0% found this document useful (0 votes)
39 views1 page

MB-A-2306 Detail Genset Room Plan MCC NEN

Uploaded by

gis500.bekasi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
39 views1 page

MB-A-2306 Detail Genset Room Plan MCC NEN

Uploaded by

gis500.bekasi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PENGGUNA JASA

A B

03 03 03 03
07 07 07 PT. PLN (Persero)
CLERANCE AREA
D Jakarta 12160, Indonesia
11 11 High Voltage Area Clearance Area 04
01 01 01 BACK PANEL ACCESS

GENSET
MV
FL ±0.000 CUBICLE

SL ±0.000 11 04 HV SIDE

Trafo 20kV/0.4kV

LV SIDE
11
07 11
11 04 07
REV. REVISIONS DATE
11 04
0 ISSUED FOR CONSTRUCTION 28-10-2024

CLERANCE AREA
05 15 GENSET EXHAUST 15

D D

BACK PANEL ACCESS


UTILITY LVSDP

11

07 11 11
KETERANGAN
01 01 01 01
11 11 04
03 C
07 07 07
03 03 03 03
FL -0.100
05 05 SL -0.100
03 03 03 03 03
07 07 07
03 03
03 B
11 11 04
01 01 01 01 SL -0.100 03

07 11 11
05 FL -0.100 PAKET PEKERJAAN
07 PEMBANGUNAN GEDUNG MAIN CONTROL
11
CENTER (MCC) DAN
DISASTER RECOVERY CONTROL CENTER

BACK PANEL ACCESS


04

CLERANCE AREA
UTILITY LVSDP

(DRC)
C 05 GENSET EXHAUST C
15 15 LOKASI
11 04
JL. JCC, Gandul, Cinere, Kota Depok,
04 04
11 Jawa Barat &
07 11 07
JL. Hayam Wuruk, Ungaran Timur, Semarang
11 LV SIDE

Trafo 20kV/0.4kV
NOMOR KONTRAK
SL -0.100
FL -0.100

GENSET 11 04 HV SIDE

FL ±0.000 MV
CUBICLE
2038.Pj/DAN.01.03/F01020000/2023
SL ±0.000
01 01 01 BACK PANEL ACCESS

01 01
11 11 High Voltage Area Clearance Area
04 04 KONSULTAN SUPERVISI ENGINEERING
CLERANCE AREA
03
A
07 07 07 07
03 03 03 03

PT. PRIMA LAYANAN NASIONAL ENJINIRING


Jl. Aipda K.S. Tubun 1/2 Jakarta - 11420, Indonesia
A B
1 2 3 4 5 KONTRAKTOR

GROUND FLOOR PLAN - GENSET HOUSE


Scale: 1:125

beyond construction
FLOOR WALL CEILING PT. ADHI KARYA (Persero) Tbk.
CONCRETE SLAB WT/ LIQUID MEMBRANE CONCRETE WALL / COLOUMN WT. SMOOTH PLASTER Jl. Raya Pasar Minggu KM. 18 Jakarta Selatan 12510
EXPOSED CONCRETE FINE SURFACE WT. 3MM
02 WATERPROOFING FULL SYSTEM AT MEP ROOM & 01 + ACRYLIC EMULSION PAINT FINISH 01
SKIMCOAT + ACRYLIC EMULSION PAINT
ROOF - SLOPE TO DRAIN (INTERIOR) 120 MM THK FINISH JUDUL GAMBAR

CONCRETE WALL / COLOUMN WT. SMOOTH PLASTER


CONCRETE SLAB WT. SMOOTH PLASTER SOUND INSULATION LAYERS BELOW CONCRETE SLAB DETAIL GENSET ROOM (PLAN) MCC
05 FINISH DUST PROOF PAINT 03 + WEATHER SHIELD PAINT FINISH 11
(TYPE & SIZE REFER TO SPECIALIST) BY SCADA/TWINK
(EXTERIOR) 120 MM THK FINISH
NOMOR GAMBAR : SKALA : LEMBAR :

CONCRETE SLAB 100 MM THK CELCON/HEBEL BLOCKWORK


15 FINISH EPOXY COATING 500 MICRON 04 WT. SMOOTH PLASTER + ACRYLIC EMULSION PAINT MB-A-2306 1 : 125 1
FINISH (INTERIOR) 120 MM THK FINISH

100 MM THK CELCON/HEBEL BLOCKWORK DIGAMBAR : DIBUAT : DIPERIKSA : DISETUJUI :


07 WT. SMOOTH PLASTER + WEATHER SHIELD PAINT
FINISH (EXTERIOR) 120 MM THK FINISH

100 MM THK CELCON/HEBEL BLOCKWORK


WT. SMOOTH PLASTER ANINDITYA SUHADI DINI SASRI W SAMSUL MA'ARIF
DRAFTER PROJECT PLANNING PROJECT ENGINEERING PROJECT MANAGER
11 + 50MM ROCKWOOL DENSITY 100KG/M3 + MANAGER
WIREMESH + GLASS CLOTH (BY SCADA/TWINK)
SHOP DRAWING