0% found this document useful (0 votes)
18 views15 pages

2574 10574 1 PB

Uploaded by

Oumou Diallo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views15 pages

2574 10574 1 PB

Uploaded by

Oumou Diallo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

Journal of Industrial Engineering and Management

JIEM, 2018 – 11(3): 513-527 – Online ISSN: 2013-0953 – Print ISSN: 2013-8423
https://doi.org/10.3926/jiem.2574

The Contribution of Global Sourcing to the Economic Performance


of Organizations: Analysis of the Points of View of the Supply
Chain Participants
Nouha Lahiani1 , Kouami Seli Apedome2 , Joelle Zhu3
1
Paris Diderot University (France)
2
Université d’Ottawa (Canada)
3
École Supérieure de Commerce Extérieure de Paris (France)

[email protected], [email protected], [email protected]

Received: January 2018


Accepted: May 2018

Abstract:
Purpose: This paper aims at investigating the reasons for the complex and long lead time from global
suppliers that causes inventory shortages. It focuses on supply chain risk management in global sourcing.
This study has revealed all the specific risks of a global sourcing project and has provided some solutions
for risk management: three-step risk management, safety stock, data sharing and driving supplier
performance.
Design/methodology/approach: A qualitative study is conducted to propose concrete
recommendations on three topics: risk management, safety stock and information sharing. A semi-
structured survey-guided interview was used to collect related data, and the answers were assessed using
syntactic, lexical, thematical and NVivo software analysis.
Findings: This study has revealed all the specific risks of a global sourcing project and has provided some
solutions for risk management: three-step risk management, safety stock, data sharing and driving supplier
performance.
Originality/value: Through research work, we have noticed that the world of the Supply Chain is
constantly evolving and that it is becoming more and more complex. Through these interviews, we have
noticed that the role of purchasing is changing differently in each sector.
Keywords: risk management, global sourcing, replenishment, lead time, inventory shortages

1. Introduction
In the current business environment, manufacturing companies should be increasingly competitive and flexible
(Lahiani, Hani, Triki & El Mhamedi, 2014). Therefore, a growing number of companies are working with Asian
suppliers in order to take advantage of cost reduction in the purchase of raw materials, components, subassemblies
and products, especially compared to the French market in which labour costs are comparatively high (Hubert,
2013; Babai, 2005). Several companies have been trying to improve their competitiveness by implementing a global
sourcing strategy (Ivanov, Tsipoulanidis & Schönberger, 2017). However, this approach does not seem to be fully
effective, as the long lead time from overseas manufacturers involved in global sourcing risks causing potential
inventory shortages. Moreover, this context leads to a complexity of replenishment flows and heightened need for
risk management in supply chains.

-513-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

This study is concerned with the risk mitigation strategies for long inventory shortages by controlling the
replenishment of flows. First, long inventory shortages due to poor risk management of distant supply flows
requires control of replenishment flows. This flow management is based on an accurate sharing of information
between the various stakeholders of a supply chain. To provide recommendations, we surveyed eleven companies
that work with global suppliers without difficulties in inventory management.
We focus on the risk management in global sourcing: how to identify and reduce risks. This study aims to
investigate the complex and long lead time from global suppliers, causing inventory shortages. It will focus on risk
management in global-sourcing supply chain. The evolution and complexity of supply chain management will be
analysed. The current issues faced by all French companies in global sourcing will be studied.
While global sourcing is considered to be a leading competitive advantage, it is also associated with risk factors such
as cultural differences, global communication and high inventory levels (Portioli-Staudacher & Tantardini, 2009).

2. Related Literature Review


This study supplements the existing body of research dedicated to risk management in global sourcing. It also
provides solutions for inventory reduction in global sourcing. Few authors focus on inventory shortages because
despite the abundance of data, there is a long lead time between two orders. Existing solutions focus on better
stock management in the global sourcing context. The goal is to find a balance to avoid both stock shortages and
excess inventory. The analysis of replenishment flows is presented in the first part and the risk prevention in distant
supply in the second.

2.1 Analysis of Procurements Flows


Procurement processes take place at the upstream of the company’s business: they represent the way to purchase
goods and services from the suppliers for storage and use in production and for sale of final products. The concept
consists of placing orders to replenish inventory according to demand (Hubert, 2013). Its role is to organize, plan
and control all inventories, plan replenishment orders and determine quantities and stock management.
Procurement actions influence five determinants of profitability and company competitiveness (Ouedraogo, 2013):
product quality, cost price or margin, continuity of production, delivery time (stock and lead time) and flexibility of
supply (variability in quantity and quality). The two methods of procurement are internal and external. Internal
procurements refer to the industrial production of raw materials such as Kanban and MRP. There are also three
methods to launch a production: make-to-stock, make-to-order, make-to-forecast. External procurements refer to
the replenishment of final products for stock management such as Economic Order Quantity (EOQ) (Hubert,
2013). Procurement strategies play a role for stock management and for forecast determination. A stock is created
for different reasons (Arda, 2008): to absorb a lead time, to deal with uncertainties in the procurement process or
the demand or to use an economy of scale related to the procurement system.
Inventory management is frequently treated in the literature. Its role is to define parameters such as policy,
objectives, level of stock, procedures, visibility and frequency of sales (Ouedraogo, 2013). The literature describes
inventory shortages as the inability of the stock to satisfy the demand of customers in terms of quantities (Arda,
2008; Gimenez & McIvor, 2016; Hubert, 2013). The major consequences of inventory shortage are the impact on
the margin, loss of customers and production slow-down. On the other hand, demand is an important parameter
for forecast determination. Companies should collect all information for future demands such as an order or a
forecast. However, since demand varies, the forecast calculations such as simple mean and exponential smoothing
have been formulated (César & Richard, 2006; Babai, 2005).
Supply-chain-flows management consists of taking a decision for each step of the supply chain, for example,
launch time for each activity of production and transportation times and methods. In the beginning, supply-chain-
flows management was limited to inventory management and has evolved with the complexification of supply
chains (Babai, 2005; Gimenez & McIvor, 2016). The objectives of this study are to identify, analyse and reduce all
the wastes in the procurement processes. Eliminating wastes, however, involves taking the right decisions in the
supply chain. According to Babai (2005) and Hubert (2013), all decisions in supply-chain management are classified
as strategic (long-term) decisions to define competitive advantage and improvement recommendations for all the

