LOAD CALCULATION
LOAD CALCULATION
SHORT
PANEL NAME DEMAND DEMAND ACCUMU
LENGTH IN CONNECTED CONNECTED DEMAND DEMAND DEMAND BREAKER BREAKER NO OF CABLE CIRCUIT
SL NO VOLTAGE HZ PF LOAD IN LOAD IN QTY TYPE ECC QTY TYPE VD % LATED REMARKS
MTR LOAD IN VA LOAD IN KW FACTOR LOAD IN VA CURRENT SIZE-AT SIZE-AF CORES SIZE CURREN
KVA KW VD %
T
FROM TO
1 METER UNIT MDB SERVICE-1 20 400 60 0.8 133484.00 106.79 0.90 120135.60 120.14 96.11 173.41 250 250 4 95 1 XLPE/PVC 50 1 PVC Y/G 0.38 0.38 21.80
2 MDB SERVICE-1 LPPG-PR-1 30 400 60 0.8 830.00 0.66 0.90 747.00 0.75 0.60 1.08 40 63 4 10 1 XLPE/PVC/SWA 10 1 PVC Y/G 0.03 0.41 2.88
3 MDB SERVICE-1 MCC MECH-1 32 400 60 0.8 48330.00 38.66 0.70 33831.00 33.83 27.06 48.83 100 100 4 25 1 XLPE/PVC/SWA 16 1 PVC Y/G 0.54 0.93 5.74
4 MDB SERVICE-1 LP EXT 85 400 60 0.8 36012.00 28.81 1.00 36012.00 36.01 28.81 51.98 100 100 4 25 1 XLPE/PVC/SWA 16 1 PVC Y/G 1.54 1.92 2.58
5 MDB SERVICE-1 CP-FIRE PUMP 42 400 60 0.8 46812.00 37.45 1.00 46812.00 46.81 37.45 67.57 125 250 4 50 1 XLPE/PVC/SWA 25 1 PVC Y/G 0.56 0.94 7.30
6 MDB SERVICE-1 LPPG-EL-1 15 400 60 0.8 1500.00 1.20 1.00 1500.00 1.50 1.20 2.17 40 63 4 6 1 XLPE/PVC 6 1 PVC Y/G 0.05 0.43 3.34
7 METER UNIT MDB SERVICE-2 20 400 60 0.8 132954.00 106.36 0.90 119658.60 119.66 95.73 172.72 250 250 4 95 1 XLPE/PVC 50 1 PVC Y/G 0.38 0.38 21.80
8 MDB-SERVICE-2 LPPG-1 45 400 60 0.8 3490.00 2.79 0.90 3141.00 3.14 2.51 4.53 40 63 4 10 1 XLPE/PVC/SWA 10 1 PVC Y/G 0.17 0.55 2.00
9 MDB-SERVICE-2 LPPG-2 85 400 60 0.8 19208.00 15.37 0.90 17287.20 17.29 13.83 24.95 40 63 4 10 1 XLPE/PVC/SWA 10 1 PVC Y/G 1.77 2.15 1.11
10 MDB-SERVICE-2 LPPG-PR-2 70 400 60 0.8 780.00 0.62 0.90 702.00 0.70 0.56 1.01 40 63 4 10 1 XLPE/PVC/SWA 10 1 PVC Y/G 0.06 0.44 1.33
11 MDB-SERVICE-2 MCC MECH-2 70 400 60 0.8 21165.00 16.93 0.70 14815.50 14.82 11.85 21.38 60 63 4 16 1 XLPE/PVC/SWA 10 1 PVC Y/G 0.81 1.19 2.02
12 MDB-SERVICE-2 MCC MECH-R 60 400 60 0.8 30000.00 24.00 1.00 30000.00 30.00 24.00 43.30 100 63 4 25 1 XLPE/PVC/SWA 16 1 PVC Y/G 0.90 1.29 3.48
13 MDB-SERVICE-2 ELEVATOR 88 400 60 0.8 9999.00 8.00 1.00 9999.00 10.00 8.00 14.43 30 63 4 6 1 XLPE/PVC/SWA 6 1 PVC Y/G 1.77 2.15 0.65
14 MDB-SERVICE-2 CP-FIRE PUMP 67 400 60 0.8 46812.00 37.45 1.00 46812.00 46.81 37.45 67.57 125 250 4 50 1 XLPE/PVC/SWA 25 1 PVC Y/G 0.89 1.27 5.22
15 MDB-SERVICE-2 LPPG-EL-2 15 400 60 0.8 1500.00 1.20 1.00 1500.00 1.50 1.20 2.17 40 100 4 6 1 XLPE/PVC 6 1 0.05 0.43 3.34
CP WATER BOOSTER
16 MCC MECH-1 15 400 60 0.8 19665.00 15.73 0.70 13765.50 13.77 11.01 19.87 60 100 4 16 1 XLPE/PVC 10 1 PVC Y/G 0.16 1.09 3.70
PUMP
CP IRRI BOOSTER
17 MCC MECH-1 15 400 60 0.8 8433.00 6.75 0.70 5903.10 5.90 4.72 8.52 30 63 4 6 1 XLPE/PVC 6 1 PVC Y/G 0.18 1.10 2.33
PUMP
CP WATER FEATURE
18 MCC MECH-1 120 400 60 0.8 9366.00 7.49 0.70 6556.20 6.56 5.24 9.46 30 63 4 6 1 XLPE/PVC/SWA 6 1 PVC Y/G 1.58 2.51 0.45
PUMP-1
CP WATER FEATURE
19 MCC MECH-1 90 400 60 0.8 9366.00 7.49 0.70 6556.20 6.56 5.24 9.46 30 63 4 6 1 XLPE/PVC/SWA 6 1 PVC Y/G 1.19 2.11 0.59
PUMP-2
20 MCC MECH-1 CP SUMP PUMP 15 230 60 0.8 1500.00 1.20 0.50 750.00 0.75 0.60 1.08 20 60 3 4 1 XLPE/PVC
CP WATER BOOSTER
21 MCC MECH-2 15 400 60 0.8 19665.00 15.73 0.70 13765.50 13.77 11.01 19.87 60 100 4 16 1 XLPE/PVC 10 1 PVC Y/G 0.16 1.09 3.70
PUMP
22 MCC MECH-2 CP SUMP PUMP 15 230 60 0.8 1500.00 1.20 0.50 750.00 0.75 0.60 1.08 20 60 3 4 1 XLPE/PVC
23 MCC MECH-R PACKAGE UNIT-1 50 400 60 0.8 15000.00 12.00 1.00 15000.00 15.00 12.00 21.65 40 63 4 10 1 XLPE/PVC 10 1 PVC Y/G 0.91 2.19 1.26
24 MCC MECH-R PACKAGE UNIT-2 20 400 60 0.8 15000.00 12.00 1.00 15000.00 15.00 12.00 21.65 40 63 4 10 1 XLPE/PVC 10 1 PVC Y/G 0.91 2.19 1.26
CALCULATION SHEET
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 96 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing TOUCHING No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 20
