ERP_Configuration_Using_GBI_Phase_II
ERP_Configuration_Using_GBI_Phase_II
Phase II - Procurement
Teaching material - Information
Software used
• SAP S/4HANA 1809
• GUI 7.50
Model
• Global Bike
Prerequisites
• None
Authors
Simha Magal
Stefan Weidner
Target Audience
Advanced
Learning Objectives
Introduction
Scenario
Enterprise structure
Process configuration
Master data
Process execution
Introduction
Scenario
Enterprise structure
Process configuration
Master data
Process execution
In a preparation project (phase 0), the scope of the implementation project was defined.
In project phase I, Bianca Cavarini (Chief Information Officer) and her team successfully configured basic
Financial Accounting processes in the S/4HANA system.
In phase II, before starting to configure the procurement process, they are observing the work of the following
GBI employees:
• Silvia Cassano (Accountant Payable Specialist GBI US)
• Stephanie Bernard (Billing Clerk Accounts Receivable GBI US)
• Shuyuan Chen (Chief Accountant GBI US)
Task Read the scenario and highlight the most important and relevant information.
Task Revisit the reference symptoms/issues and condense them into problems specific to this case.
Short Description You (in the role Mona Falco) need to come to a clear understanding of the most relevant
symptoms in Purchasing in order to identify the causes and underlying problems including the issue of invoice
discrepancy.
Task Revisit the reference problems and identify possible solutions for Global Bike.
Short Description In the role of Mona Falco (System Design and Dev Manager) and Sarah Garcia (Business
Analyst 2), analyze all relevant problems in Purchasing and Accounting and find possible solutions.
Introduction
Scenario
Enterprise structure
Process configuration
Master data
Process execution
e.g.
• Global enterprises
• Consolidated concern
• Corporation
• Holding
In this context: Global Bike Inc. (US), Global Bike Germany GmbH
(DE)
• Areas designated for different types of material (raw material, work-in-process, finished Dallas Miam i S. Diego Heidelb. Ham burg
DL## MI## SD## HD## HH##
Negotiate general conditions of purchase and contracts for one or more plants or
DL## MI## SD## HD## HH##
CC US## CC DE##
companies.
CC US## CC DE##
• Decide to purchase land, but use a realtor (external purchasing group) to execute the
purchase
MI## MI##
Define Plants
• Dallas: DL##
• Miami: MI##
• San Diego: SD##
Define Plants
Introduction
Scenario
Enterprise structure
Process configuration
Master data
Process execution
Assign Material Ledger Types to Valuation Area Set Tolerance Limits for Purchase Orders
Activate Material Ledger Types for Valuation Areas Set Tolerance Limits for Goods Receipts
Maintain Default Values for Tax Codes Define Attributes of Material Types
Introduction
Scenario
Enterprise structure
Process configuration
Master data
Process execution
Example:
• SHRT1000 + MI00+ TG00
• SHRT1000 + SD00+ TG00
• SHRT1000 + US00 + Wholesale channel
• SHRT1000 + US00 + Internet channel
One info record per combination of vendor and material (or material group)
• General data
• Conditions: pricing, discounts, free goods (current and future)
• Vendor data
• Texts (notes)
Pricing conditions
• Gross price
• Discounts and surcharges
• Freight / shipping
Create Vendor
• Vendor – Olympic Protective Gear
Introduction
Scenario
Enterprise structure
Process configuration
Master data
Process execution