SIRE 2.0 Questionnaire
SIRE 2.0 Questionnaire
4 4.1.11-2 AIS - VD What is the duration of recording any event on you ship?
4 4.1.14-2 DGPS - Where are the Aldis lamp sockets are located on bridge?
Are you familiar with NFU Mode and why is it used? How
4 4.1.3-3 GMDS - St
to change between normal and NFU mode?
What all test should be carried out for Echo Sounder and
4 4.1.7-5 BNWAS -
where to record the test?
What is CATZOC and how will you verify it for the chart
4 4.2.4-1 ECDIS
in use?
How to export and import data from the ECDIS and what
4 4.2.4-11 ECDIS
all data can be imported and exported from the ECIDS?
4 4.2.4-18 ECDIS What is AIO and what is limitation of AIO? What is MIO?
4 4.2.4-5 ECDIS What is the importance of S-52, S-57 and S-62 standards
4 4.4.5-3 GMDS - StIs GMDSS Log being maintained oand signed properly?
Are all savealls free from oil and drain plugs that have
6 6.5.1-4 Emergenc
positive closing arrangements?
7 7.2.2-9 Ship's Ac Is the gangway duty staff are familiar with his duties?
when was the last cyber security drill carried out? How
7 7.5.1-5 Cyber Sec
often this drill is being carried out?
Were the Master and all officers familiar with the vessel
specific emergency towing procedure, and was the
9 9.2.1 Mooring Pr
emergency towing equipment, where fitted, in
satisfactory condition and ready for immediate use?
9 9.2.1-1 Mooring Is there record of tool box talk prior mooring operations
On split drum winches are all the lines made fast with no
9 9.4.2-3 Mooring O
more than one layer on each tension side of the drum?
IMSPRO
2/ETR,CHENGTR,C/EFalse
CPT.5 PAR.5.2.3
IMSPRO
2/ETR,CHENGTR,C/EFalse
CPT.5 PAR.5.2.3
IMSPRO
CPT.1 PAR.1.2.8 2/ETR,CHENGTR,C/EFalse
CPT.2 PAR.2.2.8
IMSPRO
CPT.5 PAR.5.2.1,
CPT.5 PAR.5.2.3
HSQE/ Ship
2/ETR,CHENGTR,C/EFalse
Manager
Electronic
Manuals/ Forms
Matrix & Labels
VIM
2/ETR,CHENGTR,C/EFalse
CPT.2 PAR.2.1.1
VIM
CPT.6
2/ETR,CHENGTR,C/EFalse
OCIMF Certificates
Repository
Comparison
between HVPQ
Cpt.2.1.5 / PIQ
2/ETR,CHENGTR,C/EFalse
Cpt.2.1.1 /
Class Survey
Status Report
IMSPRO
CPT.12 PAR.12.2.1
CPT.12-F004
VIM CHENGTR,C/E,C/O, True
CPT.1 PAR.1.2.2
PIQ Cpt.2.2.1001-
1002
IMSPRO
CPT.12 PAR.12.2.1
MSTR,C/O,C/OTR,C False
PIQ Cpt.2.2.1001-
1002
IMSPRO
CPT.10
PAR.10.2.1-3
HSQE/Ship MSTR,CHENGTR,C/EFalse
Manager
Software/
Inspections
IMSPRO
CPT.12 MSTR,CHENGTR,C/EFalse
PAR.12.2.1.4
IMSPRO
CPT.10 PAR.10.2.2
CPT.10 PAR.10.2.4
C/O,C/OTR,MSTR,M True
CPT.10-F003/A
CPT.12-F003,
CPT.13
HSQE Ship
Manager Software C/O,C/OTR,MSTR,M False
Inspections/Audits
HSQE Ship
Manager Software C/O,C/OTR,MSTR,M False
Inspections/Audits
VIM
CPT.3 PAR.3.1.2
CPT.7 PAR.7.2.2.3
PMS
2.HULL/TANKS 2/ETR,CHENGTR,C/ETrue
GENERAL/WATER
VIM
BALLAST TANKS-
CPT.7 PAR.7.2.2.3
VOID SPACES-
CPT.3-F001
CARGO TANKS
PMS
2.HULL/TANKS 2/ETR,CHENGTR,C/ETrue
GENERAL/WATER
BALLAST TANKS-
VOID SPACES-
CARGO TANKS
VIM
CPT.3 PAR.3.1.2.4
MSTR,2/O,2/OT,3/OFalse
COM
CPT.2 PAR.2.2.10
VIM
CPT.3 PAR.3.1.2.4
COM
MSTR,2/O,2/OT,3/OTrue
CPT.2 PAR.2.2.10
Risk Assessment
14-04, 14-10
VIM
CPT.2 PAR.2.1
2/ETR,CHENGTR,C/EFalse
PMS
Unscheduled Jobs
PMS
2/ETR,CHENGTR,C/EFalse
Unscheduled Jobs
IMSPRO
CPT.20 PAR.20.3.2
2/ETR,CHENGTR,C/EFalse
VIM
CPT.1 PAR.1.1.3.1
IMSPRO
CPT.20 PAR.20.3.2
VIM
2/ETR,CHENGTR,C/EFalse
CPT.1 PAR.1.1.3.1
Vessels Filing
MAS-07
COM
CPT.7
CPT.7-F003
2/ETR,CHENGTR,C/ETrue
ENVM
CPT.4 PAR.4.2.12
CPT.9 PAR.9.2.1
BWMP
2/ETR,CHENGTR,C/EFalse
SECTION 11
BWMP
SECTION 12 2/ETR,CHENGTR,C/EFalse
SECTION 13
N/A 2/ETR,CHENGTR,C/EFalse
N/A 2/ETR,CHENGTR,C/EFalse
N/A 2/ETR,CHENGTR,C/EFalse
ENVM
CPT.3 PAR.3.1
CPT.3 PAR.3.2 2/ETR,CHENGTR,C/EFalse
Ship Specific
SEEMP I, II, III
Ship Specific
2/ETR,CHENGTR,C/EFalse
SEEMP I, II, III
Ship Specific
2/ETR,CHENGTR,C/EFalse
SEEMP I, II, III
IMSM
CPT.7 PAR.7.2.3
CPT.7 PAR.7.5
IMSPRO
CPT.1 PAR.1.2.9 2CK,2/ETR,2/O,2/O False
HSQE/ Ship
Manager Software
Electronic
Manuals
HSQE/ Ship
Manager Software
2CK,2/ETR,2/O,2/O False
Electronic
Manuals/HRM
ERM
CPT.2-APP.A 2CK,2/ETR,2/O,2/O True
DPA/CSO Poster
IMSPRO
CPT.13
CPT.16 PAR.16.2.5
2/ETR,CHENGTR,C/EFalse
HSQE/ Ship
Manager Software
Inspections/Audits
HSQE/ Ship
Manager Software 2/ETR,CHENGTR,C/EFalse
Inspections/Audits
HRM
CPT.2 PAR.2.2.5
2CK,2/ETR,2/O,2/O False
CPT.2 PAR.2.2.6
HRM
2CK,2/ETR,2/O,2/O True
CPT.2-APP.B
HRM
2CK,2/ETR,2/O,2/O True
CPT.2-APP.C
HRM
CPT.2 PAR.2.2.3
2CK,2/ETR,2/O,2/O False
IMSM
