Sem-4 Software Engineering 4 Marks IMPs

Uploaded by

saqibzuber813
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views

Sem-4 Software Engineering 4 Marks IMPs

Uploaded by

saqibzuber813
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

4 MARKS QUESTIONS

1. Explain Software Engineering as layered technology approach.


2. Explain with example Decision table.
3. Explain following elements of management spectrum: (Describe 4P’s of
management spectrum giving their significance)
i. people
ii. Process
iii. Product
iv. Project
4. List and explain basic principles of project scheduling.
5. Prescriptive process model and agile process model.
6. Describe any four principles of communication for software Engineering.
7. Draw proper labelled “Level 1 Data Flow Diagram” (DFD) for student
attendance system. Or (railway reservation system). (also, level 0)
8. State importance of “Function point” and “lines of code” in concerned
with project estimation.
9. Describe Extreme programming with proper diagram.
10.List and explain any four principles of “Core Principles” of Software
Engineering.
11.Explain RMMM plan with example.
12.Explain any one project cost estimation approach.
13.Draw time chart for Library management System (5 days a week).
Consider broad phases of SDLC.
14.State and explain with examples four categories/types of software.
15.Explain the notations used for preparing a Data Flow diagram.
16.Explain Process framework with a suitable diagram.
17.Describe four principles of good planning.
18.Explain waterfall process model with neat labelled diagram. State its
advantages and disadvantages.
19.Explain GANTT chart and its application for project tracking with an
example.
20.Explain Test Documentation with the help of following terms.
i. Test Case
ii. Test Data
iii. Test Plan.
21.Explain CMMI in detail with neat diagram.
22.State and describe four deployment principles.
23.State and describe two metrics of project size estimation.
24.Sate the need of SRS and also enlist the characteristics.
25.Distinguish between Black Box and White Box testing. (Write any four
points).
26.Explain Structured flowchart with suitable example.
27.Describe Critical Path Method with Example.
28.Distinguish between waterfall model and spiral model.
29.Explain line of code metrics for size estimation.
30.Explain Dynamic Systems Development Method (DSDM).
31.State software engineering practices and its importance.
32.State and explain the component of Risk Management.
33.Explain characteristics of software.
34.Describe work breakdown structure with diagram.
35.State the requirements to apply RAD.
36.Describe any four software coding principles.
37.Prepare decision table for accessing secured network.
38.State project size estimation techniques and explain anyone.
39.Explain adaptive software development method w.r.to
i) Speculation
ii) Collaboration

IMP
V.IMP
V.V.IMP