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
0.004960 0.001860
MDB
Upstream Switchboard Load LPPG-PR-1
SERVICE-1
ARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor G.DIRECT
Thermal resistivity of soil 1 90 Installation Method
temperature (°C) LAID
No.of cables/
Power (KW) 1 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 30
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
MDB
Upstream Switchboard Load MCC MECH-1
SERVICE-1
ARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor G.DIRECT
Thermal resistivity of soil 1 90 Installation Method
temperature (°C) LAID
Ground Temperature (°C) 40 Air temp.(°C) ----- Depth of laying (cm) 100
No.of cables/
Power (KW) 27 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 32
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
MDB
Upstream Switchboard Load LP EXT
SERVICE-1
ARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor G.DIRECT
Thermal resistivity of soil 1 90 Installation Method
temperature (°C) LAID
Ground Temperature (°C) 40 Air temp.(°C) ----- Depth of laying (cm) 100
No.of cables/
Power (KW) 29 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 85
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
MDB
Upstream Switchboard Load CP-FIRE PUMP
SERVICE-1
ARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor G.DIRECT
Thermal resistivity of soil 1 90 Installation Method
temperature (°C) LAID
Ground Temperature (°C) 40 Air temp.(°C) ----- Depth of laying (cm) 100
No.of cables/
Power (KW) 37 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 42
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
MDB
Upstream Switchboard Load LPPG-EL-1
SERVICE-1
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 1 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 15
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 96 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing TOUCHING No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 20
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
0.004960 0.001860
MDB-
Upstream Switchboard Load LPPG-1
SERVICE-2
ARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor G.DIRECT
Thermal resistivity of soil 1 90 Installation Method
temperature (°C) LAID
Ground Temperature (°C) 40 Air temp.(°C) ----- Depth of laying (cm) 100
No.of cables/
Power (KW) 3 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 45
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
MDB-
Upstream Switchboard Load LPPG-2
SERVICE-2
ARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor G.DIRECT
Thermal resistivity of soil 1 90 Installation Method
temperature (°C) LAID
Ground Temperature (°C) 40 Air temp.(°C) ----- Depth of laying (cm) 100
No.of cables/
Power (KW) 14 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 85
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
MDB-
Upstream Switchboard Load LPPG-PR-2
SERVICE-2
ARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor G.DIRECT
Thermal resistivity of soil 1 90 Installation Method
temperature (°C) LAID
No.of cables/
Power (KW) 1 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 70
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
MDB-
Upstream Switchboard Load MCC MECH-2
SERVICE-2
ARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor G.DIRECT
Thermal resistivity of soil 1 90 Installation Method
temperature (°C) LAID
Ground Temperature (°C) 40 Air temp.(°C) ----- Depth of laying (cm) 100
No.of cables/
Power (KW) 12 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 70
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
MDB-
Upstream Switchboard Load MCC MECH-R
SERVICE-2
ARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor G.DIRECT
