Project Management For Managers - Unit 13 - Week 11

Uploaded by

allen
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

10/11/23, 2:23 PM Project Management For Managers - - Unit 13 - Week 11

[email protected]

(https://swayam.gov.in)

(https://swayam.gov.in/nc_details/NPTEL)

NPTEL (https://swayam.gov.in/explorer?ncCode=NPTEL) » Project Management For Managers (course)

If already
registered, click
to check your
Week 11 : Assignment 11
payment status Your last recorded submission was on 2023-10-08, 15:28 IST Due date: 2023-10-11, 23:59 IST.

1) Cost performance index is calculated by using: 1 point

Course Actual cost / Planned value


outline Planned value / Earned value
Budget cost at completion / Actual cost
How does an Earned value / Actual cost
NPTEL online
course work?
2) Which of the following is a cost-estimating technique? 1 point
()
Variance management
Week 0 ()
Cost aggregation
Parametric estimating
Week 1 ()
Cost change control system
Week 2 ()
3) Which of the following is not a cost control technique? 1 point
Week 3 ()
Reserve analysis

Week 4 () Project performance reviews


Forecasting
Week 5 () Variance management

Week 6 () 4) Which of the technique uses a statistical relationship between historical data and other 1 point
variables to calculate a cost estimate for a schedule activity resource?

https://onlinecourses.nptel.ac.in/noc23_mg107/unit?unit=97&assessment=170 1/3
10/11/23, 2:23 PM Project Management For Managers - - Unit 13 - Week 11

Week 7 () Parametric Estimating


Bottom-up Estimating
Week 8 () Vendor Bid Analysis
Reserve Analysis
Week 9 ()
5) Cost variance (CV) can be calculated as: 1 point
Week 10 ()
Earned value – Actual cost

Week 11 () Earned value – Planned value


Planned value – Actual cost
Lesson-51
Planned value – Earned value
Crashing of
Networks- IV
(unit? 6) Estimating the cost of individual work packages or individual schedule activities with 1 point
unit=97&lesson the lowest level of detail is called?
=98)
Parametric Estimating
Lesson-52
Bottom-up Estimating
Introduction to
Project Cost Vendor Bid Analysis
Management Reserve Analysis
(unit?
unit=97&lesson
7) Which of the following is not used to provide performance measurement of any work at 1 point
=99)
given point of time?
Lesson-53 Cost
Control (Tools Planned value
and Budgeted cost at completion
Techniques)
Earned value
(unit?
unit=97&lesson Actual cost
=100)
8) Which of the following is not a cost control output? 1 point
Lesson-54 Cost
Estimation
Project management plan
(unit?
unit=97&lesson Cost estimate
=101) Cost breakdown information
Lesson-55 Cost baseline
Introduction to
Quality 9) Schedule variance (SV) is termed as: 1 point
Management
(unit? Earned value – Actual value
unit=97&lesson
Earned value – Planned value
=102)
Actual cost – planned value
Quiz: Week 11
Actual cost – Earned value
: Assignment
11
(assessment? 10) Which of the following is not a cost budgeting input? 1 point
name=170)
Project scope statement

https://onlinecourses.nptel.ac.in/noc23_mg107/unit?unit=97&assessment=170 2/3
10/11/23, 2:23 PM Project Management For Managers - - Unit 13 - Week 11

Week 12 () Project schedule


Work breakdown structure
FEEDBACK Performance reports
LINK () You may submit any number of times before the due date. The final submission will be considered
for grading.