TECHNICAL QUESTION LIST Remark can attach a picture as well THE ANSWERING Remark can attach a picture as well
2 Moderate
No. Open Date Division Area Subject Action Items / Question Remark Priority Target Date Comment Remark Status Close Date 3 Low
After I superimposed the MEP plan to the architect, it turns out it is not the same and
1 1 Nov 2024 MEP ALL TOILET AREA SUPERIMPOSE MEP DRAWING PLANS ARE NOT THE SAME AS ARCHITECT DRAWING PLANS
does not match the floor drain and sanitation points, is there a solution?
1 OPEN
1. PLEASE CHECK ON DWG FOR TEST BOX LIGHTNING PROTECTION BEFORE CONNECT TO GROUND PLAT DUE
ITS MENTIONED IN SNI 03-7015-2004
2. PLEASE CHECK ON DWG FOR TEST BOX LIGHTNING PROTECTION BEFORE CONNECT
TO GROUND PLAT DUE ITS MENTIONED IN SNI 03-7015-2004
3. REFER TO SNI 03-7015-2004 COPPER PLATE NEED PUT MIN 2 LAYER, PLEASE ADVISE WHY ONLY 1 LAYER
2 1 Nov 2024 MEP ALL Area - Grounding Scope
4. PLEASE GIVE INFORMATION RELATED PLATE SIZE
5. PLEASE PUT NON CONDUCTIVE FOR LIGHTNING ROD SEAT
6. PLEASE CHECK
1. CHECK, REVIEW AND REVISION
2. GIVE REASON IF THERE IS SOME ANOTHER OPINION 1 OPEN
1. Please separate between Pipe for fire protection (Sprinkler ETC) and Pipe for domestic water due the color line is same
2. Please Make sure for fire protection before go to pump needs put for metering and pressure gauge and also control valve
3 1 Nov 2024 MEP All Area - Plumbing Scope-Water Tank 3. Please make sure for capacity flow for piping calculation
4. give detail for dimension buried Tank installation to give detail info related piping installation 1. CHECK, REVIEW AND REVISION
5. 2. GIVE REASON IF THERE IS SOME ANOTHER OPINION 1 OPEN
1. Please Check for BCV (Branch control valve) each incoming for sprinkler
2. Please tell me for location drain pipe for testing
4 1 Nov 2024 MEP All Area - Plumbing Scope-Sprinkler Scope 3. Please give detail information related BCV
4. Please check again why put sprinkler inside toilet 1. CHECK, REVIEW AND REVISION
5. please give me detail calculation regarding fire sprinkler and placement of head fire sprinkler 2. GIVE REASON IF THERE IS SOME ANOTHER OPINION 1 OPEN
5 MEP
06 Nov 2024 waterpipe in warehouse area 1. Please consider to check update architecture drawing because there are clash between pile and waterpipe update route for water pipe 1 OPEN
1. Standard Drawings for Mechanical, Electrical, and Plumbing (MEP) Work from the Subcontractor
Please contact the subcontractor responsible for the Mechanical, Electrical, and
6 07 Nov 2024 MEP Ground Water Tank 2. Material Specifications for Mechanical, Electrical, and Plumbing (MEP) 08-11-2024
Plumbing (MEP) work for the Ground Water Tank project.
3. Width of the Flange on the Sleeve Pipe
1 OPEN
1. main incoming for water, and power, Please to coordinate with PLN and PDAM (if using Water company for water source)
8 08 Nov 2024 MEP MEP-General Plant 2. Manhole Instalation detail and Location or coordinate related permit to Majalengka goverment 1 OPEN
1. where dwg route of waterpipe in general plan area
2. Please indicate in dwg for water pump connection in layout plan
9 11 Nov 2024 MEP MEP Water Pipe General Pipe Location 3. Please consider elevation pipe and indicate in dwg for underground pipe Installation 1 OPEN