NATIONAL ECONOMICS UNIVERSITY

INTERNATIONAL SCHOOL OF MANAGEMENT AND ECONOMICS

EDEXCEL BTEC HIGHER NATIONAL DIPLOMA


Unit Code, Number and
UNIT 6 - L4 - D/618/5039
Title
Semester and
Semester 1/ Academic year 2024- 2025
AcademicYear
Unit Assessor(s) Nguyen Van Dai/Nguyen Ngoc Hien/Duong Thi Chi/Le Thi
Hong Phuong

Assignment Number A1_Project Management Plan


andTitle

Submission Date 10 am, 01st November 2024

Student Name
Pearson
NEU Student ID
ID
Plagiarism is a particular form of cheating. Plagiarism must be avoided at all costs
and students who break the rules, however innocently, may be penalised. It is your
responsibility to ensure that you understand correct referencing practices. As a
university level student, you are expected to use appropriate references throughout and
keep carefully detailed notes of all your sources of materials for material you have
used in your work, including any material downloaded from the Internet. Please
consult the relevant unit lecturer or your course tutor if you need any further advice.
I certify that the assignment submission is entirely my own
work and I fully understand the consequences of
Student declaration
plagiarism. I understand that making a false declaration is
a form of malpractice.
Student name /
Date:
Signature
Wordcount: maximum of 3000 words
Your project’s title:…
Project Management Plan
(Keep in mind that your PMP must include all 7 parts as required in this template if you
want to get a PASS for A1)
1. Project lifecycle and objective(s)

2. WBS and Gantt chart


In this section, you are expected to present WBS and Gantt chart that visualize your
project as a whole. They help you better manage and monitor your research project.
WBS goes first and then you need to present Gantt chart!
Notes: you should remember that: if you want to break one node, remember to produce at
least 2 smaller nodes for it. WBS and Gantt chart must be consistent (activities in WBS
need to be included in Gantt chart, particularly the bottom nodes – lowest level
activities). You must sequence the activities before you put them in Gantt chart.
3. Resource and cost
You should imagine the cost and the resources available for your project.
Resource Expected Costs
Any resources you think you will use Again, only cost for this project will
for your research project?. E.g, human be considered. E.g data package
resource, laptop, etc. upgrade, gasoline for research
fields, etc.

4. Quality management
The deliverables of your research project and your research project as a whole need to
satisfy some quality criteria. Then, to make sure they satisfy the quality criteria, you
should think about the way you can do to make sure they satisfy such criteria.
Deliverable Quality Quality Control
Project Deliverables
Standards/Criteria Activity
5. Risk management
Your research project can experience some risks and you need to identify the potential
risks. Then, you should think about the response strategies for them, then give more
details to each of the response strategy.

Details of
Likelihood Weight = Risk
Risks Impact the
(0.25/0.5/0 Likelihood Response
(negative) (1 to 5) response
.75) x Impact strategy
to the risk

6. Stakeholder communication plan


Who are What role they
Which How do you Frequency
stakeholders in play in your
project contact or of contact
your research research
phase? engage them? with them?
project? project?

7. In-brief overview of research methods