0% found this document useful (0 votes)
4 views1 page

ME-004

Uploaded by

muhammed.salman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
4 views1 page

ME-004

Uploaded by

muhammed.salman
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

UPS

PVC COATED METAL


FLEXIBLE CONDUIT
PROJECT
POWER WIRING
NORTH.
ISOLATOR SWITCH

FREON COPPER PIPE with 3/8"RUBBER INSULATION


with GLASS CLOTH and WEATHER PROOF PAINT
CONDENSING UNIT

ROOF SLAB

RUBBER (VIBROPADS) IN THE SHAFT or SLEEVES


FROM INDOOR TO OUTDOOR

INDOOR UNIT
WIRING PVC FLEX. ISOLATOR SWITCH (3Ph)
CORRUGATED CONDUIT (TO BE FIXED ON WALL or CEILING)
Ø25mm PVC CONDUIT

ANCHOR & THREADED ROD


(OR ANGLE BAR) CONCEALED EXPOSED FREON COPPER PIPES
WITH RUBBER PIPE INSULATION WITH CANVASS
CLOTH and CANVASS COATING

SLOPE 1:100

Ø20mm or Ø25mm PVC DRAIN


PIPE (EMBDDED IN WALL)

THERMOSTAT

CONCEALED INDOOR UNIT


FALSE CEILING LEVEL

CONDENSATE DRAIN PIPE TO THE


NEAREST FLOOR DRAIN

DRAIN PIPE TO THE UNIT 3/4


"PVC.
TO TEST THE DRAIN,
REMOVE THE AIR FILTERS
AND POUR WATER IN THE
10 CMS. OR MORE
HEAT EXCHANGER
INSTALLATION PLATE
60 CMS. OR MORE
REMOVE THE SCREW ON THE COVER
TO ACCESS THE TERMINAL BOARD

A 30 JUNE 2024 ISSUE FOR CONSTRUCTION ENG. ENG SHIMAA ENG.AMR


REV DATE ISSUED FOR DRW CHK PM

PERMANENT HEADQUARTERS DEVELOPMENT PROJECT


FOR HIGH COMMISSION FOR INDUSTRIAL SECURITY

RIYADH

HIGH COMMISSION FOR INDUSTRIAL


SECURITY

JUNE 2024

GENERAL DETAILS - MECHANICAL SYSTEM

ME-004 N.T.S

You might also like