-514-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

stakeholders of the supply chain, tactical (medium-term) decisions based on the actual planning models to manage
all the upstream and downstream operations in a supply chain, and operational (short-term) decisions to respond to
customers’ needs. To understand the origin of inventory shortages, we need to analyse the entire process of
procurement and determine which activity creates wastes and how to reduce them. Inventory shortages come from
poor control of the replenishment flows, caused not only by poor demand estimation but also by a lack of
information sharing. The management of supply chain flows is presented in Figure 1 as follows:

Figure 1. Supply Chain Flows Presentation (Bekkali, 2007)

2.2. Risk Prevention in Distant Supply


The literature is rich with works dedicated to motivating companies to implement global sourcing. Typical reasons
for global sourcing include finding comparable quality for a lower price, access to new technologies and markets
and the unavailability of supplies in the local market (Nunes, Vieira & Antunes, 2013; Jiang & Tian, 2009;
Portioli-Staudacher & Tantardini, 2009; Cheraghi, Dadashzadeh & Subramanian, 2004). The search for alternative
sources of supply in foreign markets is considered to be an opportunity for competitive advantage. In Nunes et al.
(2013), a successful project of global sourcing implementation in a Brazilian company is presented.
The case analysis is based on the success in the electronic industry of a small Brazilian company that purchased
from a distributor but had to be competitive and find global suppliers as it grew fast. This change is also due to the
global scope of the industry. To implement global sourcing, however, qualified personnel are required to work in
different languages, to participate in negotiations and to overcome barriers. The long learning process leads the
company to develop global operations based on the division of the value chain operations in different locations.
Nunes et al.(2013) observe that “the use of international suppliers can be a replication of the local supplier
practices based on the increase of the total quantity purchased in a search for large suppliers and the reduction of
the intermediary companies” (Nunes et al., 2013). The framework thus enabled the researchers to understand how
the global sourcing process was conducted by the company. The adoption of global sourcing by companies in
emerging economies is an opportunity to expand the knowledge of replenishment. One aspect of the case study is
particularly interesting: the capability of the company to analyse its value chain and to define and focus on the
activities that would add more value. In this case there were product development and distribution channels. As
shown in Table 1, the reasons for global sourcing described in the literature are numerous.

-515-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

References Reasons
Portioli-Staudacher and Tantardini (2009) The product is not available in the local country.
Jiang and Tian (2009)
Portioli-Staudacher and Tantardini (2009) Same quality as a local supplier
Nunes et al. (2013) Lower acquisition costs
Lack of local suppliers
Portioli-Staudacher and Tantardini (2009) Economy of scale
Jiang and Tian (2009)
Jiang and Tian (2009) Access to new technologies
Table 1. Reasons for global sourcing

