We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2
Province of Davao Oriental
City of Mati
INDIVIDUAL PROGRAM OF WORK
1.) Date: June 3, 2023
2.) Name of Project : 3.) Location: 4.) Type of Project (/) Buildings CONSTRUCTION OF ONE-STOREY BUNKHOUSE Sitio Tamia, Brgy. Don Martin Marundan, City of ( ) Waterworks Mati, Davao Oriental ( ) Other 5.) Project Description 6.) Category Buildings Waterworks ( ) Others: Specify CONSTRUCTION OF ONE-STOREY BUNKHOUSE (/) 1 room (/) Level 1 5.1) Dimension : 4.87 m X 9.1 m ( ) 2 rooms ( ) Level 2 ( ) 3 rooms ( ) Level 3 5.2 ) Area: 44.32 sq.m. ( ) 4 rooms 7.) Calendar Days to complete : 30 days 8.) Source of Fund: 9.) Implementation Scheme: ( ) By Administration ( ) By Contract 10.) Summary of Estimated cost 10.1) Materials: 10.2) Labor: SUMMARY OF ITEMS % of Total Quantity Units Unit Cost Total Cost 21,094.00 Total Cost 21,094.00 Prepared by: Breakdown: Direct Cost: KHEM LOID R. CUMING 1. Mobilization/Demobilization Civil Engineering Aide 2. Materials 86,774.00 3. Labor 58,000.00 Checked & Reviewed: 4. Equipment - Total Direct Cost 144,774.00 Indirect Cost: ENGR. JERARD G. DELA VICTORIA 1. OCM (Overhead,Contingencies and Miscellaneous) Engineer 2. Contractor's Profit 3. Taxes Total Indirect Cost - Total Contract Cost 144,774.00 Engineering Supervision Total Project Cost 144,774.00 Approved: Name of Project CONSTRUCTION OF ONE-STOREY BUNKHOUSE Location Sitio Tamia, Brgy. Don Martin Marundan, City of Mati, Davao Oriental Project Cost ₱ 172,966.25