CPT.7 PAR.7.2.3
HRM
CPT.2 PAR.2.2.3
2CK,2/ETR,2/O,2/O False
IMSM
CPT.7 PAR.7.2.3
HRM
CPT.2 PAR.2.2.7.1-
2CK,2/ETR,2/O,2/O True
2
HRM
CPT.2-APP.C
CPT.2 PAR.2.2.2
NAVM
CPT.2 PAR.2.2.2
CPT.2 PAR.2.2.3
MSTR,MSTRTR,C/O,False
VIM
CPT.7 PAR.7.1.1.2
CPT.7 PAR.7.1.1.3
COM
OCIMF OFFICERS'
CPT.1 PAR.1.2.12
MATRIX
MSTR,C/O,C/OTR,M False
VESSEL'S CREW
LIST
HRM
MSTR,C/O,C/OTR,M True
CPT.2 APP.A
IMSPRO
CPT.10
MSTR,MSTRTR,C/O,C
True
PAR.10.2.5.1
CPT.10-F004
IMSPRO
CPT.10
2/O,2/OT,3/O,C/O, True
PAR.10.2.5.3
CPT.10-F004
IMSPRO
CPT.10
2/O,2/OT,3/O,C/O, True
PAR.10.2.5.1
CPT.10-F004A
IMSPRO
CPT.10 PAR.10.2.7 MSTR,2/O,2/OT,3/OTrue
CPT.10-F005
IMSPRO
CPT.10 PAR.10.2.6 MSTR,MSTRTR,C/O,C
True
CPT.10-F006
IMSPRO
CPT.10 2/ETR,CHENGTR,C/EFalse
PAR.10.2.14
N/A
2/ETR,CHENGTR,C/EFalse
TMSA 3.4.1
N/A
2/ETR,CHENGTR,C/EFalse
TMSA 3.4.1
HRM
CPT.2 PAR.2.2.5 2/O,2/OT,3/O,C/O, True
CPT.2 APP.C
HRM
2/O,2/OT,3/O,C/O, True
CPT.2-APP.C
HRM
2/O,2/OT,3/O,C/O, True
CPT.2 APP.C
HRM
2/O,2/OT,3/O,C/O, True
CPT.2 APP.C
HRM
CPT.3 PAR.3.2.1.4
2CK,2/ETR,2/O,2/O True
CPT.3-F001
CPT.3-F002
SOM
CPT.3
2CK,2/ETR,2/O,2/O False
IMSM
HRM
CPT.5 PAR.5.2.1 (J)
CPT.4 PAR.4.2.5.2
CPT.4 PAR.4.2.5.3
CPT.4 PAR.4.2.9
CPT.4-F003
2CK,2/ETR,2/O,2/O True
CPT.2-F011 to
F020
SSM
HRM
CPT.1 PAR.4.2.5.2
CPT.4 PAR.1.1, 1.2
CPT.1 PAR.4.2.5.3
CPT.4 PAR.1.2.7
CPT.4 PAR.4.2.9 2CK,2/ETR,2/O,2/O True
CPT.4-F003
CPT.2-F011 to
F020
HRM
CPT.4 PAR.4.2.5.2
SOLAS Training
2CK,2/ETR,2/O,2/O False
Manual
FireFighting
Booklet
HRM
CPT.2 APP.B
SOLAS Training
2CK,2/ETR,2/O,2/O True
Manual
FireFighting
Booklet
HRM
CPT.4 PAR.4.2.5.2
CPT.4 PAR.4.2.5.3
2/O,2/OT,3/O,C/O, True
NAVM
CPT.7 PAR.7.2.1
CPT.7-F001
HRM
CPT.4 PAR.4.2.5.2
CPT.4 PAR.4.2.5.3
2/O,2/OT,3/O,C/O, True
NAVM
CPT.7 PAR.7.2.1
CPT.7-F001
HRM
CPT.4 PAR.4.2.5.2
CPT.4 PAR.4.2.5.3
2/O,2/OT,3/O,C/O, True
NAVM
CPT.7 PAR.7.2.1
CPT.7-F001
HRM
2/O,2/OT,3/O,C/O, True
CPT.2 APP.C
HRM
CPT.4 PAR.4.2.5.2
CPT.4 PAR.4.2.5.3
2/O,2/OT,3/O,C/O, True
NAVM
CPT.7 PAR.7.2.1
CPT.7-F001
NAVM
CPT.3 PAR.3.2.1.5 MSTR,MSTRTR,C/O,C
False
CPT.7 PAR.7.2.2.1
NAVM
CPT.6 PAR.6.2.5 MSTR,2/O,2/OT,3/OFalse
CPT.7 PAR.7.2.3.6
NAVM
CPT.2 PAR.2.2.3.1
CPT.2 2/O,2/OT,3/O,C/O, False
PAR.2.2.16.2
CPT.3 PAR.3.2.1.5
PMS
4.OUTFITTING/
RADAR PLANTS/X-
S BAND RADAR 2/O,2/OT,3/O,C/O, False
At least one piece
as spare to be
available onboard
NAVM
CPT.6 PAR.6.2.22
MSTR,2/O,2/OT,3/OTrue
VIM
CPT.1-F028
NAVM
MSTR,2/O,2/OT,3/OFalse
CPT.6 PAR.6.2.22
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.22
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.22
The main
difference in
NAVM of data
terms
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.22
recording between
VDRs and
S(implified)-VDRs
is the range of
sensors and
systems from 2/O,2/OT,3/O,C/O, False
which data must
be recorded. VDRs
are required to
NAVM
record data from a
CPT.6 PAR.6.2.25
wider range of
Capital Gas 2/O,2/OT,3/O,C/O, True
sensors and
Posters
systems than S-
Poster 08
VDRs.
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.14
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.14
NAVM
CPT.6 PAR.6.2.4
MSTR,2/O,2/OT,3/OTrue
VIM
CPT.1-F028
NAVM
CPT.2 PAR.2.2.6-7 MSTR,C/O,2/O,2/OTFalse
CPT.6 PAR.6.2.4
NAVM
MSTR,2/O,2/OT,3/OFalse
CPT.5.2.1.1-3
NAVM
CPT.2 PAR.2.2.6-7
MSTR,2/O,2/OT,3/OFalse
CPT.6
PAR.6.2.20.2
NAVM
CPT.6 MSTR,2/O,2/OT,3/OFalse
PAR.6.2.20.2
NAVM
CPT.6 PAR.6.2.4 MSTR,2/O,2/OT,3/OFalse
CPT.6 PAR.6.2.4.1
NAVM
MSTR,2/O,2/OT,3/OFalse
CPT.2 PAR.2.2.11
PMS
4.OUTFITTING/
GYRO PLANT,
AUTO PILOT AND MSTR,2/O,2/OT,3/OFalse
COMPASSES/MAG
NETIC COMPASS
NO.1
NAVM
MSTR,2/O,2/OT,3/OFalse
CPT.6 PAR.6.2.4.1
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.4.1
NAVM
CPT.6 PAR.6.2.11
VIM MSTR,2/O,2/OT,3/OTrue
CPT.1-F027
CPT.1-F028
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.18
IMSPRO
2/O,2/OT,3/O,C/O, True
CPT.21-APP.B
NAVM
CPT.6 PAR.6.2.18
2/O,2/OT,3/O,C/O, False
Back side of Radio
Table (Item 114)
NAVM
CPT.6 PAR.6.2.19
NAVM
2/O,2/OT,3/O,C/O, True
CPT.2-F001
CPT.2 PAR.2.2.5
CPT.3-F003
CPT.3 PAR.3.2.1.3
CPT.3 PAR.3.2.1.5
CPT.6 PAR.6.2.10
Radar Log Book
Passage Plan MSTR,2/O,2/OT,3/OFalse
Navstation
PMS
4.OUTFITTING/
RADAR PLANTS/
NO.1/2 X/S BAND
NAVM
2/O,2/OT,3/O,C/O, False
RADAR/
CPT.6 SCANNER
PAR.6.2.10
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.10
NAVM
CPT.7 PAR.7.2.6.2 2/O,2/OT,3/O,C/O, False
CPT.7 PAR.7.2.6.3
PMS
4.OUTFITTING/
RADAR
2/O,2/OT,3/O,C/O, False
