pmpp 206 kWp Max. power (=>30°C) 185 kWac
U mpp 1042 V Pnom ratio (DC:AC) 1.29
I mpp 198 A Power sharing within this inverter
Array #3 - INV-3
Number of PV modules 390 units Number of inverters 1 unit
Nominal (STC) 226 kWp Total power 175 kWac
Modules 15 string x 26 In series
At operating cond. (50°C) Operating voltage 550-1500 V
Pmpp 206 kWp Max. power (=>30°C) 185 kWac
U mpp 1042 V Pnom ratio (DC:AC) 1.29
I mpp 198 A Power sharing within this inverter
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
PV Array Characteristics
Array #4 - INV-4
Number of PV modules 390 units Number of inverters 1 unit
Nominal (STC) 226 kWp Total power 175 kWac
Modules 15 string x 26 In series
At operating cond. (50°C) Operating voltage 550-1500 V
Pmpp 206 kWp Max. power (=>30°C) 185 kWac
U mpp 1042 V Pnom ratio (DC:AC) 1.29
I mpp 198 A Power sharing within this inverter
Array #5 - INV-5
Number of PV modules 390 units Number of inverters 1 unit
Nominal (STC) 226 kWp Total power 175 kWac
Modules 15 string x 26 In series
At operating cond. (50°C) Operating voltage 550-1500 V
Pmpp 206 kWp Max. power (=>30°C) 185 kWac
U mpp 1042 V Pnom ratio (DC:AC) 1.29
I mpp 198 A Power sharing within this inverter
Array #6 - INV-6
Number of PV modules 390 units Number of inverters 1 unit
Nominal (STC) 226 kWp Total power 175 kWac
Modules 15 string x 26 In series
At operating cond. (50°C) Operating voltage 550-1500 V
Pmpp 206 kWp Max. power (=>30°C) 185 kWac
U mpp 1042 V Pnom ratio (DC:AC) 1.29
I mpp 198 A Power sharing within this inverter
Array losses
Array Soiling Losses Thermal Loss factor DC wiring losses
Loss Fraction 3.0 % Module temperature according to irradiance Global array res. 87 mΩ
Uc (const) 29.0 W/m²K Global wiring resistance 15 mΩ
Uv (wind) 0.0 W/m²K/m/s Loss Fraction 1.5 % at STC
Serie Diode Loss LID - Light Induced Degradation Module Quality Loss
Voltage drop 0.7 V Loss Fraction 2.0 % Loss Fraction -0.8 %
Loss Fraction 0.1 % at STC
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Array losses
Spectral correction
FirstSolar model
Precipitable water estimated from relative humidity
Coefficient Set C0 C1 C2 C3 C4 C5
Monocrystalline Si 0.85914 -0.02088 -0.0058853 0.12029 0.026814 -0.001781
AC wiring losses
Inv. output line up to injection point
Inverter voltage 800 Vac tri
Loss Fraction 0.03 % at STC
Inverter: SUN2000-185KTL-H1
Wire section (6 Inv.) Copper 6 x 3 x 70 mm²
Average wires length 4m
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Horizon definition
Horizon line at Al Bayān
Horizon profile
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Iso-shadings diagram
Orientation #1
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Main results
System Production
Produced Energy 2586583 kWh/year Specific production 1906 kWh/kWp/year
Apparent energy 2586583 kVAh/year Perf. Ratio PR 77.56 %
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Loss diagram
2232 kWh/m² Global horizontal irradiation
+10.1% Global incident in coll. plane
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Predef. graphs
Reference Incident Energy in Collector Plane
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Predef. graphs
Incident Irradiation Distribution
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Predef. graphs
Array Temperature vs. Effective Irradiance
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Predef. graphs
Daily System Output Energy
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Predef. graphs
System Output Power Distribution
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Predef. graphs
Array Voltage Distribution
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Module layout
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Module layout
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Module layout
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Probability distribution
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7
Operating costs
Item Total
SAR/year
Total (OPEX) 0.00
System summary
Total installation cost 0.00 SAR
Operating costs 0.00 SAR/year
Produced Energy 2587 MWh/year
Cost of produced energy (LCOE) 0.0000 SAR/kWh
PVsyst V7.4.7
VC0, Simulation date:
21/10/24 11:17
with V7.4.7