H3041-820-001/P&ID - Air sounding arrangement
H3041-815-001/P&ID - Fire fighting system
Blank 1
V2034-R-15/Piping Material Specification
V2150-M-02/DA room Ventilation system review & update (if required)
V2034-P-01/P&ID for EGCS system
V2131-R-06/Ventilation calculation
V2131-M-02/FW cooling system
H3041-740-001/P&ID - Exhaust System
H3041-101-023/Machinery Equipment List
H3041-101-023/Machinery Equipment List
ID286-R-01/LNGC to FSU Conversion Specification for Lerici
V1916-R-02/Pressure & flow analysis (LNG,NG,Glycol,SW,FW)
ID286-M-01/Master Conversion Plan
ID286-X-02/Meeting
ID286-R-01/LNGC to FSU Conversion Specification for Lerici
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
H3041-404-001/Bow Thruster room Arrangement
TBM1/Basic Machinery - Mach. Sys. Design
Blank 1
TBM4/Basic Machinery - Heat & Mass balance calc
V1916-M-12/P&ID Engine Room Drain System
V1916-P-63/P&ID For Water Ballast System
V1916-M-13/P&ID Regas Module Deck Drain System
H3041-574-002/Engine room Ventilation calculation
H3041-404-001/Bow Thruster room Arrangement
V1971-X-02/Meeting
V1916-M-12/P&ID Engine Room Drain System
V1916-M-02/Master Equipment list
001-0710-80-501/Lube Oil Transfer & Service System
H3041-815-001/P&ID - Fire fighting system
Departmental Task
Blank 1
H3041-551-002/SOTR for Food waste handling system
H3041-551-002/SOTR for Food waste handling system
ID286-M-01/Master Conversion Plan
V1916-P-63/P&ID For Water Ballast System
ID286-R-01/LNGC to FSU Conversion Specification for Lerici
H3041-830-002/SOTR for Hydraulic System
V1916-R-07/Pressure & flow analysis (Glycol)
Departmental Task
H3041-600-001/Engine room Arrangement
V1985-M-01/PID for ALS
Meeting - Internal (Non-Projects)
I-MC-3010.2G-1415-200-KES-014/M05 - STRESS ANALYSIS REPORT ? MAIN GAS COMPRESSION - CN014
V1574-X-01/Project Mgmt
ID286-X-02/Meeting
V1916-X-01/Project Management
Meeting - Internal (Non-Projects)
H3041-740-001/P&ID - Exhaust System
H3041-815-001/P&ID - Fire fighting system
H3041-551-002/SOTR for Food waste handling system
001-0710-80-501/Lube Oil Transfer & Service System
H3041-820-001/P&ID - Air sounding arrangement
V2131-M-02/FW cooling system
I-MC-3010.2G-1418-200-KES-014/M08_CN014
H3041-404-001/Bow Thruster room Arrangement
V1916-P-43/P&ID Cargo System
V1916-M-02/Master Equipment list
H3041-815-001/P&ID - Fire fighting system
TBM1/Basic Machinery - Mach. Sys. Design
V2131-M-01/Ventilation plan
H3041-820-001/P&ID - Air sounding arrangement
V1916-R-02/Pressure & flow analysis (LNG,NG,Glycol,SW,FW)
V1916-P-43/P&ID Cargo System
S2045/MY Queen Alla_ADSB - New Sea chest
H3041-400-006/Stern Thruster room arrangement
V2036-X-02/Meeting
V2150-X-06/Tracing Work for Machinery
V1916-P-43/P&ID Cargo System
V1971-M-03/Steering Gear Room Arrangement
Attend Training
V1916-M-02/Master Equipment list
I-MC-3010.2G-1415-200-KES-015/M05-STRESS ANALYSIS REPORT -
SAFETY GAS K.O. DRUM - V1231001 GAS INLET ? CN015
V1916-X-01/Project Management
I-MC-3010.2G-1415-200-KES-009/M05 - STRESS ANALYSIS REPORT ? MAIN GAS COMPRESSION - COMPRESSOR DISC
V1916-R-07/Pressure & flow analysis (Glycol)
H3041-580-001/P&ID - Sanitary discharge system
A6-V1270-X-01/Project management
V2008-R-11F/Specification for Ventilation Fan and Louver
V1459-C-P-01/P&ID Fuel oil Transfer & service system
V1574-X-01/Project Mgmt
V2181-P-01/Broad Process Block Diagram
H3041-820-001/P&ID - Air sounding arrangement
Departmental Task
V2032-G-05/Steering Gear Arrangement
V2162-X-08/Machinery Compliance
H3041-404-001/Bow Thruster room Arrangement
V2131-M-01/Ventilation plan
V2032-M-02/Steering Gear Room Arrangement
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
Departmental Task
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
H3041-570-006/SOTR for HVAC system
V2181-P-01/Broad Process Block Diagram
V2181-P-01/Broad Process Block Diagram
V1916-R-02/Pressure & flow analysis (LNG,NG,Glycol,SW,FW)
H3041-817-001/SOTR for Sprinkler and water mist system
H3041-830-002/SOTR for Hydraulic System
V1916-R-02/Pressure & flow analysis (LNG,NG,Glycol,SW,FW)
V1916-R-02/Pressure & flow analysis (LNG,NG,Glycol,SW,FW)
Departmental Task
V1716-P-01/P&ID for EGCS system
V2058-R-23/Cross flooding calculations
V2131-M-02/FW cooling system
H3041-820-001/P&ID - Air sounding arrangement
Idle
Idle
V1916-M-13/P&ID Regas Module Deck Drain System
V1916-P-63/P&ID For Water Ballast System
Idle
V2032-P-08/P&ID - Freshwater Supply System
H3041-404-001/Bow Thruster room Arrangement
V1916-R-07/Pressure & flow analysis (Glycol)
Meeting - Internal (Non-Projects)
V1916-P-63/P&ID For Water Ballast System
Idle
Meeting - External (Non-Projects)
Idle
Meeting - Internal (Non-Projects)
Blank 1
Idle
V2008-X-01/Project Management
V1916-P-66/Pipe Material Specification - BWTS
V1916-P-66/Pipe Material Specification - BWTS
Blank 1
Idle
V1916-R-07/Pressure & flow analysis (Glycol)
V1916-P-63/P&ID For Water Ballast System
V1916-P-66/Pipe Material Specification - BWTS
V1916-R-07/Pressure & flow analysis (Glycol)
V1916-P-63/P&ID For Water Ballast System
V1916-P-66/Pipe Material Specification - BWTS
V1916-P-43/P&ID Cargo System
V1985-M-01/PID for ALS
Departmental Task
H3041-404-001/Bow Thruster room Arrangement
H3041-101-023/Machinery Equipment List
V1971-P-01/Sea Water Cooling System P&ID
H3041-820-001/P&ID - Air sounding arrangement
H3041-600-001/Engine room Arrangement
H3041-710-001/P&ID - Lube Oil system
V1916-P-63/P&ID For Water Ballast System
V1985-M-01/PID for ALS
H3041-404-001/Bow Thruster room Arrangement
Meeting - Internal (Non-Projects)
V2131-M-01/Ventilation plan
V2131-M-01/Ventilation plan
A6-V1270-X-01/Project management
H3041-580-004/Sewage treatment room arrangement
Meeting - Internal (Non-Projects)
Departmental Task
V1459-C-P-01/P&ID Fuel oil Transfer & service system
001-0710-80-501/Lube Oil Transfer & Service System
H3041-600-001/Engine room Arrangement
V1916-R-02/Pressure & flow analysis (LNG,NG,Glycol,SW,FW)
H3041-574-002/Engine room Ventilation calculation
V1916-R-07/Pressure & flow analysis (Glycol)
V1971-R-04/Valve MTO
Idle
V1971-P-01/Sea Water Cooling System P&ID
V2181-P-01/Broad Process Block Diagram
V1862-X-02/Meeting
V1862-E-16/P&IDs mark up for PLC
V1916-P-63/P&ID For Water Ballast System
Idle
V1916-P-46/P&ID N2 System
V1916-M-11/P&ID Sewage Evaporation System
V1916-P-44/P&ID Regas Sea Water System
V1916-P-45/P&ID Regas Glycol Water system
V1916-P-52/P&ID Regas Steam Condensate system
V1916-P-54/P&ID Sewage system
H3041-710-001/P&ID - Lube Oil system
Departmental Task
Y-1279-X-02/Meeting
Departmental Task
H3041-744-001/P&ID - Urea filling & Trasnfer system
H3041-740-001/P&ID - Exhaust System
V1916-P-63/P&ID For Water Ballast System
V1916-P-54/P&ID Sewage system
Y-1279-X-30/TBE for Hydrophore
Y-1279-X-28/TBE for Gear or Screw pumps
Y-1279-P-01/Ballast (Flooding & De-watering) System Schematic
H3041-800-003/Ballast system flow & pressure analysis
Blank 1
H3041-830-002/SOTR for Hydraulic System
H3041-821-003/SOTR for Tank remote sounding system
V1916-P-45/P&ID Regas Glycol Water system
Departmental Task
V1916-P-54/P&ID Sewage system
V1916-P-63/P&ID For Water Ballast System
V1916-P-44/P&ID Regas Sea Water System
V1985-M-01/PID for ALS
V2038-X-01/Project Management
V2032-G-05/Steering Gear Arrangement
Blank 1
Meeting - External (Non-Projects)
Idle
V1862-E-16/P&IDs mark up for PLC
I-MC-3010.2G-1415-200-KES-014/M05 - STRESS ANALYSIS REPORT ? MAIN GAS COMPRESSION - CN014
Meeting - Internal (Non-Projects)
V1985-X-02/Meeting
M2650/RO Plant Installation
I-MC-3010.2G-1415-200-KES-015/M05-STRESS ANALYSIS REPORT -
SAFETY GAS K.O. DRUM - V1231001 GAS INLET ? CN015
V2034-M-02/Machinery Arrangement drawing
V1985-R-02/Pressure Drop for ALS
Meeting - Internal (Non-Projects)
V1574-X-01/Project Mgmt
V2032-R-14/HVAC Heat Load Calcualtion
M2630/Pre-feasibility scope for FLNG
V2032-R-14/HVAC Heat Load Calcualtion
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
H3041-404-001/Bow Thruster room Arrangement
V2162-X-08/Machinery Compliance
Idle
Y-1279-R-102/SOTR for Valves
V2032-G-05/Steering Gear Arrangement
V1985-M-01/PID for ALS
Departmental Task
I-MC-3010.2G-1418-200-KES-014/M08_CN014
Y-1279-X-30/TBE for Hydrophore
Y-1279-X-02/Meeting
V1916-P-67/MTO for Valves - BWTS
V2181-M-02/Major equipment sizing and listing
V2181-P-01/Broad Process Block Diagram
V2032-M-02/Steering Gear Room Arrangement
Departmental Task
V1916-P-63/P&ID For Water Ballast System
H3041-404-001/Bow Thruster room Arrangement
V1916-R-07/Pressure & flow analysis (Glycol)
I-MC-3010.2G-1415-200-KES-009/M05 - STRESS ANALYSIS REPORT ? MAIN GAS COMPRESSION - COMPRESSOR DISC
H3041-740-001/P&ID - Exhaust System
H3041-821-003/SOTR for Tank remote sounding system
H3041-551-002/SOTR for Food waste handling system
TBM1/Basic Machinery - Mach. Sys. Design
V1862-E-16/P&IDs mark up for PLC
V1916-X-02/Meeting
Meeting - Internal (Non-Projects)
V1985-R-02/Pressure Drop for ALS
Y-1279-R-102/SOTR for Valves
Departmental Task
Y-1279-X-02/Meeting
Y-1279-X-18/TBE for BCS (M)
Blank 1
V1916-P-48/P&ID Regas steam system
V1916-P-45/P&ID Regas Glycol Water system
Meeting - External (Non-Projects)
V2165-M-01/Cargo P&ID
V2165-M-01/Cargo P&ID
V1916-P-54/P&ID Sewage system
V1916-P-44/P&ID Regas Sea Water System