PLANTS/NO.1 X,
NO.2 S BAND
RADAR
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.10
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.10
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.10
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.10
NAVM
CPT.8
PAR.8.2.25.5 2/O,2/OT,3/O,C/O, False
Maker's Manual -
Alarm Zone
NAVM
CPT.6 PAR.6.2.10 2/O,2/OT,3/O,C/O, False
Maker's Manual
NAVM
CPT.6 PAR.6.2.10 2/O,2/OT,3/O,C/O, False
Maker's Manual
NAVM
CPT.3 PAR.3.2.1.3
2/O,2/OT,3/O,C/O, False
CPT.3 PAR.3.2.1.5
Maker's Manual
NAVM
CPT.5 PAR.5.2.1.3
MSTR,2/O,2/OT,3/OTrue
CPT.6 PAR.6.2.20
CPT.3-F010
NAVM
CPT.5
CPT.2-F001
2/O,2/OT,3/O,C/O, True
CPT.2-F002
CPT.3-F002
CPT.3-F003
NAVM
CPT.5 2/O,2/OT,3/O,C/O, False
CPT.5 PAR.5.2.2
NAVM
CPT.6 2/O,2/OT,3/O,C/O, False
PAR.6.2.20.1
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.29
NAVM
CPT.6 PAR.6.2.25
MSTR,2/O,2/OT,3/OTrue
VIM
CPT.1-F028
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.25
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.25
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.25
NAVM
MSTR,2/O,2/OT,3/OFalse
CPT.6 PAR.6.2.24
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.24
NAVM
MSTR,2/O,2/OT,3/OFalse
CPT.6 PAR.6.2.24
NAVM
MSTR,2/O,2/OT,3/OFalse
CPT.6 PAR.6.2.24
NAVM
MSTR,2/O,2/OT,3/OFalse
CPT.6 PAR.6.2.24
NAVM
CPT.6 PAR.6.2.24
MSTR,2/O,2/OT,3/OTrue
CPT.2-F001
CPT.3-F003
NAVM
CPT.6 PAR.6.2.24
Bridge Operating MSTR,2/O,2/OT,3/OFalse
Manual
CPT.2 PAR.2.4.9
NAVM
MSTR,2/O,2/OT,3/OFalse
CPT.6 PAR.6.2.24
NAVM
CPT.6 PAR.6.2.7
CPT.6 PAR.6.2.27
CPT.7 MSTR,2/O,2/OT,3/OTrue
PAR.7.2.5.2(14)
VIM
CPT.1-F028
NAVM
MSTR,2/O,2/OT,3/OFalse
CPT.6 PAR.6.2.7
NAVM
2/O,2/OT,3/O,C/O, False
CPT.7 PAR.7.2.4.3
NAVM
2/O,2/OT,3/O,C/O, False
CPT.7 PAR.7.2.9
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.7
NAVM
2/O,2/OT,3/O,C/O, False
CPT.7 PAR.7.2.9
PMS
4.OUTFITTING/
SATELITE
2/O,2/OT,3/O,C/O, False
LOGGING
EQUIPMENT/GPS
NO.1 & NO.2
NAVM
CPT.6 PAR.6.2.6
MSTR,2/O,2/OT,3/OTrue
VIM
CPT.1-F028
NAVM
CPT.2 PAR.2.2.3.2 2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.6
NAVM
CPT.2 PAR.2.2.3.2 2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.6
NAVM
CPT.2 PAR.2.2.3.2
CPT.6 PAR.6.2.6 2/O,2/OT,3/O,C/O, True
CPT.3-F002
CPT.3-F003
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.6
NAVM
CPT.6 PAR.6.2.6
2/O,2/OT,3/O,C/O, True
CPT.3-F002
CPT.3-F003
NAVM
CPT.6 PAR.6.2.28
2/O,2/OT,3/O,C/O, True
VIM
CPT.1-F028
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.28
NAVM
CPT.2 PAR.2.2.7 2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.28
NAVM
CPT.2-F001
CPT.3-F002
MSTR,2/O,2/OT,3/OTrue
CPT.3-F003
CPT.6 PAR.6.2.16
CPT.6 PAR.6.2.18
NAVM
CPT.2 PAR.2.2.3.2
2/O,2/OT,3/O,C/O, True
CPT.2-F001
CPT.6 PAR.6.2.16
NAVM
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.9
NAVM
CPT.3 PAR.3.2.1
CPT.3 PAR.3.2.7.4 MSTR,2/O,2/OT,3/OFalse
CPT.7 PAR.7.2.4.3
CPT.7 PAR.7.2.8-9
NAVM
CPT.1 PAR.1.2.3
CPT.3 PAR.3.2.4
CPT.3-F007 MSTR,2/O,2/OT,3/OTrue
UKC
CALCULATION IN
NAVSTATION
NAVM
CPT.2
MSTR,2/O,2/OT,3/OTrue
PAR.2.2.16.2
CPT.2-F007
NAVM
CPT.7 PAR.7.2.3
MSTR,2/O,2/OT,3/OFalse
CPT.7 PAR.7.2.3.5
CPT.7 PAR.7.2.9
NAVM
CPT.3 PAR.3.2.4.9
2/O,2/OT,3/O,C/O, False
CPT.3
PAR.3.2.4.10
NAVM
CPT.2
PAR.2.2.16.2
ERM 2/O,2/OT,3/O,C/O, True
CPT.5-APP.B
SCENARIO 39
(ECDIS FAILURE)
NAVM
CPT.7 2/O,2/OT,3/O,C/O, False
Maker's Manual
NAVM
2/O,2/OT,3/O,C/O, False
CPT.7 PAR.7.2.4.3
Maker's Manual 2/O,2/OT,3/O,C/O, False
NAVM
CPT.7 PAR.7.2.4.5- 2/O,2/OT,3/O,C/O, False
6
NAVM
CPT.7 PAR.7.2.3.5- 2/O,2/OT,3/O,C/O, False
9
NAVM
CPT.7 PAR.7.2.3.3- 2/O,2/OT,3/O,C/O, False
4
NAVM
2/O,2/OT,3/O,C/O, False
CPT.7 PAR.7.2.9
NAVM
2/O,2/OT,3/O,C/O, False
CPT.7 PAR.7.2.3.7
NAVM
CPT.3 PAR.3.2.1.5
CPT.7 PAR.7.2.8.1 2/O,2/OT,3/O,C/O, False
CPT.7 PAR.7.2.7.2-
4
NAVM
2/O,2/OT,3/O,C/O, False
CPT.3 PAR.3.2.1.5
NAVM
2/O,2/OT,3/O,C/O, False
CPT.7 PAR.7.2.4.2
NAVM
2/O,2/OT,3/O,C/O, False
CPT.7 PAR.7.2.2.3
NAVM
CPT.7 PAR.7.2.4.7- 2/O,2/OT,3/O,C/O, False
8
NAVM
2/O,2/OT,3/O,C/O, False
CPT.7 PAR.7.2.7.5
NAVM
CPT.3 PAR.3.2.4.4-
2/O,2/OT,3/O,C/O, False
5
CPT.6 PAR.6.2.6
NAVM
CPT.3
PAR.3.2.4.10
2/O,2/OT,3/O,C/O, False
CPT.7 PAR.7.2.5.2
CPT.7 PAR.7.2.7.4
Maker's Manual
NAVM
2/O,2/OT,3/O,C/O, False
CPT.7 PAR.7.2.7.2
NAVM
CPT.2 PAR.2.2.7
2/O,2/OT,3/O,C/O, False
CPT.6 PAR.6.2.4.1-
2
Maker's Manual -
ECDIS
2/O,2/OT,3/O,C/O, False
Alert Management
System
NAVM
CPT.6 PAR.6.2.24
Maker's Manual -