Although global sourcing is appealing and promising, it is wrongly considered to be risk free. Dittman (2005)
suggests three ways to detect supply chain risks in a company: identify, prioritize and mitigate the risks. Gathering
data on the current suppliers and on the countries they are located in will be the best way to eliminate the risks. The
priority of risks can be done with the tool Failure Mode Effect Analysis (FMEA) to establish some recommended
actions and contingency plans. For the next step, mitigation plans need to be developed to manage the top risks by
reducing the probability of the frequency and the degree of impact. Strategies which may be used include
insurance, competent partners, import excellence, expedited shipping, lean management, six sigma and Supply
Chain Event Management (SCEM). The most difficult aspect of risk management is not technical; it is related to
the human resources who need to be mobilized to cope with the process of change.
Portioli-Staudacher and Tantardini (2009) carried out a case study on lean Italian companies using global sourcing.
This process involves purchasing a large quantity from far away producers, which increases inventories, exposes
companies to a higher variability and a lack of flexibility. However, additional risks are created such as
communication and logistical issues, political instability, protection of intellectual property, creation of wastes and
exchange rate fluctuations (Platts & Song, 2009; Portioli-Staudacher & Tantardini, 2009; Hubert, 2013). In today’s
context of fast-changing markets, to secure a supply chain with lean management is considered an effective solution
(Tribune, 2016; Portioli-Staudacher & Tantardini, 2009). To demonstrate if the implementation of the lean
approach may or may not reduce these additional risks, Portioli-Staudacher and Tantardini (2009) carried out 95
telephone surveys with lean companies and selected nine firms to be involved in their case study. The companies
selected for the case study have implemented a lean approach for at least three years. The results interestingly
indicate that after the introduction of the lean approach, Italian companies did not significantly modify the
management of global suppliers, and the communication seems to have not increased after the introduction of the
lean approach. Neither the informative flow with global suppliers nor the informative systems used were changed.
The author highlights that the long lead time makes companies more dependent on forecasts and increases the
bullwhip effect (Chen, Drezner, Ryan & Simchi-Levi, 1999), which leads to higher inventory levels. However, the
authors provided some countermeasures to face the issues: consolidation centers, quality control at supplier
locations, milk-run deliveries, use of local supplier next to the global supplier and delivery services.
Global sourcing is generally described in the literature as the best opportunity to reduce the price of components,
but this sourcing strategy also has its limits. According to Schiele and Horn (2010), each failed global sourcing
project had an “ugly twin,” which means that the material not delivered by the new supplier had to be purchased
from another supplier, usually the old supplier which was meant to be replaced. A failed global sourcing project
results from all the risks neglected: cultural differences, long lead time, logistical issues, lack of flexibility and many
intermediaries (Schiele & Horn, 2010; Hubert, 2013). In Table 2, all the additional risks of global sourcing treated
in the literature compared to national sourcing are shown.
It is also interesting to analyse the issue from another point of view: Chinese factories which also had to deal with
global sourcing (Jiang & Tian, 2009). The most relevant example is the lack of experience of the Chinese factories
due to their habits of domestic purchasing, weak technological capacity, poor transportation, language differences,
customs procedures, and high customer expectations. The inexperienced Chinese manufacturers have to face these

-516-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

challenges and should pay more attention to the challenges from logistical capabilities and selecting foreign sources.
They should therefore petition the government for the relaxation of protectionist regulations. Khan and Baseer
(2016) argue that “managers should also consider elevating the position of their international procurement offices
and officers to a more centralized position within the company in order to effectively coordinate international
purchasing as part of an overall global strategy”. In the context of new global sourcing projects, some cost
elements such as those shown in Table 3 should be taken into account (Alard, 2010).
Hubert (2013) is very close to our specific problem, but he tries to reduce stock levels in global sourcing through a
comparison between a theoretical calculation of forecast and the HSS forecast calculation of his company. Based on
updated and empirical data, the HSS calculation is better than the theoretical calculation because the quantities
calculated are the optimal quantities to avoid excess inventories and shortages. Table 4 below presents a synthesis of
the literature review that considers the recommendations for risk management in stock shortages in global sourcing.

References Risks of global sourcing


Hubert (2013) ━ Long lead time
━ Defective or late deliveries
━ Less innovation and inferior quality
━ Dependence on forecasts
━ Creation of wastes
Schiele & Horn ━ More intermediaries in the supply chain
(2010) ━ Distance
━ Less flexibility
━ Logistical issues
━ Cultural differences
━ Increased costs
Portioli-Staudacher & ━ Long lead time
Tantardini (2009) ━ Political instability
━ Communication issues: cultural differences, jet lag
━ Logistical issues: transport cost, lack of infrastructure
━ Issues with global suppliers: lack of flexibility, lack of industrial culture,
misunderstandings of customers’ needs
━ Intellectual property: products patented
━ Standardization of products required
Platts & Song (2009) ━ Exchange rate fluctuation
━ Political risks
━ Cash-flow shortages and paper-work concerns
━ Extra cost of travel and communication
━ Transportation costs
━ Inventory cost tradeoffs due to increased lead-time in the supply chain
━ Cultural and linguistic differences
Table 2. Risks in the global sourcing context

Logistical costs Transaction costs Capital costs Risk costs


Packaging Vendor sourcing Investment Unforeseen costs
Transportation Initiation Obsolescence Insufficient supply availability
Temporary storage Negotiations Capital lockup: Transit times Insufficient quality
Taxes and duties Processing Payment terms Insufficient flexibility
Insurance Adaptation Safety stocks Damaged reputation
Control
Table 3. Costs of global sourcing (Alard, 2010)

