GRID LOCATION GENERAL NOTES: All Welds Are: 6.0 mm U.N.O
B5 B/1-2 MATERIAL LIST FOR ASSEMBLY B5 1 Nos. RQD
Mark Profile Material No. Length Area Weight
AA3 FLT8*100 S235 2 140 0.1 1.8
b11 RHS80*40*2 S235 1 398 0.1 1.4
Total 0.2 3.2
8 398 8
A
25 25 40 25 25
b11 AA3
25
55
25
414 (RHS80*40*2 x 398)
20
AA3 A 398
A-A
Tekla structures
B-B
1 Nos. BEAM REQUIRED AS DRAWN MARKED B5
All Holes Are: 22.0 mm U.N.O
GRID LOCATION GENERAL NOTES: All Welds Are: 6.0 mm U.N.O
B1 C/1 MATERIAL LIST FOR ASSEMBLY B1 1 Nos. RQD
Mark Profile Material No. Length Area Weight
40 84 17 235 24 40 B 25 25 100 25 25 B AA1 FLT8*100 S235 1 200 0.0 1.3
60
2668 2668 2676
PL1 PL16*220 S275 1 220 0.1 6.1
8
8
PL7 FLT8*200 S235 1 520 0.2 6.5
b3 SHS100*100*4.0 S235 1 2668 1.1 31.8
b6 SHS100*100*4.0 S235 1 566 0.2 6.7
b6 Total 1.6 52.5
400
2268
25 25 100 25 25
1184
10
b6
40
PL7
5*84
2692 (SHS100*100*4.0 x 2668)
1484
1459
25
150
2668
AA1 1309
40
1284
25
10
b3
2268
B-B
35 25 100 25 35
35
PL1
25
100
1284
25
35
b3
A-A
b3
0 0
16
A A
Tekla structures
3230
b1 SHS100*100*4.0 St-37 1 3430 1.3 40.9
b2 SHS100*100*4.0 St-37 2 1582 1.2 37.8
3080
3205
550
675
b4 SHS100*100*4.0 S235 1 3430 1.3 40.9
2525
2675
3055
3330
3430
1525
1675
3180
b5 SHS100*100*4.0 St-37 2 1382 1.1 33.0
525
650
100
100 425 25 25 850 150 850 150 380 25 25 100 100
0
100
140
140
1482 1482
1442 1442
AA2 AA2
b2
420
420
PL6 PL6
671
671
b2
1022 1022
186
186
AA3
b5
b5 836 836
1582
1582
811 811
771 771
90
90
40
40
746 746
b12
b9 AA3
186
186
560 560
PL6
671
671
PL6
420
420
b4 140
AA2 AA2 140
100 100
140
140
100
100
0 0 0 0
100 425 25 100 25 850 150 850 150 380 25 100 25 100 100
25
0
100
525
650
1525
1675
2525
2675
3055
3180
3330
3430
550
675
3205
3080
3430
3230
Tekla structures
1350
A AA3 BS AA2
AA2 b8
25
50
25
25 25 100 25 25
A 630 90 630
A-A
0
630
720
1350
8 1350 8
B-B
2 Nos. BEAM REQUIRED AS DRAWN MARKED B3
All Holes Are: 22.0 mm U.N.O
GRID LOCATION GENERAL NOTES: All Welds Are: 6.0 mm U.N.O
B4 B-C/1-2 MATERIAL LIST FOR ASSEMBLY B4 2 Nos. RQD
Mark Profile Material No. Length Area Weight
AA3 FLT8*100 S235 2 140 0.1 1.8
b10 RHS80*40*2 S235 1 868 0.2 3.2
Total 0.3 4.9
8 868 8
A AA3
25 25 40 25 25
b10
25
55
20
25
AA3
868
A-A A
884 (RHS80*40*2 x 868)
Tekla structures
B-B
2 Nos. BEAM REQUIRED AS DRAWN MARKED B4
All Holes Are: 22.0 mm U.N.O
GRID LOCATION GENERAL NOTES: All Welds Are: 6.0 mm U.N.O
B6 B/2 B B MATERIAL LIST FOR ASSEMBLY B6 2 Nos. RQD
Mark Profile Material No. Length Area Weight
B6 C/2
25 25 100 25 25 PL1 PL16*220 S275 1 220 0.1 6.1
40 60 235 17 84 40 PL7 FLT8*200 S235 1 520 0.2 6.5
24 b3 SHS100*100*4.0 S235 1 2668 1.1 31.8
2668 b6 SHS100*100*4.0 S235 1 566 0.2 6.7
Total 1.6 51.2
b6
400
2268
25 25 100 25 25
b3
10
40
PL7
2692 (SHS100*100*4.0 x 2668)
5*84
b6
2668
40
10
B-B
2268
35 25 100 25 35
35
PL1
25
125
b3
35
b3
A-A
b3
0
16
A A
Tekla structures
A A
25 50
25
b7
25
100
PL8
25
25
8 2398 8
A A
A-A 2414 (SHS100*100*4.0 x 2398)
Tekla structures
8
PL7 FLT8*200 S235 1 520 0.2 6.5
8
b3 SHS100*100*4.0 S235 1 2668 1.1 31.8
b6 SHS100*100*4.0 S235 1 566 0.2 6.7
b6 Total 1.6 52.5
400
2268
25 25 100 25 25
1184
10
b6
40
PL7
5*84
2692 (SHS100*100*4.0 x 2668)
1484
1459
25
150
2668
40
1309
10
1284
25
AA1 b3
2268
B-B
35 25 100 25 35
35
PL1
25
100
1284
25
35
b3
A-A
b3
0 0
16
A A
Tekla structures