2/O,2/OT,3/O,C/O, False
ECDIS
Alert Management
System
NAVM
CPT.3 PAR.3.2.1.5
CPT.3 PAR.3.2.2
CPT.3-F002 MSTR,2/O,2/OT,3/OTrue
CPT.3-F003
CPT.3-F010
CPT.4-F002
NAVM
CPT.3 PAR.3.2.3
CPT.3-F001
MSTR,2/O,2/OT,3/OTrue
IMSPRO
CPT.2 PAR.2.2.8
CPT.2 PAR.2.2.9
NAVM
CPT.2 PAR.2.2.1.2
CPT.3 PAR.3.2.7.2
MSTR,2/O,2/OT,3/OTrue
CPT.3-F007
CPT.3-F008
CPT.3-F009
NAVM
CPT.1 PAR.1.2.4
MSTR,2/O,2/OT,3/OFalse
CPT.2
PAR.2.2.16.2(21)
VIM
CPT.1 PAR.1.2.5
CPT.1-F027 MSTR,2/O,2/OT,3/OTrue
SOLAS TRAINING
MANUAL
VIM
CPT.1 PAR.1.2.5
CPT.1-F027 MSTR,2/O,2/OT,3/OTrue
SOLAS TRAINING
MANUAL
VIM
CPT.1 PAR.1.2.5
MSTR,2/ETR,2/O,2/ False
SOLAS TRAINING
MANUAL
ERM
CPT.5 PAR.5.2.3.2 MSTR,2/O,2/OT,3/OFalse
CPT.5 PAR.5.2.3.3
NAVM
CPT.1 PAR.1.2.2.6
CPT.2 PAR.2.2.21
CPT.2 PAR.2.2.22
CPT.6 PAR.6.2.11
MSTR,2/O,2/OT,3/OTrue
VIM
CPT.7 PAR.7.5.1.2
CPT.1-F026
CPT.1-F027
CPT.1-F028
VIM
CPT.7 PAR.7.5.1.2 2/O,2/OT,3/O,C/O, True
CPT.1-F028
VIM
CPT.7 PAR.7.5.1.2 2/O,2/OT,3/O,C/O, True
CPT.1-F028
NAVM
CPT.6
MSTR,2/O,2/OT,3/OTrue
PAR.6.2.11.1
CPT.2-F002
Shore Based
Maintenance 2/O,2/OT,3/O,C/O, False
Agreement
NAVM
CPT.6 MSTR,2/O,2/OT,3/OFalse
PAR.6.2.11.2-4
ERM
CPT.7 PAR.7.2.3 MSTR,2/ETR,2/O,2/ True
CPT.7-APP.B
ERM
CPT.5 APP.B
CPT.7 PAR.7.2.2 MSTR,2/ETR,2/O,2/ True
CPT.7-F003
CPT.7-F004
ERM
CPT.5 APP.B
CPT.7 PAR.7.2.2 MSTR,2/ETR,2/O,2/ True
CPT.7-F003
CPT.7-F004
ERM
CPT.5 APP.B
CPT.7 PAR.7.2.2 MSTR,2/ETR,2/O,2/ True
CPT.7-F003
CPT.7-F004
ERM
CPT.5 APP.B
CPT.7 MSTR,2/ETR,2/O,2/ True
CPT.7-F003
CPT.7-F004
ERM
CPT.5 APP.B
CPT.7 PAR.7.2.2 MSTR,2/ETR,2/O,2/ True
CPT.7-F003
CPT.7-F004
ERM
CPT.5 APP.B
CPT.7 MSTR,2CK,2/ETR,2/True
CPT.7-F003
CPT.7-F004
ERM
CPT.5 APP.B
CPT.7 PAR.7.2.2 MSTR,2/ETR,2/O,2/ True
CPT.7-F003
CPT.7-F004
ERM
CPT.5 APP.B
CPT.7 PAR.7.2.2 MSTR,2/ETR,2/O,2/ True
CPT.7-F003
CPT.7-F004
ERM
CPT.5 APP.B
CPT.7 MSTR,2/ETR,2/O,2/ True
SOPEP/SMPEP
Manuals
ERM
CPT.5 APP.B
CPT.7 PAR.7.2.2 MSTR,2/ETR,2/O,2/ True
CPT.7-F003
CPT.7-F004
ERM
CPT.5 APP.B
CPT.7 MSTR,2CK,2/ETR,2/True
CPT.7-F003
CPT.7-F004
ERM
CPT.5 APP.B
CPT.7 MSTR,2/ETR,2/O,2/ True
CPT.7-F003
CPT.7-F004
ERM
CPT.5 APP.B
CPT.7 MSTR,2/ETR,2/O,2/ True
CPT.7-F003
CPT.7-F004
ERM
CPT.5 APP.B
CPT.7 MSTR,2/ETR,2/O,2/ True
CPT.7-F003
CPT.7-F004
SSM
MSTR,2/O,2/OT,3/OFalse
CPT.6 PAR.6.2.2.5
SSM
CPT.6 PAR.6.2.2.2 MSTR,2/O,2/OT,3/OFalse
CPT.6 PAR.6.2.2.3
SSM
MSTR,2/O,2/OT,3/OFalse
CPT.6 PAR.6.2.2
SSM
CPT.5
MSTR,2/ETR,2/O,2/ True
PAR.5.2.15.5-7
CPT.5-F020
SOM
CPT.8
CPT.8-F001 MSTR,2/ETR,2/O,2/ True
ERM
CPT.7
SSM
CPT.2 PAR.2.2.4 MSTR,2/ETR,2/O,2/ False
CPT.6 PAR.6.2.5.4
SOM
CPT.7 PAR.7.2.6
MSTR,2/ETR,2/O,2/ False
COM
CPT.2 PAR.2.2.4
SSM
CPT.6 PAR.6.2.2.2-
3
PMS MSTR,2/ETR,2/O,2/ False
5.ACCOMMODATI
ON/GANGWAYS/
WALKWAYS
SSM
CPT.6 PAR.6.2.2.3 MSTR,2/ETR,2/O,2/ False
CPT.6 PAR.6.2.2.6
COM
CPT.1 PAR.1.2.9
SSM
2/ETR,2/O,2/OT,3/ False
CPT.4 PAR.4.2.2.3
CPT.4
PAR.4.2.2.17
VIM
CPT.7 PAR.7.7
PMS MSTR,2CK,2/ETR,2/False
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
PMS MSTR,2CK,2/ETR,2/False
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
PMS MSTR,2CK,2/ETR,2/False
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
PMS MSTR,2CK,2/ETR,2/False
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
SSM
CPT.4
MSTR,2CK,2/ETR,2/False
PAR.4.2.2.17(b)
PMS
VIM
Fire
CPT.7Fighting
PAR.7.7
Booklet
PMS
8.AUXILARY
SYSTEMS/LOOSE MSTR,2CK,2/ETR,2/False
FIRE FIGHTING
VIM
EQUIPMENT
CPT.1 PAR.1.2.7
Fire Fighting
CPT.1-F039
Booklet
CPT.7
PAR.7.12.1.1.1
MSTR,2CK,2/ETR,2/True
PMS
8.AUXILARY
SYSTEMS/FIRE
SYSTEM/FIRE
HOSES
Fire Safety Plan
Fire Fighting MSTR,2CK,2/ETR,2/False
Booklet
VIM
CPT.7 PAR.7.7
ERM
CPT.7 PAR.7.2 MSTR,2/ETR,2/O,2/ False
PMS
SOLAS Training
VIM
Manual
CPT.7 PAR.7.7
ERM
CPT.7 PAR.7.2 MSTR,2/ETR,2/O,2/ False
PMS
SOLAS Training
VIM
Manual
CPT.7 PAR.7.7
ERM
CPT.7 PAR.7.2 MSTR,2/ETR,2/O,2/ False
PMS
SOLAS Training
Manual
VIM
CPT.7 PAR.7.7
PMS MSTR,2/ETR,2/O,2/ False
SOLAS Training
Manual
VIM
CPT.7 PAR.7.7
PMS MSTR,2/ETR,2/O,2/ False
SOLAS Training
Manual
SSM
CPT.4
PAR.4.2.2.14
VIM
MSTR,2/ETR,2/O,2/ False
CPT.7 PAR.7.7
PMS
SOLAS Training
Manual
VIM
CPT.7 PAR.7.7
PMS MSTR,2CK,2/ETR,2/False
SOLAS Training
Manual
SSM
CPT.4
PAR.4.2.2.15
VIM
VIM MSTR,2CK,2/ETR,2/False
CPT.7 PAR.7.7
CPT.7 PAR.7.7
PMS
COM
SOLAS Training
CPT.1-F011
Manual
PMS
8.AUXILARY
MSTR,2/ETR,2/O,2/ True
SYSTEMS/ELECTRI
CAL
ERM
LIGHTING/EMERGE
CPT.7
NCY LIGHT
HSQE Software
SOLAS Training
Drills/Drill