-517-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

Reference Goals Method Solution Results


Hubert Reducing stock Comparison of PSA’s HSS HSS PSA method: flow HSS method is better than
(2013) levels in global method (calculation of a control method based conventional methods: HSS is
sourcing and coefficient of flexibility) and on forecasts and based on actual empirical data
preserving classic stock management forecast errors: to secure and updated forecasts, while
service levels method in the literature supplies based on past the inventory management
forecast errors for the method is based on the
supply of distant-stream normal distribution without
PSA updating the forecast
Nunes et al. Understand the Case analysis on a Brazilian Analyse framework: Effective management of how
(2013) adoption process company which adopted industry, barriers, global sourcing should be
of globa sourcing global sourcing dimensions analysis conducted by a company
Schiele and Study of a failed Secondary data: database of Considering all the costs The unsuccessful projects can
Horn (2010) global sourcing top 80% automotive and barriers for a be linked to isomorphic
project: ugly European firms in global potential project in phenomena: projects were
twins sourcing global sourcing started with a congenital
defect (complex nature of
global sourcing)
Alard (2010) Analysing costs Survey of 178 people from Total cost ownership Global-sourcing goods from a
of global various Swiss companies: (TCO) differs low-cost country generates
sourcing department managers or substantially from one additional costs on top of the
board members procurement project to purchase price.
the next and must be The respondents apply
calculated individually in different standards in their
each case. assessment of the cost
categories.
Jiang and Comparing the Interviews by phone and by Utilization of third Challenges are more serious
Tian (2009) experience of mail with a questionnaire: 6 party logistics (3PL) can for small and medium
implementing Chinese manufacturers encounter logistical companies. Inexperienced
global sourcing (Auto, Apparel, Furniture, issues regarding the manufacturers should pay
between Chinese Computers, Electric and motivation of economic more attention to the
and western Toys) globalization, cultural challenges.
companies differences and
miscommunications that
can be overcome.
Portioli- Implementing a Telephone survey with 95 Consolidation centres, No significant changes after
Staudacher lean approach to lean implementers and 9 quality control at integration of lean approach
and reduce wastes further firms involved supplier location, milk-
Tantardini created by global in the case study activity run deliveries, use of
(2009) sourcing in local supplier next to the
companies global supplier, delivery
services
Babai (2005) Proposing new Comparison of different Proposing new flow Limited to a single product
stock flow management policies, management policy system
management which are stock based on forecast of
policy on management models, where demand, which helps to
forecasting the demand is expressed as manage inventory
forecast and uncertainty
Dittman Managing risks in Tabulated data from the Three steps to risk Companies mainly use
(2005) the global supply responses of over 150 management: identify, insurance companies to
chain different supply chain prioritize and mitigate mitigate risks.
executives and in-depth, Few supply chain
face-to-face interviews with professionals use risk
senior executives from six assessment and risk mitigation
prominent companies plans.

-518-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

Reference Goals Method Solution Results


Cao (2015) Long-distance Demand prediction Suggestion for an Near-optimal approaches have
procurement techniques and adaptation framework been used to make
planning in procurement optimization for distant supply procurement plans while
global sourcing methods planning minimizing the costs of
ordering, storage and
disruption.
Kauppi, Salmi Compiling a An analysis of 57 articles Identification of key Four areas that distinguish the
and You literature review that use a thematic findings, research sourcing context in Africa:
(2017) about the specific approach challenges and -African culture and ethics
features that opportunities -the role of African countries
characterize and suppliers in value-added
supply global chains
management in -an increasing emphasis on
Africa by sustainability
conducting a -the gradual development of
systematic review professional procurement
of the literature practices
on sourcing in
Africa
Jia, Orzes, Development of Analysis of the Development of a A proposal for a three-
Sartor and a conceptual methodologies of 52 conceptual model dimensional model of global
Nassimbeni framework for journal articles which focus following the analysis in sourcing strategy (supply
(2017) global sourcing on global sourcing strategy the previous column internationalisation, internal
strategy and structure integration and external
integration)
Table 4. Existing literature

3. Case Study
3.1. Methodology
Qualitative methods make it possible to collect the maximum amount of information to respond to a complex
problem. To collect qualitative data, the literature presents three types of interviews: structured interviews (set
survey questions), semi-structured interviews (take the respondent through an interview guide on complex subjects)
and unstructured interviews (free debate; the results are very difficult to analyse) (Roche 2009). In this paper, the
method of semi-structured interviews was chosen because it is better adapted to respond to a complex problem
involving unfamiliar topics. The purpose is to gather the maximum data from the respondents. Generally speaking,
interviews with 10 to 100 people are advisable (Roche, 2009). The interviews are conducted using an interview
guide which seeks different information without influencing the respondents. The interviewer may have a list of
topics to be discussed, which could be helpful for further discussion. The strength of this method is in providing
an opportunity for each piece of information to be discussed, so no information is missed. This is neither a fixed
questionnaire nor a discussion restricted by time. The advantage of this method is to give the opportunity to the
respondent to speak with a large degree of freedom.
The semi-structured interviews should follow these steps: developing an interview guide, determining a fixed list of
respondents, setting appointments with the respondents and finally analysing the interviews. An interview guide is
composed of different topics, with open questions that interviewees can discuss and debate. It is important to
recruit interviewees who have expertise in the relevant fields. These respondents should feel invested in the project
and motivated to provide information and solutions.
In Jiang and Tian (2009), six Chinese manufacturers are interviewed. In Portioli-Staudacher and Tantardini (2009),
nine firms involved in the case study are interviewed. Ammar, Benaissa and Chabchoub (2016) interview ten
officials. In this paper, eleven supply-chain professionals were studied. These interviews lasted between 45 and 60
minutes and were audio recorded. The data collected was submitted to analysis using NVivo, efficient software for
qualitative data analysis that can support qualitative and mixed-method research. It provides highlights, coding

-519-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

stripes, in-vivo coding, word trees, comparison diagrams, text search and importation of different notes (Gibbs,
2002; Bazeley & Jackson, 2013). The codification process was conducted by the NVivo software based on our
specifications. A set of pertinent elements was identified which had to be analysed according to each specification.
For example, in the transcription of the interview, the codification could be “global sourcing.” The codification
process was required to assure the best use of the information.
Our study is based on the following propositions:
Proposition 1: Information exchange and sharing practices among the partners of the logistics chain improve the
control of distant supply flows.
Proposition 2: The development of a security stock reduces the supply risks in global sourcing.