V2181-M-02/Major equipment sizing and listing
V2181-P-01/Broad Process Block Diagram
TBM1/Basic Machinery - Mach. Sys. Design
H3041-800-003/Ballast system flow & pressure analysis
V1916-P-45/P&ID Regas Glycol Water system
Y-1279-P-01/Ballast (Flooding & De-watering) System Schematic
Y-1279-P-04/Fuel Oil Filling, Transfer & Service System Schematic
V1916-P-52/P&ID Regas Steam Condensate system
V1916-P-65/P&ID for Sea water Supply System - BWTS
V1916-P-48/P&ID Regas steam system
V1916-P-51/P&ID Exhaust steam pipe diagram
V1916-P-43/P&ID Cargo System
V1916-X-02/Meeting
V1574-X-01/Project Mgmt
Y-1279-X-01/Project Management
Meeting - Internal (Non-Projects)
V1916-X-01/Project Management
V2131-R-06/Ventilation calculation
Departmental Task
V1985-M-01/PID for ALS
H3041-444-002/FW HP Washing System
V1916-C-02/Gas Detection System Modification (SLD & Arrangement)
H3041-263-009/Bow thruster foundations
V1916-X-01/Project Management
Attend Training
Y-1279-X-32/TBE for Foam Injection System
H3041-444-002/FW HP Washing System
V1916-P-57/MTO for Marine Valves
V2162-R-02/Technical Specification
Y-1279-R-102/SOTR for Valves
Blank 1
V2162-X-08/Machinery Compliance
V1916-P-63/P&ID For Water Ballast System
Departmental Task
V1916-R-07/Pressure & flow analysis (Glycol)
H3041-444-002/FW HP Washing System
TBM1/Basic Machinery - Mach. Sys. Design
I-MC-3010.2G-1418-200-KES-024/M08_CN024
V2038-P-01/P&ID for EGCS system
V2032-R-14/HVAC Heat Load Calcualtion
H3041-404-001/Bow Thruster room Arrangement
V1985-M-01/PID for ALS
V2034-M-02/Machinery Arrangement drawing
I-MC-3010.2G-1418-200-KES-024/M08_CN024
Departmental Task
H3041-740-001/P&ID - Exhaust System
H3041-740-001/P&ID - Exhaust System
V2181-P-01/Broad Process Block Diagram
H3041-444-002/FW HP Washing System
V1916-P-46/P&ID N2 System
Meeting - Internal (Non-Projects)
V1270-M-03/MTO of Valve
V2165-M-01/Cargo P&ID
V2032-R-14/HVAC Heat Load Calcualtion
V2035-X-02/Meeting
V2032-X-02/Meeting
Departmental Task
H3041-710-001/P&ID - Lube Oil system
Y-1279-P-01/Ballast (Flooding & De-watering) System Schematic
Idle
Departmental Task
Y-1279-X-19/TBE for BCS (E)
Y-1279-X-02/Meeting
H3041-744-001/P&ID - Urea filling & Trasnfer system
H3041-740-001/P&ID - Exhaust System
Y-1279-X-16/TBE for DG Set (M)
Departmental Task
V1916-P-46/P&ID N2 System
V1916-P-48/P&ID Regas steam system
V1916-P-44/P&ID Regas Sea Water System
V1916-P-54/P&ID Sewage system
V1916-P-45/P&ID Regas Glycol Water system
Blank 1
Idle
V2165-M-01/Cargo P&ID
V2165-R-01/Valve MTO
V1916-X-02/Meeting
V1916-P-63/P&ID For Water Ballast System
V1916-P-65/P&ID for Sea water Supply System - BWTS
V2181-P-01/Broad Process Block Diagram
V2181-M-02/Major equipment sizing and listing
V2181-P-01/Broad Process Block Diagram
V2181-P-01/Broad Process Block Diagram
V1916-P-44/P&ID Regas Sea Water System
Idle
V1916-P-42/Piping material specification
V1916-P-63/P&ID For Water Ballast System
v2036-R-07/Exhaust Back Pressure Calculation
Meeting - Internal (Non-Projects)
H3041-821-003/SOTR for Tank remote sounding system
V1916-R-02/Pressure & flow analysis (LNG,NG,Glycol,SW,FW)
V1916-P-67/MTO for Valves - BWTS
V1916-P-62/Piping material specification - Marine
V2030-X-02/Meeting
H3041-744-001/P&ID - Urea filling & Trasnfer system
H3041-740-001/P&ID - Exhaust System
Blank 1
V2030-X-04/Build Specification
H3041-551-002/SOTR for Food waste handling system
V2032-R-14/HVAC Heat Load Calcualtion
Meeting - Internal (Non-Projects)
V1916-P-57/MTO for Marine Valves
Blank 1
Y-1279-X-16/TBE for DG Set (M)
H3041-722-001/P&ID - FW Cooling system
H3041-404-001/Bow Thruster room Arrangement
H3041-761-001/P&ID - Distilled and make-up water systems
Y-1279-X-02/Meeting
V2034-M-02/Machinery Arrangement drawing
H3041-444-002/FW HP Washing System
V2131-M-03/Pipe Penetration arrangement
V2181-P-01/Broad Process Block Diagram
I-MC-3010.2G-1415-200-KES-015/M05-STRESS ANALYSIS REPORT -
SAFETY GAS K.O. DRUM - V1231001 GAS INLET ? CN015
V2032-R-14/HVAC Heat Load Calcualtion
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
V1985-M-01/PID for ALS
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
V1916-P-63/P&ID For Water Ballast System
V1916-P-46/P&ID N2 System
Attend Training
V2032-R-14/HVAC Heat Load Calcualtion
Blank 1
V1916-P-63/P&ID For Water Ballast System
Attend Training
V1916-R-02/Pressure & flow analysis (LNG,NG,Glycol,SW,FW)
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
V1916-P-45/P&ID Regas Glycol Water system
V1916-P-62/Piping material specification - Marine
V2011-M-03/Machinery Arrangement Drawing
Attend Training
V2008-R-11A/MTO For Valve (50A & Above)
V2034-M-02/Machinery Arrangement drawing
V1985-M-01/PID for ALS
Attend Training
Meeting - Internal (Non-Projects)
Blank 1
H3041-800-002/P&ID - Bilge system
H3041-740-001/P&ID - Exhaust System
H3041-744-001/P&ID - Urea filling & Trasnfer system
Y-1279-X-01/Project Management
H3041-440-004/SOTR for Equipment in workshop
Meeting - Internal (Non-Projects)
H3041-551-002/SOTR for Food waste handling system
TBM1/Basic Machinery - Mach. Sys. Design
V2165-M-01/Cargo P&ID
V2165-R-01/Valve MTO
Attend Training
I-MC-3010.2G-1418-200-KES-014/M08_CN014
V1574-X-01/Project Mgmt
Blank 1
V1916-X-01/Project Management
V1916-R-07/Pressure & flow analysis (Glycol)
V1916-R-02/Pressure & flow analysis (LNG,NG,Glycol,SW,FW)
H3041-404-001/Bow Thruster room Arrangement
V2131-M-01/Ventilation plan
TBM1/Basic Machinery - Mach. Sys. Design
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
H3041-444-002/FW HP Washing System
V1916-X-02/Meeting
Y-1279-X-30/TBE for Hydrophore
Y-1279-X-32/TBE for Foam Injection System
Y-1279-R-102/SOTR for Valves
Departmental Task
V2035-X-02/Meeting
Meeting - Internal (Non-Projects)
V1716-X-02/Meeting
V2165-M-01/Cargo P&ID
V1985-X-02/Meeting
Y-1279-X-32/TBE for Foam Injection System
Blank 1
H3041-722-001/P&ID - FW Cooling system
H3041-722-001/P&ID - FW Cooling system
Blank 1
H3041-710-001/P&ID - Lube Oil system
V2181-P-01/Broad Process Block Diagram
V1916-X-03/R&D
TBM1/Basic Machinery - Mach. Sys. Design
V1916-X-03/R&D
V2181-P-01/Broad Process Block Diagram
V2032-R-14/HVAC Heat Load Calcualtion
H3041-404-001/Bow Thruster room Arrangement
V2032-R-14/HVAC Heat Load Calcualtion
Departmental Task
V2058-X-02/Meeting
V1985-M-01/PID for ALS
H3041-444-002/FW HP Washing System
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
Departmental Task
V2058-M-09/Misc. Ventilation update
Departmental Task
V2131-M-01/Ventilation plan
I-MC-3010.2G-1418-200-KES-014/M08_CN014
H3041-722-001/P&ID - FW Cooling system
Blank 1
Blank 1
H3041-722-001/P&ID - FW Cooling system
V1916-X-03/R&D
V1916-M-06/Control Philosophy for Process System
V1916-M-06/Control Philosophy for Process System
Blank 1
H3041-800-002/P&ID - Bilge system
H3041-800-002/P&ID - Bilge system
H3041-580-005/SOTR for Sanitary system
H3041-710-001/P&ID - Lube Oil system
Blank 1
H3041-817-001/SOTR for Sprinkler and water mist system
H3041-800-002/P&ID - Bilge system
Departmental Task
V1985-R-02/Pressure Drop for ALS
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
Y-1279-R-102/SOTR for Valves
Y-1279-X-32/TBE for Foam Injection System
V2165-R-01/Valve MTO
v2036-R-07/Exhaust Back Pressure Calculation
V2131-M-01/Ventilation plan
V1916-P-63/P&ID For Water Ballast System
Blank 1
Idle
V1916-P-63/P&ID For Water Ballast System
V1916-P-67/MTO for Valves - BWTS
V1916-M-03/Machinery Arrangement in Engine Room
V2030-X-02/Meeting
V1574-X-01/Project Mgmt
Y-1279-X-01/Project Management
V2030-X-01/Project Management
V1916-R-07/Pressure & flow analysis (Glycol)
V1916-X-02/Meeting
V1916-P-63/P&ID For Water Ballast System
H3041-574-002/Engine room Ventilation calculation
V1916-P-66/Pipe Material Specification - BWTS
V1916-P-66/Pipe Material Specification - BWTS
V1916-P-67/MTO for Valves - BWTS
I-MC-3010.2G-1415-200-KES-009/M05 - STRESS ANALYSIS REPORT ? MAIN GAS COMPRESSION - COMPRESSOR DISC
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
Y-1279-X-18/TBE for BCS (M)
Departmental Task
Y-1279-X-17/TBE for DG Set (E)
Y-1279-R-39/MTO for Valves
V1916-X-02/Meeting
V1916-M-03/Machinery Arrangement in Engine Room
V1971-R-02/SW Pump Pressure Drop Calculation
H3041-570-006/SOTR for HVAC system
H3041-800-002/P&ID - Bilge system
H3041-800-002/P&ID - Bilge system
V2030-X-01/Project Management
Departmental Task
Y-1279-R-62/SOTR for BCS
V1916-X-01/Project Management
Meeting - Internal (Non-Projects)
I-MC-3010.2G-1418-200-KES-014/M08_CN014
V2161-X-01/Project Management
V2161-X-01/Project Management
Departmental Task
V2035-M-01/Master Conversion Plan
H3041-710-001/P&ID - Lube Oil system
H3041-740-001/P&ID - Exhaust System
Departmental Task
Departmental Task
H3041-580-001/P&ID - Sanitary discharge system
v2036-R-07/Exhaust Back Pressure Calculation
M-2001/P & ID for Bilge & Ballast, GS System
Departmental Task
V2030-X-02/Meeting
H3041-800-002/P&ID - Bilge system
Y-1279-X-19/TBE for BCS (E)
Blank 1
Blank 1
Departmental Task
I-MC-3010.2G-1418-200-KES-014/M08_CN014
H3041-722-001/P&ID - FW Cooling system
Y-1279-R-102/SOTR for Valves
Blank 1
V1916-X-03/R&D
Departmental Task
H3041-580-001/P&ID - Sanitary discharge system
Idle
V1916-M-06/Control Philosophy for Process System
Departmental Task