Manual MSTR,2/ETR,2/O,2/ False
Schedule-Records
VIM
SOLAS/Fire
CPT.1-F007
Fighting Training
CPT.1-F008
Manual
CPT.1-F009
CPT.1-F010
MSTR,2/ETR,2/O,2/ True
CPT.1-F015
CPT.1-F016
CPT.1-F017
CPT.1-F018
VIM
CPT.1-F033
CPT.1-F010
CPT.1-F015 MSTR,2/ETR,2/O,2/ True
CPT.1-F017
CPT.1-F018
Fire Safety Plan MSTR,2/ETR,2/O,2/ False
SSM
CPT.5 PAR.5.2.4 MSTR,2CK,2/ETR,2/True
CPT.5-F005
SSM
CPT.5 PAR.5.2.3
MSTR,2CK,2/ETR,2/True
CPT.5-F001
CPT.5-F002
SSM
CPT.4 APP.A
MSTR,2CK,2/ETR,2/True
CPT.5 PAR.5.2.6
CPT.5-F003
SSM
CPT.4 APP.A
MSTR,2CK,2/ETR,2/True
CPT.5 PAR.5.2.6
CPT.5-F003
SSM
CPT.4 APP.A
MSTR,2/ETR,2/O,2/ True
CPT.5 PAR.5.2.5
CPT.5-F003
SSM
CPT.5 PAR.5.2.13
MSTR,2/ETR,2/O,2/ True
CPT.5-F018
CPT.5-F019
IMSPRO
CPT.17
VIM
MSTR,2/ETR,2/O,2/ True
CPT.7 PAR.7.14
SSM
CPT.5-F023
COM
CPT.1 PAR.1.2.8.6
MSTR,2/ETR,2/O,2/ False
"Fixed Gas
Detection System"
IMSPRO
MSTR,2/ETR,2/O,2/ False
CPT.14 PAR.14.2.6
IMSPRO
CPT.14
PAR.14.2.3-6
CPT.14-F001
MSTR,2CK,2/ETR,2/True
HSQE/Ship
Manager
Software/ Vessel
IMSPRO
Events
CPT.12
PAR.12.2.1.1
MSTR,2CK,2/ETR,2/True
SSM
CPT.3 PAR.3.2.1
CPT.3-F001
SSM
CPT.3 PAR.3.2.2 MSTR,2CK,2/ETR,2/True
CPT.3-F002
SSM
MSTR,2CK,2/ETR,2/False
CPT.1 PAR.1.2.4
IMSPRO
CPT.21 MSTR,2CK,2/ETR,2/True
CPT.21-F001
SSM
CPT.12
MSTR,2CK,2/ETR,2/False
COM
CPT.5
SOM
MSTR,2CK,2/ETR,2/False
CPT.10
SSM
CPT.2 PAR.2.2.2.3 MSTR,2/ETR,2/O,2/ True
CPT.2-F002
SSM
CPT.2 PAR.2.2.2.3 MSTR,2CK,2/ETR,2/True
CPT.2-F003
SSM
CPT.2 PAR.2.2.2.3 MSTR,2CK,2/ETR,2/True
CPT.2-F003
SSM
CPT.2 PAR.2.2.2.3 MSTR,2CK,2/ETR,2/True
CPT.2-F002
SSM
CPT.2 PAR.2.2.2.3 MSTR,2CK,2/ETR,2/True
CPT.2-F002
SSM
CPT.2 PAR.2.2.2.3 MSTR,2CK,2/ETR,2/True
CPT.2-F003
VIM
MSTR,2CK,2/ETR,2/False
CPT.7 PAR.7.13.1
SSM
MSTR,2CK,2/ETR,2/False
CPT.5 PAR.5.2.1
SSM
MSTR,2CK,2/ETR,2/False
CPT.5
SSM
CPT.5
MSTR,2CK,2/ETR,2/True
CPT.5-F002-005
CPT.5-F020
SSM
CPT.5
MSTR,2CK,2/ETR,2/True
CPT.5-F002-005
CPT.5-F020
VIM
2/ETR,2/O,2/OT,3/ False
CPT.1 PAR.1.2.7
COM
CPT.7 PAR.7.2.3-5
ENVM
CPT.9 PAR.9.2.1 2/ETR,2/O,2/OT,3/ False
Ballast Water
Management Plan
Appendix 2 Par.2
SOPEP
Manual
2CK,2/ETR,2/O,2/O True
VIM
CPT.1-F008
ENVM
CPT.5 PAR.5.2.3
2CK,2/ETR,2/O,2/O False
VIM
CPT.7 PAR.7.10
ENVM
CPT.5 PAR.5.2.3
ERM
CPT.5 APP.A SC.6
2/ETR,2/O,2/OT,3/ True
VIM
CPT.7
PAR.7.1.1.6.6
CPT.7 PAR.7.10
ENVM
CPT.5 PAR.5.2.3.1 2/ETR,2/O,2/OT,3/ False
CPT.5 PAR.5.2.5.5
ENVM
2/ETR,2/O,2/OT,3/ False
CPT.5 PAR.5.2.3.4
ENVM
2/ETR,2/O,2/OT,3/ False
CPT.9 PAR.9.2.6.1
ENVM
2/ETR,2/O,2/OT,3/ False
CPT.5 PAR.5.2.3.2
HRM
CPT.4 PAR.4.2.5.2
CPT.4 PAR.4.2.5.3
CPT.4 PAR.4.2.9
CPT.4-F003
2CK,2/ETR,2/O,2/O True
CPT.2-F011 to
F020
SSM
CPT.1 PAR.1.1, 1.2
CPT.1 PAR.1.2.7
Ship Security Plan
2CK,2/ETR,2/O,2/O False
ISPS-06
Ship Security Plan
2CK,2/ETR,2/O,2/O False
ISPS-06
NAVTOR PASSAGE
PLAN THROUGH
MSTR,MSTRTR,C/O,C False
PLANNING
STATION/ECDIS
Risk Assessment
Filing
MAS-07
RA-13-02
2/O,2/OT,3/O,C/O, True
RA-13-03
Ship Security Plan
Appendices
Hardening Plan
NAVM
CPT.3 PAR.3.2.1.2
MSTR,MSTRTR,C/O,False
Passage Plan
Ship Security Plan
Vessel's
Hardening Plan
PMS
2/ETR,2/O,2/OT,3/ False
5.ACCOMMODATI
ON/SHIP SECURITY
EQUIPMENT
SOM
CPT.9 PAR.9.2.8
SSM
CPT.6 PAR.6.2.2 2CK,2/ETR,2/O,2/O True
HRM
CPT.4-F003
Ship Security Plan
NAVM
CPT.3 PAR.3.2.1.2
Ship Security Plan 2/ETR,2/O,2/OT,3/ True
Capital Gas Poster
HRM
#56 PAR.4.2.5.3
CPT.4
CPT.4 PAR.4.2.5.6
CPT.2 APP.B
NAVM
2/ETR,2/O,2/OT,3/ True
CPT.2 PAR.2.2.2.1
CPT.2 PAR.2.2.3.4
ERM
Ship Security Plan
CPT.2
Cyber Security
CPT.5 APP.B (43)
Manual
IMSPRO
2/ETR,2/O,2/OT,3/ True
CPT.20 PAR.20.2.1
CPT.21 PAR.21.9
Cyber Security
Manual
Cyber Security
Manual
2CK,2/ETR,2/O,2/O False
through HSQE
Software
Cyber Security
Manual
CPT.5 2CK,2/ETR,2/O,2/O True
PAR.5.2.14.1
CPT.5-F001
Cyber Security
Manual
2CK,2/ETR,2/O,2/O True
CPT.4-APP.A
CPT.7 PAR.7.2.2
Cyber Security
Manual 2/ETR,2/O,2/OT,3/ True
CPT.4-APP.A
Cyber Security
Manual
CPT.1 PAR.1.2.3
2/ETR,2/O,2/OT,3/ True
CPT.5
PAR.5.2.14.1
CPT.5-F001
Cyber Security
Manual 2/ETR,2/O,2/OT,3/ False
CPT.7 PAR.7.2.2
HSQE Software
Drills/Cyber 2CK,2/ETR,2/O,2/O False
Threat
Cyber Security
Manual 2CK,2/ETR,2/O,2/O False
CPT.2 PAR.2.2.4
Risk Assessment
Filing 2/ETR,2/O,2/OT,3/ False
MAS-07
Cyber Security
Manual
CPT.5
PAR.5.2.14.1
2CK,2/ETR,2/O,2/O False
CPT.5
PAR.5.2.15.1
CPT.7 PAR.7.2.2
HSQE Software
CPT.7 PAR.7.2.12
Electronic
Manuals/Documen
2CK,2/ETR,2/O,2/O False
ts
(Circulars,
Bulletins)
COM
CPT.1 PAR.1.2.11
