Cutover activities

Uploaded by

mendesamuel143
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

EWM Cutover Activities

1. Business Partner (Assign Plants to BP) -Extend the BP to purchasing


organization and Sales area.
2. Maintain Business System Group
3. Assign Logical System and Queue Type
Note: - Make sure to assign the S/4HANA Logical system and not EWM Logical
system. SCU can only be created after this assignment.
4. Define Own Business System
5. Define Business System
6. Name Logical Systems
Define the logical systems
7. Define RFC Connection in SM59
8. Assign RFC Destination to Logical Systems (BD97)
9. Maintain Supply Chain Unit (/SCMB/SCUMAIN)
Note:- SCU can not be created unless the step “Assign Logical System and Queue
Type” is completed.
10.Assign Warehouse Number (/SCWM/LGNBP)
11.Create Interim Storage Bins
Note: - Make sure to change source storage bin in WPT 1010 and Destination
Storage Bin in 2020 WPT.
12.EWM – Settings (Assign user to Exception code profile)
13.Define Number Range for Physical Inventory Documents (No transport for
number ranges)
14.Assign User to Tolerance Group for Recount/Clearing
Assign User to Tolerance Group for Difference Analyzer
15.Maintain number ranges for object - /SCWM/TO
16.Maintain Warehouse Specific Printing Parameters
17.Create Condition Records for Printing Warehouse Orders (/SCWM/PRW06)
18.Create Condition Records for Printing Physical Inventory

19.Maintain Condition Records for PPF Schedule Conditions


(SAP Easy Access -> Delivery Processing -> Actions)
20.Assign Logical Systems to a client (defined by SAP)
21.SMQS
22.SMQR
23.Control for RFC Queue
24.Assign Warehouse numbers from Logistics Execution
Note: - System does not do any check for ERP warehouse numbers
25.Map Storage Locations from ERP System to EWM
Note: - Make sure to map right storage locations to the right logical system, right
warehouse and right availability group.
26.Table - /SCWM/TWMEQUEUE
27.Define Number Ranges for Deliveries
28.Run program “/SCWM/R_ERP_RFC_DEST” – SE38
29.Maintain Presentation Devices - /SCWM/PRDVC
30.Maintain Resources (Resource Types, Resource Groups and Resources)
31.Maintain shipping point using SM30 in “V_T001W_L”
32.Generate Distribution Model for Transaction Data Transfer to SAP EWM
33.Maintain Number Ranges for Consolidation Group (/SCWM/DSGR) for both
warehouses in transaction code SNRO
34.Fix for serial number load should be in cutover list
35.After the batch stock is loaded, make sure batch expiry dates are not
overwritten