0% found this document useful (0 votes)
14 views13 pages

HIDCO Work Status & Program

Uploaded by

Bhaskar Mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views13 pages

HIDCO Work Status & Program

Uploaded by

Bhaskar Mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

PH

Previous Target Date Revised Date Previous Target Date Revised Date Previous Target Date Revised Date
S.No. Activity
LIG-1 LIG-4 LIG-2

1 PHE WORK Completed 10/26/2024 10/29/2024

HANDING OVER
10/30/2024 11/25/2025 11/10/2024 11/13/2024
(without grating)

2 FF WORK 10/20/2024 10/30/2024 10/29/2024

HANDING OVER 10/30/2024 11/9/2024 11/8/2024


PROJECT- HIDCO AFFORDABLE HOUSING COMPLEX

PHE AND FF WORK COMPLITION PROGRAM (WITHOUT TESTING COMMISSIONING WORK)

Previous Target Date Revised Date Previous Target Date Revised Date Previous Target Date Revised Date Previous Target Date Revised Date
EWS
LIG-6 LIG-3 LIG-5
PART-A

11/3/2024 11/24/2024 12/23/2024 10/5/2024

11/18/2024 12/9/2024 12/30/2024 10/20/2024

10/31/2024 11/19/2024 12/21/2024 10/26/2024

11/10/2024 11/29/2024 12/29/2024 11/5/2024


Previous Target Date Revised Date Previous Target Date Revised Date
EWS
EXTERNAL Remarks
PART-C PART-B

10/14/2024 10/29/2024 Completed

Clearance for SS grating by 7th


10/29/2024 11/13/2024 11/15/2024 nov-24 from ACIL, JCCPL will
required 45 days for fixing

10/28/2024 10/30/2024 11/15/2024

11/7/2024 11/9/2024 11/25/2024


EWS Part A
PHE Work FHC FF Work
FHC Piping Sprinkler
Floor Chinaware CP Fittings Erection Final Welding Revised Date Painting Revised Date Fixing Remarks

14th Floor PP PP 10/18/2024 10/24/2024 11/28/2024 10/25/2024 11/29/2024 NA


13th Floor PP PP 10/17/2024 10/24/2024 11/28/2024 10/25/2024 11/29/2024 NA
12th Floor PP PP 10/17/2024 10/23/2024 11/27/2024 10/25/2024 11/29/2024 NA
11th Floor PP PP 10/17/2024 10/23/2024 11/27/2024 10/25/2024 11/29/2024 NA
10th Floor PP 9/26/2024 10/16/2024 10/22/2024 11/27/2024 10/25/2024 11/29/2024 NA
9th Floor PP 9/27/2024 10/16/2024 10/22/2024 11/26/2024 10/25/2024 11/29/2024 NA
8th Floor PP 9/28/2024 10/16/2024 10/21/2024 11/26/2024 10/26/2024 11/29/2024 NA
7th Floor PP 9/29/2024 10/15/2024 10/21/2024 11/26/2024 10/26/2024 11/29/2024 NA
6th Floor PP 9/30/2024 10/15/2024 10/20/2024 11/25/2024 10/26/2024 11/29/2024 NA
5th Floor PP 10/1/2024 10/15/2024 10/20/2024 11/25/2024 10/26/2024 11/29/2024 NA
4th Floor PP 10/2/2024 PP 10/19/2024 11/25/2024 10/26/2024 11/29/2024 NA
3rd Floor PP 10/3/2024 PP 10/19/2024 11/24/2024 10/26/2024 11/29/2024 NA
2nd Floor PP 10/4/2024 PP 10/18/2024 11/24/2024 10/26/2024 11/29/2024 NA
1st Floor PP 10/5/2024 PP 10/18/2024 11/24/2024 10/26/2024 11/29/2024 NA
Ground Floor PP 10/5/2024 PP PP 10/26/2024 11/29/2024
Fitter 0
Helper 1 1
Welder 1 1 2
EWS Part B
PHE Work FHC FF Work Corridor FF Work
New Target New Target FHC Piping New Target New Target New Target Sprinkler New Target
Floor Chinaware Date CP Fittings Date Erection New Target Date Final Welding Date Painting Date Branching Date Fixing Date Remarks

