0% found this document useful (0 votes)
9 views

Annexure 1

Uploaded by

saif ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
9 views

Annexure 1

Uploaded by

saif ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Page 1 of 3

CGMP PROJECTS PVT LTD.


SAB INFRA & DESIGN
BOQ FOR IIT DELHI HAUZ KHAS
M-7/6 ZAKIR NAGAR OKHLA NEW DELHI -110025
DATE-13-11-2024
Sr. No. Description Unit Qty. RATE AMOUNT REMARK
Schedule A - Civil Works
1 Earth work in excavation by mechanical means
(Hydraulic excavator)/ manual means over
areas (exceeding 30 cm in depth, 1.5 m in width
as well as 10 sqm on plan) including getting out
and disposal of excavated earth lead upto 50 m
and lift upto 1.5 m, as directed by Engineer-in
charge.

1.1 All kinds of soil Cum. 33 564.96 18643.68


2 Providing and laying in position cement concrete
of specified grade excluding the cost of centering
and shuttering - All work up to plinth level:

2.1 1:3:6 (1 Cement: 3 coarse sand (zone-III)


derived from natural sources : 6 graded stone
Cum. 5.63 5900 33217
aggregate 20 mm nominal size derived from
natural sources)
3 Providing and laying in position specified grade
of reinforced cement concrete, excluding the
cost of centering, shuttering, finishing and
reinforcement - All work up to plinth level :

3.1 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III)


derived from natural sources : 3 graded stone
Cum 15 7500 112500
aggregate 20 mm nominal size de rived from
natural sources)
4 Centering and shuttering including strutting,
propping etc. and removal of form for

4.1 Foundations, footings, bases for columns Sqm. 42 592 24855.6


4.2 Lintels, beams, plinth beams, girders,
Sqm. 9 624 5616.72
bressumers and cantilevers
5 Steel reinforcement for R.C.C. work
including straightening, cutting, bending, placing
in position and binding all complete upto
plinth level.
5.1 Thermo-Mechanically Treated bars of grade Fe-
Kg. 1028 88 90464 RATHI STEEL
500D or more.
6 Half brick masonry with common burnt clay
F.P.S. (non-modular) bricks of class designation
7.5 in superstructure above plinth level up to
floor V level.
6.1 Cement mortar 1:4 (1 cement :4 coarse sand)
Sqm. 15 1080 16200

SAB INFRA AND DESIGN


Page 2 of 3

7 Providing and fixing Ist quality ceramic glazed


wall tiles conforming to IS: 15622 (thickness to
be specified by the manufacturer), of approved
make, in all colours, shades except burgundy,
bottle green, black of any size as approved by
Engineer-in-Charge, in skirting, risers of steps Base Rate of Tile -
and dados, over 12 mm thick bed of cement Sqm. 17 1597.9 27163.62 50/sqft (epoxy
mortar 1:3 (1 cement : 3 coarse sand) and Grout not include)
jointing with grey cement slurry @ 3.3kg per
sqm, including pointing in white cement mixed
with pigment of matching shade complete.

10 Providing and laying rectified Glazed Ceramic


floor tiles of size 300x300 mm or more (thickness
to be specified by the manufacturer), of 1st
quality conforming to IS : 15622, of approved
make, in all colours, shades, except White, Ivory,
Grey, Fume Red Brown, laid on 20 mm thick Base Rate of Tile -
Cement Mortar 1:4 (1 Cement : 4 Coarse sand), Sqm. 8 1716.22 13729.76 60/sqft (epoxy
jointing with grey cement slurry @ 3.3 kg/ sqm Grout not include)
including pointing the joints with white
cement and matching pigments etc., complete.

13 Demolishing cement concrete manually/ by


mechanical means including disposal of material
within 50 metres lead as per direction of
Engineer - in - charge
13.1 Nominal concrete 1:3:6 or richer mix (i/c
Cum. 19.09 1765.5 33703.40
equivalent design mix)
14 Demolishing R.C.C. work manually/ by
mechanical means including stacking of steel
bars and disposal of unserviceable material Cum. 25 1765.5 44137.5
within 50 metres lead as per direction of
Engineer - in- charge.
15 Demolishing brick work manually/ by mechanical
means including stacking of serviceable material
and disposal of unserviceable material within 50
metres lead as per direction of Engineer-in-
charge.

15.1 In cement mortar Cum. 83 1235.85 102575.55


16 Dismantling doors, windows and clerestory
windows (steel or wood) shutter including
chowkhats, architrave, holdfasts etc. complete
and stacking within 50 metres lead :

16.1 Of area 3 sq. metres and below Each. 12 300 3600


16.2 Of area beyond 3 sq. metres Each. 10 500 5000
17 Dismantling tile work in floors and roofs laid in
cement mortar including stacking material within
50 metres lead.
17.1 For thickness of tiles above 25 mm and up to 40
Sqm. 255 107.6 27438
mm

SAB INFRA AND DESIGN


Page 3 of 3

18 Dismantling wooden boardings in lining of walls


and partitions, excluding supporting members
but including stacking within 50 metres lead :

18.1 Thickness above 25 mm up to 40 mm Sqm. 120 86.08 10329.6


19 Dismantling cement asbestos or other hard
board ceiling or partition walls including stacking
of serviceable materials and disposal of Sqm. 255 269 68595
unserviceable materials within 50 metres lead.

20 Dismantling G.I. pipes (external work) including


excavation and refilling trenches after taking out
the pipes, manually/ by mechanical means
including stacking of pipes within 50 metres lead
as per direction of Engineer- in-charge:

20.1 15 mm to 40 mm nominal bore Mtr. 33 164 5412


21 Dismantling C.I. pipes including excavation and
refilling trenches after taking out the pipes,
manually/ by mechanical means breaking lead
caulked joints, melting of lead and making into
blocks including stacking of pipes & lead at site
within 50 metre lead as per direction of Engineer-
in-charge:

21.1 Up to 150 mm diameter Mtr. 31 196.8 6100.8


22 Dismantling of flushing cistern of all types
(C.I./PVC/Vitreous China) including stacking of
useful materials near the site and disposal of Each. 15 400 6000
unserviceable materials within 50 metres lead.

TOTAL 6,55,282
NOTE:
1 GST EXTRA AS PER GOVERNMENT RULE.
2 ELECTRICITY WILL BE IN CLIENT SCOPE.
3 ANY PERPAR WORK RELATED TO SITE ENTRY EXIT ETC MANAGE BY CLIENT.
4 WATER ARRANGE By YOU.
5 ALL ITEMS MAKE APPROVAL BY CLIENT Before DISPATCH.
PAYMENT TERM
1 10% ADVANCE FOR MOBILIZATION
2 REST OF THE PAYMENT AS PER RUNING BILLS

SAB INFRA & DESIGN


(M-7,Gali.no -6 ,1st floor zakir nagar okhla new delhi-110025)
GSTIN Number :- 07BIXPA4022L1Z3

SAB INFRA AND DESIGN