Thermal resistivity of soil 1 90 Installation Method
temperature (°C) LAID
Ground Temperature (°C) 40 Air temp.(°C) ----- Depth of laying (cm) 100
No.of cables/
Power (KW) 24 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 60
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
MDB-
Upstream Switchboard Load ELEVATOR
SERVICE-2
ARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor G.DIRECT
Thermal resistivity of soil 1 90 Installation Method
temperature (°C) LAID
Ground Temperature (°C) 40 Air temp.(°C) ----- Depth of laying (cm) 100
No.of cables/
Power (KW) 8 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 88
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
MDB-
Upstream Switchboard Load CP-FIRE PUMP
SERVICE-2
ARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor G.DIRECT
Thermal resistivity of soil 1 90 Installation Method
temperature (°C) LAID
Ground Temperature (°C) 40 Air temp.(°C) ----- Depth of laying (cm) 100
No.of cables/
Power (KW) 37 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 67
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
MDB-
Upstream Switchboard Load LPPG-EL-2
SERVICE-2
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 1 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 15
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
CP WATER BOOSTER
Upstream Switchboard MCC MECH-1 Load
PUMP
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 11 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 15
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
CP IRRI BOOSTER
Upstream Switchboard MCC MECH-1 Load
PUMP
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 5 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 15
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
CP WATER FEATURE
Upstream Switchboard MCC MECH-1 Load
PUMP-1
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 5 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 120
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
CP WATER FEATURE
Upstream Switchboard MCC MECH-1 Load
PUMP-2
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 5 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 90
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
MCC MECH-
Upstream Switchboard Load PACKAGE UNIT-1
R
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 12 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 50
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
MCC MECH-
Upstream Switchboard Load PACKAGE UNIT-1
R
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 12 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 50
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
SCECO
Upstream Switchboard Load Rest-1
METER
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 65 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 150
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 90 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 95
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
SCECO
Upstream Switchboard Load REST-10
METER
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 21 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 130
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A
SCECO
Upstream Switchboard Load OFFICE 22
METER
UNARM. CU
Selected Cable Type No. of cores 4 Insulation XLPE
CABLE
Conductor LAID IN FREE
Thermal resistivity of soil ----- 90 Installation Method
temperature (°C) AIR
Ground Temperature (°C) ----- Air temp.(°C) 45 Depth of laying (cm) -----
No.of cables/
Power (KW) 440 1 Voltage (V) 400
circuits in group
Power factor (Ø) 0.8 Spacing d No.of phases 3
Load factor for the cable 0.70 No of Tray layers 1 Length (m) 60
Frequency (Hz) 60 Standard selection NEC
DERATING FACTORS
Derating factor for variation in ground temp. N/A