V2181-P-01/Broad Process Block Diagram
V1971-R-02/SW Pump Pressure Drop Calculation
H3041-800-003/Ballast system flow & pressure analysis
H3041-722-001/P&ID - FW Cooling system
Blank 1
V1916-M-03/Machinery Arrangement in Engine Room
Idle
V1916-M-04/Equipment Arrangement on Deck
V1916-M-03/Machinery Arrangement in Engine Room
V1916-X-02/Meeting
V1916-M-11/P&ID Sewage Evaporation System
Y-1279-R-102/SOTR for Valves
H3041-744-001/P&ID - Urea filling & Trasnfer system
Departmental Task
H3041-740-001/P&ID - Exhaust System
V1916-M-03/Machinery Arrangement in Engine Room
TBM1/Basic Machinery - Mach. Sys. Design
I-MC-3010.2G-1415-200-KES-009/M05 - STRESS ANALYSIS REPORT ? MAIN GAS COMPRESSION - COMPRESSOR DISC
H3041-817-001/SOTR for Sprinkler and water mist system
Blank 1
V1916-X-01/Project Management
V2161-X-01/Project Management
Idle
V1916-X-02/Meeting
V1916-M-10/Arrangement of Engine Room ventilation
H3041-800-002/P&ID - Bilge system
Blank 1
H3041-800-002/P&ID - Bilge system
V1916-M-03/Machinery Arrangement in Engine Room
Departmental Task
Departmental Task
H3041-740-001/P&ID - Exhaust System
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
v2036-X-15/Sea chest Structural Drawing
H3041-800-002/P&ID - Bilge system
H3041-744-001/P&ID - Urea filling & Trasnfer system
Departmental Task
H3041-740-001/P&ID - Exhaust System
H3041-580-001/P&ID - Sanitary discharge system
H3041-580-004/Sewage treatment room arrangement
v2036-R-07/Exhaust Back Pressure Calculation
V1916-P-80/P&ID for Cooling Fresh water
Blank 1
V1916-P-52/P&ID Regas Steam Condensate system
V1971-R-02/SW Pump Pressure Drop Calculation
V1916-P-52/P&ID Regas Steam Condensate system
V1916-M-10/Arrangement of Engine Room ventilation
V1971-R-02/SW Pump Pressure Drop Calculation
H3041-570-001/HVAC Design philosophy
V1985-M-01/PID for ALS
V2035-R-07/Exhaust Back Pressure Calculation
H3041-580-001/P&ID - Sanitary discharge system
Attend Training
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
Departmental Task
V2032-R-25/Machinery Room Ventilation Calculation
V2032-X-01/Project Management
TBM1/Basic Machinery - Mach. Sys. Design
H3041-722-001/P&ID - FW Cooling system
Blank 1
V1916-M-06/Control Philosophy for Process System
Y-1279-R-102/SOTR for Valves
Blank 1
H3041-722-001/P&ID - FW Cooling system
V1916-M-06/Control Philosophy for Process System
Idle
v2036-X-15/Sea chest Structural Drawing
Departmental Task
v2036-R-11A/MTO for Valve (50A & Above)
V2058-M-01/Air vent Drawing
R&D
V2035-R-07/Exhaust Back Pressure Calculation
V2032-M-05/Machinery Room Ventilation Arrangement
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
H3041-580-001/P&ID - Sanitary discharge system
TBM1/Basic Machinery - Mach. Sys. Design
H3041-710-001/P&ID - Lube Oil system
H3041-800-002/P&ID - Bilge system
Blank 1
V1916-M-03/Machinery Arrangement in Engine Room
Attend Training
V1916-X-02/Meeting
Departmental Task
Idle
V2008-M-08/Machinery Arrangement Drawing
Attend Training
V1916-M-04/Equipment Arrangement on Deck
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
V2032-R-25/Machinery Room Ventilation Calculation
Blank 1
Idle
V2058-R-23/Cross flooding calculations
H3041-817-001/SOTR for Sprinkler and water mist system
H3041-744-001/P&ID - Urea filling & Trasnfer system
H3041-800-002/P&ID - Bilge system
H3041-740-001/P&ID - Exhaust System
Idle
Departmental Task
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
TBM1/Basic Machinery - Mach. Sys. Design
I-MC-3010.2G-1418-200-KES-020/M08_CN020
Departmental Task
V2032-R-25/Machinery Room Ventilation Calculation
V2058-X-02/Meeting
Departmental Task
V2058-R-23/Cross flooding calculations
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
V2035-X-02/Meeting
V2032-X-02/Meeting
V1574-X-01/Project Mgmt
V1916-X-01/Project Management
V2030-X-01/Project Management
Attend Training
I-MC-3010.2G-1418-200-KES-020/M08_CN020
V1916-P-52/P&ID Regas Steam Condensate system
V2181-X-01/Project Management
Meeting - Internal (Non-Projects)
H3041-740-001/P&ID - Exhaust System
Departmental Task
H3041-744-001/P&ID - Urea filling & Trasnfer system
H3041-580-004/Sewage treatment room arrangement
Blank 1
V2053-P-05/P and ID for Bilge and Ballast GS System
H3041-722-001/P&ID - FW Cooling system
Y-1279-R-102/SOTR for Valves
Idle
V2036-X-02/Meeting
v2036-R-13/Exhaust pipe & support analysis
I-MC-3010.2G-1416-200-KES-116/M06B_CN016
v2036-P-01/P&ID for EGCS system
H3041-570-001/HVAC Design philosophy
V1916-P-48/P&ID Regas steam system
V1916-P-45/P&ID Regas Glycol Water system
V1916-M-03/Machinery Arrangement in Engine Room
V1916-X-02/Meeting
Blank 1
H3041-722-001/P&ID - FW Cooling system
I-MC-3010.2G-1418-200-KES-020/M08_CN020
Blank 1
Meeting - Internal (Non-Projects)
TBM1/Basic Machinery - Mach. Sys. Design
V2058-M-09/Misc. Ventilation update
V2161-X-01/Project Management
V1916-X-02/Meeting
V1916-X-01/Project Management
H3041-570-001/HVAC Design philosophy
V1916-P-44/P&ID Regas Sea Water System
V1971-R-02/SW Pump Pressure Drop Calculation
V1916-P-52/P&ID Regas Steam Condensate system
V1916-P-54/P&ID Sewage system
Y-1279-X-01/Project Management
V1574-X-01/Project Mgmt
Blank 1
V2161-X-01/Project Management
V2030-X-01/Project Management
V2032-R-14/HVAC Heat Load Calcualtion
Meeting - Internal (Non-Projects)
H3041-817-001/SOTR for Sprinkler and water mist system
I-MC-3010.2G-1418-200-KES-027/M08_CN027
H3041-800-003/Ballast system flow & pressure analysis
H3041-722-001/P&ID - FW Cooling system
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
V1916-M-04/Equipment Arrangement on Deck
V2032-R-25/Machinery Room Ventilation Calculation
V1916-M-04/Equipment Arrangement on Deck
V1916-M-03/Machinery Arrangement in Engine Room
Idle
V1916-P-63/P&ID For Water Ballast System
M-2001/P & ID for Bilge & Ballast, GS System
H3041-761-001/P&ID - Distilled and make-up water systems
H3041-580-001/P&ID - Sanitary discharge system
I-MC-3010.2G-1418-200-KES-027/M08_CN027
Departmental Task
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
V2165-X-01/Project Management
Departmental Task
V2032-R-25/Machinery Room Ventilation Calculation
V1574-X-01/Project Mgmt
V1883-X-01/Project Management
H3041-800-002/P&ID - Bilge system
H3041-710-001/P&ID - Lube Oil system
H3041-810-004/SOTR for Fire Detection alarm System
Departmental Task
Y-1279-X-02/Meeting
H3041-800-003/Ballast system flow & pressure analysis
H3041-800-002/P&ID - Bilge system
H3041-710-001/P&ID - Lube Oil system
V1916-R-04/Heat and Mass balance analysis report
V1916-R-04/Heat and Mass balance analysis report
V1916-P-52/P&ID Regas Steam Condensate system
V1916-R-04/Heat and Mass balance analysis report
V1916-X-03/R&D
V1916-P-44/P&ID Regas Sea Water System
V1916-P-54/P&ID Sewage system
H3041-580-004/Sewage treatment room arrangement
Departmental Task
V1883-P-07/MTO for Valves
H3041-720-002/P&ID - FW (Hot normal) & SW Transfer & service System
V1883-M-04/BWTS Equipment List
Departmental Task
V1916-X-01/Project Management
V1916-P-45/P&ID Regas Glycol Water system
V1916-P-45/P&ID Regas Glycol Water system
V1916-P-45/P&ID Regas Glycol Water system
V1916-P-44/P&ID Regas Sea Water System
H3041-570-006/SOTR for HVAC system
V2181-X-01/Project Management
V1916-P-45/P&ID Regas Glycol Water system
H3041-570-002/HVAC Heat load calcualtion
Departmental Task
Idle
H3041-761-001/P&ID - Distilled and make-up water systems
H3041-761-001/P&ID - Distilled and make-up water systems
V1916-P-54/P&ID Sewage system
H3041-740-001/P&ID - Exhaust System
H3041-800-002/P&ID - Bilge system
H3041-701-001/P&ID - Fuel Oil Fill Transfer & Serv System
H3041-815-002/SOTR for Firefighting system with gas
V1916-P-51/P&ID Exhaust steam pipe diagram
H3041-444-004/SOTR for High pressure washing system
Idle
V1916-P-45/P&ID Regas Glycol Water system
V1916-P-48/P&ID Regas steam system
V1916-P-51/P&ID Exhaust steam pipe diagram
V2008-R-11D/MTO For Expansion Joint
V1916-P-44/P&ID Regas Sea Water System
H3041-800-003/Ballast system flow & pressure analysis
H3041-800-001/P&ID - Ballast & Anti rolling system
H3041-820-001/P&ID - Air sounding arrangement
H3041-800-002/P&ID - Bilge system
V1916-P-44/P&ID Regas Sea Water System
V1916-P-46/P&ID N2 System
V1971-R-02/SW Pump Pressure Drop Calculation
V1916-P-55/MTO for Process Valves
Blank 1
Departmental Task
Y-1279-X-35/TBE for Portable Engine Driven Emergency Fire Pump
Departmental Task
H3041-701-001/P&ID - Fuel Oil Fill Transfer & Serv System
H3041-744-001/P&ID - Urea filling & Trasnfer system
Departmental Task
H3041-800-003/Ballast system flow & pressure analysis
H3041-722-001/P&ID - FW Cooling system
H3041-761-001/P&ID - Distilled and make-up water systems
V2032-M-02/Steering Gear Room Arrangement
H3041-580-001/P&ID - Sanitary discharge system
Blank 1
H3041-815-001/P&ID - Fire fighting system
Departmental Task
v2036-R-07/Exhaust Back Pressure Calculation
v2036-P-01/P&ID for EGCS system
v2036-R-15/Piping Material Specification
v2036-R-14/Equipment List
Meeting - Internal (Non-Projects)
V1916-X-01/Project Management
V1574-X-01/Project Mgmt
H3041-570-006/SOTR for HVAC system
V2058-M-09/Misc. Ventilation update
R&D
V2032-M-02/Steering Gear Room Arrangement
H3041-580-001/P&ID - Sanitary discharge system
H3041-820-001/P&ID - Air sounding arrangement
