1. Machines used in track
1. Machines used in track
Plain Track
4 DUO (0) DO. Generally deployed at work 15 10 3:35 4:00 0.8km do
Tamping
site. But can pack two sleepers
Plain Track
5 WST at a time 15 10 3:35 4:00 0.8 km do
Tamping
20kmph or 40kmph if
Ballast It screens track ballast by
30 as 3 DTS+ TTM deployed
screening of removing muck, thus, improve
6 BCM m/c go in 40 2:50 4:00 0.2km behind it & stipulated
Plain & Turnout drainage & elasticity of track for
block safety instructions
Track safe & comfortable running
followed.