14th Floor 10/15/2024 11/24/2024 11/25/2024 10/20/2024 11/30/2024 10/30/2024 12/14/2024 10/30/2024 12/15/2024 NA NA
13th Floor 10/16/2024 10/16/2024 11/26/2024 10/19/2024 11/29/2024 10/30/2024 12/13/2024 10/30/2024 12/15/2024 NA NA
12th Floor 10/17/2024 10/17/2024 11/28/2024 10/19/2024 11/29/2024 10/29/2024 12/12/2024 10/30/2024 12/16/2024 NA NA
11th Floor 10/18/2024 10/18/2024 11/29/2024 10/19/2024 11/28/2024 10/28/2024 12/11/2024 10/30/2024 12/16/2024 NA NA
10th Floor 10/19/2024 11/22/2024 10/19/2024 12/1/2024 10/18/2024 11/28/2024 10/27/2024 12/10/2024 10/30/2024 12/17/2024 NA NA
9th Floor 10/20/2024 11/24/2024 10/20/2024 12/2/2024 10/18/2024 11/27/2024 10/26/2024 12/9/2024 10/30/2024 12/17/2024 NA NA
8th Floor 10/21/2024 11/26/2024 10/21/2024 12/4/2024 10/18/2024 11/27/2024 10/25/2024 12/8/2024 10/30/2024 12/18/2024 NA NA
7th Floor 10/22/2024 11/28/2024 10/22/2024 12/5/2024 10/17/2024 11/26/2024 10/24/2024 12/7/2024 10/30/2024 12/18/2024 NA NA
6th Floor 10/23/2024 11/30/2024 10/23/2024 12/7/2024 10/17/2024 11/26/2024 10/23/2024 12/6/2024 10/30/2024 12/19/2024 NA NA
5th Floor 10/24/2024 12/2/2024 10/24/2024 12/8/2024 10/17/2024 11/25/2024 10/22/2024 12/5/2024 10/30/2024 12/19/2024 NA NA hidco 160425
4th Floor 10/25/2024 12/4/2024 10/25/2024 12/10/2024 PP 11/25/2024 10/21/2024 12/4/2024 10/30/2024 12/20/2024 NA NA gp 11309
3rd Floor 10/26/2024 12/6/2024 10/26/2024 12/11/2024 PP 11/24/2024 10/20/2024 12/3/2024 10/30/2024 12/20/2024 NA NA
2nd Floor 10/27/2024 12/8/2024 10/27/2024 12/13/2024 PP 11/24/2024 10/19/2024 12/2/2024 10/30/2024 12/21/2024 NA NA 171,734.00
1st Floor 10/28/2024 12/10/2024 10/28/2024 12/14/2024 PP 11/23/2024 10/18/2024 12/1/2024 10/30/2024 12/21/2024 NA NA
Ground Floor 10/29/2024 12/11/2024 10/29/2024 12/16/2024 PP 11/23/2024 PP 12/21/2024 15.10.24 11/30/2024 15.10.24 11/30/2024 Community Hall
Fitter 2 2 4
Helper 2 2 2 6
Welder 2 2
EWS Part C
PHE Work FHC FF Work
FHC Piping Sprinkler
Floor Chinaware CP Fittings Target Date Final Welding Target Date Painting Target Date Remarks
Erection Fixing
14th Floor PP PP 10/10/2024 10/16/2024 12/4/2024 10/27/2024 12/5/2024 NA
13th Floor 9/26/2024 9/26/2024 10/9/2024 10/16/2024 12/3/2024 10/27/2024 12/5/2024 NA
12th Floor 9/28/2024 9/28/2024 10/9/2024 10/15/2024 12/2/2024 10/27/2024 12/5/2024 NA
11th Floor 9/30/2024 9/30/2024 10/9/2024 10/15/2024 12/2/2024 10/27/2024 12/5/2024 NA
10th Floor 10/2/2024 10/2/2024 10/8/2024 10/14/2024 12/2/2024 10/27/2024 12/5/2024 NA
9th Floor 10/4/2024 10/4/2024 10/8/2024 10/14/2024 12/1/2024 10/27/2024 12/5/2024 NA
8th Floor 10/6/2024 10/6/2024 PP 10/13/2024 12/1/2024 10/27/2024 12/5/2024 NA
7th Floor 10/7/2024 10/7/2024 PP 10/13/2024 12/1/2024 10/27/2024 12/5/2024 NA
6th Floor 10/8/2024 10/8/2024 PP 10/12/2024 11/30/2024 10/28/2024 12/5/2024 NA
5th Floor 10/9/2024 10/9/2024 11/24/2024 PP 10/12/2024 11/30/2024 10/28/2024 12/5/2024 NA
4th Floor 10/10/2024 10/10/2024 11/26/2024 PP 10/11/2024 11/30/2024 10/28/2024 12/5/2024 NA
3rd Floor 10/11/2024 10/11/2024 11/28/2024 PP 10/11/2024 11/29/2024 10/28/2024 12/5/2024 NA
2nd Floor 10/12/2024 10/12/2024 11/30/2024 PP 10/10/2024 11/29/2024 10/28/2024 12/5/2024 NA
1st Floor 10/13/2024 10/13/2024 11/30/2024 PP 10/10/2024 11/29/2024 10/28/2024 12/5/2024 NA
Ground Floor 10/14/2024 10/14/2024 12/1/2024 PP PP 10/28/2024 12/5/2024
Fitter 1 1 2
Helper 1 2 3
Welder 0
LIG -1
Floor PHE Work FHC Shaft FF Work Corridor FF Work Remarks