H3041-815-001/P&ID - Fire fighting system
I-MC-3010.2G-1413-200-KES-027/M03 - STRESS ANALYSIS REPORT ? EXPORTATION GAS COMPRESSIO
V1916-X-02/Meeting
Idle
V1916-P-43/P&ID Cargo System
H3041-722-001/P&ID - FW Cooling system
Y-1279-R-81/SOTR for Portable Engine Driven Emergency Fire Pump
V1916-X-03/R&D
I-MC-3010.2G-1418-200-KES-028/M08_CN028
I-MC-3010.2G-1413-200-KES-027/M03 - STRESS ANALYSIS REPORT ? EXPORTATION GAS COMPRESSIO
v2036-R-07/Exhaust Back Pressure Calculation
v2036-P-01/P&ID for EGCS system
v2036-R-15/Piping Material Specification
I-MC-3010.2G-1418-200-KES-021/M08_CN021
V1916-P-51/P&ID Exhaust steam pipe diagram
V1916-P-48/P&ID Regas steam system
V1916-P-54/P&ID Sewage system
H3041-570-006/SOTR for HVAC system
H3041-444-004/SOTR for High pressure washing system
H3041-817-001/SOTR for Sprinkler and water mist system
V2054-X-02/Meeting
Blank 1
V1574-X-01/Project Mgmt
v2036-R-07/Exhaust Back Pressure Calculation
V2032-X-02/Meeting
V2058-R-23/Cross flooding calculations
Departmental Task
V2032-X-03/R&D
Departmental Task
Blank 1
H3041-744-001/P&ID - Urea filling & Trasnfer system
H3041-740-001/P&ID - Exhaust System
H3041-800-001/P&ID - Ballast & Anti rolling system
H3041-701-001/P&ID - Fuel Oil Fill Transfer & Serv System
H3041-722-001/P&ID - FW Cooling system
V2030-X-02/Meeting
V1916-X-03/R&D
V1916-C-13/MTO for Instruments
V1916-P-55/MTO for Process Valves
V1916-P-43/P&ID Cargo System
V2032-M-02/Steering Gear Room Arrangement
H3041-580-001/P&ID - Sanitary discharge system
V1916-P-48/P&ID Regas steam system
Blank 1
V1971-X-02/Meeting
V1916-X-01/Project Management
H3041-820-001/P&ID - Air sounding arrangement
V2030-X-02/Meeting
V1916-P-43/P&ID Cargo System
V1916-X-01/Project Management
V1971-R-02/SW Pump Pressure Drop Calculation
H3041-740-001/P&ID - Exhaust System
Y-29/Y-30_4040/Air Vent and Sounding Arrangement
Departmental Task
V2030-X-02/Meeting
H3041-101-023/Machinery Equipment List
H3041-820-001/P&ID - Air sounding arrangement
H3041-701-001/P&ID - Fuel Oil Fill Transfer & Serv System
Attend Training
l-MC-3010.2G-1416-200-KES-107/M06B - STRESS ANALYSIS REPORT ? MOLECULAR SIEVE GAS COALES
V1916-M-02/Master Equipment list
V1916-P-54/P&ID Sewage system
Idle
V1916-P-52/P&ID Regas Steam Condensate system
V2181-X-01/Project Management
V1574-X-01/Project Mgmt
V1916-C-13/MTO for Instruments
H3041-570-002/HVAC Heat load calcualtion
V1916-P-52/P&ID Regas Steam Condensate system
Idle
S2071/CONVERT CARGO TANKS TO HANDLE BITUMEN
Meeting - Internal (Non-Projects)
I-MC-3010.2G-1413-200-KES-027/M03 - STRESS ANALYSIS REPORT ? EXPORTATION GAS COMPRESSIO
M08_CN018/M08_CN018
Departmental Task
H3041-740-001/P&ID - Exhaust System
Idle
V2030-X-02/Meeting
H3041-744-001/P&ID - Urea filling & Trasnfer system
H3041-761-001/P&ID - Distilled and make-up water systems
Attend Training
M-2001/P & ID for Bilge & Ballast, GS System
V1849-M-01/Machinery Arrangement Drawing-Funnel & Engine Room
H3041-600-001/Engine room Arrangement
V2030-X-02/Meeting
Blank 1
H3041-722-001/P&ID - FW Cooling system
Departmental Task
R&D
l-MC-3010.2G-1416-200-KES-104/M06B-STRESS ANALYSIS REPORT-MOLECULAR SIEVE INLET GAS K.O
V2097-E-03/Machinery Arrangement in Engine room
H3041-744-001/P&ID - Urea filling & Trasnfer system
H3041-701-001/P&ID - Fuel Oil Fill Transfer & Serv System
H3041-800-002/P&ID - Bilge system
H3041-740-001/P&ID - Exhaust System
V2097-E-03/Machinery Arrangement in Engine room
Meeting - Internal (Non-Projects)
V2097-E-03/Machinery Arrangement in Engine room
H3041-580-001/P&ID - Sanitary discharge system
V1916-P-56/Pipe Stress analysis report
H3041-722-001/P&ID - FW Cooling system
H3041-800-001/P&ID - Ballast & Anti rolling system
H3041-744-001/P&ID - Urea filling & Trasnfer system
H3041-740-001/P&ID - Exhaust System
Blank 1
H3041-570-006/SOTR for HVAC system
H3041-440-004/SOTR for Equipment in workshop
Departmental Task
V1916-P-44/P&ID Regas Sea Water System
V1916-P-48/P&ID Regas steam system
V1916-P-51/P&ID Exhaust steam pipe diagram
V1916-P-43/P&ID Cargo System
V1916-P-54/P&ID Sewage system
Departmental Task
H3041-800-001/P&ID - Ballast & Anti rolling system
V1916-R-04/Heat and Mass balance analysis report
V1916-R-04/Heat and Mass balance analysis report
V1916-P-43/P&ID Cargo System
V1916-P-59/Process Safety Valves Data Sheet
V1916-M-02/Master Equipment list
H3041-800-002/P&ID - Bilge system
H3041-701-001/P&ID - Fuel Oil Fill Transfer & Serv System
V2030-X-02/Meeting
H3041-761-001/P&ID - Distilled and make-up water systems
Attend Training
V1971-S-07/Arrangement of distance piece for hull
H3041-570-002/HVAC Heat load calcualtion
Attend Training
V1971-S-07/Arrangement of distance piece for hull
Meeting - Internal (Non-Projects)
V1916-M-02/Master Equipment list
V1916-P-43/P&ID Cargo System
V1916-P-46/P&ID N2 System
Blank 1
H3041-570-002/HVAC Heat load calcualtion
V2181-X-01/Project Management
I-MC-3010.2G-1415-200-KES-015/M05-STRESS ANALYSIS REPORT -
SAFETY GAS K.O. DRUM - V1231001 GAS INLET ? CN015
V1574-X-01/Project Mgmt
V1916-X-01/Project Management
Departmental Task
V2034-X-02/Meeting
H3041-744-001/P&ID - Urea filling & Trasnfer system
H3041-740-001/P&ID - Exhaust System
H3041-600-001/Engine room Arrangement
Departmental Task
V1916-P-44/P&ID Regas Sea Water System
V1916-P-54/P&ID Sewage system
V1916-P-51/P&ID Exhaust steam pipe diagram
V2032-X-02/Meeting
V2035-X-02/Meeting
V2097-E-03/Machinery Arrangement in Engine room
M2694/Modification of Apollonia fuel system
V1574-X-01/Project Mgmt
V2030-X-02/Meeting
Departmental Task
Departmental Task
H3041-580-001/P&ID - Sanitary discharge system
V1916-P-44/P&ID Regas Sea Water System
V1916-M-02/Master Equipment list
V1916-P-43/P&ID Cargo System
V1916-P-45/P&ID Regas Glycol Water system
Blank 1
H3041-701-001/P&ID - Fuel Oil Fill Transfer & Serv System
H3041-570-002/HVAC Heat load calcualtion
V1916-P-63/P&ID For Water Ballast System
V1916-P-44/P&ID Regas Sea Water System
H3041-800-002/P&ID - Bilge system
H3041-740-001/P&ID - Exhaust System
H3041-815-001/P&ID - Fire fighting system
Departmental Task
H3041-820-001/P&ID - Air sounding arrangement
H3041-721-001/P&ID - SW Cooling system
Meeting - Internal (Non-Projects)
H3041-744-001/P&ID - Urea filling & Trasnfer system
V2035-R-07/Exhaust Back Pressure Calculation
Idle
H3041-740-001/P&ID - Exhaust System
V2181-X-01/Project Management
V1574-X-01/Project Mgmt
V2030-X-01/Project Management
Departmental Task
I-MC-3010.2G-1415-200-KES-015/M05-STRESS ANALYSIS REPORT -
SAFETY GAS K.O. DRUM - V1231001 GAS INLET ? CN015
V2032-X-01/Project Management
V2032-X-01/Project Management
R&D
V2032-X-02/Meeting
H3041-761-001/P&ID - Distilled and make-up water systems
V2054-X-03/R&D
Departmental Task
R&D
V2032-M-02/Steering Gear Room Arrangement
V2058-M-18/Cross flooding Arrng Plan
V1916-P-63/P&ID For Water Ballast System
V1916-P-44/P&ID Regas Sea Water System
V1916-P-54/P&ID Sewage system
V1916-P-55/MTO for Process Valves
V1916-P-59/Process Safety Valves Data Sheet
V1916-P-43/P&ID Cargo System
H3041-722-001/P&ID - FW Cooling system
V1916-P-51/P&ID Exhaust steam pipe diagram
H3041-800-001/P&ID - Ballast & Anti rolling system
H3041-820-001/P&ID - Air sounding arrangement
Departmental Task
v2036-X-06/Mach-Arrangement of distance piece for hull fitting
V1916-M-02/Master Equipment list
I-MC-3010.2G-1415-200-KES-015/M05-STRESS ANALYSIS REPORT -
SAFETY GAS K.O. DRUM - V1231001 GAS INLET ? CN015
H3041-815-001/P&ID - Fire fighting system
Blank 1
V1916-P-43/P&ID Cargo System
H3041-722-001/P&ID - FW Cooling system
V2053-P-05/P and ID for Bilge and Ballast GS System
V1916-C-13/MTO for Instruments
V1916-P-46/P&ID N2 System
V1916-P-44/P&ID Regas Sea Water System
Blank 1
H3041-721-001/P&ID - SW Cooling system
H3041-101-023/Machinery Equipment List
V2053-P-05/P and ID for Bilge and Ballast GS System
Y-29/Y-30_4040/Air Vent and Sounding Arrangement
v2036-X-06/Mach-Arrangement of distance piece for hull fitting
v2036-P-01/P&ID for EGCS system
V2035-R-07/Exhaust Back Pressure Calculation
V1985-M-01/PID for ALS
Meeting - Internal (Non-Projects)
V1985-M-01/PID for ALS
H3041-761-001/P&ID - Distilled and make-up water systems
Departmental Task
H3041-740-001/P&ID - Exhaust System
H3041-701-001/P&ID - Fuel Oil Fill Transfer & Serv System
H3041-744-001/P&ID - Urea filling & Trasnfer system
H3041-740-001/P&ID - Exhaust System
Meeting - Internal (Non-Projects)
H3041-440-004/SOTR for Equipment in workshop
H3041-551-002/SOTR for Food waste handling system
H3041-551-002/SOTR for Food waste handling system
Departmental Task
H3041-740-001/P&ID - Exhaust System
H3041-744-001/P&ID - Urea filling & Trasnfer system
H3041-722-001/P&ID - FW Cooling system
V1916-C-13/MTO for Instruments
V1916-P-55/MTO for Process Valves
V1916-P-63/P&ID For Water Ballast System
V1916-P-46/P&ID N2 System
V1916-P-45/P&ID Regas Glycol Water system
V1916-P-48/P&ID Regas steam system
H3041-731-001/P&ID - Starting air system
I-MC-3010.2G-1415-200-KES-015/M05-STRESS ANALYSIS REPORT -
SAFETY GAS K.O. DRUM - V1231001 GAS INLET ? CN015
H3041-740-001/P&ID - Exhaust System
H3041-600-001/Engine room Arrangement
H3041-744-001/P&ID - Urea filling & Trasnfer system
Departmental Task
I-MC-3010.2G-1416-200-KES-106/M06B - STRESS ANALYSIS REPORT ? MOLECULAR SIEVE GAS COALES
