0% found this document useful (0 votes)
31 views1 page

Annexure-2

Annexure-2

Uploaded by

sthita mohapatra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

Annexure-2

Annexure-2

Uploaded by

sthita mohapatra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

BOQ FOR GEOTECHNICAL INVESTIGATION FOR JITHPUR MINE INFRA WORKS

Sr. No. Description Unit Quantity Rate Amount

1 Mobilization of personnels & equipment's to site of work and Demobilization LS 1

2 Setup and transfer of equipment to different borehole location at proposed road area No. 33

3 Vertical boring of 150mm diameter bore holes through all kinds of soils
a) Up to 10m deep from ground level RM 99
b) From 10m to 20m deep from ground level RM Rate only
c) From 20m to 30m deep from ground level RM Rate only

Drilling vertically through weathered / soft rock (RQD<25%) using NX size double tube core
4 RM 231
barrel with diamond bit

Drilling vertically through hard rock (RQD>25%) using NX size double tube core barrel with
5 RM 165
diamond bit

6 Conducting standard penetration test (SPT) in boreholes as per relevant IS code of practice No. 66

7 Collecting undisturbed soil sample (UDS) from bore holes as per relevant IS code of practice No. 33

8 Collecting water samples from boreholes No. 33

Conducting Trial Pits of size 2.0m x 2.0m x 3.0m (deep) & carrying out sieve analysis,
Atterberg limits at 1m,2m & 3m depth sample followed by Conducting unsoaked & 4 day
9 No. 29
soaked CBR in laboratory as per relevant IS code of practice (Soil samples shall be collected
from 1.0m (one) below the Ground level)

Conducting Electrical Resistivity Test as per Wenners method in line with relevant IS Code.
10 The spacing for the test shall be at 0.5m, 1m, 2m, 3m, 5m, 10m, 15m in each of eight directions No. 12
(N, NE, E, SE, S, SW, W, NW).

11 Conducting laboratory tests as per relevant IS code of practice


A) Seive analysis No. 99
B) Hydrometer analysis (wherever fines > 12%) No. 99
C) Atterbergs limit No. 99
D) Specific gravity No. 66
E) Natural moisture content on selected UDS No. 33
F) Saturated & dry densities on selected UDS No. 33
G) Free Swell Index Test No. 33
H) Consolidation tests on UDS No. 66
I) Box shear test No. 66
J) Triaxial compression test on
i) Unconsolidated undrained test No. 33
ii) Consolidated undrained test No. 7
iii) Consolidated drained test No. 7
K) Compaction Test (Optimum Moisture Content & Max Dry Density) No. 29
L) Tests on rock
i) Unconfined compression strength test (saturated) No. 198
ii) Point load test No. 198
iii) Saturated moisture content No. 165
iv) Specific gravity No. 165
v) Density / Unit weight No. 165
vi) Porosity & Water absorption No. 165
vii) Modulus of elasticity No. 198

M) Chemical analysis of water sample ((Ph, Carbonate, chloride, sulphate & organic content) No. 33

N) Chemical analysis of soil sample (Ph, Carbonate, chloride, sulphate & organic content) No. 33

Submission of technical report covering investigation data, field & laboratory test results and
12 LS 1
recommendations

TOTAL AMOUNT

Note : 1. The quantities given in the table above are indicative and are mentioned for broad guidance of the bidder.
2. THIRTY THREE (33) No of boreholes are to be explored upto depth of 15m below ground level (as per the attached drawing) or 3m (min) of continuous
drilling in moderately weathered rock with a RQD value of >25%, whichever occurs earlier.
3. CBR Soil samples (29 Nos) shall be collected from 1.0m (one) below the Ground level.
4. Vane shear / Box shear / Triaxial / Consolidation / Unconfined compression test quantities will be finally decided based on collected soil samples as per
the actual soil type and condition encountered.
5. The rates quoted shall include collection of soil / rock / water samples, sealing, packing and transportation of all samples to the laboratory etc all
complete.