Assignment # 4(Part B and C)
Assignment # 4(Part B and C)
Planner - Creating a plan for how the each part of Assignment#4 will be completed.
Level 1: Creating a plan for how the each part of Assignment#4 will be completed.
Level 2:
1. Write success matrices to evaluate the completion of assignment.(Nov12- Non15,2024)
2. Identify Stakeholders (Nov 16- Nov 20, 2024).
3. Create two Project Planner using MS planner (Nov 21- Nov30, 2024).
4. Draft one Communication plan for both scenarios (Dec1 – Dec 5, 2024).
5. Review and finalize (Dec6- Dec9, 2024).
6. In class activity (project completion analysis) (Dec 10, 2024).
Level 3:
1. Write success matrices to evaluate the completion of assignment (Nov12- Non15, 2024).
1.1 Review assignment objectives and deliverables.(Nov12,2024).
1.2 Identify evaluation criteria for each deliverable (e.g., quality, timeliness, stakeholder
alignment).(Nov13,2024).
1.3 Define success metrics for Stakeholder identification, Project plans, and Communication
plan.(Nov 14,2024).
1.4 Document and format the success matrices for submission (Nov 15, 2024).
Success Metrics
I will measure the success of the assignment#4 in the following ways:
All components of the assignment will meet rubric criteria and will be submitted on time.
Scenarios and WBS plans will be realistic, clear, and detailed in terms of milestones and
due dates.
Stakeholder involvement in their assigned tasks will be successfully demonstrated
through MS Planner as well as communication plans.
Communication plan will address stakeholder needs, effectively track progress and
manage potential conflicts.