CPT.1-F011 2/ETR,2/O,2/OT,3/ True
IMSPRO
CPT.17 PAR.17.2.1
COM
CPT.1-F011
Cargo Operational 2/ETR,2/O,2/OT,3/ True
Manual
CPT.4 PAR.4.16
VIM
CPT.1 2/ETR,2/O,2/OT,3/ False
PMS
ERM
CPT.5 APP.B
Cargo Operational 2/ETR,2/O,2/OT,3/ True
Manual
CPT.7
COM
CPT.2 PAR.2.2.2
CPT.2 PAR.2.2.9
2/ETR,2/O,2/OT,3/ True
CPT.3 PAR.3.2.2
Cargo Operational
CPT.4 PAR.4.2.8
Manual
CPT.1-F011
CPT.4 PAR.14
PMS
2.HULL/TANKS
MSTR,2/ETR,2/O,2/ False
GENERAL/CARGO
TANKS/CARGO
TANK/IBS-IS
RELIEF VALVE
COM
No.1-2
CPT.1 PAR.1.2.2
MSTR,2/ETR,2/O,2/ False
Cargo Operational
Manual
Cargo Operational
Manual MSTR,2/ETR,2/O,2/ False
CPT.5 PAR.5.2
Cargo Operational
Manual
COM MSTR,2/ETR,2/O,2/ False
CPT.3 PAR.3.2
CPT.1 PAR.1.2.8
CPT.4 PAR.4.10.2
CPT.2 PAR.2.2.2-3
CPT.2 PAR.2.2.7.1-
3
CPT.3 PAR.3.2.2-3
MSTR,2/ETR,2/O,2/ False
CPT.3 PAR.3.2.6.1-
3
Cargo
COM Operational
ManualPAR.1.2.8.3-
CPT.1
CPT.4 PAR.4.1.3
4
CPT.6 PAR.5.2.3.9
CPT.5 PAR.6.5.6 MSTR,2/ETR,2/O,2/ False
Cargo Operational
Manual
CPT.4 PAR.4.1
Cargo Operational
Manual MSTR,2/ETR,2/O,2/ False
CPT.7
PMS
3.CARGO
EQUIPMENT/
CARGO TANK MSTR,2/ETR,2/O,2/ False
PRESSURE
CONTROL/
CARGO LINES
SSM
CPT.4
Cargo Operational
MSTR,2/ETR,2/O,2/ False
Manual
CPT.8 PAR.8.9
CPT.8 PAR.8.10
Cargo Operational
Manual
COM MSTR,2/ETR,2/O,2/ False
CPT.2 PAR.4.2.4
CPT.4 PAR.2.3.2
PMS
3.CARGO
COM
EQUIPMENT/
CPT.3 PAR.3.2.6
CARGO HANDLING
Cargo Operational MSTR,2/ETR,2/O,2/ False
SYSTEMS/
Manual
RELIQUEFACTION
CPT.4 PAR.4.5-7
PLANT
PMS
Cargo Operational
3.CARGO
Manual
EQUIPMENT/
CPT.4 PAR.4.15 MSTR,2/ETR,2/O,2/ False
CARGO HANDLING
SYSTEMS/
VAPORIZERS &
HEATERS
COM
ERM
7.MACHINERY
CPT.2
CPT.5 PAR.2.2.8-9
APP.B
SYSTEMS/
Cargo Operational
COM MSTR,2/ETR,2/O,2/ False
CONDENSATE
Manual
CPT.2 PAR.2.2.2
SYSTEM
CPT.4
CPT.3 PAR.4.10.2
PAR.3.2.2
CPT.4 PAR.4.2.3
Cargo Operational
Manual
MSTR,2/ETR,2/O,2/ True
CPT.7 PAR.7.9
PMS
3.CARGO
EQUIPMENT/
ERM
CARGOAPP.B
CPT.5 TANK
PRESSURE
Cargo Operational MSTR,2/ETR,2/O,2/ True
CONTROL/
Manual
VENT
CPT.7 MASTS
COM
CPT.1-F003
Cargo Operational
CPT.1-F011
Manual
CPT.3 PAR.3.2.2
CPT.4 PAR.14
CPT.3 PAR.3.2.11- MSTR,2/ETR,2/O,2/ True
PMS
12
2.HULL/ TANKS
Cargo Operational
GENERAL/ CARGO
Manual
TANKS/ IBS RELIEF
CPT.4 PAR.4.3
VALVES
3.CARGO MSTR,2/ETR,2/O,2/ False
EQUIPMENT/
COM
CARGO TANK
CPT.1-F011
PRESSURE
CPT.2 PAR.2.2.2
CONTROL/
CPT.3 PAR.3.2.2
CARGO TANK
Cargo Operational MSTR,2/ETR,2/O,2/ True
RELIEF VALVES &
Manual
COM
CARGO PIPING
CPT.3 PAR.1.2.7.1
CPT.1 PAR.3.3
RELIEF VALVES
CPT.4 PAR.2.2.2
CPT.2
COM PAR.4.2
CPT.4 PAR.1.2.10
CPT.3
CPT.1 PAR.4.12
PAR.3.2.2
CPT.1-F011
CPT.1 PAR.1.2.12
MSTR,2/ETR,2/O,2/ True
CPT.2-F002
CPT.2 PAR.2.2.6
CPT.3-F002
CPT.2-F003
Cargo PAR.6.2.1-2
CPT.6 Operational
Manual
CPT.6-F001
CPT.4 PAR.13
CPT.6-F002
Cargo Operational
COM MSTR,2/ETR,2/O,2/ True
ManualPAR.6.2.1
CPT.6
PAR.6.2.2-4
CPT.6 PAR.6.2.2
CPT.6 PAR.6.3.2
IMSPRO
CPT.6 PAR.6.5.2-3
CPT.17
CPT.6 PAR.6.6.1
PAR.17.2.8.3
MSTR,2/ETR,2/O,2/ False
CPT.6 PAR.6.7.3
Cargo Operational
CPT.6 PAR.6.8.2
Manual
CPT.6 PAR.4.9
CPT.4 PAR.6.8.5
CPT.6 PAR.6.1
CPT.6 PAR.6.2.2
Cargo Operational
CPT.6 PAR.6.8.4
Manual MSTR,2/ETR,2/O,2/ False
CPT.4 PAR.4.9
VIM
CPT.3 PAR.3.1.2.3
CPT.3 PAR.3.1.2.4
PMS
2.HULL/TANKS
MSTR,2/ETR,2/O,2/ False
GENERAL/WATER
COM
BALLAST TANKS
CPT.2
2.HULL/TANKS
CPT.2-F002
GENERAL/VOID
CPT.3-F002
SPACES
CPT.3
MSTR,2/ETR,2/O,2/ True
CPT.7
Cargo Operational
Manual
CPT.6 PAR.6.3
COM
CPT.6 PAR.6.5
CPT.1-F011
MSTR,2/ETR,2/O,2/ True
CPT.2 PAR.2.2.2
CPT.3 PAR.3.2.2
COM
CPT.1-F011
MSTR,2/ETR,2/O,2/ True
CPT.2 PAR.2.2.2
CPT.3 PAR.3.2.2
Cargo Pumps
specification/instr MSTR,2/ETR,2/O,2/ False
uction manual
COM
CPT.1-F011 MSTR,2/ETR,2/O,2/ True
CPT.3-F002
Cargo Operational
Manual
MSTR,2/ETR,2/O,2/ False
CPT.4 PAR.4.3
CPT.5 PAR.5.7
COM
CPT.1 PAR.1.2.6 MSTR,2/ETR,2/O,2/ True
CPT.1-F001
COM
CPT.1 PAR.1.2.9-
13 MSTR,2/ETR,2/O,2/ True
CPT.1-F001
CPT.1-F002
COM
MSTR,2/ETR,2/O,2/ False
CPT.7 PAR.7.2.1.2
COM
MSTR,2/ETR,2/O,2/ False
CPT.1 PAR.1.2.10
Cargo Operational
Manual/
MSTR,2/ETR,2/O,2/ False
Ship Specific
Plans/Manuals
COM
CPT.1-F011
CPT.2 PAR.2.2.2
COM PAR.3.2.2
CPT.3
CPT.2-F002
PMS MSTR,2/ETR,2/O,2/ True
CPT.1-F011
3.CARGO
EQUIPMENT/CARG
COM
O HYDRAULIC
CPT.1-F011
SYSTEM/CARGO
CPT.2 PAR.2.2.2
VALVEPAR.3.2.2
CPT.3 HYDRAULIC
MSTR,2/ETR,2/O,2/ True
UNIT/CARGO
PMS
VALVE REMOTE
3.CARGO
CONTROL SYSTEM
EQUIPMENT/
8.AUXILIARY
CARGO
SYSTEMS/SPECIAL
MONITORING/
COM
COMMON