H3041-101-023/Machinery Equipment List
H3041-740-001/P&ID - Exhaust System
H3041-721-001/P&ID - SW Cooling system
H3041-744-001/P&ID - Urea filling & Trasnfer system
H3041-721-001/P&ID - SW Cooling system
V2030-X-02/Meeting
Meeting - External (Non-Projects)
Meeting - Internal (Non-Projects)
V2035-R-07/Exhaust Back Pressure Calculation
Blank 1
Departmental Task
V1574-X-01/Project Mgmt
R&D
Departmental Task
H3041-580-001/P&ID - Sanitary discharge system
V1985-M-01/PID for ALS
H3041-551-002/SOTR for Food waste handling system
H3041-821-003/SOTR for Tank remote sounding system
Departmental Task
H3041-570-006/SOTR for HVAC system
H3041-570-006/SOTR for HVAC system
V2032-X-01/Project Management
H3041-761-001/P&ID - Distilled and make-up water systems
H3041-580-001/P&ID - Sanitary discharge system
Blank 1
V1756-G-05/Hazardous Area Plan
V2035-R-15/Piping Material Specification
Blank 1
H3041-731-001/P&ID - Starting air system
V1916-X-01/Project Management
V1916-P-54/P&ID Sewage system
V1916-P-46/P&ID N2 System
H3041-101-023/Machinery Equipment List
V2008-M-08/Machinery Arrangement Drawing
V1916-P-43/P&ID Cargo System
V2032-G-05/Steering Gear Arrangement
Y-29/Y-30_4040/Air Vent and Sounding Arrangement
H3041-580-001/P&ID - Sanitary discharge system
H3041-761-001/P&ID - Distilled and make-up water systems
Departmental Task
V1916-P-63/P&ID For Water Ballast System
V1916-P-45/P&ID Regas Glycol Water system
V1916-X-01/Project Management
V1916-P-42/Piping material specification
V1916-P-43/P&ID Cargo System
V1916-C-13/MTO for Instruments
V1916-P-55/MTO for Process Valves
V1916-P-42/Piping material specification
V1916-P-59/Process Safety Valves Data Sheet
l-MC-3010.2G-1416-200-KES-101/M06B - STRESS ANALYSIS REPORT ? GAS DEHYDRATION AND FUEL G
V1916-P-45/P&ID Regas Glycol Water system
ID286-M-01/Master Conversion Plan
V1916-P-48/P&ID Regas steam system
H3041-440-005/SOTR For Vacuum cleaning system
Meeting - Internal (Non-Projects)
V2030-X-03/R&D
V2008-M-02/Exhaust gas back pressure calculation
V1916-P-43/P&ID Cargo System
Departmental Task
V1916-P-48/P&ID Regas steam system
V1916-P-45/P&ID Regas Glycol Water system
Departmental Task
V1916-P-63/P&ID For Water Ballast System
l-MC-3010.2G-1416-200-KES-101/M06B - STRESS ANALYSIS REPORT ? GAS DEHYDRATION AND FUEL G
V1916-M-11/P&ID Sewage Evaporation System
Departmental Task
ID281-E-01/Preliminary electrical load Balance
V2008-M-02/Exhaust gas back pressure calculation
I-MC-3010.2G-1416-200-KES-105/M06B - STRESS ANALYSIS REPORT ? EXPORTATION GAS DEHYDRATIO
v2036-R-13/Exhaust pipe & support analysis
H3041-721-001/P&ID - SW Cooling system
H3041-710-001/P&ID - Lube Oil system
V2032-X-03/R&D
H3041-761-001/P&ID - Distilled and make-up water systems
Departmental Task
Idle
H3041-710-001/P&ID - Lube Oil system
H3041-600-001/Engine room Arrangement
Departmental Task
Meeting - Internal (Non-Projects)
V1574-X-01/Project Mgmt
V1916-X-01/Project Management
V2181-X-01/Project Management
H3041-580-001/P&ID - Sanitary discharge system
I-MC-3010.2G-1416-200-KES-106/M06B - STRESS ANALYSIS REPORT ? MOLECULAR SIEVE GAS COALES
R&D
R&D
ID286-R-01/LNGC to FSU Conversion Specification for Lerici
V1916-P-55/MTO for Process Valves
V1916-P-53/P&ID Water spray system
Blank 1
H3041-731-001/P&ID - Starting air system
Blank 1
H3041-731-001/P&ID - Starting air system
H3041-710-001/P&ID - Lube Oil system
l-MC-3010.2G-1416-200-KES-101/M06B - STRESS ANALYSIS REPORT ? GAS DEHYDRATION AND FUEL G
V1916-P-55/MTO for Process Valves
H3041-761-001/P&ID - Distilled and make-up water systems
H3041-580-001/P&ID - Sanitary discharge system
H3041-710-001/P&ID - Lube Oil system
H3041-722-001/P&ID - FW Cooling system
V1916-P-43/P&ID Cargo System
Departmental Task
V1916-P-59/Process Safety Valves Data Sheet
V1916-P-43/P&ID Cargo System
V1916-P-43/P&ID Cargo System
Departmental Task
V1916-P-42/Piping material specification
V1916-P-43/P&ID Cargo System
V1916-C-02/Gas Detection System Modification (SLD & Arrangement)
Y-29/Y-30_4040/Air Vent and Sounding Arrangement
Departmental Task
V2032-X-03/R&D
V2054-X-02/Meeting
H3041-710-001/P&ID - Lube Oil system
H3041-721-001/P&ID - SW Cooling system
H3041-803-004/P&ID - Oily water separation system
H3041-761-001/P&ID - Distilled and make-up water systems
Departmental Task
H3041-710-001/P&ID - Lube Oil system
Departmental Task
H3041-800-002/P&ID - Bilge system
Blank 1
H3041-440-005/SOTR For Vacuum cleaning system
Departmental Task
V1916-M-04/Equipment Arrangement on Deck
ID286-M-01/Master Conversion Plan
R&D
H3041-761-001/P&ID - Distilled and make-up water systems
v2036-R-07/Exhaust Back Pressure Calculation
V2035-P-01/P&ID for EGCS system
H3041-761-001/P&ID - Distilled and make-up water systems
V2035-R-07/Exhaust Back Pressure Calculation
Meeting - External (Non-Projects)
H3041-761-001/P&ID - Distilled and make-up water systems
Blank 1
V1916-P-61/MTO for Regas Aux Valves
ID286-R-01/LNGC to FSU Conversion Specification for Lerici
V1916-X-01/Project Management
Y-29/Y-30_4040/Air Vent and Sounding Arrangement
V2030-X-01/Project Management
M2702/Black Sea Marmara for conversion to FSRU with 21mmscfd capacity
Meeting - Internal (Non-Projects)
H3041-730-002/P&ID - Control air system
V1916-P-61/MTO for Regas Aux Valves
ID286-R-01/LNGC to FSU Conversion Specification for Lerici
V1916-P-63/P&ID For Water Ballast System
Blank 1
Departmental Task
H3041-722-001/P&ID - FW Cooling system
H3041-710-001/P&ID - Lube Oil system
H3041-761-001/P&ID - Distilled and make-up water systems
H3041-580-001/P&ID - Sanitary discharge system
H3041-731-001/P&ID - Starting air system
Blank 1
H3041-721-001/P&ID - SW Cooling system
H3041-761-001/P&ID - Distilled and make-up water systems
V1916-P-45/P&ID Regas Glycol Water system
V2032-M-05/Machinery Room Ventilation Arrangement
V1916-P-44/P&ID Regas Sea Water System
V1916-P-43/P&ID Cargo System
V1916-X-02/Meeting
ID286-X-02/Meeting
V1916-M-11/P&ID Sewage Evaporation System
R&D
V1916-P-53/P&ID Water spray system
V1916-M-03/Machinery Arrangement in Engine Room
V1916-M-04/Equipment Arrangement on Deck
V1916-M-11/P&ID Sewage Evaporation System
V1916-P-44/P&ID Regas Sea Water System
R&D
V1916-P-53/P&ID Water spray system
V1916-X-02/Meeting
V1916-P-43/P&ID Cargo System
V1916-P-43/P&ID Cargo System
V1916-P-55/MTO for Process Valves
V1916-C-13/MTO for Instruments
H3041-440-005/SOTR For Vacuum cleaning system
H3041-570-002/HVAC Heat load calcualtion
Meeting - Internal (Non-Projects)
V1916-X-01/Project Management
Meeting - Internal (Non-Projects)
V1574-X-01/Project Mgmt
Blank 2
Blank 1
V2030-X-01/Project Management
V2035-R-07/Exhaust Back Pressure Calculation
V1916-M-03/Machinery Arrangement in Engine Room
V1916-M-04/Equipment Arrangement on Deck
V1916-C-02/Gas Detection System Modification (SLD & Arrangement)
H3041-710-001/P&ID - Lube Oil system
H3041-721-001/P&ID - SW Cooling system
Blank 1
V1916-P-42/Piping material specification
V1916-X-03/R&D
V1916-C-13/MTO for Instruments
V1916-P-55/MTO for Process Valves
V1916-P-43/P&ID Cargo System
R&D
H3041-580-001/P&ID - Sanitary discharge system
H3041-761-001/P&ID - Distilled and make-up water systems
V1916-P-51/P&ID Exhaust steam pipe diagram
V1916-3D-01/3D modelling Equipment
V2058-R-23/Cross flooding calculations
Y-29/Y-30_4040/Air Vent and Sounding Arrangement
V2032-P-13/Fixed Firefighting System
V2058-X-02/Meeting
Departmental Task
H3041-710-001/P&ID - Lube Oil system
H3041-722-001/P&ID - FW Cooling system
H3041-761-001/P&ID - Distilled and make-up water systems
v2036-X-06/Mach-Arrangement of distance piece for hull fitting
I-MC-3010.2G-1418-200-KES-028/M08_CN028 ANALYSIS REPORT -
I-MC-3010.2G-1415-200-KES-015/M05-STRESS
SAFETY GAS K.O. DRUM - V1231001 GAS INLET ? CN015
V2160-M-01/ME and GE F.O. Service System
I-MC-3010.2G-1418-200-KES-024/M08_CN024
I-MC-3010.2G-1418-200-KES-027/M08_CN027
v2036-S-03/Arrangement of distance piece for hull fitting
V1916-M-03/Machinery Arrangement in Engine Room
V1916-M-04/Equipment Arrangement on Deck
Blank 1
ID286-M-01/Master Conversion Plan
V1916-C-02/Gas Detection System Modification (SLD & Arrangement)
V1916-M-03/Machinery Arrangement in Engine Room
ID286-M-01/Master Conversion Plan
V1916-P-63/P&ID For Water Ballast System
V1916-M-04/Equipment Arrangement on Deck
H3041-800-002/P&ID - Bilge system
Departmental Task
H3041-710-001/P&ID - Lube Oil system
H3041-761-001/P&ID - Distilled and make-up water systems
V2058-R-23/Cross flooding calculations
v2036-X-07/Structure-Exhaust pipe & support analysis
V2032-P-13/Fixed Firefighting System
Blank 1
H3041-722-001/P&ID - FW Cooling system
Departmental Task
H3041-730-001/P&ID - Compressed air system
H3041-731-001/P&ID - Starting air system
Meeting - Internal (Non-Projects)
Idle
V2035-R-08/Scrubber SW Pump pressure drop calculation
V1849-M-03/Feed Water System Diagram
V2030-X-02/Meeting
Departmental Task
H3041-710-001/P&ID - Lube Oil system
H3041-722-001/P&ID - FW Cooling system
H3041-730-001/P&ID - Compressed air system
H3041-722-001/P&ID - FW Cooling system
V1916-C-14/MTO for Instruments - Regas Aux
ID286-M-01/Master Conversion Plan
V1916-P-45/P&ID Regas Glycol Water system
H3041-710-001/P&ID - Lube Oil system
H3041-440-005/SOTR For Vacuum cleaning system
