0% found this document useful (0 votes)
22 views

HIRARC Structural Roof Works

Uploaded by

Khaty Jah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views

HIRARC Structural Roof Works

Uploaded by

Khaty Jah
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

G.

C TIMUR SDN BHD HIRADC ANALYSIS FORMAT


Hazard Identification, Risk Assessment, Determining Control
[ HIRADC ]
PROJECT Ref: DESCRIPTION OF JOB OR WORK ACTIVITY: Prepared by Approved by HIRADC No:
PROJECT / SITE: SHOP LOT PM SE / SA SHO Subcon SITE MANAGER
ROOF
Rev No: 1
Name KHATIJAH
LOCATION: LEGAL & OTHER REQUIREMENTS: Page: 1 of 1
Sungai Petani OSHA 1994 - Act 514 Date Prepared:
FMA 1967 - Act 139 Signature 1/7/2024
NO JOB SEQUENCE / BASIC HAZARD IDENTIFICATION RISK ASSESSMENT DETERMINING CONTROL Person in
STEPS / WORK ACTIVITY Hazards Effects Probability Consequences Risk Ranking PPE Personal Protective Equipment Charge (PIC)
(A) (B) (C) = (A) x (B) AM Administrative Measure
EC Engineering Control
I Isolation
Score Level S Substitution
E Elimination

1 Handling & storage Falling of material Bodily injury 4 5 20 H EC To use Serviceable crane with valid CF Site Supervisor / Operator
(PMA) & Operator has valid CF from DOSH Crane / Designated
Person

AM Barricade the work area & Stay away during All


lifting

2 Lifting roof structures Falling of structures Bodily injury 4 5 20 H EC To use appropriate method of lifting Site Supervisor / Operator
Crane

Lifting / chains snaps Bodily injury 4 5 20 H AM Check chain condition daily Site Supervisor / Operator
Crane

Legend PROBABILITY (A) CONSEQUENCES (B) Example 1 Example 2 Example 3 RISK RANKING (C) = (A) x (B)
Rating Likehood Rating Severity Bodily Injury Fire Spillage / Leakage Score Level
5 Most Likely 5 Catastropic Numerous fatality, irrecoverable property damage Fire which causes fatality, property and Spillage / Leak which causes fire and explosion
& productivity productivity damages 15 - 25 High Risk (H)

4 Possible 4 Fatal Approximately one single fatality major property Fire which causes total evacuation Spillage / Leak which causes total evacuation
damage if hazard is realized 5 -12 Medium Risk (M)

3 Conceivable 3 Serious Non - fatal injury, permanent disability Fire which causes using of fire extinguisher Spillage / Leak which causes legislative NC
2 Remote 2 Minor Disabling but not permanent injury Fire which triggers the fire alarm Spillage / Leak with minimal mitigation cost
1-4 Low Risk (L)
1 Inconceivable 1 Negligible Minor abrasions, bruises, cuts, first aid type injury No fire only smoke Spillage / Leak which can be manually controlled