FHC Piping Valve & Sprinkler


Chinaware CP Fittings Final Welding Branching Painting
Erection Accessories Fixing Fixing

15th Floor PP PP PP 10/20/2024 PP PP PP


14th Floor PP PP PP 10/19/2024 PP PP PP
13th Floor PP PP PP 10/18/2024 PP PP PP
12th Floor PP PP PP 10/17/2024 PP PP PP
11th Floor PP PP PP 10/16/2024 PP PP PP
10th Floor PP PP PP 10/15/2024 PP PP PP
9th Floor PP PP PP 10/14/2024 PP PP PP
8th Floor PP PP PP 10/12/2024 PP PP PP
7th Floor PP PP PP 10/10/2024 PP PP PP
6th Floor PP PP PP 10/8/2024 PP PP PP
5th Floor PP PP PP 10/6/2024 PP PP PP
4th Floor PP PP PP 10/4/2024 PP PP PP
3rd Floor PP PP PP PP PP PP PP
2nd Floor PP PP PP PP PP PP PP
1st Floor PP PP PP PP PP PP PP
Ground Floor PP PP PP PP 11/28/2024 11/30/2024 12/1/2024
KH MALLIK CONTRACTOR
LIG -2
PHE Work FHC Shaft FF Work Corridor FF Work

New Target New Target New Target


Floor Chinaware CP Fittings FHC Piping Erection Target Date Final Welding Target Date Branching Painting Sprinkler Fixing Remarks
Date Date Date

15th Floor 10/1/2024 10/1/2024 10/5/2024 11/30/2024 10/22/2024 1/6/2025 PP PP 10/29/2024