Departmental Task
V1916-P-61/MTO for Regas Aux Valves
H3041-721-001/P&ID - SW Cooling system
R&D
ID286-M-01/Master Conversion Plan
H3041-761-001/P&ID - Distilled and make-up water systems
V2032-M-05/Machinery Room Ventilation Arrangement
V2035-R-08/Scrubber SW Pump pressure drop calculation
V2046-R-01/HPU Specification
H3041-722-001/P&ID - FW Cooling system
H3041-730-001/P&ID - Compressed air system
Blank 1
Meeting - Internal (Non-Projects)
Meeting - Internal (Non-Projects)
v2036-R-13/Exhaust pipe & support analysis
V2035-R-07/Exhaust Back Pressure Calculation
V1916-P-55/MTO for Process Valves
V1916-C-13/MTO for Instruments
V1916-P-43/P&ID Cargo System
H3041-721-001/P&ID - SW Cooling system
H3041-803-004/P&ID - Oily water separation system
H3041-710-001/P&ID - Lube Oil system
V1916-X-02/Meeting
H3041-580-001/P&ID - Sanitary discharge system
V2046-R-01/HPU Specification
V2032-P-13/Fixed Firefighting System
H3041-570-002/HVAC Heat load calcualtion
Meeting - Internal (Non-Projects)
V1916-P-54/P&ID Sewage system
V1916-P-45/P&ID Regas Glycol Water system
V2030-X-02/Meeting
H3041-817-001/SOTR for Sprinkler and water mist system
Idle
Departmental Task
V1916-M-11/P&ID Sewage Evaporation System
V1916-P-44/P&ID Regas Sea Water System
V1916-M-03/Machinery Arrangement in Engine Room
v2036-R-06/Scrubber Foundation Stress Analysis report
H3041-761-001/P&ID - Distilled and make-up water systems
ID286-M-01/Master Conversion Plan
V1916-P-45/P&ID Regas Glycol Water system
V1916-P-54/P&ID Sewage system
V1916-M-04/Equipment Arrangement on Deck
V1916-M-05/MTO For loose item
V1916-C-14/MTO for Instruments - Regas Aux
V1916-P-57/MTO for Marine Valves
Departmental Task
V2035-X-02/Meeting
I-MC-3010.2G-1418-200-KES-006/M08 - STRESS ANALYSIS REPORT ? AMINE CONTACTOR ?A? (T-12340
Meeting - External (Non-Projects)
ID286-X-01/Project Management
V1916-X-01/Project Management
ID286-R-01/LNGC to FSU Conversion Specification for Lerici
H3041-650-009/SOTR for Generators
V2030-X-01/Project Management
H3041-650-009/SOTR for Generators
H3041-721-001/P&ID - SW Cooling system
V2030-X-01/Project Management
ID286-X-01/Project Management
H3041-761-001/P&ID - Distilled and make-up water systems
V1574-X-01/Project Mgmt
V2032-X-02/Meeting
ID286-M-01/Master Conversion Plan
ID286-R-01/LNGC to FSU Conversion Specification for Lerici
V1916-P-44/P&ID Regas Sea Water System
V1916-P-52/P&ID Regas Steam Condensate system
Departmental Task
V2058-R-23/Cross flooding calculations
V1916-P-51/P&ID Exhaust steam pipe diagram
V1916-P-54/P&ID Sewage system
V1916-P-67/MTO for Valves - BWTS
V1916-P-44/P&ID Regas Sea Water System
V1916-P-57/MTO for Marine Valves
H3041-761-001/P&ID - Distilled and make-up water systems
V1916-P-45/P&ID Regas Glycol Water system
V1916-P-52/P&ID Regas Steam Condensate system
V2008-M-08/Machinery Arrangement Drawing
V1916-P-81/P&ID for Escape Pipe
V1916-P-44/P&ID Regas Sea Water System
V1916-M-03/Machinery Arrangement in Engine Room
V1916-P-54/P&ID Sewage system
V1916-P-45/P&ID Regas Glycol Water system
H3041-761-001/P&ID - Distilled and make-up water systems
H3041-721-001/P&ID - SW Cooling system
V2032-M-05/Machinery Room Ventilation Arrangement
Departmental Task
V2035-R-08/Scrubber SW Pump pressure drop calculation
V2032-X-02/Meeting
V1916-X-03/R&D
V1916-P-43/P&ID Cargo System
V1916-X-02/Meeting
H3041-580-001/P&ID - Sanitary discharge system
v2036-X-07/Structure-Exhaust pipe & support analysis
H3041-721-001/P&ID - SW Cooling system
Departmental Task
H3041-722-001/P&ID - FW Cooling system
H3041-730-001/P&ID - Compressed air system
V2035-P-01/P&ID for EGCS system
Meeting - Internal (Non-Projects)
H3041-570-002/HVAC Heat load calcualtion
V2030-X-02/Meeting
R&D
H3041-650-010/SOTR for Harbour Generator
H3041-730-001/P&ID - Compressed air system
H3041-722-001/P&ID - FW Cooling system
V1916-P-54/P&ID Sewage system
V1916-P-65/P&ID for Sea water Supply System - BWTS
Departmental Task
H3041-722-001/P&ID - FW Cooling system
V1849-M-03/Feed Water System Diagram
H3041-710-001/P&ID - Lube Oil system
V1916-P-45/P&ID Regas Glycol Water system
V1916-P-61/MTO for Regas Aux Valves
V1916-C-13/MTO for Instruments
ID286-M-01/Master Conversion Plan
H3041-710-001/P&ID - Lube Oil system
V2035-R-08/Scrubber SW Pump pressure drop calculation
V2035-R-08/Scrubber SW Pump pressure drop calculation
V2035-R-08/Scrubber SW Pump pressure drop calculation
V2194-R-01/Ballast Water Management Plan
Idle
H3041-721-001/P&ID - SW Cooling system
V1916-P-63/P&ID For Water Ballast System
ID286-M-01/Master Conversion Plan
V1916-M-04/Equipment Arrangement on Deck
v2036-P-01/P&ID for EGCS system
v2036-P-02/P&ID for Control Air system
V2036-X-02/Meeting
V2035-R-07/Exhaust Back Pressure Calculation
V2035-R-08/Scrubber SW Pump pressure drop calculation
V1916-P-45/P&ID Regas Glycol Water system
ID286-X-01/Project Management
H3041-440-005/SOTR For Vacuum cleaning system
Departmental Task
H3041-710-001/P&ID - Lube Oil system
v2036-R-06/Scrubber Foundation Stress Analysis report
Rev WP Shift Status
3WP-Drafting
3WP-Drafting
4WP-Review
1WP-Basis
Output
4WP-Review
4WP-Review
4WP-Review
3WP-Report
4WP-Review
4WP-Review
4WP-Review
4WP-Review
1WP-Basis
2WP-Pre-Process & Calc
3WP-Drafting
2WP-Concept
Class Room Training
2_Vendor Coordination
1_SOTR Preparation
3WP-Drafting
2WP-Concept
2WP-Pre-Process & Calc
1_SOTR Preparation
2WP-Pre-Process & Calc
3WP-Drafting
1WP-Basis
3WP-Drafting
1WP-Basis
1WP-Basis
WP1_Initiate Model
3WP-Drafting
3WP-Drafting
1_SOTR Preparation
1WP-Basis
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
2WP-Concept
3WP-Report
4WP-Review
Self Training
2WP-Concept
4WP-Review
2WP-Pre-Process & Calc
2WP-Concept
Meeting
4WP-Review
4WP-Review
1WP-Basis
3WP-Drafting
3WP-Drafting
3WP-Report
Output
WP3_Review
Output
1WP-Basis
1WP-Basis
1WP-Basis
4WP-Review
1WP-Basis
1WP-Basis
1WP-Basis
3WP-Drafting
3WP-Drafting
1WP-Basis
3WP-Drafting
3WP-Drafting
4WP-Review
4WP-Review
3WP-Drafting
2_Vendor Coordination
1WP-Basis
1WP-Basis
Output
1_SOTR Preparation
1_SOTR Preparation
3WP-Report
4WP-Review
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
4WP-Review
4WP-Review
3WP-Report
4WP-Review
4WP-Review
2WP-Pre-Process & Calc
2WP-Pre-Process & Calc
3WP-Report
4WP-Review
2WP-Pre-Process & Calc
3WP-Report
4WP-Review
2WP-Pre-Process & Calc
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Report
4WP-Review
4WP-Review
4WP-Review
4WP-Review
4WP-Review
2WP-Concept
4WP-Review
4WP-Review
2WP-Concept
4WP-Review
3WP-Drafting
4WP-Review
4WP-Review
3WP-Drafting
3WP-Report
2WP-Pre-Process & Calc
4WP-Review
1WP-Basis
4WP-Review
3WP-Drafting
4WP-Review
3WP-Drafting
4WP-Review
4WP-Review
4WP-Review
4WP-Review
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
1WP-Basis
3WP-Drafting
1WP-Basis
3WP-Drafting
3WP-Drafting
4WP-Review
1WP-Basis
3WP-Drafting
2WP-Pre-Process & Calc
1_SOTR Preparation
1_SOTR Preparation
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
3WP-Drafting
1WP-Basis
4WP-Review
3WP-Drafting
3WP-Drafting
WP5_Generation
Estimation
3WP-Drafting
2WP-Concept
1WP-Basis
1WP-Basis
2WP-Pre-Process & Calc
Meeting
2WP-Pre-Process & Calc
3WP-Drafting
3WP-Drafting
1WP-Basis
1WP-Basis
3WP-Drafting
2WP-Concept
3WP-Drafting
3WP-Report
1WP-Basis
2WP-Pre-Process & Calc
1WP-Basis
1WP-Basis
4WP-Review
3WP-Drafting
4WP-Review
2WP-Pre-Process & Calc
Output
4WP-Review
1_SOTR Preparation
1_SOTR Preparation
Class Room Training
3WP-Drafting
WP1_Initiate Model
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
3WP-Drafting
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
2WP-Concept
Class Room Training
2WP-Pre-Process & Calc
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
2WP-Concept
WP3_Review
1WP-Basis
1WP-Basis
WP1_Initiate Model
4WP-Review
4WP-Review
1WP-Basis
3WP-Drafting
4WP-Review
WP3_Review
3WP-Report
2WP-Concept
2WP-Pre-Process & Calc
1WP-Basis
1WP-Basis
3WP-Drafting
2WP-Concept
1WP-Basis
2WP-Concept
3WP-Drafting
4WP-Review
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
4WP-Review
3WP-Drafting
1WP-Basis
1WP-Basis
4WP-Review
4WP-Review
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
3WP-Drafting
3WP-Report
WP1_Initiate Model
3WP-Drafting
3WP-Drafting
2WP-Concept
2WP-Concept
3WP-Drafting
2WP-Concept
4WP-Review
4WP-Review
4WP-Review
2WP-Pre-Process & Calc
2_Vendor Coordination
2WP-Pre-Process & Calc
2WP-Pre-Process & Calc
2WP-Pre-Process & Calc
4WP-Review
4WP-Review
4WP-Review
4WP-Review
1_SOTR Preparation
4WP-Review
3WP-Report
1WP-Basis
3WP-Drafting
2WP-Concept
1WP-Basis
3WP-Drafting
3WP-Drafting
3WP-Drafting
1WP-Basis
Output
2WP-Pre-Process & Calc
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
4WP-Review
4WP-Review
1WP-Basis
4WP-Review
1WP-Basis
4WP-Review
4WP-Review
4WP-Review
4WP-Review
1WP-Basis
1WP-Basis
3WP-Drafting
3WP-Drafting
1WP-Basis
1_SOTR Preparation
1_SOTR Preparation
Class Room Training
3WP-Drafting
3WP-Report
Output
1WP-Basis
WP1_Initiate Model
2WP-Pre-Process & Calc
2WP-Pre-Process & Calc
3WP-Drafting
3WP-Drafting
Class Room Training
3WP-Drafting
3WP-Drafting
WP1_Initiate Model
4WP-Review
4WP-Review
4WP-Review
1WP-Basis
4WP-Review
4WP-Review
WP5_Generation
1WP-Basis
1WP-Basis
2WP-Concept
4WP-Review
4WP-Review
WP3_Review
Self Training
WP1_Initiate Model
3WP-Drafting
