0% found this document useful (0 votes)
6 views3 pages

Evidence-Plan

Evidence-Plan

Uploaded by

Juzielou Resare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views3 pages

Evidence-Plan

Evidence-Plan

Uploaded by

Juzielou Resare
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

EVIDENCE PLAN

Competency Standards:

Unit of Competency

Ways in which evidence will be collected:


[tick the column]

Demonstration w/
questioning

Written test
The evidence must show that the candidate…
1. Interprets drawing based on the Job

requirement.
2. Selects correct quantities of conduit, fittings  
and accessories as per job requirements.
3. Selects tools and equipment as per job 

requirements.
4. Assembles conduit ensuring that fittings are
fully inserted and tightened as per job  
requirements.
5. Bends conduits with bends not exceeding 90°
 
as per job requirements*
6. Installs conduit couplings and elbows as per

job requirements.
7. Threads conduit in line with job requirements 
8. Follows safety procedures in line with

standard operating procedures (SOPs)
9. Interprets drawing based on the Job

requirement.
10. Selects correct quantities of materials as per

job requirements.
11. Selects tools and equipment as per job

requirements.
12. Installs wire ways and cable trays are per job

requirements. *
13. Follows safety procedures in line with SOPs. 
14. Interprets correct drawing to determine job

requirements.
15. Selects correct quantities of materials as per

job requirements.
EVIDENCE PLAN

16. Selects tools and equipment as per job



requirements.
17. Installs auxiliary terminal cabinets as per job

requirements. *
18. Installs auxiliary main distribution frame as

per job requirements. *
19. Follows safety procedures in line with SOPs. 
20. Prepares necessary tools, equipment,
materials and personal protective equipment 
(PPE) in line with job requirements.
21. Identifies cable pulling & installation
requirements and constraints from plan and 
site inspection as per job requirements.
22. Sets up cable lay out and installation
equipment is set in accordance with 
manufacture’s and job requirements.
23. Secures and safe site for cable installation. 
24. Selects suitable protective clothing and use

required safety devices.
25. Assess support structure as safe for normal
 
working conditions.
26. Follows safety procedures based on safety
regulations, identifies and selects PPE in line  
with safety requirements.
27. Identifies and obtains tools, equipment,
pulling compound and safety requirements for 
the lay out and installation.
28. Installs and tensions properly the pulling

materials as to required specifications. *
29. Secures permanently the cable to support in
accordance with standard installation 
procedures.
30. Observes bending radius and loops tolerance
 
on cable materials at all times.
31. Follows schedule of wire cutting lists based
on estimates, quantity and sizes to avoid 
wastage.
32. Further instructions are sought if unplanned

events or conditions occur.
EVIDENCE PLAN

33. Checking of quality of work is done in


accordance with instructions and  
requirements. *
34. Final checks are made to ensure that work
conforms with instructions and job 
requirements. *
35. Supervisor is notified upon completion of
 
work.
36. Tools, equipment and any surplus resources
and materials are, where appropriate,

cleaned, checked and returned to storage in
accordance with established procedures
37. Work area is cleaned up and made safe
 
according to OHSA regulations
NOTE: *Critical Aspects of Competency

Prepared by: John E. Perang Date: July 25,


2024

Checked by: Doris R. Oval Date:

You might also like