14th Floor 10/3/2024 11/24/2024 10/3/2024 11/25/2024 10/4/2024 11/29/2024 10/21/2024 1/4/2025 PP PP 10/28/2024
13th Floor 10/5/2024 11/26/2024 10/5/2024 11/27/2024 10/3/2024 11/29/2024 10/20/2024 1/1/2025 PP PP 10/27/2024
12th Floor 10/7/2024 11/28/2024 10/7/2024 11/29/2024 10/2/2024 11/28/2024 10/19/2024 12/30/2024 PP 9/28/2024 10/26/2024
11th Floor 10/9/2024 11/30/2024 10/9/2024 12/1/2024 10/1/2024 11/28/2024 10/18/2024 12/27/2024 PP 9/30/2024 10/25/2024
10th Floor 10/11/2024 10/11/2024 12/2/2024 PP 10/17/2024 12/25/2024 PP 10/2/2024 10/24/2024
9th Floor 10/13/2024 10/13/2024 12/3/2024 PP 10/16/2024 12/22/2024 PP 10/4/2024 10/23/2024
8th Floor 10/15/2024 10/15/2024 12/4/2024 PP 10/15/2024 12/20/2024 PP 10/6/2024 10/22/2024
7th Floor 10/17/2024 10/17/2024 12/5/2024 PP 10/14/2024 12/17/2024 PP 10/8/2024 10/21/2024
6th Floor 10/19/2024 10/19/2024 12/6/2024 PP 10/13/2024 12/15/2024 PP 10/10/2024 10/20/2024
5th Floor 10/21/2024 10/21/2024 12/7/2024 PP 10/12/2024 12/12/2024 PP 10/12/2024 11/23/2024 10/19/2024
4th Floor 10/23/2024 10/23/2024 12/8/2024 PP 10/11/2024 12/10/2024 PP 10/14/2024 11/25/2024 10/18/2024
3rd Floor 10/25/2024 10/25/2024 12/9/2024 PP 10/10/2024 12/7/2024 PP 10/16/2024 11/27/2024 10/17/2024
2nd Floor 10/27/2024 12/2/2024 10/27/2024 12/10/2024 PP 10/9/2024 12/5/2024 PP 10/18/2024 11/29/2024 10/16/2024
1st Floor 10/29/2024 12/4/2024 10/29/2024 12/11/2024 PP 10/7/2024 12/2/2024 PP 10/20/2024 12/1/2024 10/14/2024
Ground Floor PP
Fitter 1 1
Helper 2 2
Welder 0
LIG -3
PHE Work FHC Shaft FF Work Corridor FF Work
Floor Chinaware CP Fittings FHC Piping Erection Final Welding Branching Painting Sprinkler Fixing Remarks
15th Floor 10/27/2024 10/27/2024 11/13/2024 11/30/2024 10/13/2024 11/1/2024 10/29/2024
14th Floor 10/29/2024 10/29/2024 11/12/2024 11/29/2024 10/11/2024 11/3/2024 10/28/2024
13th Floor 10/31/2024 10/31/2024 11/11/2024 11/28/2024 10/9/2024 11/5/2024 10/27/2024
12th Floor 11/2/2024 11/2/2024 11/10/2024 11/27/2024 10/7/2024 11/7/2024 10/26/2024
11th Floor 11/4/2024 11/4/2024 11/9/2024 11/26/2024 10/5/2024 11/9/2024 10/25/2024
10th Floor 11/6/2024 11/6/2024 11/7/2024 11/25/2024 PP 11/10/2024 10/24/2024
9th Floor 11/8/2024 11/8/2024 11/5/2024 11/24/2024 PP 11/11/2024 10/23/2024
8th Floor 11/10/2024 11/10/2024 11/3/2024 11/23/2024 PP 11/12/2024 10/22/2024
7th Floor 11/12/2024 11/12/2024 11/1/2024 11/22/2024 PP 11/13/2024 10/21/2024
6th Floor 11/14/2024 11/14/2024 PP 11/21/2024 PP 11/14/2024 10/20/2024
5th Floor 11/16/2024 11/16/2024 PP 11/20/2024 PP 11/15/2024 10/19/2024
4th Floor 11/18/2024 11/18/2024 PP 11/19/2024 PP 11/16/2024 10/18/2024
3rd Floor 11/20/2024 11/20/2024 PP 11/18/2024 PP 11/17/2024 10/17/2024
2nd Floor 11/22/2024 11/22/2024 PP 11/17/2024 PP 11/18/2024 10/16/2024
1st Floor 11/24/2024 11/24/2024 PP 11/15/2024 PP 11/19/2024 10/14/2024
Ground Floor PP
LIG -4
PHE Work FHC Shaft FF Work Corridor FF Work
FHC Piping
Floor Chinaware CP Fittings Final Welding Branching Painting Sprinkler Fixing Remarks
Erection
15th Floor PP PP 10/14/2024 10/30/2024 9/30/2024 10/30/2024 10/29/2024
14th Floor PP 9/30/2024 10/13/2024 10/29/2024 9/29/2024 10/30/2024 10/28/2024
13th Floor PP 10/2/2024 10/12/2024 10/28/2024 9/28/2024 10/30/2024 10/27/2024
12th Floor PP 10/4/2024 10/11/2024 10/27/2024 PP 10/30/2024 10/26/2024
11th Floor 10/6/2024 10/6/2024 10/10/2024 10/26/2024 PP 10/30/2024 10/25/2024
10th Floor 10/8/2024 10/8/2024 10/9/2024 10/25/2024 PP 10/30/2024 10/24/2024
9th Floor 10/10/2024 10/10/2024 10/8/2024 10/24/2024 PP 10/30/2024 10/23/2024
8th Floor 10/12/2024 10/12/2024 10/7/2024 10/23/2024 PP 10/30/2024 10/22/2024