2WP-Pre-Process & Calc
4WP-Review
Output
1WP-Basis
4WP-Review
3WP-Drafting
3WP-Drafting
2WP-Concept
4WP-Review
Output
2WP-Concept
3WP-Drafting
WP1_Initiate Model
2WP-Concept
1WP-Basis
4WP-Review
1WP-Basis
2_Vendor Coordination
4WP-Review
1_SOTR Preparation
3WP-Drafting
4WP-Review
4WP-Review
3WP-Report
3WP-Report
4WP-Review
4WP-Review
3WP-Drafting
3WP-Drafting
4WP-Review
4WP-Review
3WP-Drafting
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
2WP-Pre-Process & Calc
WP1_Initiate Model
4WP-Review
2WP-Pre-Process & Calc
4WP-Review
2WP-Pre-Process & Calc
2WP-Pre-Process & Calc
3WP-Drafting
3WP-Drafting
1WP-Basis
4WP-Review
4WP-Review
WP3_Review
1WP-Basis
4WP-Review
1_SOTR Preparation
3WP-Drafting
4WP-Review
1WP-Basis
1WP-Basis
WP1_Initiate Model
Output
3WP-Report
1WP-Basis
4WP-Review
3WP-Drafting
2WP-Concept
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
3WP-Drafting
3WP-Drafting
4WP-Review
WP3_Review
1WP-Basis
2WP-Concept
1WP-Basis
3WP-Report
2WP-Pre-Process & Calc
3WP-Drafting
4WP-Review
4WP-Review
3WP-Drafting
WP3_Review
1WP-Basis
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
Class Room Training
Output
1_SOTR Preparation
WP3_Review
3WP-Report
WP3_Review
3WP-Drafting
4WP-Review
3WP-Drafting
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
2WP-Concept
1WP-Basis
4WP-Review
1WP-Basis
3WP-Drafting
3WP-Drafting
4WP-Review
1WP-Basis
4WP-Review
3WP-Report
1WP-Basis
4WP-Review
1WP-Basis
1WP-Basis
4WP-Review
4WP-Review
4WP-Review
Class Room Training
3WP-Drafting
3WP-Drafting
4WP-Review
3WP-Drafting
2WP-Concept
4WP-Review
4WP-Review
2WP-Concept
4WP-Review
WP3_Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
2WP-Pre-Process & Calc
4WP-Review
1_SOTR Preparation
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
Class Room Training
3WP-Drafting
4WP-Review
4WP-Review
4WP-Review
4WP-Review
1WP-Basis
1WP-Basis
1WP-Basis
WP1_Initiate Model
1WP-Basis
Output
3WP-Drafting
1WP-Basis
3WP-Drafting
3WP-Drafting
3WP-Drafting
1WP-Basis
3WP-Drafting
4WP-Review
1WP-Basis
1WP-Basis
4WP-Review
2WP-Concept
4WP-Review
1WP-Basis
1WP-Basis
1WP-Basis
WP1_Initiate Model
3WP-Drafting
4WP-Review
Self Training
2WP-Concept
3WP-Report
WP3_Review
WP1_Initiate Model
3WP-Report
1WP-Basis
3WP-Report
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
Output
1WP-Basis
4WP-Review
1_SOTR Preparation
Output
3WP-Report
3WP-Drafting
3WP-Drafting
3WP-Drafting
2WP-Pre-Process & Calc
4WP-Review
4WP-Review
2WP-Concept
2WP-Concept
2WP-Concept
3WP-Drafting
3WP-Drafting
4WP-Review
4WP-Review
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
4WP-Review
1_SOTR Preparation
1WP-Basis
4WP-Review
1WP-Basis
3WP-Drafting
3WP-Report
1WP-Basis
3WP-Drafting
4WP-Review
WP2_Concept Model
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Report
3WP-Drafting
3WP-Report
WP3_Review
3WP-Drafting
1WP-Basis
4WP-Review
4WP-Review
1_SOTR Preparation
1WP-Basis
1WP-Basis
2WP-Pre-Process & Calc
3WP-Drafting
2WP-Concept
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
1_SOTR Preparation
3WP-Drafting
1_SOTR Preparation
3WP-Drafting
3WP-Drafting
3WP-Drafting
4WP-Review
3WP-Drafting
3WP-Report
3WP-Drafting
3WP-Drafting
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Report
4WP-Review
4WP-Review
3WP-Drafting
3WP-Drafting
4WP-Review
4WP-Review
1WP-Basis
4WP-Review
1WP-Basis
3WP-Drafting
3WP-Report
4WP-Review
4WP-Review
4WP-Review
WP1_Initiate Model
1WP-Basis
1_SOTR Preparation
2WP-Concept
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
Output
WP3_Review
4WP-Review
4WP-Review
1WP-Basis
WP1_Initiate Model
3WP-Drafting
3WP-Drafting
2WP-Pre-Process & Calc
3WP-Drafting
3WP-Report
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
1_SOTR Preparation
1_SOTR Preparation
1_SOTR Preparation
1WP-Basis
1WP-Basis
4WP-Review
1WP-Basis
4WP-Review
1WP-Basis
4WP-Review
3WP-Drafting
4WP-Review
3WP-Drafting
4WP-Review
1WP-Basis
WP2_Concept Model
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
1WP-Basis
WP3_Review
4WP-Review
4WP-Review
3WP-Drafting
WP3_Review
1WP-Basis
2WP-Concept
2WP-Concept
4WP-Review
3WP-Report
3WP-Drafting
4WP-Review
Output
2WP-Pre-Process & Calc
4WP-Review
1WP-Basis
4WP-Review
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
Estimation
3WP-Drafting
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
4WP-Review
1WP-Basis
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
4WP-Review
3WP-Drafting
3WP-Drafting
1WP-Basis
4WP-Review
3WP-Drafting
4WP-Review
4WP-Review
1_SOTR Preparation
1_SOTR Preparation
3WP-Drafting
3WP-Drafting
4WP-Review
3WP-Drafting
3WP-Drafting
4WP-Review
3WP-Report
4WP-Review
2WP-Concept
4WP-Review
4WP-Review
4WP-Review
4WP-Review
1WP-Basis
3WP-Drafting
4WP-Review
2WP-Pre-Process & Calc
4WP-Review
1WP-Basis
3WP-Drafting
3WP-Drafting
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
1WP-Basis
1WP-Basis
4WP-Review
Estimation
1WP-Basis
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Report
3WP-Drafting
3WP-Drafting
3WP-Drafting
2WP-Pre-Process & Calc
4WP-Review
1WP-Basis
3WP-Drafting
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
3WP-Drafting
1WP-Basis
3WP-Drafting
1WP-Basis
1WP-Basis
1WP-Basis
Output
4WP-Review
1WP-Basis
1WP-Basis
1WP-Basis
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
4WP-Review
2WP-Pre-Process & Calc
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
4WP-Review
4WP-Review
3WP-Drafting
2WP-Concept
2WP-Concept
3WP-Report
3WP-Drafting
3WP-Drafting
1WP-Basis
Output
1WP-Basis
4WP-Review
3WP-Drafting
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
1_SOTR Preparation
1_SOTR Preparation
2_Vendor Coordination
4WP-Review
4WP-Review
4WP-Review
3WP-Report
3WP-Report
3WP-Drafting
3WP-Drafting
4WP-Review
4WP-Review
1WP-Basis
3WP-Drafting
3WP-Drafting
1WP-Basis
3WP-Drafting
Output
3WP-Report
3WP-Drafting
3WP-Drafting
3WP-Drafting
2WP-Concept
2WP-Concept
1WP-Basis
1WP-Basis
1WP-Basis
4WP-Review
1_SOTR Preparation
1_SOTR Preparation
2_Vendor Coordination
1_SOTR Preparation
1WP-Basis
4WP-Review
4WP-Review
1WP-Basis
4WP-Review
1WP-Basis
WP1_Initiate Model
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
2WP-Concept
4WP-Review
3WP-Drafting
3WP-Drafting
WP3_Review
3WP-Report
4WP-Review
4WP-Review
4WP-Review
4WP-Review
4WP-Review
Output
3WP-Drafting
3WP-Drafting
3WP-Drafting
1_SOTR Preparation
2WP-Concept
3WP-Report
3WP-Drafting
4WP-Review
4WP-Review
4WP-Review
Output
4WP-Review
3WP-Drafting
3WP-Drafting
1WP-Basis
WP1_Initiate Model
1WP-Basis
3WP-Drafting
3WP-Drafting
3WP-Drafting
2WP-Concept
4WP-Review
Output
Output
3WP-Drafting
3WP-Drafting
4WP-Review
4WP-Review
2WP-Concept
1WP-Basis
4WP-Review
3WP-Drafting
3WP-Drafting
2WP-Concept
2WP-Concept
3WP-Drafting
1WP-Basis
1_SOTR Preparation
3WP-Drafting
3WP-Drafting
1WP-Basis
4WP-Review
4WP-Review
2WP-Concept
2WP-Pre-Process & Calc
2WP-Concept
3WP-Drafting
2WP-Pre-Process & Calc
3WP-Report
3WP-Drafting
4WP-Review
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
4WP-Review
3WP-Drafting
4WP-Review
3WP-Drafting
4WP-Review
4WP-Review
WP3_Review
4WP-Review
4WP-Review
2WP-Concept
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
4WP-Review
WP3_Review
4WP-Review
Output
Output
Output
1_SOTR Preparation
4WP-Review
WP1_Initiate Model
1WP-Basis
1WP-Basis
2WP-Pre-Process & Calc
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
3WP-Drafting
4WP-Review
WP2_Concept Model
Output
Output
Output
3WP-Drafting
3WP-Drafting
4WP-Review
WP1_Initiate Model
4WP-Review
3WP-Drafting
2WP-Concept
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
4WP-Review
4WP-Review
4WP-Review
4WP-Review
4WP-Review
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
3WP-Drafting
3WP-Drafting
1WP-Basis
1WP-Basis
1WP-Basis
1WP-Basis
2WP-Concept
3WP-Drafting
3WP-Drafting
4WP-Review
3WP-Drafting
3WP-Drafting
4WP-Review
4WP-Review
4WP-Review
1WP-Basis
3WP-Drafting
1_SOTR Preparation
4WP-Review
3WP-Drafting
4WP-Review
3WP-Drafting
3WP-Drafting
1WP-Basis
3WP-Report
3WP-Drafting
3WP-Drafting
4WP-Review
4WP-Review
4WP-Review
1_SOTR Preparation
4WP-Review
3WP-Drafting
4WP-Review
Output
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Report
3WP-Report
1WP-Basis
4WP-Review
1WP-Basis
WP3_Review
3WP-Report
3_TBE
4WP-Review
3_TBE
1WP-Basis
1WP-Basis
1WP-Basis
4WP-Review
1WP-Basis
1WP-Basis
4WP-Review
1WP-Basis
4WP-Review
4WP-Review
1WP-Basis
3WP-Drafting
3WP-Drafting
3WP-Report
2WP-Concept
3WP-Report
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
3WP-Drafting
4WP-Review
3WP-Drafting
3WP-Drafting
3WP-Drafting
2WP-Concept
3WP-Drafting
3WP-Drafting
3WP-Drafting
1WP-Basis
4WP-Review
1WP-Basis
4WP-Review
3WP-Drafting
3WP-Drafting
4WP-Review
4WP-Review
4WP-Review
4WP-Review
4WP-Review
4WP-Review
3WP-Report
2WP-Pre-Process & Calc
4WP-Review
3WP-Drafting
2WP-Pre-Process & Calc
2WP-Pre-Process & Calc
3WP-Report
3WP-Report
3WP-Drafting
3WP-Drafting
2WP-Concept
3WP-Drafting
4WP-Review
4WP-Review
1WP-Basis
4WP-Review
4WP-Review
3WP-Drafting
1WP-Basis
1_SOTR Preparation
3WP-Drafting
Output
Remarks
Webinar:CCS and Departmental Task
Tagging continuation
Comments update/Finalization/Checklist
V2030
Update as per QC Comment
Vessel Inputs Study
QC Comments response + Closure
Vent. calculation Review & Release
FW Cooling System Review & Release
PFD
synergy meeting
drain cooler capacity
.