3.2. The Proposed Interview Guide


The interview guide developed is composed of four topics:
Topic 1: Risk identification in long replenishment flows
What do risk and risk management mean?
What is the role of supply chain risk management?
What are the main risks in your company? What is the most important risk to mitigate?
How are these risks identified? Which department should do the risk management?
Are risks more or less significant with a global supplier or a domestic supplier and why?
What is the information to take into account in a risk- management process?
Does risk management have a positive impact on the company’s performance?
Topic 2: Sharing information/data
Do you work with an Electronic Data Interchange (EDI) or another mechanism to share information?
What is the role of an EDI?
Is An EDI necessary in the company?
Who must use an EDI?
How can sharing information between supply chain stakeholders reduce inventory shortages?
Topic 3: Safety stock
Does your company work with a safety stock?
In which situation is a safety stock necessary?
Which department should implement a safety-stock policy?
How can a safety stock shared between supply chain stakeholders reduce inventory shortages?
Which situation do you prefer: inventory shortage or overstock?
Topic 4: various
Do you wish to share any other pertinent information?

3.3. Research Population


Before the results are given, we will first introduce the French companies that responded to our interviews.
The interviews were conducted from 06/24/2016 to 07/05/2016, with an average duration of between 45 minutes
and 60 minutes. Thirty French firms were contacted for the interview, but only eleven officials representing supply

-520-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

chain managers were interviewed. This sample respects the mean time suggested by Roche (2009). The number of
interviewees is evaluated as optimal.
The research population was composed mainly of purchasing managers, supply chain managers and category
managers of French companies working with global suppliers. Eleven companies from the same industry were
contacted by phone and were registered. A preliminary pilot test was done to anticipate difficulties. The interviews
were focused on companies in the industry of kitchenware, but also included other industries for comparative
purposes. The companies’ different sizes enabled us to compare their sourcing strategies. Due to the requirement
of participating companies to keep their identities confidential, alphabetical letters were attributed to represent the
companies. In Table 5, the company size and interviewers’ profiles are presented.

Company Respondent Company size Interviewee profiles


A M.M Big company Procurement manager
B E.D Big company Purchaser
C C.B1 Small and medium-sized enterprise Purchaser
D S.T Big company Procurement manager
E D.C Small and medium-sized enterprise Purchaser
F L.S Big company Purchaser
G A.A Big company Procurement manager
H C.J Very small company Category manager
I C.B2 Very small company Purchaser
J A.V Big company Category manager
K E.T Small and medium-sized enterprise Purchaser
Table 5. List of respondents

4. Experimental Results
Three elements are essential for the creation of value: risk management, security stocks and monitoring.

4.1. Organizational Performance Requires Improved Risk Management of External Procurement


Risk management is the daily routine of all companies buying from outside. However, this notion of risk is
perceived differently by the respondents. The specificity of the companies surveyed is that they work mainly with
Asia, whether with Chinese, Indian or other suppliers.
The risks involved are the same: quality problems, too-long delivery times and product non-conformities. Only
company B has a special service, the “supplier development” service that manages risks in supply chains. This task
force checks Coface’s (French Insurance Company for Foreign Trade) contact information and financial situation.
Once the supplier is included in the panel, an audit is carried out to follow up on the procedures and advocate areas
for improvement. In other companies, risk management is generally carried out by buyers, product managers,
category managers and suppliers for whom risk management is an integral part of their daily lives. The central
question is: are the risks more or less significant with a domestic supplier or a foreign supplier? Two respondents, C
and D, face 77 percent less risk with a foreign supplier. According to them, the location of the supplier has no
impact since the most important factor is the relationship with the supplier. This reflects the same idea as Größler’s
(2010) that suppliers are much more internationally engaged, and the relationship between a foreign supplier and a
world producer is much stronger than between domestic producers and their suppliers.
We advise companies to set up a dialogue with the supplier to avoid misunderstandings and reduce all types of
risks. The other nine respondents responded in a similar manner: a distant supplier causes significant risks
associated with time and distance. Only three companies, B, C and K, have a panel of “backup providers” because

-521-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

it is not feasible for them to have stock shortages. For example, a chain stop can cost € 5000 for company B. It is
interesting to note that company E works closely with Asian suppliers, but only through intermediaries. This means
that the company is in constant contact with another French company, which has to manage the relationship with
the Asian supplier, including factory production and quality control. The risks are thus outsourced and the
company E does not have to manage them.
Companies C and K specialize in the textile sector. From the interviews, we found that they have the same
procedure to limit the risks of poor quality: pre-production samples are taken and then analysed before a quality
control on the finished product takes place at the end of production. Purchases in the textile sector are
distinguished by the fact that they involve seasonal products that sell over short-term periods, such as fall-winter or
spring-summer collections. In addition, these two companies use the same method of sourcing: a second source of
closer supply is created in the event of a dispute with the main supplier. Both respondents have already faced this
type of situation in which the primary supplier becomes a supplier at risk and a second source of supply is
developed. Here the principle of “ugly twins” often applies (Schiele & Horn, 2010), that is, the raw material that
could not be supplied by the new supplier had to be purchased from another supplier, which often turns out to be
the former supplier that has been replaced.
We used NVivo and compared the comments of respondents C and K using source encoding (node creation). The
sources correspond to the interviews with the respondents (respondent C 78 = source 3).
The encoding corresponds to an assignment of nodes on the comments of our respondents, and the nodes are
chosen themes. We find that several identical nodes, such as “permanent product” and “pre-production sample”,
appear for both companies, thus proving that the vocabulary used and their working methods are the same.