7th Floor 10/14/2024 10/14/2024 10/6/2024 10/22/2024 PP 10/30/2024 10/21/2024
6th Floor 10/16/2024 10/16/2024 10/5/2024 10/21/2024 PP 10/30/2024 10/20/2024
5th Floor 10/18/2024 10/18/2024 10/4/2024 10/20/2024 PP 10/30/2024 10/19/2024
4th Floor 10/20/2024 10/20/2024 10/3/2024 10/19/2024 PP 10/30/2024 10/18/2024
3rd Floor 10/22/2024 10/22/2024 PP 10/18/2024 PP 10/30/2024 10/17/2024
2nd Floor 10/24/2024 10/24/2024 PP 10/17/2024 PP 10/30/2024 10/16/2024
1st Floor 10/26/2024 10/26/2024 PP 10/15/2024 PP 10/30/2024 10/14/2024
Ground Floor PP
LIG -3
PHE Work FHC Shaft FF Work Corridor FF Work
Floor Chinaware CP Fittings FHC Piping Erection Final Welding Branching Painting Sprinkler Fixing Remarks
15th Floor 11/25/2024 11/25/2024 12/15/2024 12/31/2024 11/17/2024 11/18/2024 12/7/2024
14th Floor 11/27/2024 11/27/2024 12/14/2024 12/30/2024 11/14/2024 11/20/2024 12/8/2024
13th Floor 11/29/2024 11/29/2024 12/13/2024 12/29/2024 11/11/2024 11/22/2024 12/9/2024
12th Floor 12/1/2024 12/1/2024 12/12/2024 12/28/2024 11/8/2024 11/24/2024 12/10/2024
11th Floor 12/3/2024 12/3/2024 12/11/2024 12/27/2024 11/5/2024 11/26/2024 12/11/2024
10th Floor 12/5/2024 12/5/2024 12/10/2024 12/26/2024 11/2/2024 11/27/2024 12/12/2024
9th Floor 12/7/2024 12/7/2024 12/9/2024 12/25/2024 10/30/2024 11/28/2024 12/13/2024
8th Floor 12/9/2024 12/9/2024 12/8/2024 12/24/2024 10/27/2024 11/29/2024 12/14/2024
7th Floor 12/11/2024 12/11/2024 12/7/2024 12/23/2024 10/24/2024 11/30/2024 12/15/2024
6th Floor 12/13/2024 12/13/2024 12/6/2024 12/22/2024 10/21/2024 12/1/2024 12/16/2024
5th Floor 12/15/2024 12/15/2024 12/5/2024 12/21/2024 10/18/2024 12/2/2024 12/17/2024
4th Floor 12/17/2024 12/17/2024 12/4/2024 12/20/2024 10/15/2024 12/3/2024 12/18/2024
3rd Floor 12/19/2024 12/19/2024 12/3/2024 12/19/2024 PP 12/4/2024 12/19/2024
2nd Floor 12/21/2024 12/21/2024 12/2/2024 12/18/2024 PP 12/5/2024 12/20/2024
1st Floor 12/23/2024 12/23/2024 12/1/2024 12/16/2024 PP 12/6/2024 12/21/2024
Ground Floor PP
LIG -6
PHE Work FHC Shaft FF Work Corridor FF Work
FHC Piping Sprinkler
Floor Chinaware CP Fittings Final Welding Branching Painting Remarks
Erection Fixing
15th Floor 10/6/2024 PP 10/25/2024 11/10/2024 10/3/2024 10/3/2024 10/29/2024
14th Floor 10/8/2024 10/8/2024 10/24/2024 11/9/2024 10/2/2024 10/5/2024 10/28/2024
13th Floor 10/10/2024 10/10/2024 10/23/2024 11/8/2024 10/1/2024 10/7/2024 10/27/2024
12th Floor 10/12/2024 10/12/2024 10/22/2024 11/7/2024 PP 10/9/2024 10/26/2024
11th Floor 10/14/2024 10/14/2024 10/21/2024 11/6/2024 PP 10/11/2024 10/25/2024
10th Floor 10/16/2024 10/16/2024 10/20/2024 11/5/2024 PP 10/13/2024 10/24/2024
9th Floor 10/18/2024 10/18/2024 10/19/2024 11/4/2024 PP 10/15/2024 10/23/2024
8th Floor 10/20/2024 10/20/2024 10/18/2024 11/3/2024 PP 10/17/2024 10/22/2024
7th Floor 10/22/2024 10/22/2024 10/17/2024 11/2/2024 PP 10/19/2024 10/21/2024
6th Floor 10/24/2024 10/24/2024 10/16/2024 11/1/2024 PP 10/21/2024 10/20/2024
5th Floor 10/26/2024 10/26/2024 10/15/2024 10/31/2024 PP 10/23/2024 10/19/2024
4th Floor 10/28/2024 10/28/2024 10/14/2024 10/30/2024 PP 10/25/2024 10/18/2024
3rd Floor 10/30/2024 10/30/2024 PP 10/29/2024 PP 10/27/2024 10/17/2024
2nd Floor 11/1/2024 11/1/2024 PP 10/28/2024 PP 10/29/2024 10/16/2024
1st Floor 11/3/2024 11/3/2024 PP 10/26/2024 PP 10/31/2024 10/14/2024
Ground Floor PP
Project- Hidco Affordable Housing

TERRACE OVERHEAD TANK WATER CHARGE SCHEDULE

S.No. Description LIG-1 LIG-2 LIG-3 LIG-4 LIG-5 LIG-6 EWS Remarks

Terrace Ring Main Complete


with Connection and Water 05.10.24 30.10.24 30.10.24 15.10.24 15.12.24 10.11.24 07.10.24
1 Charge in Overhead Tank on-

Including all valve,Y Stainer


filter,Vent etc.
Tank Cover etc.