CARGO TANK MSTR,2/ETR,2/O,2/ True
CPT.1-F011
HYDRAULIC
RADAR OIL
GAUGES,
CPT.2 PAR.2.2.2
SYSTEM/BALLAST
CARGO TANK
CPT.3 PAR.3.2.2
VALVE HYDRAULIC
TEMPERATURE
CPT.3 PAR.3.2.10
SYSTEM
GAUGES,
Cargo Operational
CARGO TANK
Manual MSTR,2/O,2/OT,3/OTrue
PRESSURE
COM
CPT.5 PAR.5.4
GAUGES
CPT.2 &
PAR.2.2.12
PMS
FLOATPAR.4.2.6
CPT.4 LEVEL
4.OUTFITTING/
GAUGES
Cargo Operational
LOADING /
Manual
STABILITY
CPT.7 MSTR,2/O,2/OT,3/OFalse
COMPUTER
VESSEL'S
DRAWING
Calculation of
COM
Filling PAR.5.2.3.7-
CPT.5 Limit of
Cargo Tanks
11
MSTR,2/ETR,2/O,2/ False
Company's
Vessels do not
carry Cargo Hoses
COM
MSTR,2/ETR,2/O,2/ True
CPT.1-F001
NAVM
CPT.9
PAR.9.2.8.15
VIM
CPT.1 PAR.1.2.4.3
MSLMS Plan
MSTR,MSTRTR,C/O,C
False
CPT.4
NAVM SEC.2 PAR.5
PMS PAR.9.2.4
CPT.9
CERTIFICATES/
CPT.9
ANNUAL BRAKE
PAR.9.2.8.11
HOLDING
CPT.9
CAPACITY TEST
PAR.9.2.8.12 MSTR,2/O,2/OT,3/OTrue
COM
CPT.1-F001
NAVM
CPT.2-F002
CPT.9 PAR.9.2.8
CPT.3-F002
CPT.9 PAR.9.2.8.2
MSLMS Plan
VIM MSTR,2/O,2/OT,3/OFalse
CPT.1 PAR.1.2.4.4-
6
MSLMS Plan
NAVM
CPT.9 PAR.9.2.8.1
VIM
MSTR,2/O,2/OT,3/OFalse
CPT.1 PAR.1.2.4.4
CPT.1 PAR.1.2.4.6
MSLMS Plan
VIM
CPT.1 PAR.1.2.4.5
MSTR,2/O,2/OT,3/OFalse
Emergency
Towing Booklet
SSM
CPT.3-F002
Risk Assessments MSTR,2/O,2/OT,3/OTrue
Library
RA.09-01
SSM
CPT.3-F002
Risk Assessments MSTR,2/O,2/OT,3/OTrue
Library
RA.09-01
NAVM
CPT.9
PAR.9.2.8.15
VIM MSTR,2/O,2/OT,3/OFalse
CPT.1 PAR.1.2.4.3
MSLMS Plan
CPT.4 SEC.2 PAR.5
SSM
CPT.3-F002
Risk Assessments MSTR,2/O,2/OT,3/OTrue
Library
RA.09-01
SSM
CPT.3-F002
Risk Assessments MSTR,2/O,2/OT,3/OTrue
Library
RA.09-01
NAVM
CPT.8 PAR.8.2.3
CPT.8 PAR.8.2.5 MSTR,2/O,2/OT,3/OTrue
CPT.8 PAR.8.2.17
CPT.2-F004
NAVM
CPT.8 PAR.8.2.17
Risk Assessments MSTR,2/O,2/OT,3/OTrue
Library
RA.01-01
NAVM
CPT.8 PAR.8.2.17
CPT.8 PAR.8.2.19-
20 MSTR,2/O,2/OT,3/OTrue
Risk Assessments
Library
RA.01-01
NAVM
CPT.8 PAR.8.2.17
CPT.8.2.20
MSTR,2/O,2/OT,3/OTrue
Risk Assessments
Library
RA.01-01
NAVM
CPT.8 PAR.8.2.17
CPT.8 PAR.8.2.19
MSTR,2/O,2/OT,3/OTrue
Risk Assessments
Library
RA.01-01
NAVM
CPT.8 PAR.8.2.17
Risk Assessments MSTR,2/O,2/OT,3/OTrue
Library
RA.01-01
NAVM
CPT.8 PAR.8.2.18
Risk Assessments MSTR,2/O,2/OT,3/OTrue
Ship Specific
Library
Manuals
RA.01-01
MSMP Manual
CPT.2 PAR.2.9
Bridge Operating
Manual MSTR,2/O,2/OT,3/OFalse
1.1.2 PRINCIPAL
PARTICULARS OF
MACHINERY &
DECK
NAVM
EQUIPMENT
CPT.8 PAR.8.2.17
MSTR,2/O,2/OT,3/OTrue
CPT.8-F004
CPT.8-F005
NAVM
CPT.8 PAR.8.2.3
CPT.8 PAR.8.2.5
MSTR,2/O,2/OT,3/OFalse
CPT.9 PAR.9.2.8.2
CPT.9 PAR.9.2.8.3
MSLMS Plan
NAVM
CPT.9 PAR.9.2.5
CPT.9 PAR.9.2.6
MSTR,2/O,2/OT,3/OTrue
CPT.9 PAR.9.2.8.7
SSM
CPT.4 APP.A
NAVM
CPT.9 PAR.9.2.4
CPT.9 PAR.9.2.8.5-
MSTR,2/O,2/OT,3/OFalse
6
CPT.9 PAR.9.2.8.8-
11
NAVM
CPT.9 PAR.9.2.4
CPT.9 PAR.9.2.8.5-
MSTR,2/O,2/OT,3/OFalse
6
CPT.9 PAR.9.2.8.8-
11
NAVM
CPT.9 PAR.9.2.4
CPT.9 PAR.9.2.8.5-
MSTR,2/O,2/OT,3/OFalse
6
CPT.9 PAR.9.2.8.8-
11
NAVM
CPT.9 PAR.9.2.4
CPT.9 PAR.9.2.8.5-
MSTR,2/O,2/OT,3/OFalse
6
CPT.9 PAR.9.2.8.8-
11
NAVM
CPT.9 PAR.9.2.4
CPT.9 PAR.9.2.8.5-
MSTR,2/O,2/OT,3/OFalse
6
CPT.9 PAR.9.2.8.8-
11
NAVM
CPT.2-F002
MSTR,2/O,2/OT,3/OTrue
CPT.2-F004
CPT.2-F005
NAVM
CPT.2-F002
MSTR,2/O,2/OT,3/OTrue
CPT.2-F004
CPT.2-F005
NAVM
CPT.9 PAR.9.2.3 MSTR,2/O,2/OT,3/OFalse
CPT.9 PAR.9.2.5
NAVM
CPT.9
PAR.9.2.8.12
COM
MSTR,2/O,2/OT,3/OTrue
CPT.5
CPT.5-F001 to
F007
STS Manual
COM
CPT.5 PAR.5.2.2
CPT.5-F001 to MSTR,2/O,2/OT,3/OTrue
F007
STS Manual
COM
PAR.5.2.1.9
CPT.5 PAR.5.2.2.3
CPT.5-F001
CPT.5 to
PAR.5.2.2.6 MSTR,2/O,2/OT,3/OTrue
F007 PAR.5.2.3.8
CPT.5
STS Manual
CPT.5-F003
CPT.5-F006
NAVM
CPT.9
MSTR,2/O,2/OT,3/OTrue
PAR.9.2.8.12
STS Manual
CPT.6
COM
CPT.8
CPT.5 PAR.5.2.2.3
Ship Specific
CPT.5 PAR.5.2.2.6
MSMP manual MSTR,2/O,2/OT,3/OTrue
CPT.5 PAR.5.2.3.8
CPT.5 PAR.5.5.4
CPT.5-F003
CPT.5 PAR.5.5.6
COM
CPT.5-F006
CPT.5 PAR.5.2.2.3
CPT.5 PAR.5.2.2.6
CPT.5 PAR.5.2.3.8
MSTR,2/O,2/OT,3/OTrue
CPT.5-F001-F007
STS Manual
COM
CPT.6
CPT.5 PAR.5.2.2.3
CPT.8
NAVM
CPT.5 PAR.5.2.2.6
CPT.9 PAR.9.2.7
CPT.5 PAR.5.2.3.8
VIM MSTR,2/O,2/OT,3/OTrue
CPT.5-F001-F007
CPT.1 PAR.1.2.4.4
STS Manual
CPT.1 PAR.1.2.4.6
CPT.6
Ship Specific
CPT.8
NAVM Manual
MSMP
CPT.9-F001
CPT.4
MSTR,2/O,2/OT,3/OTrue
Vessel's
PMS
Certificates
4.OUTFITTING/
WINDLASS-
MOORING
NAVM
EQUIPMENT
CPT.9 PAR.9.2.7
4.OUTFITTING/
VIM MSTR,2/O,2/OT,3/OFalse
MOORING
CPT.1 PAR.1.2.4.4
WINCHES
Ship Specific
4.OUTFITTING/
MSMP Manual
FIXED MOORING
CPT.4
EQUIPMENT
PMS
MSTR,2/O,2/OT,3/OFalse
4.