Figure 2. Comparison between company C and K by Nvivo

-522-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

It is interesting to note that the risks are more likely to appear for new products than for established ones. Since the
volumes released are not identical, it is difficult to estimate a sale curve for a new product, so purchases are made a
little randomly according to the typology of the product, the sales potential, the market trend, the sales network, or
the sales format (per unit, in display). Due to the encoding used on NVivo on the “novelty” node, six respondents
out of ten (A, B, E, F, J, I) told us that they encountered difficulties with each launch of new products.
Analysis of interview results showed that risks are greater for new products. In order to limit these risks, the sales
history of similar products would be helpful. If no similar product is available, it is possible to order only MOQ or
to negotiate a lower MOQ with the supplier in order to facilitate the product’s market entry.
The inflexibility of external suppliers is a difficult obstacle to overcome. Indeed, factories did not foresee the arrival
of global sourcing and had to learn to work with Chinese factories which lack a common industrial culture (Jiang &
Tian, 2009). Collaboration between Chinese and French companies is challenging: specifications often do not
match the capabilities of supplier s, and misunderstandings are common.
Transparency of communication is crucial in order to avoid surprises with suppliers because hidden information
could lead to serious adverse consequences. For example, if an Asian supplier outsources a component elsewhere,
that outsourcing adds an additional but hidden risk which could complicate or undermine improvement plans..
There may be problems with tools or with parts of the production that are subcontracted, which causes cumulative
delays in the production.
Risks in supply chain are often similar (quality, delivery time, etc.) and must be understood by buyers when selecting
suppliers. Independent risks such as the parity of the euro and the dollar or natural disasters are more difficult to
manage.
We recommend that companies implement the three risk-management steps of Dittman (2005), that is, identify,
prioritize and mitigate risks. It is possible to start by collecting different risk data, classifying them and creating the
most urgent risk- reduction plans, in collaboration between the offices of the countries concerned.

4.2. Organizational Performance Requires Better Management of The Security Stock


We find that all companies surveyed have set up a security stock in their own way, except for company A which
specialized in luxury goods. The purchasing policy of respondent A is to create stock shortages in order to stir up
demand for luxury goods, while company G is a wholesaler and its purchasing policy is to have a large stock. Some
have set up a security stock only on permanent product references that have a good sales turnover, whereas this is
not the case for seasonal products. Other respondents rely on buffer stocks, that is, products in production. We
have created two nodes in NVivo “buffer stock” and “warehouse security stock”, which we encoded according to
the information from each respondent. We also noticed that it was usually the big companies that have set up a
security stock in warehouses (D, F, G, J).
It is interesting to note that G is a wholesaler with more than 16,000 product references to manage, and its
procurement policy is to always buy products in large quantities, regardless of customer’s predictions and the
profile of the product. Over-stocking is part of their policy, so suppliers have never experienced stock-outs.
Regarding the calculation of the security stock, it is the same for the respondents: to respect a minimum stock and
a maximum stock, and never to exceed the two thresholds. The goal is to find a “balance”, a term often heard. Five
out of ten respondents (B, C, D, E, F) use software that sets up alerts of potential stock shortages, thus making it
possible to better anticipate stock shortages.
Two respondents out of eleven (D and K) advocated putting in place a security stock according to methods already
existing in Supply Chain such as the ABC ranking or the Pareto law. The principle remains the same: to favor the
stock on the references of products with high rotations.

-523-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

Figure 3. Encoding of the “buffer stock” and “warehouse stock” nodes under NVivo software

The idea of a safety stock is considered to be the most effective solution to avoid stock-outs by each respondent.
All interviewees said that they preferred to be overstocked than out of stock, especially on important permanent
products. During the interviews, we felt heightened attention among supply chain professionals regarding product
profiles (permanent, seasonal, promotional, etc.)
This is a parameter to be taken into account in order for the entire supply chain to understand product sales and to
be able to anticipate future purchase orders.
It should be noted that company B has a particularity regarding its stock management: it has consignment stock.
This alternative makes it possible to have a stock available without necessarily using it immediately. This is beneficial
because overstocking creates an additional cost of product storage, and being out of stock leads to a loss of
turnover.
The analysis of these interviews suggests that companies operating in same context must put in place a stock of
security on product references with a strong turnover of sales.
In this case, one parameter to take into account is the minimum of quantity (MOQ) required by Asian suppliers. If
the MOQ is too high, storage cost will become excessive. If the MOQ is too high and the company is waiting for
stock warehouse supply to drop to avoid overstocking, lead time is not to be neglected because it is possible to fall
out of stock easily during the supply period. For example, for the end-of-year sales that are most important, it is
possible to set up an exceptionally safe stock.

4.3. Organizational Performance Requires Effective Communication


Not all companies work with EDI; only three respondents (B, D, F) out of eleven works in EDI with their supplier.
Most use in-house software to exchange information, gain insight into inventory, generate sales and anticipate
purchase orders. Companies D and F have an EDI internally and have also created a special EDI with big suppliers,
in which the information is better managed because the supplier is much more responsive. We note that these are
the only two companies in the household appliances business that share the information with the supplier.