Coordination
Webinar on BRics CAd
Data search for methanol
Webinar on CCS
PFD
Update in Cranes SOTR for com. hyd. sys requ.
Ventilation Cal.
bwts equipment status sheet
SKID PCF
Huddle
HUddle
Response to Axima
Operation in FLNG
Basis & Inputs FLNG
DT
FINALIZATION/CHECKLIST/RECHECK
MIND FIZZ
QUIZZ COMPETITION
MIND FIZZ
ASHRAE 62.1
quiz event
sampling system
P&ID and PMS CHANGE TO JIS STANDARD
task discussed
COMMENTS UPDATE
task arrangement
CRS
CRS
CRS & Sunbo PCF
CRS & Sunbo PCF
CRS & Sunbo PCF
AMAN COMMENTS
Task discussion & coordination
Meeting with Sea syst
LUBEOIL, UREA & EXHST SYSTEM
UPDTNG AS PER OTHER DCMNTS
IRS COMPLIANCE SHEET
ADD TEMPLATE
Checking Client comments
Concept
NA
Planner
P&ID Update
PM
DH
Discussion regarding
co ordination
Soft skills
Vendor data review_CRS update
CV Format filling
review
Short Updates in ballast & Fuel System
AHM
Task discussion & coordination
Comments on vendor data
Meeting with sea syst
Review/meeting/discuss/coordination
Review/meeting/discuss/coordination
Comments on vendor data
C
Study on Calculation
Internal Meeting
Site Visit
Study
Study
AHM
Coordination
SW Valve update
V2030
VENDOR DATA REVIEW_CRS UPDATE
FW_BUILD SPECS.
study
Meeting_BCS_SEASYST
Comments Update
Line & valve tag added, CP & first page updated
Typical Penetration Detail
FLNG Process study
detail A & B
P&ID UPDATE
HVAC study
Review & Discussion with PB sir
Soft Skill Training
Coordination
PCF review
BWTS PMS
Softskills
valve offer checked
Review as per client feedback
Class comments response
BricsCAD Seminar
Daily Huddle + Coordination
P&ID update
CRS sheet
Exhaust P&ID update
Urea P&ID update
.
.
.
Site Visit
Comments on vendor data
Comments on vendor data
Comments on vendor data
task discussion & coordination
HVAC study
Meeting
ALS Updated P&ID Review
.
.
Daily huddle
Concept Preparation
Weekly task mail + coordination
Ventilation Plan Review & Release
BS/RULES/CONCEPTS/DISCUSSION/CO-ORD.
FW Cooling System
V2030 - FW COOLING
P&ID_Initiation
ESD hierarchy, Operation philosophy
P&ID review
CRS sheet review with RB
CRS sheet
Query response.
LO P&ID review
SOLAs req, Equipment details for Mist system
SOTR prep.
comments sheets discussion
Weekly task status update
vendor co-ordination
V2030-H3041-ORV-Internal Fortnight Meeting
finalization
Site Visit
finalization
finalization
ADD TEMPALTE
P&ID UPDATE
Comments on vendor data
Task discussion & coordination with team
Comments on vendor data
Comments on vendor data
Site visit
Coordination
ALS PD Mail revert & review initiate
Update
Comment Response Sheet
weekly meeting
DT
weekly meeting
Internal discussions
Input Study, SW P&ID, FW P&ID
Planner update & discussion
Daily Huddle
V2181-FLNG Conceptual study
finalization
Ballast/bilge pressure drop
fw cooling system
cooling system
naviswork flatshot
site visit
PCF File
coordination with DD team
Review
Task allocation and coordination
Review
SOTR prep
Mist system
coordination
FW P&ID, SW P&ID, ER Layout
Internal discussions
site visit
markup
Comment Response Sheet
Bilge P&ID Update
Bilge P&ID Update
tasks
DT
sheet space work
P&ID UPDATE
comments update
comments update
UPDTNG DG MAM COMMENTS
EXHAUST,UREA & STP LYT
SPRTNG MAIN & AXLRY SYSTM & DG COMMNTS UPD
CHCKLST
HVAC
STUDY
SOFT SKILL TRAINING
review with SS
Task planning
soft skills
LO P&ID Review
Bilge P&ID update
LO P&ID Review
SoftSkill Training-2
site visit
AHM
co-ordination
.
.
Class req. for fire systems
mehendi
Cross flooding
V2054-Air vent P&ID comments, huddle
Coordination
client comment check
Coordination
Internal discussion with Hemant for Comments
V2030
PFD EQUIPMENT TAGGING AND AUX. SYSTEM FINALIZATION
Coordination
Discussions on MFM Retrofit
Daily Huddle + Coordination
V2054-Breather Valve Venting Capacity calculation
Concept preparation
SW P&ID, FW P&ID, ER layout comments update
site visit
coordination
Area cal for appendix - I
software explore
coordination
P&ID update
P&ID update
P&ID update
Area calculation
SOTR preparation
tasks dicsusion
offer checked
comments update
update as pe GRSE requirements
PMS/review/coordinate/tank list
review/coordinate
HVAC
Planner & study
Review
FUEL OIL & UREA
GRSE COMMENTS (REVISION RB)
CONVERTING PFD TO P&ID (REVISION R0)
Task discussion
Review
Review
AUT-UMS
review/coordinate
Weekly Task planning + coordination
BP calc. Report.
P&ID as per dd markup & Revised tech Spec.
PMS cHECK
Check as per revised Tech. spec.
weekly meeting and task discussion
Review with SS
Discussion with SS
Update and release for internal review
Air vent discussion class comments
V2054-Air vent class comments
Task allocation and discussion
Aut-UMs study
Task discussion & coordination
urea P&ID check and update
urea P&ID check and update
Exhaust P&ID update
Review
FO P&ID update
Review
Discussion with shyamal sir
Vent mast calculation & Report
Datasheets review
V2030
Meeting With ALS
overview
fw cooling meeting with ss
co-ordination
ALS PD update & reply as per ALS requirements
material & coordination
V2054-PV Valve venting Capacity Calculation
Daily Huddle
FW COOLING SYS._SS REVIEW
UPDATE ACC. TO P&IDs
SV_COMMENTS UPDATE
reviw/coordinate
HVAC
Electricity Outage
overall Coordination
CHCKNG EQPMNTS
FW COOLING SYSTEM_REVIEW BY SS
V2030
FW Cooling_UPDATE BY SS
Daily Huddle
V2054-PVRV Sizing calculation
Coordination + Review + Release
Coordination
urea P&ID check and update
FO P&ID check and update
bilge P&ID check and update
exhaust P&ID check and update
Machinery Arrangement review
Daily Huddle + Coordination
comments update
drafting work
Input Collection
review/coordination
short update
review
review
Class rules, HVAC
Review with SS
Update
AHM
PD for PSV
HVAC
DT
Draco weekly Meeting
COMMENTS UPDATE
PFD TO P&ID,CHNGS AS PER EG ROOM
CHCKNG EQPMNTS IN EG ROOM & MKNG EXCL
EXHST,UREA AND EGNE ROOM
cost estimation
DT
SFI Tags
PFD_Finalization
machinery arrangemnt update
SW velocity report
HVAC
sw cooling & other P&Id's coordination/overview
ACC. TO P&IDs
V2053-M-01_DECK HOUSE ARRANGEMENT
.
Concept to DF
Coordination
BPC. concept to Vishaal
P&ID Update Check & Release
Daily Huddle + Coordination
comment update and search of valve
sotr study
EXHST,UREA AND FO
AMAN COMMENTS
DVYA MAM COMMENTS
CHNGS TAGS & UPDATE EXHST CHNGS & SV CMMNTS
ENGN BRTHR PIPES & TAGS UPDATES
Coordination for FW generator and RO plant
Update and Release R0 through VDD
Update
Vendor offer check and revert
Task discussion & coordination
Review & release
Review & release
Review
.
.
discussion with SS
.
.
coordination
coordination
Vacuum cleaning system
Coordination
planner, huddle
ME Maker query
Coordination
C II Modelling Initiate
SW P&ID update
LO P&ID update
AUt-UMS study
Concept guide
Planner
RPLCLNG AUTOCAD
UPDTD AS PER LATEST DRWNG
UPDTD AS PER VEDAM FORMAT
ENGINE ROOM & LUBEOIL
weekly meeting
V2030
P&ID_Initialization
HVAC
PFD for Engines
review
.
.
Review
Review
Gas detector system
Task discussion & coordination
Validate PSC calculation for buffer tank
LO P&ID update
SW P&ID update
OWS P&ID concept
Review with SS
class rule studied
PFD FINALIZATION
LO SYSTEM FINLZTN
INITIATED 2030- OWS (PFD/P&ID)
HVAC
DT
PFD Updates
DT
V2030
.
Task discussion & coordination
Review
Review
system
SW cooling
review
.
Sunbo PCF
.
Sunbo PCF
Sunbo PCF
Weekly meeting synergy
project meeting_prospective projects
BSC
LO P&ID update
SW P&ID update
P/V valve
PMS- Process
Gas detector system
PCF
PCF
PCF
Synergy-AE Pressure drop issue-caln.
DISCUSSION
DISCUSSION, REVIEW & UPDATE
PCF file
PCF file
P/V valve
Study about Fm200
Cross flooding
Task discussion & coordination
Review
Review
DESIGN CHANGES
Distance piece Drawing review + Release
coordination + Output
coordination + Output
Client query response
coordination + Output
coordination + Output
IDENTIFY PIPE & VALVES
HVAC
Coordination
coordination
PCF file
Review
Coordination
including PCF
Pre-Bid meeting
Review with ELE team
AHM
team tasks
PFD
including pcf
guide
SW report
Regas & Exhaust Steam system
comments update & design changes
.
.
.
.
COORDINATION
Coordination
Review
CCAMS meeting with vendors
Synergy-AE Pressure drop issue caln.
Pre-bid Meeting with vendors
PFD_Finalization
PFD_Finalization
Task discussion
Review
Client queries
Review
LO P&ID update
Internal discussion on changes
Line diagram changes in Pipe flow
Report preparation
Network issue
SW P&ID update
PRANAV COMMENTS
VCCM CLNNG SYSTM APP-1
FINALIZATING PFD (RA)
Remark
Should go in Vtraining ?
Should go in Vtraining ?
should go in support or can be book in projects?
should go in support or can be book in projects?
Should go in Vtraining ?
should go in support or can be book in projects?
Should go in Vtraining ?
should go in support or can be book in projects?
should go in support or can be book in projects?
Should go in Vtraining ?
should go in support or can be book in projects?