OUTFITTING/LOOS
E MOORING
EQUIPMENT
4.
OUTFITTING/EMER
GENCY TOWING
SYSTEM
Ship Specific
MSMP Manual
CPT.4
PMS MSTR,2/O,2/OT,3/OFalse
4.OUTFITTING/
FIXED MOORING
EQUIPMENT
Ship Specific
MSMP Manual MSTR,2/O,2/OT,3/OFalse
CPT.4 PAR.4.3.1
Ship Specific
MSMP Manual
CPT.4
PMS MSTR,2/O,2/OT,3/OFalse
4.OUTFITTING/
FIXED MOORING
EQUIPMENT
Ship Specific
MSMP Manual MSTR,2/O,2/OT,3/OFalse
CPT.5 PAR.5.4.3
NAVM
MSTR,2/O,2/OT,3/OFalse
CPT.9 PAR.9.2.1
Ship Specific
MSMP Manual MSTR,2/O,2/OT,3/OFalse
CPT.4 PAR.4.2.5
Risk Assessments
Library
RA.09-01 2/O,2/OT,3/O,AB,B True
RA.09-02
RA.09-03
Ship Specific
MSMP Manual MSTR,2/O,2/OT,3/OFalse
CPT.4
Ship Specific
MSTR,2/O,2/OT,3/OFalse
MSMP Manual
NAVM
CPT.9-F001
Vessel's
PMS Loose
Mooring
4.OUTFITTING/
equipment
WINDLASS-
MSTR,2/O,2/OT,3/OFalse
certificates
MOORING
Ship Specific
EQUIPMENT
MSMP Manual
4.OUTFITTING/
MOORING
WINCHES
VIM
4.OUTFITTING/ MSTR,2/O,2/OT,3/OTrue
CPT.1 PAR.1.2.4.3
FIXED MOORING
Ship Specific
EQUIPMENT
MSMP Manual
4.
CPT.4 PAR.4.2.5
OUTFITTING/LOOS
PMS
E MOORING
4.OUTFITTING/ MSTR,2/O,2/OT,3/OFalse
EQUIPMENT
WINDLASS-
4.
MOORING
OUTFITTING/EMER
EQUIPMENT
NAVM
GENCY TOWING
4.OUTFITTING/
CPT.9-F001
SYSTEM
MOORING
Vessel's Loose
MSTR,2/O,2/OT,3/OTrue
WINCHES
Mooring
equipment
certificates
NAVM
CPT.9 PAR.9.2.7
VIM
CPT.1 PAR.1.2.4.4
PMS PAR.1.2.4.6
CPT.1
4.OUTFITTING/
Ship Specific
WINDLASS-
MSMP Manual
MOORING
CPT.4
MSTR,2/O,2/OT,3/OFalse
EQUIPMENT
PMS
4.OUTFITTING/
MOORING
WINDLASS-
WINCHES
MOORING
EQUIPMENT
4.OUTFITTING/ MSTR,2/O,2/OT,3/OFalse
MOORING
VIM
WINCHES
CPT.7
4.OUTFITTING/
PAR.7.1.1.10
FIXED MOORING
CPT.7
EQUIPMENT
PAR.7.1.1.6.1
MSTR,2/ETR,3/E,4/ False
4.
CPT.7 PAR.7.4.1.1
OUTFITTING/LOOS
CPT.7 PAR.7.4.1.7
E MOORING
ePMS for
EQUIPMENT &
automation
VIM
4.
alarms
CPT.7 checks
OUTFITTING/EMER
PAR.7.1.1.10 C/E,2/ETR,2/O,2/O True
GENCY TOWING
ERM
SYSTEM
CPT.5 APP.B
VIM
CPT.7
PAR.7.1.1.10 MSTR,2/ETR,2/O,2/ True
ERM
CPT.5 APP.B
VIM
CPT.1 PAR.1.2.2.3
CPT.1 PAR.1.1.5
MSTR,2/ETR,2/O,2/ False
CPT.7 PAR.7.4.1.3
ePMS for Weekly
inspection of EDG
VIM
CPT.7 PAR.7.10
CPT.1-F001 MSTR,2/ETR,2/O,2/ True
ePMS for Bilge
Alarms testing
VIM
CPT.7 PAR.7.10
CPT.1-F001 MSTR,2/ETR,2/O,2/ True
ePMS for Bilge
VIM
Alarms testing
CPT.7
PAR.7.1.1.12
CPT.7-F003
SSM
C/E,2/ETR,2/O,2/O True
CPT.6 PAR.6.2.5
NAVM
CPT.2 PAR.2.2.13
CPT.2-F006
VIM
Engine Logbook
CPT.7
C/E,2/ETR,2/O,2/O True
PAR.7.1.1.12
CPT.7-F003
VIM
CPT.7 MSTR,2/ETR,2/O,2/ False
PAR.7.1.1.12
VIM
CPT.1 PAR.1.1.3.3
CPT.1-F001
MSTR,2/ETR,2/O,2/ True
CPT.7
PAR.7.1.1.12
SOM
CPT.7 PAR.7.4.1.7
CPT.7
CPT.7-F002 to
F009
MSTR,2/ETR,2/O,2/ True
CPT.7-F016
RA Template
RA-03.02
Bunkering Ops
VIM
CPT.7 PAR.7.4.1.6
MSTR,2/ETR,2/O,2/ True
CPT.1 PAR.1.1.5.1
VIM
CPT.1-APP.A
CPT.7
PAR.7.1.1.6.6
CPT.7
PAR.7.1.1.12
MSTR,2/ETR,2/O,2/ False
CPT.7 PAR.7.8
SSM
CPT.6 PAR.2.1
IMSM
CPT.6 PAR.5.3.1
CPT.5 PAR.2.1.4
CPT.6 PAR.2.1.5
HRM
CPT.2 APP.A 2CK,2/O,2/OT,3/E, True
CPT.2 APP.B
IMSPRO
CPT.7
VIM
CPT.7 PAR.7.7
procedures? PMS MSTR,2CK,2/ETR,2/False
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
stems from outside the space served? PMS MSTR,2CK,2/ETR,2/False
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
PMS MSTR,2/ETR,2/O,2/ False
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
instructions displayed at the control stations? PMS MSTR,2/ETR,2/O,2/ False
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
rating instructions clearly displayed at the control
PMS MSTR,2/ETR,2/O,2/ False
stations?
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
operating instructions clearly displayed at the control
PMS MSTR,2/ETR,2/O,2/ False
stations?
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
e use? PMS MSTR,2/ETR,2/O,2/ False
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
SSM
galley ranges, exhaust vents, filter cowls free of grease
CPT.9 MSTR,2/ETR,2/O,2/ False
or combustible material?
PMS
Fire Fighting
Booklet
Cargo Operation
Manual
MSTR,2/ETR,2/O,2/ False
CPT.8 PAR.8.2
PMS
VIM
CPT.7 PAR.7.7
immediate use, with the release procedure and
PMS MSTR,2/ETR,2/O,2/ False
operating instructions displayed at the control stations?
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
instructions clearly displayed at the control stations. PMS MSTR,2/ETR,2/O,2/ False
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
SSM
immediate use? CPT.7 PAR.7.2.7 MSTR,2/ETR,2/O,2/ False
PMS
Fire Fighting
Booklet
VIM
CPT.7 PAR.7.7
immediate use, with operating instructions clearly
PMS MSTR,2/ETR,2/O,2/ False
displayed at the control stations?
Fire Fighting
Booklet
NAVM
CPT.7 PAR.7.2.3.9
MSTR,2/O,2/OT,3/OFalse
CPT.7 PAR.7.2.6.1
CPT.3 PAR.3.2.1.2
NAVM
CPT.2 PAR.2.2.2.1
CPT.2 PAR.2.2.10
executed in accordance with company expectations? MSTR,2/O,2/OT,3/OFalse
VIM
CPT.7 PAR.7.1.1.2
CPT.7 PAR.7.1.1.3
COM
CPT.1 PAR.1.2.8.6
MSTR,2/O,2/OT,3/OFalse
VIM
CPT.7 PAR.7.8