-524-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

Interestingly, respondents E and J believe that EDI is not the solution to the problem but that it plays a support or
tool role in helping to reduce stock-outs.
We note that these are large corporate structures that have implemented an EDI, so there is a link between the
implementation of an EDI and the size of the company. Respondent I pointed out that only retailers like
Carrefour, Auchan or Walmart can work with EDI.
Six out of eleven respondents (C, E, H, I, J, K) think that it is difficult to implement a special EDI with the supplier
because the product profiles are different: some products are permanent where sales are made throughout the year
and others are seasonal. Respondents from companies E and F believe that EDI must become mandatory in all 82
companies because the exchange of information by the computer has become indispensable for the performance
of the company.
Respondents from companies B and C have similar points of view in the sense that EDI should be implemented in
companies with a large number of suppliers and a large reference quantity of products to be managed. The fact
that the orders are generated automatically by the system with the necessary information (time of supply, price,
minimum of quantity (MOQ), etc.) simplifies the process, avoiding overstocking and immobilizing money. If there
are concerns about purchase orders, it is possible to manually intervene with the system and modify the orders.
Although EDI can automate procedures and streamline information, human surveillance is still needed.
Company B, which specializes in the automotive sector, is the only company to use Materials Requirements
Planning (MPR), a computerized production management system, processed by Hubert (2013). Indeed, the
nomenclature is managed with the product tree for the industrial part. The role of purchasing is to put prices for
each component (MOQ, supply time, etc.) and to make the link with the logistics (it is necessary to order/anticipate
in advance according to the delivery time). This information is filled out months in advance. Logistics puts
management data, match the needs of customers, and looks into the nomenclature to determine how many
components they need. Then, the MRP calculates the need with an open command: automatically sending it to the
supplier. It is then necessary to wait until the weekend for the MRP to update.
Exchanges of computer data have been in existence for more than twenty years, whether in the form of sending
Excel files or by software, information always passes between a supplier and a customer.
Feedback on EDI has all been the same: it is an effective interface for internally sharing information that sheds light
on different product movements, but it is not necessarily a solution as such to avoid stock outs. EDI is no longer
considered a useful tool.
It is useful to implement a better EDI only internally. While this is not the ultimate solution to the supply problem,
it helps to solve it. Indeed, EDI will remain a support tool, and in order to avoid long stock-outs, communication
between suppliers and customers must be much more lively and transparent. Only companies B and F can set up an
EDI with the supplier in the form of a module if their information system is compatible, where the supplier can
consult customers’ stock without intervening and launch production based on this information.
There is a relation between company structure and the performance of the EDI. If the structure is large, the
technical resources that go with it are more important and the corresponding computer system should be much
more efficient. In our current case, we cannot work with Asian suppliers using modules because technical resources
are quite limited. In addition, setting up an EDI that gives access to our inventory also represents a risk. This
implementation must be based on a very high level of trust because a supplier is no longer just a supplier ; that
supplier becomes a partner.
However, it is possible to set up an interface/EDI specifically for customers in order to collect their forecasts in
advance and to anticipate purchase orders.

5. Conclusion
With an increasingly globalized economy, global sourcing has evolved considerably in recent years. This particular
environmental context creates complex flows and risk management challenges. The main objective of this paper
has been to suggest solutions for stock management in global sourcing with a real case-study. From the analysis of

-525-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

semi-directive interviews, we have shown that the establishment of an EDI and a security stock in a company
working in global sourcing would reduce the risks in the supply chain, but not to the point of eliminating those
risks.
The control of risk management in the supply chain has a positive impact on a company’s performance because it
makes it possible to provide rapid solutions to the additional risks of global sourcing if a risk reduction plan is
created. Throughout this study, we have noticed that the field of the supply chain is constantly evolving and that it
is becoming more and more complex. From the analysis of the interviews in this study, we identified the role of
purchasing changes in each sector. As a limitation to this research, we will mention the small sample size and the
fact that we have limited our analysis to three areas of focus: risk management associated with lead time, security
stock and implementation of EDI. In a future study, it would be productive to conduct this research in a different
geographic context and/or with a larger sample.

Declaration of Conflicting Interests


The authors declared no potential conflicts of interest with respect to the research, authorship, and/or publication
of this article.

Funding
The authors received no financial support for the research, authorship, and/or publication of this article.

