Advance Metering Tech AMR MRI & BCS 250413
Advance Metering Tech AMR MRI & BCS 250413
INTRODUCTION
Advanced Metering Infrastructure (AMI) are systems that measure, collect, and analyze
energy usage, and communicate with metering devices such as electricity meters, either
on request or on a schedule. These systems include hardware, software,
communications, consumer energy displays and controllers, customer associated
systems, Meter Data Management (MDM) software, and supplier business systems.
IMPORTANCE OF METERING
METERING PLACES/POINTS
1
2
PURPOSE OF METERING
Type of Meters
MRI is an instrument by which we can retrieve meter data of a particular maker’s meter
for that MRI is suitable.
2
3
CMRI is an instrument by which we can retrieve meter data of different maker’s meters
(having different meter’s software ) as per our requirement.
In this process modem is connected with meter through optical or RJ11 port and power
up by available 110 V/230V supply from TTB or as the case may be. Another modem
need to be connected to computer in which BCS is loaded. Energy meter is having its
own protocol or DLMS protocol to which it responds. Schedules for reading are to be
prepared in BCS and then they are run on computer. In schedules the GSM No. which
is to be dialed is fed. When schedule runs it dials that number and send a hand shaking
commend. The meter on the other hand recognizes that these commands and send the
data to BCS . The data when received by BCS is saved in a particular file at some pre
defined location. (So in this manner the data which was to be collected from site by MRI
is collected in computer with the help of BCS and lot of time /man power is saved.)
In GSM Infrastructure:
1. Store and forward mode : In this mode stored data in GSM modem at
meter end is received as per configuration of modem i.e.
hourly/daily/weekly/monthly. In this mode baud rate is 9600bps . For
receiving all meter data from a meter memory it will takes about 3 to 4
minutes only.
2. Transparent mode : In this mode meter reading data directly received
from meter. In this mode baud rate is 1200bps. For receiving all meter
data from a meter memory it will takes about 30 to 40 minutes .
In GPRS Infrastructure:
3
4
ADVANTAGE OF AMR
A BCS play vital role to read the meter remotely and for efficient and speedy
recovery of data read through CMRI/HHU and also to view the downloaded
information in different formats & graphs.
The BCS software shall be user friendly. Windows based Base computer
software shall be supplied. Base Computer software shall give all details
adequate for analysis and load surveys parameters. The software shall have the
facility to convert all the consolidated information / data of selectable parameters
into ASCII and XML format. EDP department of purchaser can generate its own
DBF (data base files) to downloaded all the required information into it.
i. Platform : The BCS shall be executable on all WINDOWS system. The BCS
shall be suitable to run on IBM compatible PC hardware platform.
ii. Meter Data Display :The software shall show electrical condition existing at the
time of reading the meter in tabular forms as well as graphical format (Phase
diagram)
4
5
All the information about energy, maximum demand and their respective TOD
register reading, billing register readings shall be shown in a manner which user
can easily understand.
All the load survey data shall be available in numerical as well as graphical
format. It shall be possible to view this data daily, weekly, and monthly format.
The load survey graph will show values where the cursor is placed for the
selected or for all parameter.
All the information about abnormality events shall be accompanied with date and
time stamping along with 'snap-shot' of respective electrical conditions. This
information shall be displayed in the sequence in which it happened in
cumulative format as well as summary format.
The software shall be capable of preparing CMRI to read the meter information
or time setting of the meter.
iii. Support Display: There shall be "user friendly" approach for viewing meter data
for the reading collected now or for the reading collected in the past. All
information about a particular consumer will be sorted out and available at one
place so that locating any consumer 's past data is easy. It shall be possible to
retrieve/locate data on the basis of either one of the following particulars:
a) Consumer's ID/Numbers.
b) Meter Sr. No.
c) Date of meter reading.
d) Location.
iv. The Data Transfer :It shall be possible to transfer data to and fro from CMRI
through serial interface.
v. Remote Meter Reading option: It should be possible to read remote end meter
using GSM/ GPRS infrastructure with configurable auto reading mode and
manual mode. The auto dialling and reading mode shall have enough flexibility to
define different groups and their priority orders to read the meter etc.
vi. Configurability :It shall be possible to have selective printing of all available data
of the meter. Print out shall not include anything and everything available with
the BCS. The software shall support "print wizard" whereby user can decide
what to print out. The use of the software need not revert back to the supplier of
the software for modifying the software just to print what he desires.
BCS shall have facility to export data to ASCII or spreadsheet format for
integrating with the purchaser's billing system. Here again an "Export wizard" or
similar utility shall be available whereby user can select file format, what data to
export, the field width selection etc.
vii. Security: The BCS shall have multilevel password for data protection and
security. The first level shall allow the user to enter the system. The different
software features shall be protecting by different passwords. The configurable of
passwords shall be user definable.
5
6
viii. Help: The exhaustive online help shall be available with the software so that user
can use all the features of the software by just reading the help contents.
6
7
7
8
In GSM Infrastructure:
1. Store and forward mode : In this mode stored data in GSM modem at
meter end is received as per configuration of modem i.e.
hourly/daily/weekly/monthly. In this mode baud rate is 9600bps . For
receiving all meter data from a meter memory it will takes about 3 to 4
minutes only.
2. Transparent mode : In this mode meter reading data directly received
from meter. In this mode baud rate is 1200bps. For receiving all meter
data from a meter memory it will takes about 30 to 40 minutes .
In GPRS Infrastructure:
3. We can view the live data of the programmed intervals.
Advantages of AMR
- No need of man power to take the meter readings data.
- Manual errors eliminates completely
- Time saving in reading & billing process.
- Expenditure saved against vehicles and stationary etc.
Que. 2: Brief on the information to be retrieved from the meter with the help
of CMRI/AMR.