References
Alard, R. (2010). The costs of global sourcing. Nature, 439(26), 374-375.
André, T. (2016). Piloter la performance fournisseurs pour sécuriser sa logistique. Supply Chain Magazine, 102, 153.
Ammar, M.H., Benaissa, M., & Chabchoub, H. (2016). Preliminary Study on Stakeholders’ Needs and Requirements
in the Development of a Traceability System for Road Transport of Crude Oil. IEEE International Conference on
Advanced Logistics and Transport (ICALT). At Krakow, Polond.
Arda, Y. (2008). Politiques d’approvisionnement dans les systèmes à plusieurs fournisseurs et Optimisation des décisions dans les
chaînes logistiques décentralisées. Thèse de doctorat en Systèmes industriels, Institut National des Sciences Appliquées
de Toulouse.
Babai, M.Z. (2005). Politiques de pilotage de flux dans les chaines logistiques : impact de l’utilisation des previsions sur la gestion des
stocks. Thèse de doctorat en Génie Industriel, Ecole Centrale Paris.
Bazeley, P., & Jackson, K. (2013). Qualitative data analysis with NVivo. Sage Publications.
Bekkali, M. (2007). Quand le Marketing fait appel au Supply Chain Management. Point de vue Marketing du 12 october 2007.
https://pointdevuemarketing.wordpress.com/2007/10/12/quand-le-marketing-fait-appel-au-supply-chain-management
%e2%80%a6/
Cao, Y. (2015). Long-distance procurement planning in global sourcing. Chemical and Process Engineering. Ecole Centrale
Paris.
César, E., & Richard, B. (2006). Les Séries Temporelles, 1-34.
Chen, F., Drezner, Z., Ryan, J. K., & Simchi-Levi, D. (1999). The bullwhip effect: Managerial insights on the impact
of forecasting and information on variability in a supply chain. Quantitative Models for Supply Chain Management, 17,
417-439. https://doi.org/10.1007/978-1-4615-4949-9_14
Cheraghi, S.H., Dadashzadeh, M., & Subramanian, M. (2004). Critical success factors for supplier selection: An
update. Journal of Applied Business Research, 20(2), 91-108.
Dittman, J.P. (2005). Managing risk in the global supply chain. Game-Changing Trends in Supply Chain, 231.
Gibbs, G. (2002). Qualitative data analysis: Explorations with NVivo (understanding social research). Buckingham.

-526-
Journal of Industrial Engineering and Management – https://doi.org/10.3926/jiem.2574

Gimenez, C. & McIvor, R. (2016). Risk, risk management practices, and the success of supply chain integration.
International Journal of Production Economics, 171, 361-370. https://doi.org/10.1016/j.ijpe.2015.03.020
Größler, A. (2010). An Exploratory Study of Differences in Manufacturing Strategy between National and Global
Production Firms. Journal of Management and Strategy, 1(1), 47-63. https://doi.org/10.5430/jms.v1n1p47
Hubert, T. (2013). Prévision de la demande et pilotage des flux en approvisionnement lointain. Thèse de doctorat en Génie
Industriel, Ecole centrale Paris.
Ivanov, D., Tsipoulanidis, A., & Schönberger, J. (2017). Basics of Supply Chain and Operations Management.
Global Supply Chain and Operations Management. Springer International Publishing., 1–14. https://doi.org/10.1007/978-3-
319-24217-0_1
Jia, F., Orzes, G., Sartor, M. & Nassimbeni, G. (2017). Global sourcing strategy and structure: Towards a conceptual
framework. International Journal of Operations & Production Management, 37(7), 840-864.
https://doi.org/10.1108/IJOPM-09-2015-0549
Jiang, C. & Tian, Y. (2009). Problems and challenges of global sourcing: A study of Chinese manufacturing
enterprises. Mémoire de master en Business Administration, Jonkoping University.
Kauppi, K., Salmi, A., & You, W. (2017). Sourcing from Africa: a systematic review and a research agenda.
International Journal of Management Reviews, 20(2), 627-650.
Khan, M.A. & Baseer, M. (2016). Globalization of Logistics and Supply Chain Management. Supply Chain
Management.
Lahiani, N., Hani, Y., Triki, A., & El Mhamedi, A. (2014). Multiobjective Optimization Approach to Solve a
Maintenance Process Problem. 3dr Stochastic Modeling Techniques and Data Analyses International Conference SMTDA’14
(397-404). Lisbon, Portugal.
Nunes, M., Vieira, L., & Antunes, J. (2013). The adoption of Global Sourcing by a Brazilian Company. Journal of
Operations and Supply Chain Management, 6(2), 114-127. https://doi.org/10.12660/joscmv6n2p114-127
Ouedraogo, Z. (2013). Analyse des risques liés à l’approvisionnement en matières premières dans une entreprise industrielle : Cas de
Winner Industrie (Burkina Faso). Master professionnel de comptabilité et gestion financière, Institut supérieur de
comptabilité, de banque et de finance.
Platts, K., & Song, N. (2009). The true costs of overseas sourcing. POMS 20th Annual Conference (1-26).
Portioli-Staudacher, A., & Tantardini, M. (2009). Global Sourcing: Lessons from lean companies to improve supply
chain performances. 3rd International Conference on Industrial Engineering and Industrial Management (1549-1558).
Terrassa, Barcelona.
Roche, D. (2009). Réaliser une étude de marché avec succès. Eyrolles.
Schiele, H., & Horn, P. (2010). The “UGLY TWINS”: Failed global sourcing projects and their substitutes.
Competitive paper for the 26th IMP conference. Budapest.
Tribune (2016). Piloter la performance fournisseurs pour sécuriser sa logistique. Supply Chain Magazine, 102, 153.

Journal of Industrial Engineering and Management, 2018 (www.jiem.org)

Article’s contents are provided on an Attribution-Non Commercial 4.0 Creative commons International License. Readers are
allowed to copy, distribute and communicate article’s contents, provided the author’s and Journal of Industrial Engineering and
Management’s names are included. It must not be used for commercial purposes. To see the complete license contents, please
visit https://creativecommons.org/licenses/by-nc/4.0/.

-527-

You might also like